{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: ..IPM Number: JPM-A1.1R Revision:
{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
    ..IPM Number:           JPM-A1.1R                 Revision: -~-
1 II. Initiated:
1 II. Initiated:
R. J. Ashey Developer 9/14112011 Date III. Reviewed:
R. J. Ashey                         9/14112011 Developer                            Date III. Reviewed:
Technical Reviewer Date IV. Approved:
Technical Reviewer                         Date IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training SupE~rvisor                  Date Page 1 of 10
Date Nuclear Training Date Page 1 of 10 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE 2006-317 9/14/2011 DESCRIPTION Update JPM to include HUP evaluations and new format Updated JPM to include NRC comments.
OF CHANGES:
REV/CHANGE 1/0 Page 2 of 10
All & DATE                   DESCRIPTION                      REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format 9/14/2011    Updated JPM to include NRC comments.                     1/0 Page 2 of 10
-----------------------------------
 
-----------------JPM Number: JPM-A1.1R Rev. 1 JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                        JPM-A1.1R                                Rev.
Facility:
                                                                                  - - - -
_M_P_2__ Examinee:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:
Facility:      _M_P_2_ _              Examinee:
Rev. ____0=---__ Task Title: System: Auxiliary Feedwater Time Critical Task: Yes No X Validated Time (minutes):
JPM Number:                        JPM-A1.1R
25 Task No.(s): ___________
                                                -----------------------------     Rev. ____0=---__
_ Applicable To: SRO RO X PEO KIA No. 2.2.13 KIA Rating __4_.1_/4_._3
Task Title:
__ Method of Testing: Simulated Actual Performance:
System:       Auxiliary Feedwater Time Critical Task:     Yes             No     X Validated Time (minutes):                 25 Task No.(s): _ _ _ _ _ _ _ _ _ _ __
X Classroom:
Applicable To:             SRO               RO     X       PEO
X Simulator:
                                  ---                                  ---
Task At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB. Required Materials
KIA No.                 2.2.13               KIA Rating _ _    4_.1_/4_._3__
* 25203-26005 SH.3 (Condensate Storage and Aux Feed). (procedures, equipment.
Method of Testing:
etc.>: 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3/ A4)) OP 2322*-001, Draining the Auxiliary Feedwater System OP-M-200, Equipment Clearance Non-Electronic Tagging Process, Attachment
Simulated Performance:                          Actual Performance:            X
: 2. * * *
                              -----                                        -~~-
Location:
Classroom:       X               Simulator:                  In-Plant:
                ----                          ---                            ----
Task Standards:                  At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB.
Required Materials
* 25203-26005 SH.3 (Condensate Storage and Aux Feed).
(procedures, equipment. etc.>:
* 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3/ A4))
* OP 2322*-001, Draining the Auxiliary Feedwater System
* OP-M-200, Equipment Clearance
* Non-Electronic Tagging Process, Attachment 2.
                                  * * *
* READ TO "fHE EXAMINEE * * *
* READ TO "fHE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 10
Page 3 of 10 JPM I\lumber:
 
JPM-A1:1 Rev. ___1___ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM I\lumber:                     JPM-A1:1 R                              Rev. _ _ _1_ __
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
Initial Conditions:
Initiating Cues: Simulator Reguirements: Unit 2 is in lVIode 5 for a refueling outage. There is evidence that 2-FW-8B, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve, may be leaking by. The Maintenance Department will be performing a seating surface and general condition inspection of this valve. Determine thE! proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-8B, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. The tagging computer is NOT available; therefore, a manual clearance must be initiated. The clearancE!
* Unit 2 is in lVIode 5 for a refueling outage.
must include: Tag type (color) Component I D Component description Tagged position Tagging order Restoration position Restoration order Not applicablEL * *
* There is evidence that 2-FW-8B, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve, may be leaking by. The Maintenance Department will be performing a seating surface and general condition inspection of this valve.
* NOTES TO EVALUATOR * * *
Initiating Cues:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must thl:! student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 10 PERFORMANCE JPM JPM-A1.1R PERFORMANCE 1 Obtain the required material for determination of clearance boundary.
* Determine thE! proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-8B, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
Cue: Comments:
* The tagging computer is NOT available; therefore, a manual clearance must be initiated.
Rev.. _1_ STANDARD
* The clearancE! must include:
__________ Examinee reviews the material provided N for determination of clearance boundary: P&ID 25203-26005 SH.3 Storage and Aux P&ID25203-30005 (Single Line & Relay Diagram 4.16KV Buses 24C, Aux Feed Valve line-up, OP .in.....anr Page 5 of 10 PERFORMANCE JPM Number:
o Tag type (color) o Component ID o Component description o Tagged position o Tagging order o Restoration position o Restoration order Simulator
Rev.. _1_ STEP 2. PERFORMANCE (OP-AA-200 3.2.29). ESTABLISH the tagging sequence.
* Not applicablEL Reguirements:
WHEN procedural guidance exists, THEN the procedure takes precedence over the normal sequence of isolation.
                                  * *
The normal sequence of isolation is as follows: 1 . POSITION control switch 2. REMOVE power from component(s)
* NOTES TO EVALUATOR * * * *
Cue: STANDARD Examinee establishes a clearance boundary with the following components and sequencing. (See attached Answer Key)
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* Examinee CAUTION tags "P9B-HS (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down N
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
* Examinee removes power from "B" MDAFP by "RACKING DOWN" 4160VAC breaker (A406) and placing a Red Tag on the breaker. y Comments: The Yellow CAUTION tag on P9B-HS is for information use and is NOT required to be sequenced first, but would typically be Order #1. (Order #2, if the breaker is first) The Red Tag on the breaker is the first component required to be tagged; therefore, this would be Order #2. #1, if the handswitch was NOT first.). (See Answer Page 6 of 10 PERFORMANCE JPM Number: JPM-A1.1R Rev.. _1_ STEP 3. 3. PERFORMANCE ISOLATE component/system from high pressure side to low pressure side Cue: STANDARD ISOLATE component/system from high pressure side to low pressure side by Danger Tagging "CLOSED":
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" or "What are you observing?").
2-FW-98 ("8" AUX FEED DISCHARGE y STOP VALVE) 2-FW-52C ("8" AUX FEED y*RECIRCULATION STOP VALVE) y*2-CN-298 ( "8" AUX FEED SUCTION 2-FIRE-948
: 4. Under NO circumstances must thl:! student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
("8" AUX FEED PUMP EMERGENCY FIRE WATER Comments:
Page 4 of 10
I The discharge stop must be closed prior to closing the suction or minimum flow recirculation valves. (Order #3)
 
* The exact sequence of suction side/recirculation alignment is NOTcritical. (Order #4, #5, and #6) (See Answer Key) Page 7 of 10 PERFORMANCE INFORMATION JPM Number:
PERFORMANCE INFORMATION JPM Number:    JPM-A1.1R                                                                     Rev.. _1_
Rev.. _1_ STEP STANDARD 4. OPEN drain valve(s) Examinee tags open one or both of following drain valves and one or both OPEN vent valve(s) the following vent valves: 2-CN-332 ( "B" AUX FEED PUMP Y* SUCTION HEADER DRAIN) 2-CN 331 ( "B" AUX FEED PUMP y* DISCHARGE HEADER DRAIN VALVE) 2-CN-330 ("B" AUX FEED PUMP CASING r y* VENT VALVE) 2-CN-329 ("B" AUX FEED PUMP CASING , y* VENT VALVE) Comments: It is NOT critical to open both vent and drain valves. To provide proper depressurization and draining, only vent and one drain are required to be If only one vent and drain valve are opened, the Order Number is #7 and #8. Either the vent or the drain may be opened first. (See Answer Key) The restoration order and position are NOT critical.
STEP                  PERFORMANCE                               STANDARD 1~~~1~.:__________
TERMINATION CUE: The evaluation for this JPM is concluded.  
: 1.      Obtain the required material for       Examinee reviews the material provided            N determination of clearance boundary. for determination of clearance boundary:
..  
* P&ID 25203-26005 SH.3 (Condensate Storage and Aux Feed).
.._____ Page 8 of 10
* P&ID25203-30005 (Single Line Meter
-----JPM Number: JPM-A1.1R Rev. 1 VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, Abb critical steps must be completed correctly.
                                                        & Relay Diagram 4.16KV Emerg.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
Buses 24C, 240)
25 Actual Time to Complete (minutes):
* Aux Feed Valve line-up, OP 2322-001
JPM Work Practice Evaluation:
                                                                        .in.....anr Clearance Cue:
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
Comments:
never put anyone's safety at risk. Pass I Fail never put equipment reliabili!Jt at risk. Pass I Fail never violated radiological work practices.
Page 5 of 10
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
 
Page 9 of 10
PERFORMANCE INFORMATION JPM Number:       JPM-A1.1R                                                                              Rev.. _1_
-----JPM Number:
STEP                     PERFORMANCE                                        STANDARD
Rev. 1 STUDENT Initial Conditions: Unit 2 is in Mode 5 for a refueling outage. There is evidence that 2-FW-SB, uB" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve, may be leaking by. The Maintenance Department will be performing a seating surface and general condition inspection of this valve. Initiating Cues: Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-SB, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. The tagging computer is NOT available; therefore, a manual clearance must be initiated on OP-AA-200, Equipment Clearance, Attachment
: 2.     (OP-AA-200 3.2.29).                               Examinee establishes a clearance ESTABLISH the tagging sequence. WHEN             boundary with the following components procedural guidance exists, THEN the             and sequencing. (See attached Answer procedure takes precedence over the               Key) normal sequence of isolation. The normal sequence of isolation is as follows:
: 2. The clearance must include: Tag type (color) Component 10 Component description Tagged position Tagging order Restoration position Restoration order Page 100f10
1 . POSITION control switch
* Examinee CAUTION tags "P9B-HS               N (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down
* Examinee removes power from "B"             y
: 2. REMOVE power from component(s)
MDAFP by "RACKING DOWN" 4160VAC breaker (A406) and placing a Red Tag on the breaker.
Cue:
Comments: I. The Yellow CAUTION tag on P9B-HS is for information use and is NOT required to be sequenced first, but would typically be Order #1. (Order #2, if the breaker is first)
* The Red Tag on the breaker is the first component required to be tagged; therefore, this would be Order #2.
                        #1, if the handswitch was NOT first.). (See Answer Page 6 of 10
 
PERFORMANCE INFORMATION JPM Number:       JPM-A1.1R                                                                               Rev.. _1_
STEP                   PERFORMANCE                                      STANDARD
: 3.       3. ISOLATE component/system from high        ISOLATE component/system from high pressure side to low pressure side       pressure side to low pressure side by Danger Tagging "CLOSED":
2-FW-98 ("8" AUX FEED DISCHARGE                     y STOP VALVE) 2-FW-52C ("8" AUX FEED y*
RECIRCULATION STOP VALVE) 2-CN-298 ( "8" AUX FEED PUMP                        y*
SUCTION ISOLATION) 2-FIRE-948 ("8" AUX FEED PUMP                       y*
EMERGENCY FIRE WATER SUPPLY VALVE)
Cue:
Comments: I The discharge stop must be closed prior to closing the suction or minimum flow recirculation valves. (Order #3)
* The exact sequence of suction side/recirculation alignment is NOTcritical. (Order #4, #5, and #6) (See Answer Key)
Page 7 of 10
 
PERFORMANCE INFORMATION JPM Number:       JPM-A1.1R                                                                                  Rev..         _1_
STEP                   PERFORMANCE                                      STANDARD
: 4.      4. OPEN drain valve(s)                           Examinee tags open one or both of the following drain valves and one or both of
: 5. OPEN vent valve(s)                         the following vent valves:
2-CN-332 ( "B" AUX FEED PUMP                               Y*
SUCTION HEADER DRAIN) 2-CN 331 ( "B" AUX FEED PUMP                               y*
DISCHARGE HEADER DRAIN VALVE) 2-CN-330 ("B" AUX FEED PUMP CASING r                       y*
VENT VALVE) 2-CN-329 ("B" AUX FEED PUMP CASING ,                       y*
VENT VALVE)
Comments: I. It is NOT critical to open both vent and drain valves. To provide proper depressurization and draining, only one vent and one drain are required to be open.
* If only one vent and drain valve are opened, the Order Number is #7 and #8. Either the vent or the drain may be opened first. (See Answer Key)
* The restoration order and position are NOT critical.
TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                                        ~. ';~J~'\~"'fW.rr~*,.iw (0~~~~N~;t.;,l!!I~~;S--,~~;,-. _ _ _ __
Page 8 of 10
 
JPM Number:                     JPM-A1.1R                         Rev.
                                                                          - - -
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, Abb critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No   X
                                -
Validated Time (minutes):                     25 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT         UNSAT           NA       (circle one)
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass I Fail and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail never put equipment reliabili!Jt at risk.                                       Pass I Fail never violated radiological work practices.                                     Pass I Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
Page 9 of 10
 
JPM Number:                 JPM-A1.1R                            Rev.
                                                                      - - -
STUDENT HANDOUT Initial Conditions:
* Unit 2 is in Mode 5 for a refueling outage.
* There is evidence that 2-FW-SB, uB" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve, may be leaking by. The Maintenance Department will be performing a seating surface and general condition inspection of this valve.
Initiating Cues:
* Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-SB, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
* The tagging computer is NOT available; therefore, a manual clearance must be initiated on OP-AA-200, Equipment Clearance, Attachment 2.
* The clearance must include:
o Tag type (color) o Component 10 o Component description o Tagged position o Tagging order o Restoration position o Restoration order Page 100f10


.Millstone StatiiJii  
sectiiJ!!,Coriiitsheet~                                    . Millstone StatiiJii
;ragout: 2C19 !section:
;ragout: 2C19
2322X00-002A 09/20/111935 Component to be Worked 2_TB _00106_ AFRV .Reason 2-FW-SB CHECK VALVE INSPECTION ,Instructionsl Cautions:
!section: 2322X00-002A                                                                                 09/20/111935 Component to be Worked 2-FW-SB 2_TB           _00106_ AFRV AREA_
Additional Information:  
Notes:
;25203-26005 SH.31 Condensate Storage and Aux .25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D Section Attributes:
.Reason Tagged 2-FW-SB CHECK VALVE INSPECTION
Work Order List: Number I Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:
,Instructionsl Cautions:
Status Name Verification Date
Additional Information:
:prePilredBy:
;25203-26005 SH.31 Condensate Storage and Aux Feed
Appr()\ff:d  
.25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)
..... ..... Appr,ovf:qBy:
Section Attributes:
Authorized , AutQ(lri?t:!clI3Y:
Work Order List:
ii Work Released
Number I Equipment ID                                                       Description 2-FW-SB                           Perform Check Valve Inspection Section Verification:
_00m !
Status                           DescriJ)~ion                          Name     Verification Date
To Clear , Authorize Tags t()c1f:arL I System Restored Restoration C:0l11plete  
,Prep~rf:q                    :prePilredBy:
! 'I , The Answer Key denotes the MINIMUM tagging required to safely isolate the component for the work to be performed.
Appr()\ff:d . . .           . . . Appr,ovf:qBy:
Addition components may be tagged, but are NOT required.  
Authorized                 , AutQ(lri?t:!clI3Y:
******Page 1 ofa J I ANSWER Section Coversheet Millstone Station ragout: 2C19 $ection: 2322XOO-OO2A 09/20/111935 Tag Place. 1st Ver i Pia As Left i Rest. 1st Rest. 2nd I . _______________  
ii Work Released 0."~  _00m
*: Req : Seq ;Configuration Verit : Req
                                ! Work~elea~f:cIBy:
____ _ Configuration!
To Clear                   , Authorize Tags t()c1f:arL                                                             I System Restored                   Restoration C:0l11plete                                                           !
Verit I Verit* Equipment DeSCription i* Notes Time/Date  
                                                                                                                      'I, The Answer Key denotes the MINIMUM tagging required to safely isolate the component for the work to be performed.
,* Notes iTime/DateTime/Date;
Addition components may be tagged, but are NOT required.
* Equipment Location .. 'T' iN/A 1 INJA 5 i
ANSWERKEY lPM-Al.1R I
* HANDSWITCH FOR "S"  
                                                                                                      ******Page 1 ofa J
... --.... AUXILIARY FEEDWATER '" 2_CB _03606_ CNTRL A 406 2 ******4*1 RiCKED , 3 .OPEN OPEN  
 
* "S"AUX fEED PUMP I ......
ANSWER KEY Section Coversheet                                                                                                                                                                                 Millstone Station ragout: 2C19
..
$ection: 2322XOO-OO2A                                                                                                                                                                                                                                                                                                                                                     09/20/111935 Tag 'Equipment                                                                                                            "Tv;~Tpl;'fpl~'~;;;;;t'--                                                                                              Place. 1st Ver i Pia ;R~!];tnratinn                                                              As Left               i Rest. 1st Rest. 2nd Type                                                                                                                            :Req : Seq ;Configuration I                 .                   ~  _______________
..
* Verit  : Req lSeq~~,!~¥!:,~!i~!I____ _                                           Configuration! Verit I Verit
....i .....J ....... ....... ........................
* Equipment DeSCription                                                                                                                                   i* Notes                                                                 Time/Date                   ,* Notes                                                                                   iTime/DateTime/Date
_ .... _ .........L ....... ***.*******
                          ;* Equipment Location
_ ........*.******..*.
                                      ,", ,~""".,.~_,_u~,  .. ,~
... *.*i**.... **...**-*.-**..*******...-,.** .......Red ! 2_FW-S2C *llV.. I !CLOSED 2* 'l.OCKEDOPEN
                                                                                                                                                                                    'T'     .~
:LOCKED OPEN .. ."S"AUXFEEDPUMP  
pgB-HS                                                                                                                                            1 INJA                                                                                                                                                                  iN/A i
., r.,.-------,.-----.,.*
* HANDSWITCH FOR "S" 5 !N/A
I RECIRCULATION STOP VAlVE
                                                                                                                                                                                                                                                                                              --~-----          ... -- ---
* 2_TB _ 00l06_ABOVE"S"AFP m,,,,"",,.
                                                                                                                                                                                                                                                                                                                          ....
u"',  
AUXILIARY FEEDWATER PUMP
",b-*' "=-"", __'"""'""''''Y' WM"; _____ ,,_,", n__ '. ,,___,.*___ .___ ___."" .."
                            '" 2_CB                             _03606_ CNTRL RM COS A 406                                                                                                                                         2                                                                                                 ******4*1RiCKED UP
__***  
                                                                                                                                                                                      ~-------~---~---.
.. __. + Red 2-CN-29S IV lCLOSED
                                                                                                                                                                                  ,*~t*"    ,
__________
3 iCLOSED                                                                                                        .OPEN                                                   OPEN
_ *'''B" AUX FEED PUMP SUCTION .. ISOLATION " i :. I i
                                                                                                                                                                                      ~-----------~-~-.
* 2 TB 00106 AFW RM i ! I, , I i .. .....  
                            *       "S"AUX fEED PUMP DISCHARGE STOPYAlVE
--.-..-£LOSED* .. "B/1 AUXFEED PUMP EMERGENCY FIRE WATER SUPPlY 23B _00106_ AFW .ve,' -,_.___._ ._ __, , .... ___ '0'._""'*
                                                                                                                                                          .
_ = --___",,-.
I
1 !cLOSED ;CLOSED ANSWER Page 2 0'3 ANSWER * * "sn AUXFEED pUMP SUCTION HEADER DRAIN IV 1 Ca.oseD CLOSED 5 ,OPEN 1* .'CLOSED ;CLOSED
                . . ~ ..L~~.~'!I=.i.;.c...._=~cg.~96.:::..~.F!1 . ~~~.*j._, i .....J ....... -.~ . ~... ~_.. ~_. . . . . .~j._ ............. _.... _ .........                                                                                                                   L ....... j~ ***.*******_ ....... ~ .*.******..*. ~*.*.*** ... *.* i**.... **...**-*.-**..*******...-,.** ........
Red         ! 2_FW-S2C                                                                                                     *llV.. I 4 !CLOSED                                                                                                                             2* 'l.OCKEDOPEN                                             :LOCKED OPEN L* "S"AUXFEEDPUMP                                                                                                     .,                                     r.,.-------,.-----.,.*                                                                                 -----------'----
                                                                                                                                                                                                                                                                                            ..                                    .
I         RECIRCULATION STOP VAlVE
* 2_TB ",b-*'_"=-"",00l06_ABOVE"S"AFP m,,,,"",,. u"', """"_'~'"''''''        __
                                                                    '"""'""''''Y' WM";                                                       _
                                                                                      ,,,,,,,,,,,,,,,,,,,,,,,.;,;,,~>,,~~,,,)_,,,;.,y~,,,,,;, ~,~ _ _ ,,_,", n__ '. ,,__ ,.*~___ .___ +~___."" .." Y.~_,~ __ *** ,",H~ .. ,,,,~.=",~,, ~,",, __. ,,'._"_~,,_,,_                                                                                    +
Red             2-CN-29S                                                                                                             IV 4 lCLOSED                                                                                                                       2~~~~ __________ _                                              lOPEN
                            * '''B" AUX FEED PUMP SUCTION                                                                                                                             ~.---------~----~
..                                   ISOLATION                                                                                   "                                                     i
:.           I           i
* 2 TB                                               00106 AFW RM                                                                   i                   !                                                                         I   ,           , I                                                                                                   i iL~ ~. ".~. 'R.;I'-"'T*2~A~94B~""**~:::*'*~'**'~~***~*~'riV .~ 4*ta.OSED*~-~*~**~~*****~t*                                                                        ...                                                                                             -- .-.. ~"+"""-"~2~LOSED"""-'"'' .~~ -£LOSED* .. *~*-y*
                            *        "B/1 AUXFEED PUMP EMERGENCY j FIRE WATER SUPPlY VALVE 23B                                 _00106_ AFW =RM
                                                                      .ve,' - , _ .___._       ._     __, , ....___ '0'._""'* _ --___",,-.
1,"~"~;J"'~;-CN~331
                                                                                          -~¥,-      "'~
1 !cLOSED                                                     ;CLOSED ANSWER KEY                                                                                                                                                  Page 2 0'3
 
ANSWER KEY
* ~ed                              IV                                  1  Ca.oseD        CLOSED
        * "sn AUXFEED pUMP SUCTION HEADER DRAIN 5 ,OPEN
                                                                            ~'"~-.
1* .'CLOSED       ;CLOSED
* Only one vent and one drain are required to be open to provide proper venting and draining.
* Only one vent and one drain are required to be open to provide proper venting and draining.
ANSWER KEY Page 3 of3 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: JPM Number:
ANSWER KEY                                       Page 3 of3
Revision:
 
0II. Initiated:
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
Robert L. Cimmino, Jr. Developer 09/15/11 Date III. Reviewed:
JPM Number:             JPM-A2R~                Revision:     0
Technical Reviewer Date IV. Approved:
                                                                --=-
Cognizant Plant Supervisor (optional)
II. Initiated:
Date Nuclear Training Supervisor Date Page 1 of 11 JOB PERFORMANCE MEASURE  
Robert L. Cimmino, Jr.                     09/15/11 Developer                            Date III. Reviewed:
Technical Reviewer                         Date IV. Approved:
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor                   Date Page 1 of 11
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 0/0 09/15/11 Minor changes to incorporate NRC validation comments.
OF CHANGES:
011 Page 2 of 11
All & DATE                     DESCRIPTION                       REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format     0/0 09/15/11 Minor changes to incorporate NRC validation comments. 011 Page 2 of 11
---------------------------------
 
------------------------------JPM Number: Rev. ___0,--__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                          JPM-A2R                                  Rev. ___0,--__
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
MP2 JPM Number: JPM-A2R ° Task Title: System: Equipment Control Time Critical Task: Yes No x Validated Time (minutes): Task Applicable To: SRO RO X KIA No. 2.2.37 KIA Rating __3._6/_4_.6
Facility:      MP2                    Examinee:
__ Method of Simulated Performance:
                                                    ---------------------------------
Actual Performance:
JPM Number:                            JPM-A2R                                        Rev.
Classroom:
Task Title:
X Simulator:
                                                                                              °
_c:..:-_ Task At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F. Required Materials OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment.
                                                                                          ------
etc.): OU-M2-201 Attachment 3, Millstone Unit 2 SFP Time to II 150°F Calculation" General OU-M2-201 "Shutdown Safety Assessment Checklist" TRM 3.9.3.2 Spent Fuel Pool Temperature '" '" '" '" READ TO THE EXAMINEE'" '" '" '" I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
System:        Equipment Control Time Critical Task:     Yes
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
                                --           No    x Validated Time (minutes):                      15 Task No.(s):
Page 3 of 11
Applicable To:             SRO                    RO    X        PEO
-----JPM Number: Rev. o JOB PERFORMANCE.
                                  ---                                      ---
MEASURE WORKSHEET (continued)
KIA No.                2.2.37                   KIA Rating _ _    3._6/_4_.6__
Initial Conditions: Unit-2 is in day 12 of a refueling outage. Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool. Unit 2 has just experienced a Station Blackout. Present Spent Fuel Pool temperature as read on TR-7030 is 93°F. Initiating Cues: The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit. Simulator
Method of Testing:
* N/A Requirements: * *
Simulated Performance:                             Actual Performance:
* NOTES TO EVALUATOR * * *
                              ----                                            - -X- -
* Critical steps for this JPM are inclicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 11 PERFORMANCE JPM Number: JPM-A2R STEP STANDARD :!if  
Location:
'i.....-'___ 1 NOTE: The SSA Checklist or Heatup Examinee reads and acknowledges notes Calculations may be completed by any licensed Operator (except the on-duty or the STA using, at a minimum, the control board system NOTE: Systems planned to be from service in the next 24 hours may assumed to be out of service, therefore, not NOTE: Attachment 4 through Attachment provide further guidance while SSA NOTE: SSA Checklists are completed Daily Prior to removing any required to support the KSFs daily review already equipment is out of Equipment available to support KSFs unexpectedly Prior to performing plant
Classroom:        X               Simulator:                      In-Plant:
* changes when shutdown. A system/component is restored available status and is desired to immediately credit system/component for Shutdown or it is more than six hours until the SSA Checklist is to be Page 5 of 11 PERFORMANCE JPM Number: STEP Cue: Com 2. Cue: Comments:
_c:..:-_
3.2 Heatup Calculations IF a Time to Core Boil determination is desired, THEN PERFORM the following: REFER to Attachment 2, Millstone Unit 2 RCS Time to Boil Calculation, and FOLLOW instructions. RECORD results on Attachment
                                                  ----                          ----
: 2. 3.2.2 IF a time to reach 150°F SFP design temperature determination is desired THEN PERFORM the following: REFER to Attachment 3, Millstone Unit 2 SFP Time to 150°F Calculation, and FOLLOW instructions. RECORD results on Attachment
Task Standards:                    At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F.
: 3. STANDARD Examinee determines that this step is not N applicable.
Required Materials               OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment. etc.):   OU-M2-201 Attachment 3, Millstone Unit 2 SFP Time to II 150°F Calculation" General  
Examinee refers to Attachment 3, N Millstone Unit 2 SFP Time to 150°F Calculation.
 
Page 6 of 11 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD 3. NOTE: SFP temperature should be obtained from TR-7030 pt 1. Otherwise, portable dip probe may be used (if TR-7030 is unavailable).
==References:==
If SFP temperature is I Examinee reads and acknowledges note. N expected to increase, a SFP temperature of up to 5°F greater than the current SFP temperature can be used to bound 1--___
OU-M2-201 "Shutdown Safety Assessment Checklist" TRM 3.9.3.2 Spent Fuel Pool Temperature
conditions.
                                  '" '" '" '" READ TO THE EXAMINEE'" '" '" '"
Cue: Comments:
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
I Examinee may choose to add up to 5°F to current SFP temperature based on the above note and expected SFP temoerature rise. It is acceotable to use a startino temoerature of 98"F for the calculation. 4 . I I Examinee records 12 days after shutdown N Record time after reactor shutdown (in on Attachment 3 days), and current SFP temperature I Examinee records current Spent Fuel pool N temperature of 93°F or 98°F on Attachment 3 Examinee refers to Table 1 to obtain SFP N Heatup Rate Page 7 of 11 PERFORMANCE JPM Number: PERFORMANCE Table 1 SFP Heatup Rates NOTE: When using this table, the more conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup Comments: 7 . I Record SFP Heatup Rate Cue: 8. 3. Calculate and record SFP Time to 150 0 F Calculation:
Page 3 of 11
SFP Time to 150 0 F ={(150°F -SFP Temperature (OF)) I SFP Heatup Rate (OF/hour)}
 
{(150°F -98°F) I 17.rF/hour}  
JPM Number:                       JPM-A2R                            Rev.
= -2.9 Hrs. OR {(150°F -93°F) I 17.7°F/hour}  
                                                                            ---    o--
= -3.2 Hrs. STANDARD Examinee reads and acknowledges note N Examinee records a SFP Heatup Rate of 17.7°F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days (most conservative value) on Attachment
JOB PERFORMANCE. MEASURE WORKSHEET (continued)
: 3. y Examinee performs the following calculation to determine SFP temperature to 150°F: {(150°F -98°F) I 17.7°F/hour}
Initial Conditions:
=-2.9 Hrs. OR {(150°F -93°F) I 17.7°F/hour}
* Unit-2 is in day 12 of a refueling outage.
=-3.2 Hrs. y Page 8 of 11 PERFORMANCE JPM Number: STEP STANDARD Sign Performed by (STA or Licensed Examinee signs "Performed by" block Attachment TERMINATION CUE: The evaluation for this JPM is concluded.
* Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
_____ Page 9 of 11 JPM Number: JPM-A2R Rev. ___0'--__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* Unit 2 has just experienced a Station Blackout.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
* Present Spent Fuel Pool temperature as read on TR-7030 is 93°F.
15 Actual Time to Complete (minutes):
Initiating Cues:
Overall Result of JPM: SAT UNSAT (circle one) Areas for Improvement/Comments:
* The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.
Page 10 of 11
Simulator
-----JPM Number: Rev. 0 Initiating Cues: Initial Conditions:
* N/A Requirements:
STUDENT Unit-2 is in day 12 of a refueling outage. Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool. Unit-2 has just experienced a Station Blackout. Present Spent Fuel Pool temperature as read on TR-7030 is 93°F. The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit. Page 11 of 11 Calculation:
                                * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are inclicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 11
 
PERFORMANCE INFORMATION JPM Number:       JPM-A2R STEP                     PERFORMANCE                                  STANDARD
:!if p'Ei~r.fi:~\
IJt'~;If,,,JiWH,, ' i . . . . . - '_ __
: 1.      NOTE: The SSA Checklist or Heatup               Examinee reads and acknowledges notes         N Calculations may be completed by any                                                                   I licensed Operator (except the on-duty SM) or the STA using, at a minimum, the main control board system status.
NOTE: Systems planned to be removed from service in the next 24 hours may be assumed to be out of service, and, therefore, not credited.
NOTE: Attachment 4 through Attachment 8 provide further guidance while performing SSA Checklist.
NOTE: SSA Checklists are completed as follows:
* Daily
* Prior to removing any equipment required to support the KSFs unless daily review already assumed equipment is out of service
* Equipment available to support the KSFs unexpectedly becomes unavailable
* Prior to performing plant MODE changes when shutdown.
* system/component is restored to A
available status and is desired to either immediately credit the system/component for Shutdown Risk or it is more than six hours until the next SSA Checklist is to be performed Page 5 of 11
 
PERFORMANCE INFORMATION JPM Number:     JPM-A2R STEP                   PERFORMANCE                                STANDARD Cue:
Com
: 2.     3.2 Heatup Calculations 3.2.1 IF a Time to Core Boil determination Examinee determines that this step is not N is desired, THEN PERFORM the         applicable.
following:
: a. REFER to Attachment 2, Millstone Unit 2 RCS Time to Boil Calculation, and FOLLOW instructions.
: b. RECORD results on Attachment 2.
3.2.2 IF a time to reach 150°F SFP design temperature determination is desired THEN PERFORM the following:
: a. REFER to Attachment 3, Millstone  Examinee refers to Attachment 3,          N Unit 2 SFP Time to 150°F        Millstone Unit 2 SFP Time to 150°F Calculation, and FOLLOW         Calculation.
instructions.
: b. RECORD results on Attachment 3.
Cue:
Comments:
Page 6 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                                        PERFORMANCE                              STANDARD
: 3.           NOTE: SFP temperature should be                      I Examinee reads and acknowledges note. N obtained from TR-7030 pt 1. Otherwise, portable dip probe may be used (if TR-7030 is unavailable). If SFP temperature is expected to increase, a SFP temperature of up to 5&deg;F greater than the current SFP temperature can be used to bound 1--_ _ _-+I"'"""'~xr*?"7'"""<e~f"rte"1l!""~ conditions.
Cue:
Comments: I Examinee may choose to add up to 5&deg;F to current SFP temperature based on the above note and expected SFP temoerature rise. It is acceotable to use a startino temoerature of 98"F for the calculation.
: 4.       I                                    Instructions:
: 1. Record time after reactor shutdown (in I Examinee records 12 days after shutdown on Attachment 3 N
days), and current SFP temperature (OF).                                      I Examinee records current Spent Fuel pool N temperature of 93&deg;F or 98&deg;F on Attachment 3
: 5.                                                                   Examinee refers to Table 1 to obtain SFP N Heatup Rate Page 7 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                      PERFORMANCE                                  STANDARD
: 6.                            Table 1 SFP Heatup Rates NOTE: When using this table, the more        Examinee reads and acknowledges note      N conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup Comments:
: 7.      I Record SFP Heatup Rate                      Examinee records a SFP Heatup Rate of     y 17.7&deg;F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days (most conservative value) on Attachment 3.
Cue:
: 8.       3. Calculate and record SFP Time to         Examinee performs the following 1500 F Calculation:                     calculation to determine SFP temperature
                                    =
SFP Time to 1500 F {(150&deg;F - SFP             to 150&deg;F:
Temperature (OF)) I SFP Heatup Rate (OF/hour)}                                   {(150&deg;F - 98&deg;F) I 17.7&deg;F/hour} =-2.9 Hrs.
OR
{(150&deg;F - 98&deg;F) I 17.rF/hour} = -2.9 Hrs.    {(150&deg;F - 93&deg;F) I 17.7&deg;F/hour} =-3.2 Hrs.
OR
{(150&deg;F - 93&deg;F) I 17.7&deg;F/hour} = -3.2 Hrs.                                            y Page 8 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP              PERFORMANCE                            STANDARD
: 9.      Sign Performed by (STA or Licensed Examinee signs "Performed by" block on Attachment 3 TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                      "'~~.itialll"W1il.
t-9:~:'t~~-~~JD!i~-~lj,-~~-
_ _ _ __
Page 9 of 11
 
JPM Number:                     JPM-A2R                            Rev. ___0'--__
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes           No     X
                              -
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Areas for Improvement/Comments:
Page 10 of 11
 
JPM Number:                 JPM-A2R                            Rev.         0
                                                                      ---      --
STUDENT HANDOUT Initiating Cues:
* Unit-2 is in day 12 of a refueling outage.
* Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
* Unit-2 has just experienced a Station Blackout.
* Present Spent Fuel Pool temperature as read on TR-7030 is 93&deg;F.
Initial Conditions:
* The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.
Page 11 of 11
 
Calculation:
SFP Time to 150&deg;F= {(150&deg;F-SF=P Temperature (OF)/ SFP Heatup Rate (OF/Hour))
SFP Time to 150&deg;F= {(150&deg;F-SF=P Temperature (OF)/ SFP Heatup Rate (OF/Hour))
Time From SFP SFP Shutdown Temperature Rate SFP Time Date/Time (Days) (OF) (OF/hour) 150 Today/now.
Time From           SFP               SFP Heatup Shutdown         Temperature               Rate       SFP Time to Date/Time     (Days)           (OF)               (OF/hour)         150 of Today/now. 12             . 93                   17.7           ~ 3.2       examinee
12 . 93 17.7 3.2 examinee . Today/now 12 98 examinee Answer ,,, ,!j{ <, '-:;};":-  
. Today/now 12               98                                               examinee
------JOB PERFORMANCE MEASURE APPROVAL JPM Title: JPM Number: JPM-A3R Revision:
                                    '~~~~
0 Initiated:
JPIVI;,-t\~~'R
Marc R. 02/01/11 Date Reviewed:
                ,,, ,!j{ <,         '-:;};":- ~7A~}
Technical Date Approved:
Answer Key
Cognizant Plant Supervisor Date Nuclear Training Date Page 1 of 8 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-A3R                 Revision:
                                                                  ------
0 II. Initiated:
Marc R. Pucel                        02/01/11 Developer                            Date III. Reviewed:
Technical Reviewer                          Date IV. Approved:
Cognizant Plant Supervisor (optional)              Date Nuclear Training Supervisor                    Date Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE:
OF CHANGES:
2006-317 Update JPM to include HUP evaluations and new format Page 2 of 8
All & DATE                   DESCRIPTION                       REV/CHANGE:
------------------------------------
2006-317     Update JPM to include HUP evaluations and new format Page 2 of 8
-----------------JPM JPM-A3R Rev. JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                          JPM-A3R                              Rev.    &deg;
MP2 Examinee:
                                                                                ----
JPM Number: Rev. ___-:.0::...-
JOB PERFORMANCE MEASURE WORKSHEET (continued)
__ Task Title: System: Radiation Protection Time Critical Task: Yes No x Validated Time (minutes):
Facility:      MP2                    Examinee:
15 Task No.{s): Applicable To: SRO RO X PEO KiA No. 2.3.7 KiA Rating __3._5/_3_.6
                                                  ------------------------------------
__ Method of Testing: Simulated Performance:
JPM Number:                          JPM-A3R                                     Rev. ___-:.0::...-__
Actual Performance:
Task Title:
X----Location:
System:       Radiation Protection Time Critical Task:     Yes             No     x Validated Time (minutes):                   15 Task No.{s):
Classroom:
Applicable To:             SRO                 RO     X     PEO
X Simulator:
                                  ---                                  ----
In-Plant:
KiA No.                 2.3.7                 KiA Rating _ _    3._5/_3_.6_ _
Task At the completion of this JPM, the examinee has determined all of the requested radiological requirements for entering the CLRW filter skid area to assist the Radwaste Coordinator Reguired Materials Health Physics Survey Map (procedures.
Method of Testing:
equipment.
Simulated Performance:                           Actual Performance:         X
etc.): Operations blanket RWP General  
                              ----                                        ---'--
Location:
Classroom:       X               Simulator:                 In-Plant:
                ----                                                        ------
Task Standards:                    At the completion of this JPM, the examinee has determined all of the requested radiological requirements for entering the CLRW filter skid area to assist the Radwaste Coordinator Reguired Materials               Health Physics Survey Map (procedures. equipment. etc.):   Operations blanket RWP General  


==References:==
==References:==
* * *
 
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Page 3 of 8
 
------JPM Number: JPM-A3R Rev. o JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                           JPM-A3R                             Rev.
Initial Conditions: You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid. The PEO being briefed has 450 mrem of annual dose exposure remaining.
                                                                                - - -o- - -
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
* You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid.
* The PEO being briefed has 450 mrem of annual dose exposure remaining.
The examiner will act as Health Physics (HP) for any related questions.
The examiner will act as Health Physics (HP) for any related questions.
Initiating Cues: State the radiological requirements for entering this area. Include in your discussion: Which RWP task Gob step) is appropriate for this assignment Highest loose contamination level in the work area Protective clothing required in the work area Highest general area radiation level in the work area Dose rate alarm setting Maximum time that the operator can remain at the filter skid (and NO other area) without exceeding any dose limit Simulator N/A Reguirements: * *
Initiating Cues:
* NOTES TO EVALUATOR * * *
* State the radiological requirements for entering this area. Include in your discussion:
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what his/her simulated action/observation would be, read appropriate Ifnecessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD 1 . I Which RWP task Gob step) is appropriate Examinee states that the appropriate RWP N for this assignment task ( job step) for this assignment is Job Ste01 Comments: 3 . I Protective clothing required in the work Examinee states that the protective y area clothing required in the work area is "Full PC's" (consisting of Cotton liners, Booties, Coveralls, Shoe covers, Rubber gloves, Comments:
o Which RWP task Gob step) is appropriate for this assignment o Highest loose contamination level in the work area o Protective clothing required in the work area o Highest general area radiation level in the work area o Dose rate alarm setting o Maximum time that the operator can remain at the filter skid (and NO other area) without exceeding any dose limit Simulator                         N/A Reguirements:
: 5. Page 5 of 8 PERFORMANCE JPM Number: STEP STANDARD Maximum time that the operator can remain Examinee states that the maximum at the filter skid without exceeding any dose allowed stay time at the filter skid without 1--------41 limit exceedina any dose limit is 30 minutes. Comments:
                                  * *
I The RWP Dose Alarm is set at 50 mrem in a 100 mrem/hr field. 50/100=0.5 TERMINATION CUE: The evaluation for this JPM is concluded. Page 60f8 JPM Number: JPM-A3R Rev. ___0,,--__ VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* NOTES TO EVALUATOR * * * *
If task is Time Critical.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes Validated Time (minutes):
: 2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
Actual Time to Complete (minutes):
: 3. Ifnecessary, question the student for details of simulated actions/observations     (i.e. "What are you looking at?" or "What are you observing?").
No X 15 JPM Work Practice Evaluation:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one)
Page 4 of 8
During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
 
never-.2ut anyone's safejy at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated work practices.
PERFORMANCE INFORMATION JPM Number:
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
STEP                   PERFORMANCE                                 STANDARD
Page 7 of 8
:1~lIfI1r*
-----JPM Number: Rev. o Initial Conditions:
                                                                                                            -----
Initiating Cues: STUDENT HANDOUT You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid. The PEO being briefed has 450 mrem of annual dose exposure remaining.
: 1. I Which RWP task Gob step) is appropriate Examinee states that the appropriate RWP         N for this assignment                     task ( job step) for this assignment is Job Ste01 Comments:
The examiner will act as Health Physics (HP) for any related questions. State the radiological requirements for entering this area. Include in your discussion: Which RWP task Gob step) is appropriate for this assignment Highest loose contamination level in the work area Protective clothing required in the work area Highest general area radiation level in the work area Dose rate alarm setting Maximum time that the operator can remain at the filter skid (and NO other area) without exceeding any dose limit Page 8 of 8 JPM-A3R RADIATION WORK PERMIT  
: 3. I Protective clothing required in the work Examinee states that the protective             y area                                     clothing required in the work area is "Full PC's" (consisting of Cotton liners, Booties, Coveralls, Shoe covers, Rubber gloves, Comments:
5.
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                     PERFORMANCE                                  STANDARD
: 6.      Maximum time that the operator can remain     Examinee states that the maximum at the filter skid without exceeding any dose allowed stay time at the filter skid without 1--------41 limit                                         exceedina any dose limit is 30 minutes.
Cue:
Comments: I The RWP Dose Alarm is set at 50 mrem in a 100 mrem/hr field. 50/100=0.5 hrs TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                                        ~llllJ"~:IMI;~t~' - - - - - -
Page 60f8
 
JPM Number:                       JPM-A3R                           Rev. ___0,,--__
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical. it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No    X
                                -
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT          UNSAT          NA        (circle one)
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass I Fail and adherence requirements.
never-.2ut anyone's safejy at risk.                                             Pass I   Fail never put equipment reliability at risk.                                       Pass I   Fail never violated radiolo~ical work practices.                                     Pass I   Fail demonstrated effective use of event-free human performance tools.               Pass I   Fail Areas for Improvement/Comments:
Page 7 of 8
 
JPM Number:               JPM-A3R                            Rev.
                                                                  - - -o - -
STUDENT HANDOUT Initial Conditions:
* You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid.
* The PEO being briefed has 450 mrem of annual dose exposure remaining.
The examiner will act as Health Physics (HP) for any related questions.
Initiating Cues:
* State the radiological requirements for entering this area. Include in your discussion:
o Which RWP task Gob step) is appropriate for this assignment o Highest loose contamination level in the work area o Protective clothing required in the work area o Highest general area radiation level in the work area o Dose rate alarm setting o Maximum time that the operator can remain at the filter skid (and NO other area) without exceeding any dose limit Page 8 of 8
 
JPM-A3R RADIATION WORK PERMIT  


==SUMMARY==
==SUMMARY==
2110205 Millstone Station PLANT CODE YEAR RWP NUMBER REV. RWPSTART TYPE CATEGORY RWP EXPIRATION 2 11 0 01-AUG-2011 00:00 S RO I 30-0CT-2011 23:59 RWP DESCRIPTION Operations RWP TASK  
2110205 Millstone Station PLANT CODE YEAR                   RWP NUMBER REV.                     RWPSTART           TYPE       CATEGORY             RWP EXPIRATION 2                 11           2110205                0     01-AUG-2011 00:00       S               RO   I         30-0CT-2011 23:59 RWP DESCRIPTION Operations RWP TASK  


==SUMMARY==
==SUMMARY==
DOSE ALARM 1 ({HRA) Operations activities in RCAs. Radiation Areas. and High Radiation Areas 50 2 (LHRA) Operations activities in Locked High Radiation Areas. 75 ALARA INFORMATION ALARA Review No.
 
Person-mrem 21132 5150 SPECIAL INSTRUCTIONS:
DOSE ALARM 1 ({HRA) Operations activities in RCAs. Radiation Areas. and High Radiation Areas                 50 2 (LHRA) Operations activities in Locked High Radiation Areas.                                     75 ALARA INFORMATION ALARA Review No.                                                 Hours-Estimated                                              Person-mrem 21132                                                         :5400                                                      5150 SPECIAL INSTRUCTIONS:
Access to RCAs to perform routine and special Operations activities RCA access includes Containment Health Physics supervision may change teledosimetry atus. radiological conditions, or required coverage.
Access to RCAs to perform routine and special Operations activities RCA access includes Containment Health Physics supervision may change teledosimetry req                                        atus. radiological conditions, or required coverage.
Activities may include, but are not limited to:
Activities may include, but are not limited to:
* Routine and special rounds
* Routine and special rounds
Line 253: Line 504:
* LLRT
* LLRT
* Venting or draining of systems
* Venting or draining of systems
* System alignments and restorati9ps Entry on this RWP req . ** Be knowledgeable of ** Adhere to the requi .. Notify HP before e ** Monitor electronic lIy in high noise areas ** Unless specifically TE alarm sounds, move to a lower dose area and notify HP "If DOSE otify HP HP BEFORE logging enever PCs are DATE: 41" ,,/. tJ2tJ// DATE: DATE: DATE:
* System alignments and restorati9ps Entry on this RWP req .
JPM-A3R Job Steps 1 OF 2 VALID FROM 01-AUG-2011 00:00 TO 30-0CT-2011 23:59 RWP 2110205-1 REV. NO 0 DOSE RA"rE ALARM: 300 mrem/Hr BUDGETED DOSE: 1000 mrem DOSE LIMIT ALARM: 50 mrem ALARA EVALUATION NO: 21132 JOB LOCATIONS:
** Be knowledgeable of
JOB DESCRIPTION: (HRA) Operations activities in RCAs, Radiation Areas, and High Radiation*
** Adhere to the requi
.. Notify HP before e
** Monitor electronic                                   lIy in high noise areas
** Unless specifically                                     TE alarm sounds, move to a lower dose area and notify HP "If DOSE                                           otify HP HP BEFORE logging out enever PCs are worn Supervision                                            DATE:       41" ,,/. tJ2tJ//                   DATE:
DATE:                                           DATE:
 
JPM-A3R Job Steps 1 OF 2 VALID FROM 01-AUG-2011 00:00                 TO 30-0CT-2011 23:59           RWP 2110205-1                           REV. NO 0 DOSE RA"rE ALARM: 300 mrem/Hr                                                           BUDGETED DOSE: 1000 mrem DOSE LIMIT ALARM: 50 mrem                                                               ALARA EVALUATION NO: 21132 JOB LOCATIONS:
JOB DESCRIPTION:             (HRA) Operations activities in RCAs, Radiation Areas, and High Radiation*
RADIOLOGICAL CONDITIONS:
RADIOLOGICAL CONDITIONS:
* Indicates estimated value for RWP Preparation.
* Indicates estimated value for RWP Preparation. "'''''~i:ill'UI GENERAL AREA RADIATION LEVELS (mrem/hr):
GENERAL AREA RADIATION LEVELS (mrem/hr):
Review latest radiological surveys or historical data prior to entering RCA.
Review latest radiological surveys or historical data prior to entering RCA. CONTACT/HOT SPOT RADIATION LEVELS (mrem/hr):
CONTACT/HOT SPOT RADIATION LEVELS (mrem/hr):
CONTAMINATION LEVELS (dpm/100cm2):
CONTAMINATION LEVELS (dpm/100cm2):
AIRBORNE RADIOACTIVITY (DAC): All areas, < 0.3 DOSIMETRY REQUIREMENTS:
AIRBORNE RADIOACTIVITY (DAC):
ED TLD PROTECTIVE CLOTHING REQUIREMENTS:
All areas, < 0.3 DOSIMETRY REQUIREMENTS:
A RWP PRE-JOB BRIEFING IS REQU\ WORKER NO entry to Locked High HP supervision may adju
ED     TLD PROTECTIVE CLOTHING REQUIREMENTS:
* ALARA reviews .
A RWP PRE-JOB BRIEFING IS REQU\
WORKER INSTRUCTIONS:
NO entry to Locked High   Radiation\~
HP supervision may adju
* ALARA reviews     .
* Heat stress evalua
* Heat stress evalua
* FME cont entries: simeter AND knowledge of area dose rates, OR continuous HP coverage
* FME cont entries:
simeter AND knowledge of area dose rates, OR continuous HP coverage
* worn for inspection-related tasks only; no physical work in contaminated areas may be performed.
* worn for inspection-related tasks only; no physical work in contaminated areas may be performed.
A briefing from required before venting or draining any contaminated systems, to ensure proper drainage is established and adequate radiological controls are Ends of hoses shall be capped or bagged when disconnecting from contaminated A minimum of lab coat and rubber gloves shall be worn when hoses are connected to or disconnected from contaminated systems.
A briefing from       required before venting or draining any contaminated systems, to ensure proper drainage is established and that adequate radiological controls are used.
Job Steps 2 OF VALID FROM 01-AUG-2011 00:00 TO 30-0CT-2011 23:59 RWP 2110205-2 REV. NO 0 DOSE RATE ALARM: 500 mremlHr BUDGETED DOSE: 75 mrem DOSE LIMIT ALARM: 75 mrem ALARA EVALUATION NO: 21132 JOB LOCATIONS:
Ends of hoses shall be capped or bagged when disconnecting from contaminated systems.
JOB DESCRIPTION: (LHRA) Operations activities in Locked High Radiation Areas. RADIOLOGICAL CONDITIONS:  
A minimum of lab coat and rubber gloves shall be worn when hoses are connected to or disconnected from contaminated systems.
*Indicates estimated value for RWP GENERAL AREA RADIA1"ION LEVELS (mrem/hr):
 
Solid Rad Waste: 5 -1500 CONTACT/HOT SPOT RADIATION LEVELS (mrem/hr):
JPM-A3R Job Steps 2 OF 2 VALID FROM 01-AUG-2011 00:00                   TO 30-0CT-2011 23:59                     RWP 2110205-2                   REV. NO 0 DOSE RATE ALARM: 500 mremlHr                                                   BUDGETED DOSE: 75 mrem DOSE LIMIT ALARM: 75 mrem                                                       ALARA EVALUATION NO: 21132 JOB LOCATIONS:
JOB DESCRIPTION: (LHRA) Operations activities in Locked High Radiation Areas.
RADIOLOGICAL CONDITIONS: *Indicates estimated value for RWP Preparati~n.
GENERAL AREA RADIA1"ION LEVELS (mrem/hr):
Solid Rad Waste: 5 - 1500 CONTACT/HOT SPOT RADIATION LEVELS (mrem/hr):
CONTAMINATION LEVELS (dpm/100cm2):
CONTAMINATION LEVELS (dpm/100cm2):
Solid Rad Waste: < 1 K AIRBORNE RADIOACTIVITY (DAC): , DOSIMETRY REQUIREMENTS:
Solid Rad Waste: < 1K AIRBORNE RADIOACTIVITY (DAC):
ED TELEDOSIMETRY TLD DOSIMETRY COMMENTS:
~j                                  ,
loves " Modesty garments clothing requirements based on any of the following: " .. F .,;0'i\;",
DOSIMETRY REQUIREMENTS:
Locked High Radiation Area entry: .. Dose rate meter or alarming dosimeter AND knowledge of area dose rates, OR continuous HP coverage .. Area MUST or guarded at ALL times " Health Physics briefing for Locked High Radiation Areas " If dose rate fields in work area are> 1000 mremlhr OR dose per entry is > 500 mrem, continuous HP coverage and Stay Time are required.
ED         TELEDOSIMETRY             TLD DOSIMETRY COMMENTS:
loves " Modesty garments clothing requirements based on any of the following:
"
.. F       .,;0'i\;",
Requiremen~Jor      Locked High Radiation Area entry:
.. Dose rate meter or alarming dosimeter AND knowledge of area dose rates, OR continuous HP coverage
.. Area MUST be'la~ked or guarded at ALL times
" Health Physics briefing for Locked High Radiation Areas
" If dose rate fields in work area are> 1000 mremlhr OR dose per entry is > 500 mrem, continuous HP coverage and Stay Time are required.
Lab coats may be wom for inspection-related tasks only; no physical work in contaminated areas may be performed.
Lab coats may be wom for inspection-related tasks only; no physical work in contaminated areas may be performed.
A briefing from HP is required before venting or draining any contaminated systems, to ensure proper drainage is established and that adequate radiological controls are used. Ends of hoses shall be capped or bagged when disconnecting from contaminated systems. A minimum of lab coats and rubber gloves shall be wom when hoses are connected to or disconnected from contaminated systems.
A briefing from HP is required before venting or draining any contaminated systems, to ensure proper drainage is established and that adequate radiological controls are used.
2/12 MILl:.STONE NUCLEAR POWER STATION-RADIATION SURVEY FIGURE UNIT 2 DATE SURVEY By REVIEWED BY Type Of Survey 10/03/11 SIGNATURE o Routine TIME % REACTOR POWER I!!I Special 0812 PRINT NAME John E. o RWP# Type Instrument Type Serial Number 1IEffIcIency Background calibration Due y RO*20 1273 NlA NlA L*177 207213 10 <80 CPM a L*2241 43*2 217619 22171 6.1 0 I -5 Aux Bldg. Clean Waste Temp. Filter Room Smear Results NUMBER DPM/100cm 2 1-7 <1000 8 9 10 11 0 alpha1*11 <20 G) 60 RBAST SOP<V I I L ___ verified on: 09/30/2011 I .::::3* t******' ( ******RAD CONTRL. AREA RAD MAT. AREA CONTAMINATED AREA RAD AREA HIGH RAD AREA LHRA GRAVE DANGER AREA 100 -gamma(r) at waist level in mremlhr 100'" -gamma(r) contact in mremlhr 25n -neutron(on
Ends of hoses shall be capped or bagged when disconnecting from contaminated systems.
: 1) in mremlhr <9 -contamination survey point 50 mrad -beta (P) reading in mradlhr JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-A4R Revision:
A minimum of lab coats and rubber gloves shall be wom when hoses are connected to or disconnected from contaminated systems.
_-=O=---_
 
MILl:.STONE NUCLEAR POWER STATION- RADIATION SURVEY FIGURE NO.23                                                                                UNIT 2 DATE                     SURVEY By                                                       REVIEWED BY                         Type Of Survey 10/03/11         SIGNATURE                                                                                           o     Routine TIME                                                                                     % REACTOR POWER                     I!!I Special 0812           PRINT NAME                   John E. Tech                                            80          o     RWP#             /
Type         Instrument Type             Serial Number               1IEffIcIency                 Background                 calibration Due Date y               RO*20                         1273                       NlA                         NlA                             2112 f\+y              L*177                       207213                       10                       <80 CPM                           3/12 a       L*2241     I    43*2       217619 22171                 6.1                         0                     1112 J      2/12
                -5 Aux Bldg. Clean Waste Temp. Filter Room Smear Results NUMBER           DPM/100cm2 1-7               <1000 8                 6000 9                 22000 Vent                                                            100 10                 18000 11                 9000 0
alpha 80 G)                                                                                    1*11                 <20 60                   100                                    @
RBAST r--                                                      95 I      SOP 100
                          <V                                                   G)
I         45 I
L ___
G)                               
    ~-;tJ RAD CONTRL. AREA
                    ~A RAD MAT. AREA I     .::::3*
CONTAMINATED AREA 100 - gamma(r) at waist level in mremlhr RAD AREA t * * * * * *'
HIGH RAD AREA 100'" - gamma(r) contact in mremlhr
( ******)
LHRA            ,----  verified on: 09/30/2011 GRAVE DANGER AREA          ~
25n - neutron(on 1) in mremlhr NEUTRON
<9 -contamination survey point                             50 mrad - beta (P) reading in mradlhr
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-A4R                 Revision: _-=O=---_
II. Initiated:
II. Initiated:
Robert L. Cimmino, Jr. Developer 09/14/11 Date III. Reviewed:
Robert L. Cimmino, Jr.                     09/14/11 Developer                            Date III. Reviewed:
Technical Reviewer Date IV. Approved:
Technical Reviewer                         Date IV. Approved:
Cognizant Plant Supervisor (optional)
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor                     Date Page 1 of 13
Date Nuclear Training Supervisor Date Page 1 of 13 JOB PERFORMANCE MEASURE  
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 010 09/14/11 Minor changes to incorporate NRC validation comments 011 Page 2 of 13
OF CHANGES:
------------------------------------
All & DATE                     DESCRIPTION                     REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format     010 09/14/11 Minor changes to incorporate NRC validation comments     011 Page 2 of 13
----------------------JPM Number: Rev. ____0'---__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Facility:
JPM Number:                          JPM-A4R                              Rev. ____0'---__
MP2 JPM Number: JPM-A4R &deg; Task Title: System: Reactivity Control Time Critical Yes No x Validated Time Task Applicable To: SRO __ RO X PEO __KIA KIA Rating ______Method of Simulated Performance:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Actual Performance:
Facility:      MP2                    Examinee:
Classroom:
                                                ------------------------------------
X Simulator:
JPM Number:                           JPM-A4R                                    Rev.
Task At the completion of this JPM the examinee will successfully determined whether SDM is being satisfied for postulated SBO Reguired Materials EOP 2530 " Station Blackout" (procedures.
Task Title:
equipment.
                                                                                      -------&deg; System:       Reactivity Control Time Critical Task:      Yes             No   x Validated Time (minutes):
etc.): EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 21) General  
Task No.(s):
Applicable To:             SRO _ _            RO     X       PEO _ __
KIA No.                                        KIA Rating _______
Method of Testing:
Simulated Performance:                           Actual Performance:          X
                              ----                                      -----'-~-
Location:
Classroom:       X               Simulator:                  In-Plant:
                --    -                        ---                        -----
Task Standards:          At the completion of this JPM the examinee will have successfully determined whether SDM is being satisfied for a postulated SBO eVt:mt.
Reguired Materials               EOP 2530 " Station Blackout" (procedures. equipment. etc.):   EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 21)
General  


==References:==
==References:==


........ READ TO THE EXAMINEE" I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
                                  ........ READ TO THE EXAMINEE" ......
You may use any approved reference materials normally available in the Control Room, including logs. Make a/1 written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make a/1 written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 13 JPM Number:
Page 3 of 13
Rev. ___0,,---__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
JPM Number:                         JPM-A4.R                              Rev. ___0,,---__
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
Initial Conditions:
Initiating Cues: Simulator Requirements: Unit 2 has experienced a plant trip with a concurrent Station Blackout 30 minutes ago. Unit 2 had been operating at 100% power for one month prior to the trip. The crew is performing EOP 2530. Station Blackout. The BOP is making preparations to restore power to Unit 2 from the SBO Diesel when it becomes available. Tavg is being maintained at 532&deg;F. Chemistry has determined present RCS Boron concentration is 670 ppm. Present Core Burnup is 6500 MWD/MTU. All CEAs are fully inserted. The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied at this time. Additionally.
* Unit 2 has experienced a plant trip with a concurrent Station Blackout 30 minutes ago.
if it is determined that SDM is NOT being satisfied.
* Unit 2 had been operating at 100% power for one month prior to the trip.
then calculate the amount of boric acid that must be added to the RCS. N/A * *
* The crew is performing EOP 2530. Station Blackout.
* NOTES TO EVALUATOR * * *
* The BOP is making preparations to restore power to Unit 2 from the SBO Diesel when it becomes available.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 13 PERFORMANCE JPM Number: PERFORMANCE EOP 2530 Step 30 Check Shutdown Margin is satisfied.
* Tavg is being maintained at 532&deg;F.
Refer to Appendix 17, Shutdown f-----....l"..." EOP 2541, Appendix 17 IF desired to calculate required shutdown boron concentration, PERFORM Attachment 17 -A, "Required Shutdown Boron Concentration." If boration to the RCS to maintain shutdown margin is desired, PERFORM Attachment 17 -B "Boration to the RCS from the BAST." Com Attachment 17 A, Required Shutdown Boron Concentration NOTE The initial calculation is used to determine that SOM is met at the current conditions.
* Chemistry has determined present RCS Boron concentration is 670 ppm.
The subsequent calculation determines if SOM will be met for anticipated STANDARD
* Present Core Burnup is 6500 MWD/MTU.
___ Examinee obtains Appendix 17, Shutdown N Margin. Examinee refers to EOP 2541, Appendix N 17 -A to calculate required shutdown boron concentration.
* All CEAs are fully inserted.
N Examinee determines that this step is Not Applicable.
Initiating Cues:
Examinee reads and acknowledges note N about initial and subsequent calculations ofSOM. temoeratures when coolina down the RCS . .",..,,.,,.,,,,,..,,,,..,,,,,.,,,,,,,...,, Cue: Comments:
* The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied at this time.
Page 5 of 13 PERFORMANCE JPM Number: STEP 4. Cue: Comments:
* Additionally. if it is determined that SDM is NOT being satisfied. then calculate the amount of boric acid that must be added to the RCS.
: 6. 3. PERFORMANCE REQUEST Chemistry to sample the RCS for boron. RECORD core burnup from ONE of the following:  
Simulator
* "CVBURNUP" (PPC)
* N/A Requirements:
* Control Room Daily Surveillance Reactor Engineering D/MTU STANDARD Examinee states from Initial Conditions that RCS Boron concentration is 670 Examinee records core burnup as y 6500 MWD/MTU as given in Initial Conditions.
                                  * *
Page 6 of 13 PERFORMANCE JPM Number: STEP 7. 4. Cue: Comments:
* NOTES TO EVALUATOR * * * *
Refer To the applicable curve in Reactor Engineering Curve and Data Book and DETERMINE the required shutdown boron concentration for the core burnup and the current T AVE as follows: IF directed to this Appendix by SBO or Functional Recovery EOPs use "1.0% Shutdown Boron Concentration vs. Moderator Temperature" (RE-B-02) IF more than one CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA, greater than one, not fully inserted.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
STANDARD Examinee uses "1.0% Shutdown Boron y Concentration VS. Moderator Temperature" (RE-B-02) and determines the required shutdown boron concentration for the core burnup and the current TAVE is 719 ppm, if data is taken from the table and interpolated.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
(710-730 ppm, if data is taken from the curve) Examinee determines that there is no y indication that more than one CEA is NOT fully inserted and that this step is Not Applicable.
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" or "What are you observing?").
Page 7 of 13 PERFORMANCE JPM Number: STEP 8. 9. 5. Cue: Comments:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
: 10. 6. Cue: Comments:
Page 4 of 13
JPM-A4R PERFORMANCE IF directed to this Appendix by any other EOP use "3.6% Shutdown Boron Concentration vs. Moderator Temperature" (RE-B-01) IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.
 
RECORD the required shutdown concentration and the T AVE for which was
PERFORMANCE INFORMATION JPM Number:
___DETERMINE Inverse Boron Worth present core burnup. Refer To Engineering Curve and Data Book. __MWD/MTU (step __STANDARD Examinee states that this step is Not Examinee records the required shutdown boron concentration and the T AVE which it was 719 ppm (710-730 y Examinee determines Inverse Boron Worth at present core burnup (6500 MWD/MTU ) is 112.7 ppm/%..1.p, if data is taken from the table and interpolated.
STEP                          PERFORMANCE                                                         STANDARD
(112.5-112.9 ppm/%Ap, if data is taken from the curve) Page 8 of 13 PERFORMANCE JPM Number: STEP 11 . 7. PERFORMANCE DETERM I N E smallest xenon reactivity worth expected within the time frame being evaluated.
                                                                                                                  ~tAattlMlJ;L-'_ __
Refer To ANY of the following: "Xenon-Samarium Post Trip Report" Reactor Engineering Curve and Data Book (RE-C-01) "XENON-SAMARIUM DEMAND" program on STANDARD Using "Reactor Engineering Curve and y Data Book (Xenon Worth vs. Time After Reactor Shutdown From Various Equilibrium Power Levels Cycle 21, MOC, RE-C-01)" the examinee determines that the smallest xenon reactivity worth expected for the first hour after shutdown is 2.682 %ap, if data is taken from the table and interpolated.
: 1.            EOP 2530 Step 30                                     Examinee obtains Appendix 17, Shutdown          N Check Shutdown Margin is satisfied. Refer            Margin.
(2.670-2.750 if data is taken from the curve) Page 9 of 13 PERFORMANCE JPM Number: STEP 13. Cue: Comments:
to Appendix 17, Shutdown f - - - - -....l "..."
: 14. Cue: Comments:
: 2.            EOP 2541, Appendix 17
PERFORMANCE I CALCULATE Boron Equivalent of Xenon Reactivity Worth (BE of XRW) as follows: Xenon X Inverse Boron Equivalent Reactivity Worth Boron Worth of Xenon Reactivity Worth 10. CALCULATE Xenon Corrected Required Shutdown Boron Required Shutdown Boron Equivalent  
: 1. IF desired to calculate required                   Examinee refers to EOP 2541, Appendix          N shutdown boron concentration,                     17-A to calculate required shutdown boron PERFORM Attachment 17-A,                         concentration.
= Boron Concentration of Xenon Reactivity Worth Xenon Corrected Required Shutdown Boron Concentration STANDARD Examinee calculates Boron Equivalent of Xenon Reactivity Worth (BE of XRW) as follows: 2.682 %ilp 112.7I2pm/%ilp 302.3 ppm y Xenon X Inverse Reactivity Worth Boron Worth Equivalent Xenon Using minimum values: 2.670 x 112.5 = 300.4 ppm Using maximum values: 2.750 x 112.9 = 310.5 ppm Examinee calculates Xenon Corrected y Required Shutdown Boron 719 ppm 302.3 ppm Required Shutdown Boron Equivalent  
                        "Required Shutdown Boron Concentration."
= Boron Concentration of Xenon Reactivity Worth 416.7 Xenon Corrected Required Shutdown Boron Concentration Minimum value: 710 -310.5 =399.5 ppm Maximum value: 730 -300.4 =429.6 ppm Page 10 of 13 PERFORMANCE JPM Number: JPM-A4R STEP STANDARD 15. 11. Record ANY of the following: I
Examinee determines that this step is Not      N
* Examinee records RCS boron at the y RCS boron concentration at the time time of the Reactor trip as 670 ppm. of the reactor trip (Due to Station Blackout, RCS boron ___ ppm at time of Rx trip at the tinme of the trip must be the RCS boron sample results obtained same as RCS boron results recently from Chemistry obtained from Chemistry.)
: 2. If boration to the RCS to maintain shutdown margin is desired, PERFORM             Applicable.
___ ppm from Chemistry I
Attachment 17-B "Boration to the RCS from the BAST."
* Examinee records RCS boron sample y sample results obtained from Chemistry sample as 670 ppm. (Obtained from Initial Cond Cue: Comments: 12. CHECK RCS boron concentration Examinee compares the Xenon Corrected greater than Xenon Corrected Required Required Shutdown Boron Shutdown Boron concentration.
Com
calculated in step 10 with the present boron concentration and determines that the present RCS boron concentration is greater than Xenon Corrected Required Shutdown Boron concentration (Le., Shutdown Margin is satisfied.);
: 3.            Attachment 17A, Required Shutdown Boron Concentration NOTE                             Examinee reads and acknowledges note            N The initial calculation is used to determine         about initial and subsequent calculations that SOM is met at the current conditions.            ofSOM.
therefore, Emeraencv Boration is NOT Com TERMINATION CUE: The evaluation for this JPM is concluded.  
The subsequent calculation determines if SOM will be met for anticipated temoeratures when coolina down the RCS . .",..,,.,,.,,,,,..,,,,..,,,,,.,,,,,,,...,,
.:e.C!T.*.*"da 1MiltE" }i 0 .%Wf;' Page 11 of 13
Cue:
-------JPM Number: JPM-A4R Rev. o VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Comments:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No Validated Time Actual Time to Complete JPM Work Practice Evaluation:
Page 5 of 13
SAT UNSAT NA (circle one) Overall Result of JPM: SAT UNSAT (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
 
never put anyone's safety at risk. Pass I Fail never put e_quipment reliability at risk. Pass I Fail never violated radiological work practices.
PERFORMANCE INFORMATION JPM Number:
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
STEP                   PERFORMANCE                              STANDARD
Page 12 of 13
: 4.         REQUEST Chemistry to sample the       Examinee states from Initial Conditions RCS for boron.                       that RCS Boron concentration is 670 Cue:
-----, JPM Number: Initial Conditions:
Comments:
Initiating Cues: Rev. 0 STUDENT Unit 2 has experienced a plant trip with a concurrent Station Blackout 30 minutes ago. Unit 2 had been operating at 100% power for one month prior to the trip. The crew is performing EOP 2530, Station Blackout. The BOP is making preparations to restore power to Unit 2 from the SBO Diesel when it becomes available. Tavg is being maintained at 532"F. Chemistry has determined present RCS Boron concentration is 670 ppm. Present Core Burnup is 6500 MWD/MTU. All CEAs are fully inserted. The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied at this time. Additionally, if it is determined that SDM is NOT being satisfied, then calculate the amount of boric acid that must be added to the RCS. Page 13 of 13 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: ..IPM Number: Shift$taffitigBased Requirements JPM-A1.1S Revision:
: 6.      3. RECORD core burnup from ONE of the following:                            Examinee records core burnup as        y
1II. Initiated:
              *   "CVBURNUP" (PPC)                 6500 MWD/MTU as given in Initial
R. J. Ashey Developer 9/15/2011 Date III. Reviewed:
* Control Room Daily Surveillance Conditions.
Technical Reviewer Date IV. Approved:
* Reactor Engineering D/MTU Page 6 of 13
Cognizant Plant Supervisor (optional)
 
Date Nuclear Training Supervisor Date Page 1 of 10 JOB PERFORMANCE MEASURE  
PERFORMANCE INFORMATION JPM Number:    JPM-A4R STEP                    PERFORMANCE                                  STANDARD
: 7.      4. Refer To the applicable curve in Reactor Engineering Curve and Data Book and DETERMINE the required shutdown boron concentration for the core burnup and the current TAVE as follows:
: a. IF directed to this Appendix by SBO   Examinee uses "1.0% Shutdown Boron          y or Functional Recovery EOPs use     Concentration VS. Moderator Temperature" "1.0% Shutdown Boron               (RE-B-02) and determines the required Concentration vs. Moderator        shutdown boron concentration for the core Temperature" (RE-B-02)              burnup and the current TAVE is 719 ppm,
* IF more than one CEA is not       if data is taken from the table and fully inserted, INCREASE the    interpolated. (710-730 ppm, if data is taken required shutdown boron         from the curve) concentration 350 ppm per CEA,                                               y Examinee determines that there is no greater than one, not fully indication that more than one CEA is NOT inserted.
fully inserted and that this step is Not Applicable.
Cue:
Comments:
Page 7 of 13
 
PERFORMANCE INFORMATION JPM Number:     JPM-A4R STEP                 PERFORMANCE                                    STANDARD
: 8.         b. IF directed to this Appendix by any   Examinee states that this step is Not    y other EOP use "3.6% Shutdown           Applicable.
Boron Concentration vs. Moderator Temperature" (RE-B-01)
* IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.
: 9.      5. RECORD the required shutdown boron        Examinee records the required shutdown    N concentration and the T AVE for which it  boron concentration and the T AVE for was calculated.                          which it was calculated.
_ _ _ppm                                  719 ppm (710-730 ppm)
Cue:
Comments:
: 10.      6. DETERMINE Inverse Boron Worth at                                                    y present core burnup. Refer To Reactor    Examinee determines Inverse Boron Engineering Curve and Data Book. (RE    Worth at present core burnup (6500 F-02)                                    MWD/MTU ) is 112.7 ppm/%..1.p, if data is
_ _ MWD/MTU (step 3.)                    taken from the table and interpolated.
_ _ IBW                                  (112.5-112.9 ppm/%Ap, if data is taken from the curve)
Cue:
Comments:
Page 8 of 13
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                                  STANDARD 11 . 7. DETERM IN E smallest xenon reactivity Using "Reactor Engineering Curve and      y worth expected within the time frame   Data Book (Xenon Worth vs. Time After being evaluated. Refer To ANY of the   Reactor Shutdown From Various following:                             Equilibrium Power Levels Cycle 21, MOC,
              * "Xenon-Samarium Post Trip Report"   RE-C-01)" the examinee determines that
* Reactor Engineering Curve and       the smallest xenon reactivity worth Data Book (RE-C-01)              expected for the first hour after shutdown
              * "XENON-SAMARIUM DEMAND"              is 2.682 %ap, if data is taken from the program on PPC                    table and interpolated. (2.670-2.750 %~p, Reactor                          if data is taken from the curve)
Page 9 of 13
 
PERFORMANCE INFORMATION JPM Number:
STEP                       PERFORMANCE                                                STANDARD
: 13. I 9. CALCULATE Boron Equivalent of                        Examinee calculates Boron Equivalent of Xenon Reactivity Worth (BE of XRW) as               Xenon Reactivity Worth (BE of XRW) as follows:                                            follows:
2.682 %ilp 112.7I2pm/%ilp                302.3 ppm      y Xenon X        Inverse                Boron Xenon        X    Inverse        Boron Equivalent   Reactivity Worth  Boron Worth          Equivalent of Reactivity Worth   Boron Worth        of Xenon                                               Xenon Reactivity Reactivity Worth                                             Worth Using minimum values:
2.670 x 112.5 = 300.4 ppm Using maximum values:
2.750 x 112.9 = 310.5 ppm Cue:
Comments:
: 14.      10. CALCULATE Xenon Corrected                          Examinee calculates Xenon Corrected                     y Required Shutdown Boron                            Required Shutdown Boron 719 ppm                     302.3 ppm Required Shutdown Boron Concentration Boron Equivalent of Xenon Reactivity
                                                              =     Required Shutdown Boron Concentration Boron Equivalent of Xenon Reactivity
                                                                                                                      =
Worth                                                    Worth 416.7 Xenon Corrected Required                               Xenon Corrected Required Shutdown Boron Concentration                            Shutdown Boron Concentration Minimum value: 710 - 310.5 399.5 ppm =
Maximum value: 730 - 300.4 429.6 ppm   =
Cue:
Comments:
Page 10 of 13
 
PERFORMANCE INFORMATION JPM Number:     JPM-A4R STEP                   PERFORMANCE                                    STANDARD
: 15.     11. Record ANY of the following:         I
* Examinee records RCS boron at the                     y
* RCS boron concentration at the time       time of the Reactor trip as 670 ppm.
of the reactor trip                     (Due to Station Blackout, RCS boron
_ _ _ ppm at time of Rx trip             at the tinme of the trip must be the
* RCS boron sample results obtained         same as RCS boron results recently from Chemistry                           obtained from Chemistry.)
_ _ _ ppm from Chemistry           I
* Examinee records RCS boron sample                     y sample                                   results obtained from Chemistry sample as 670 ppm. (Obtained from Initial Cond Cue:
Comments:
: 16.      12. CHECK RCS boron concentration           Examinee compares the Xenon Corrected                     y greater than Xenon Corrected Required   Required Shutdown Boron Concentration Shutdown Boron concentration.           calculated in step 10 with the present RCS boron concentration and determines that the present RCS boron concentration is greater than Xenon Corrected Required Shutdown Boron concentration (Le.,
Shutdown Margin is satisfied.); therefore, Emeraencv Boration is NOT Com TERMINATION CUE: The evaluation for this JPM is concluded.
                                                                                                  .:e.C!T.*.*"da 1MiltE" }i0 .%
                                                                                                      ~~! Wf;' :;rJ,-:;!'~;'0'~' ;~{E~. ' - - - -
Page 11 of 13
 
JPM-A4R                          Rev.        o JPM Number:
                                                                          -----
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No   X
                                --
Validated Time (minutes):
Actual Time to Complete (minutes):
JPM Work Practice Evaluation:                 SAT         UNSAT           NA       (circle one)
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass I Fail and adherence requirements.
never put anyone's safety at risk.                                             Pass I Fail never put e_quipment reliability at risk.                                       Pass I Fail never violated radiological work practices.                                     Pass I Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for Improvement/Comments:
Page 12 of 13
 
, . JPM Number:                   JPM-A4R                            Rev.
                                                                          - - -
STUDENT HANDOUT Initial Conditions:
* Unit 2 has experienced a plant trip with a concurrent Station Blackout 30 minutes ago.
* Unit 2 had been operating at 100% power for one month prior to the trip.
* The crew is performing EOP 2530, Station Blackout.
* The BOP is making preparations to restore power to Unit 2 from the SBO Diesel when it becomes available.
* Tavg is being maintained at 532"F.
* Chemistry has determined present RCS Boron concentration is 670 ppm.
* Present Core Burnup is 6500 MWD/MTU.
* All CEAs are fully inserted.
Initiating Cues:
* The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied at this time.
* Additionally, if it is determined that SDM is NOT being satisfied, then calculate the amount of boric acid that must be added to the RCS.
Page 13 of 13
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:     Shift$taffitigBased on\~.all1if1i$tl'ative Requirements
    ..IPM Number:           JPM-A1.1S                         Revision:     1
                                                                          --
II. Initiated:
R. J. Ashey                                 9/15/2011 Developer                                      Date III. Reviewed:
Technical Reviewer                                  Date IV. Approved:
Cognizant Plant Supervisor (optional)                      Date Nuclear Training Supervisor                              Date Page 1 of 10
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 11/30/2011 Created JPM for LOIT 2011 NRC Exam 0/0 9/1512011 Revised JPM based on NRC comments.
OF CHANGES:
1/0 Page 2 of 10
All & DATE                   DESCRIPTION     REV/CHANGE 11/30/2011 Created JPM for LOIT 2011 NRC Exam     0/0 9/1512011 Revised JPM based on NRC comments. 1/0 Page 2 of 10
--------------------------------------
 
-----------------------Facility:
Facility:      MP-2                      Examinee:
MP-2 Examinee:
                                                    --------------------------------------
JPM JPM-A 1.1 S Rev. 1 Task Title:
JPM Number:                            JPM-A1.1 S                                Rev.            1
System: Conduct of Operations Time Critical Task: Yes No N Validated Time (minutes):
                  ----------------~----------
15 Task No.(s): N/A Applicable To: SRO X RO PEO KJA No. 2.1.5 KJA Rating 2.9/3.9 Method of Testing: Simulated Performance:
Task Title:         $hiftStafflngS~sedon Admini:strative~egUirefnents System:       Conduct of Operations Time Critical Task:             Yes                 N
X Actual Performance:
                                    - - No Validated Time (minutes):                     15 Task No.(s):                         N/A Applicable To:                   SRO     X       RO             PEO KJA No.                       2.1.5               KJA Rating       2.9/3.9 Method of Testing:
Simulated Performance:
                                    - -X- -          Actual Performance:
                                                                              ----
Location:
Location:
Classroom:
Classroom:           X               Simulator:                   In-Plant:
X Simulator:
              --....;,...:..-                    ------                    -------
In-Plant:
Task Standards:                        At the completion of this JPM, the SRO will determine who is fit for duty and can be called in for shift coverage when the on shift RO becomes incapacitated (cannot perform licensed activities).
Task At the completion of this JPM, the SRO will determine who is fit for duty and can be called in for shift coverage when the on shift RO becomes incapacitated (cannot perform licensed activities).
Required Materials                    Unit 2 Technical Specifications (procedures, equipment, etc.):        U-AA-700 (Rev. 4-00), Fatigue Management and Work Hour Limits for Covered Workers SY-AA-FFD-101 (Rev. 6-00), Fitness For Duty Operator Schedule (Handout)
Required Unit 2 Technical Specifications (procedures, equipment, U-AA-700 (Rev. 4-00), Fatigue Management and Work Hour Limits for Covered Workers SY-AA-FFD-101 (Rev. 6-00), Fitness For Duty Operator Schedule (Handout)
General  
General Unit 2 Technical Specifications, Administrative Section U-AA-700700 (Rev. 4-00), Fatigue Management and Work Hour Limits for Covered Workers SY-AA-FFD-101 (Rev. 6-00), Fitness For Duty * * *
 
==References:==
Unit 2 Technical Specifications, Administrative Section U-AA-700700 (Rev. 4-00), Fatigue Management and Work Hour Limits for Covered Workers SY-AA-FFD-101 (Rev. 6-00), Fitness For Duty
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide cues. When you complete the task successfully, the objective for this job performance will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in Control Room, including logs. Make all written reports, oral reports, alarm and log entries as if the evolution was actually being Page 3 of 10 Initial Conditions:
Page 3 of 10
* The plant is in MODE 1 and stable at 100% power Initiating Cues: Available Operator 1 Operator 2 Operator 3 Operator 4 Operator 5 The crew began its 12 hour shift at 1800 Current time and Date is 1830 on Wednesday, October 5, 2011. The Balance of Plant Operator has become ill early (1830) on his last night of Night Shift and has been sent home, which places the shift below minimum staffing levels. (Prior to the BOP becoming ill, the crew was at minimum staffing.) You are the Night Crew Shift Manager. Based on Administrative requirements, determine the following from the attached list of available operators: How soon must a relief be found? From the list provided, who is immediately eligible to assume shift duties? For those who are NOT eligible, what is the reason? NO other Shift Managers are available to assist with your decision. All other qualified operators are unavailable.
 
Response "I came in for Work Control coverage at 0600 this morning for 8 hours today and I'm scheduled for vacation tomorrow.
Initial Conditions:
My plans fell through, so I can easily reschedule my vacation.
* The plant is in MODE 1 and stable at 100% power
If you really need someone, I could probably be there in about 30 minutes." . "It's the last day of my SeVE!n days off. We just got back from Atlantic City, New Jersey, a half hour ago. I only got a few hours of sleep while my wife drove. I really don't want to come in, but I can be there in about an hour if in a bind." "I've been on day shift for the last few days, including a makeup day of Training yesterday.
* The crew began its 12 hour shift at 1800
I'm on vacation for a couple of days starting tomorrow.
* Current time and Date is 1830 on Wednesday, October 5, 2011.
I don't have plans for vacation, so I can be there in about an hour or so." "I'm on the last day of my seven days off. I had a couple of beers with dinner, but I'll come in if you want me to. It usually takes me 50 minutes to get to work, but I can be there in about 35 minutes, if I hurry and there's no traffic." ''I'm scheduled to come in tomorrow night for my first night of midnights.
* The Balance of Plant Operator has become ill early (1830) on his last night of Night Shift and has been sent home, which places the shift below minimum staffing levels. (Prior to the BOP becoming ill, the crew was at minimum staffing.)
I'm just getting over a pretty nasty coOld and I'd don't want to infect anyone, but, if you really need me, I'll come in. I just took a double dose of Nyquil about an hour ago, so I don't feel too bad right now. I can be there in about an hour. I just need to jump in the shower to wake up a little before I leave." See Operator Schedules on next page. Simulator N/A Reguirements: * *
Initiating Cues:
* NOTES TO EVALUATOR * * *
* You are the Night Crew Shift Manager.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during performance of this JPM (in-plant Page 4 of 10 Operator Wed Thurs Fri Sat Sun Mon Tues Wed Thurs Fri Sat Sun Mon Tues Wed 9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8 10/9 10/10 10/11 10/12 #1 Day OFF OFF OFF Day Day Day we Vac. Vac. Night Night Night OFF OFF (12) (12) (12) (0600-(6) (12) (6) 1400) #2 Day OFF OFF I OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (6) (12) (12) (12)
* Based on Administrative requirements, determine the following from the attached list of available operators:
(6) #3 OFF Day Day Day Day Day T OFF Vac. Vac. OFF OFF Night Night Night (12) (12) (12) (12) (12) (6) (12) (12) #4 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12)
o How soon must a relief be found?
(6) #5 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night -Night OFF OFF ____ (12) (12)
o From the list provided, who is immediately eligible to assume shift duties?
_
o For those who are NOT eligible, what is the reason?
_ (6)_._._.--.... _.... -.... -_ .... _ .... _ .... _ .. -_ .... _.... _ .... _... Day (12) =12 hour Day WC = Work Night (12) =12 Hour Night Night (6) =6 hours on the first evening or last morning of Night T (8) =8 hours of OFF = Scheduled day Vac. =
* NO other Shift Managers are available to assist with your decision.
Page 5 of 10
* All other qualified operators are unavailable.
------PERFORMANCE JPM JPM-A1.1S Rev. _1_.. Shift Staffing Based on STEP STANDARD STARTTJMEf y1 How soon must a relief be found? Examinee determines that another RO Determines from Technical report within 2 hours Specifications Section 6.2 Table 6.2-1, Specifications, Table that the crew composition may be than minimum requirements for a of time not to exceed 2 hours in order Cue: * *....
Available                                                  Response Operator 1        "I came in for Work Control coverage at 0600 this morning for 8 hours today and I'm scheduled for vacation tomorrow. My plans fell through, so I can easily reschedule my vacation. If you really need someone, I could     .
* .  
probably be there in about 30 minutes."
"'; '. Comments: 2 . I From the list provided, who is eligible ,-Examinee refers to the list of available Y to assume shift operators, reviews their responses, and determines that, although Operator 2 may NOT want to work a 12 hour shift, he/she is the only individual eligible to assume shift duties without condition.
                                                                                                              .
Cue: lit to contact answer; the phoni.:or.reply to the page. -''.' , ," " Comments:
Operator 2        "It's the last day of my SeVE!n days off. We just got back from Atlantic City, New Jersey, a half hour ago. I only got a few hours of sleep while my wife drove. I really don't want to come in, but I can be there in about an hour if y~'re_ in a bind."
Page 6 of 10 PERFORMANCE JPM JPM-A 1.1 S Rev. Shift Administrative Reguiref!le!:!ts_
Operator 3        "I've been on day shift for the last few days, including a makeup day of Training yesterday. I'm on vacation for a couple of days starting tomorrow. I don't have plans for vacation, so I can be there in about an hour or so."
STEP STANDARD 3. For those who are NOT eligible, what
Operator 4        "I'm on the last day of my seven days off. I had a couple of beers with dinner, but I'll come in if you want me to. It usually takes me 50 minutes to get to work, but I can be there in about 35 minutes, if I hurry and there's no traffic."
* Examinee determines that Operator #1 is I Y is the reason? NOT eligible because he/she would NOT have a break of at least 10 hours between work periods. He/she would also exceed more than 16 work hours in a rolling 24 hour period. (LI-AA-700, step 3.3.1) Examinee determines that Operator #3 is Y NOT eligible because he/she would work more than 72 hours in a 7 day period. AA-700, step 3.3.1) Examinee determines that Operator #4 is Y NOT eligible due to the consumption of alcoholic beverages within the past 5 hours. (SY-AA-FFD-101, step 3.19) Examinee determines that Operator #5 is Y NOT eligible due to the use of counter medication that may affect his/her ability to perform required duties. FFD-1 01, step 3.19)
Operator 5        ''I'm scheduled to come in tomorrow night for my first night of midnights. I'm just getting over a pretty nasty coOld and I'd don't want to infect anyone, but, if you really need me, I'll come in. I just took a double dose of Nyquil about an hour ago, so I don't feel too bad right now. I can be there in about an hour. I just need to jump in the shower to wake up a little before I leave."
See Operator Schedules on next page.
Simulator                 N/A Reguirements:
                                        * *
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations   (Le. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 10
 
Operator Wed Thurs Fri                     Sat     Sun     Mon     Tues   Wed   Thurs Fri                               Sat Sun Mon Tues Wed 9/28 9/29 9/30             10/1     10/2     10/3     10/4   10/5   10/6 10/7 10/8 10/9 10/10 10/11 10/12
    #1         Day       OFF       OFF     OFF     Day     Day       Day     we     Vac.         Vac.               Night             Night     Night             OFF     OFF (12)                                 (12)     (12)     (12)  (0600-                                           (6)         (12)         (6) 1400)
    #2         Day       OFF     OFF   I OFF     OFF     OFF       OFF   OFF   Night     Night                   Night             Night     Night             OFF     OFF (12)                                                                    (6)           (12)                   (12)           (12)       (6)
    #3         OFF       Day       Day     Day     Day     Day         T     OFF   Vac.         Vac.                     OFF           OFF       Night             Night Night (12)     (12)     (12)   (12)     (12)       (8)                                                                            (6)           (12)   (12)
    #4         Day       OFF     OFF     OFF     OFF     OFF       OFF   OFF   Night     Night                   Night             Night     Night             OFF     OFF (12)                                                                   (6)           (12)                   (12)           (12)
                                                                                                                                                -
(6)
    #5         Day       OFF     OFF     OFF     OFF     OFF       OFF   OFF   Night     Night                   Night Night Night                             OFF     OFF (12)                                                         _._._.- __ ~61 __ - .... _(12)
                                                                                                      .... - .... - _ .... _ _ _ - _ J~2! _ _ _ _ _ -
(12)
                                                                                                                              .... .... ..         ....
(6)
                                                                                                                                                        .... .... ... ~.--.--
                                                                                                                                                                              --
          =
Day (12) 12 hour Day Shift WC = Work Control
          =
Night (12) 12 Hour Night Shift
          =
Night (6) 6 hours on the first evening or last morning of Night Shift
      =
T (8) 8 hours of Training OFF = Scheduled day off Vac. = Vacation Page 5 of 10
 
PERFORMANCE INFORMATION JPM Number:          JPM-A1.1S                                                                             Rev. _1_.
Shift Staffing Based on AdministrativeR~quirerrients STEP                     PERFORMANCE                                      STANDARD STARTTJMEf
                                                                                                                        ------
: 1.        How soon must a relief be found?             Examinee determines that another RO must            y Determines from Technical                     report within 2 hours (Technical Specifications Section 6.2 Table 6.2-1,       Specifications, Table 6.2-1).
that the crew composition may be less than minimum requirements for a period of time not to exceed 2 hours in order to Cue:
              * *. . 6~'1liriO~~~~r~a~~~itl1!$s.*for'outy RrQg~am~'.D*~A~*~&#xa3;~5.
              * . OPEu~tQ~'*S.~tJEf~iije{a~cbed hal11out~'****~.,,',* "'; '.
Comments:
: 2.     I From the list provided, who is eligible ,-       Examinee refers to the list of available         Y to assume shift duties?                          operators, reviews their responses, and determines that, although Operator 2 may NOT want to work a 12 hour shift, he/she is the only individual eligible to assume shift duties without condition.
Cue: lit the~xami~e~.~~~rn.Pts to contact other;'a~~i~i~l1al'.indiv!ti~als,~il1(or.n-lliin1herthat none9t!tJ'i~liji!Will answer; the phoni.:or.reply to the page. - ' ' . '                         , ,"                       "
Comments:
Page 6 of 10
 
PERFORMANCE INFORMATION JPM Number:      JPM-A1.1 S                                                                       Rev.
Shift Staffing~~~_d_on Administrative Reguiref!le!:!ts_ .~._
STEP                 PERFORMANCE                                  STANDARD
: 3.     For those who are NOT eligible, what
* Examinee determines that Operator #1 is I       Y is the reason?                             NOT eligible because he/she would NOT have a break of at least 10 hours between work periods. He/she would also exceed more than 16 work hours in a rolling 24 hour period. (LI-AA-700, step 3.3.1)
* Examinee determines that Operator #3 is         Y NOT eligible because he/she would work more than 72 hours in a 7 day period. (LI AA-700, step 3.3.1)
* Examinee determines that Operator #4 is         Y NOT eligible due to the consumption of alcoholic beverages within the past 5 hours. (SY-AA-FFD-101, step 3.19)
* Examinee determines that Operator #5 is         Y NOT eligible due to the use of over-the counter medication that may affect his/her ability to perform required duties. SY-AA FFD-1 01, step 3.19)
Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 7 of 10
Page 7 of 10
-----JPM Number: JPM-A1.1S Rev. 1 VERIFICATION OF JPM COMPLETION Date Performed:
 
Student: Evaluator:
Rev.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
JPM Number:                     JPM-A1.1S
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes Validated Time (minutes):
                                                                          - - -
Actual Time to Complete (minutes):
VERIFICATION OF JPM COMPLETION Date Performed:
No X 15 Overall Result of JPM: SAT UNSAT (circle one) Areas for ImprovemenVComments:
Student:
Page 8 of 10 Rev. ___1___JPM JPM-A1.1S STUDENT HANDOUT Initial Conditions:
Evaluator:
* The plant is in MODE 1 and stable at 100% power Initiating Cues: Available Operator 1 Operator 2 Operator 3 Operator 4 Operator 5 The crew began its 12 hour shift at 1800 Current time and Date is 1830 on Wednesday, October 5, 2011. The Balance of Plant Operator has become ill early (1830) on his last night of Night Shift and has been sent home, which places the shift below minimum staffing levels. (Prior to the BOP becoming ill, the crew was at minimum staffing.) You are the Night Crew Shift Manager. Based on Administrative requirements, determine the following from the attached list of available operators: How soon must a relief be found? From the list provided, who is immediately eligible to assume shift duties? For those who are NOT eligible, what is the reason? NO other Shift Managers are available to assist with your decision. All other qualified operators are unavailable.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Response "I came in for Work Control coverage at 0600 this morning for 8 hours today and I'm scheduled for vacation tomorrow.
Time Critical Task?       Yes           No    X
My plans fell through, so , can easily reschedule my vaca!ion.
                              -
If you really need someone, I could probably be there in about 30 minutes." "It's the last day of my seven days off. We just got back from Atlantic City, New Jersey, a half hour ago. I only got a few hours of sleep while my wife drove. I really don't want to come in, but I can be there in about an hour if you're in a bind.>> "I've been on day shift for the last few days, including a makeup day of Training yesterday.
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
I'm on vacation for a couple of days starting tomorrow.
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
I don't have plans for vacation, so I can be there in about an hour or so." "I'm on the last day of my seven days off. I had a couple of beers with dinner, but I'll come in if you want me to. It usually takes me 50 minutes to get to work, but I can be there in about 35 minutes, if I hurry and there's no traffic." "I'm scheduled to come in tomorrow night for my first night of midnights.
Areas for ImprovemenVComments:
I'm just getting over a pretty nasty cold and I'd don't want to infect anyone, but, if you really need me, I'll come in. I just took a double dose of Nyquil about an hour ago, so , don't feel too bad right now. 'can be there in about an hour. I just need to jump in the shower to wake up a little before I leave." (See Operator Schedule on next page) Page 9 of 10 JPM Number: JPM-A1.1S Rev. 1 Operator Schedule Operator Wed Thurs Fri Sat Sun Mon Tues Wed Thurs Fri Sat Sun Mon Tues Wed 9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8 10/9 10/10 10/11 10/12 #1 Day OFF OFF OFF Day Day Day we Vac. Vac. Night Night Night OFF OFF (12) (12) (12) (12) (6) (12) (6) 1400) #2 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6) -#3 OFF Day Day Day Day Day T OFF Vac. Vac. OFF OFF Night Night Night (12) (12) (12) (12) (12) (8) (6) (12) (12) #4 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6) #5 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6) Day (12) = 12 hour Day Shift WC =Work Control Night (12) = 12 Hour Night Shift Night (6) =6 hours on the first evening or last morning of Night Shift T (8) =8 hours of Training OFF = Scheduled day off Vac. =Vacation Page 10 of 10 T JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: ..IPM Number: JPM-A1.2S Revision:
Page 8 of 10
1II. Initiated:
 
R. J. Ashey Developer 9/14/2011 Date III. Reviewed:
JPM Number:                        JPM-A1.1S                           Rev. ___1_ __
Technical Reviewer Date IV. Approved:
STUDENT HANDOUT Initial Conditions:
Cognizant Plant Supervisor (optional)
* The plant is in MODE 1 and stable at 100% power
Date Nuclear Training Supervisor Date Page 1 of 8 JOB PER.FORMANCE MEASURE  
* The crew began its 12 hour shift at 1800
* Current time and Date is 1830 on Wednesday, October 5, 2011.
* The Balance of Plant Operator has become ill early (1830) on his last night of Night Shift and has been sent home, which places the shift below minimum staffing levels. (Prior to the BOP becoming ill, the crew was at minimum staffing.)
Initiating Cues:
* You are the Night Crew Shift Manager.
* Based on Administrative requirements, determine the following from the attached list of available operators:
o How soon must a relief be found?
o From the list provided, who is immediately eligible to assume shift duties?
o For those who are NOT eligible, what is the reason?
* NO other Shift Managers are available to assist with your decision.
* All other qualified operators are unavailable.
Available                                              Response Operator 1      "I came in for Work Control coverage at 0600 this morning for 8 hours today and I'm scheduled for vacation tomorrow. My plans fell through, so , can easily reschedule my vaca!ion. If you really need someone, I could probably be there in about 30 minutes."
Operator 2      "It's the last day of my seven days off. We just got back from Atlantic City, New Jersey, a half hour ago. I only got a few hours of sleep while my wife drove. I really don't want to come in, but I can be there in about an hour if you're in a bind.>>
Operator 3      "I've been on day shift for the last few days, including a makeup day of Training yesterday. I'm on vacation for a couple of days starting tomorrow. I don't have plans for vacation, so I can be there in about an hour or so."
Operator 4      "I'm on the last day of my seven days off. I had a couple of beers with dinner, but I'll come in if you want me to. It usually takes me 50 minutes to get to work, but I can be there in about 35 minutes, if I hurry and there's no traffic."
Operator 5      "I'm scheduled to come in tomorrow night for my first night of midnights. I'm just getting over a pretty nasty cold and I'd don't want to infect anyone, but, if you really need me, I'll come in. I just took a double dose of Nyquil about an hour ago, so , don't feel too bad right now. 'can be there in about an hour. I just need to jump in the shower to wake up a little before I leave."
(See Operator Schedule on next page)
Page 9 of 10
 
JPM Number:                   JPM-A1.1S                           Rev.       1 Operator Schedule Operator       Wed     Thurs Fri           Sat     Sun     Mon       Tues     Wed   Thurs Fri   Sat   Sun Mon Tues Wed 9/28     9/29 9/30         10/1     10/2     10/3     10/4   10/5   10/6 10/7   10/8 10/9 10/10 10/11 10/12
    #1         Day     OFF     OFF     OFF     Day     Day       Day     we   Vac. Vac. Night Night Night OFF   OFF (12)                               (12)     (12)     (12)   (0600                (6) (12) (6) 1400)
    #2         Day     OFF     OFF     OFF     OFF     OFF       OFF     OFF   Night Night Night Night Night OFF   OFF (12)                                                                   (6)   (12) (12) (12) (6)
                                                                                                                            -
    #3         OFF     Day       Day     Day     Day     Day         T     OFF   Vac. Vac. OFF   OFF   Night Night Night (12)     (12)   (12)     (12)     (12)       (8)                                   (6) (12)   (12) 1--
    #4         Day     OFF     OFF     OFF     OFF     OFF       OFF     OFF   Night Night Night Night Night OFF   OFF (12)                                                                   (6) (12)   (12) (12) (6)
    #5         Day     OFF     OFF     OFF     OFF     OFF       OFF     OFF   Night Night Night Night Night OFF   OFF (12)                                                                   (6) (12)   (12) (12) (6)
Day (12) = 12 hour Day Shift
      =
WC Work Control Night (12) = 12 Hour Night Shift
          =
Night (6) 6 hours on the first evening or last morning of Night Shift
      =
T (8) 8 hours of Training OFF = Scheduled day off Vac. =Vacation Page 10 of 10
 
T JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
      ..IPM Number:           JPM-A1.2S                 Revision:     1
                                                                    --
II. Initiated:
R. J. Ashey                         9/14/2011 Developer                            Date III. Reviewed:
Technical Reviewer                         Date IV. Approved:
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor                   Date Page 1 of 8
 
JOB PER.FORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All &DATE 2006-317 9/14/2011 DESCRIPTION Update JPM to include HUP evaluations and new format Revised to include NRC comments.
OF CHANGES:
REV/CHANGE 1/0 Page 2 of 8
All & DATE                     DESCRIPTION                      REV/CHANGE 2006-317     Update JPM to include HUP evaluations and new format 9/14/2011    Revised to include NRC comments.                         1/0 Page 2 of 8
.JPM Number: JPM-A1.2S Rev. ___1......--.
 
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
.JPM Number:                         JPM-A1.2S                             Rev. ___1......--.__
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
__ Examinee:
Facility:     _M~P.;;:..2_ _          Examinee:
JPM Number: JPM-A1.2S Rev. 1Task Title: System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes):
JPM Number:                           JPM-A1.2S
Task No.(s): __________
                                                    -----------------------------------
_ Applicable To: SRO KiA No. 2.2.14 Method of Testing: Simulated Performance:
Rev.           1
Location:
                                                                                      -----
Classroom:
Task Title:
X Task Standards:
System:         Auxiliary Feedwater Time Critical Task:         Yes           No     x Validated Time (minutes):
Required Materials (procedures, equipment.
Task No.(s): _ _ _ _ _ _ _ _ _ __
etc.): General  
Applicable To:               SRO       X        RO              PEO KiA No.                   2.2.14               KiA Rating        3.9/4.3 Method of Testing:
Simulated Performance:                             Actual Performance:        X Location:
Classroom:            X            Simulator:                  In-Plant:
Task Standards:                     At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why.
Required Materials
* The following P&ID's (procedures, equipment. etc.):
o 25203-26005 SH.3, Condensate Storage and Aux Feed),
o 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)
* OP 2354G, Draining the Auxiliary Feedwater System
* OP-AA-200 (Equipment Clearance)
General  


==References:==
==References:==
RO KiA Rating Actual Performance:
* OP-AA-200 (Equipment Clearance)
X In-Plant:
                                    * * *
At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why. The following P&ID's 25203-26005 SH.3, Condensate Storage and Aux Feed), 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4) OP 2354G, Draining the Auxiliary Feedwater System OP-AA-200 (Equipment Clearance) OP-AA-200 (Equipment Clearance) * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Page 3 of 8
 
------JPM Number:
JPM Number:                        JPM-A1.2S                              Rev.          1
Rev. 1 JOB PERFORMANCE MEASURE WORKSHEET (continued)
                                                                                ------
Initial Conditions: Unit 2 is in Mode 5 There is evidence of leak-by of 2-FW-8B, the "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve. A tag clearance to accomplish the inspection has been prepared on the tagging computer, which is NOT available now. Initiating Cues: Your task is to review the printed Tag Clearance and determine if it can be approved and authorized as written. If the Tag Clearance cannot be approved and authorized as written, determine the changes required to approve and authorize Tag Clearance Sheet. Simulator
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* N/A Reguirements: * *
Initial Conditions:
* NOTES TO EVALUATOR * * *
* Unit 2 is in Mode 5
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: STEP 1 . OP-AA-200 "Equipment Clearance" 3.2.3c. REVIEW the completed Tagging Record for accuracy and completeness, referencing controlled documents as necessary.
* There is evidence of leak-by of 2-FW-8B, the "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
The reviewing SRO or designee shall: ENSURE that the tag-out is adequate for the tasks and hazards involved. ENSURE that the proper sequence of component alignment and tag placement is specified. ENSURE that the appropriate entries have been made in the comment section of the Tagging Record. DETERMINE if support is required from Maintenance Personnel to execute the out. Cue: Examinee reviews the completed N Tagging Clearance for accuracy and completeness, using the following controlled drawings: 25203-26005 SH.3, Storage and Aux 25203-30005 Single Line Meter Relay Diagram 4.16KV Buses 24C,24D yExaminee identifies that the incorrect 4160 VAC breaker (A307) is Red Tagged and that the correct breaker (A406) is required to be Red Tagged in the "Racked Down" position. Examinee identifies that 2-FIRE-94B, y "B" AUX FEED PUMP EMERGENCY FIRE WATER SUPPLY VALVE" has been incorrectly omitted from the tagging sheet and that this valve is required to be Red Tagged in the "Closed" position.
* Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
yExaminee determines that this tag clearance CANNOT be approved or authorized as written for the task to be performed.
* A tag clearance to accomplish the inspection has been prepared on the tagging computer, which is NOT available now.
Comments:
Initiating Cues:
I.
* Your task is to review the printed Tag Clearance and determine if it can be approved and authorized as written.
* Examinee may determine that only one casing vent valve one header drain valve (2-CN-331 or 2-CN-332).
o If the Tag Clearance cannot be approved and authorized as written, determine the changes required to approve and authorize Tag Clearance Sheet.
At least one casing vent valve and one header drain valve must be tagged open. Examinee may desire to tag open the motor heater breaker for "B" MDAFW pump. This is NOT necessary, but may be considered for the clearance. (See Answer Key) Page 5 of 8 PERFORMANCE JPM Number: STEP PERFORMANCE STANDARD TERMINATION CUE: The evaluation for this JPM is concluded.
Simulator
Page 6 of 8
* N/A Reguirements:
-----JPM Number: JPM-A1.2S Rev. 1 VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
                                  * *
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes Validated Time (minutes):
* NOTES TO EVALUATOR * * * *
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ~ critical steps must be completed correctly.
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 3. If necessary, question the student for details of simulated actions/observations   (Le. "What are you looking at?" or "What are you observing?").
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Page 4 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                                  STANDARD
: 1.     OP-AA-200 "Equipment Clearance"
* Examinee reviews the completed            N Tagging Clearance for accuracy and 3.2.3c. REVIEW the completed Tagging             completeness, using the following Record for accuracy and                 controlled drawings:
completeness, referencing                o 25203-26005 SH.3, Condensate controlled documents as necessary.          Storage and Aux Feed The reviewing SRO or designee            o 25203-30005 Single Line Meter &
shall:                                      Relay Diagram 4.16KV Emerg.
* ENSURE that the tag-out is                Buses 24C,24D (A3,A4 adequate for the tasks and
* Examinee identifies that the incorrect     y hazards involved.                    4160 VAC breaker (A307) is Red
* ENSURE that the proper                Tagged and that the correct breaker sequence of component                (A406) is required to be Red Tagged in alignment and tag placement is        the "Racked Down" position.
specified.
* Examinee identifies that 2-FIRE-94B,       y
* ENSURE that the appropriate            "B" AUX FEED PUMP EMERGENCY entries have been made in the        FIRE WATER SUPPLY VALVE" has comment section of the Tagging        been incorrectly omitted from the Record.                              tagging sheet and that this valve is
* DETERMINE if support is                required to be Red Tagged in the required from Maintenance            "Closed" position.
Personnel to execute the tag
* Examinee determines that this tag         y out.                                  clearance CANNOT be approved or authorized as written for the task to be performed.
Cue:
Comments: I. Examinee may determine that only one casing vent valve one header drain valve (2-CN-331 or 2-CN-332). At least one casing vent valve and one header drain valve must be tagged open.
* Examinee may desire to tag open the motor heater breaker for "B" MDAFW pump. This is NOT necessary, but may be considered for the clearance. (See Answer Key)
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP     PERFORMANCE                           STANDARD TERMINATION CUE: The evaluation for this JPM is concluded.
Page 6 of 8
 
JPM Number:                     JPM-A1.2S                         Rev.
                                                                          - - -
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes             No    X
                                -
Validated Time (minutes):                   10 min.
Actual Time to Complete (minutes):
Actual Time to Complete (minutes):
No X 10 min. JPM Work Practice Evaluation:
JPM Work Practice Evaluation:                   SAT        UNSAT          NA        (circle one)
Overall Result of JPM: SAT SAT UNSAT UNSAT NA (circle one) (circle one) During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.
Overall Result of JPM:                         SAT         UNSAT                     (circle one)
never put anyone's safety at risk. Pass I Fail never-'put equipment reliability at risk. Pass I Fail never violated radiological work practices.
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass I Fail and adherence requirements.
Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:
never put anyone's safety at risk.                                             Pass I   Fail never-'put equipment reliability at risk.                                       Pass I   Fail never violated radiological work practices.                                     Pass I   Fail demonstrated effective use of event-free human performance tools.               Pass I   Fail Areas for Improvement/Comments:
Page 7 of 8 JPM Number:
Page 7 of 8
Rev. ___. Initial Conditions:
 
Initiating Cues: STUDENT HANDOUT Unit 2 is in Mode 5 There is evidence of leak-by of 2-FW-8B, the "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve. Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve. A tag clearance to accomplish the inspection has been prepared on the tagging computer, which is NOT available now. Your task is to review the printed Tag Clearance and determine if it can be approved and authorized as written. If the Tag Clearance cannot be approved and authorized as written, determine the changes required to approve and authorize Tag Clearance Sheet. Page 8 of 8 SeCtion CovefSheet " 'Tagout: 2C2:1. iSeCtion:
JPM Number:                 JPM-A1.2S                          Rev. _~_1___.
2322X00-OO2A Component to be Worked 2-FW-8B Millstriiiestation
STUDENT HANDOUT Initial Conditions:
:1.0/03/:1.:1.
* Unit 2 is in Mode 5
:1.935 2_TB _00106_ AFRV AREA_ Notes: Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructionsl Cautions:
* There is evidence of leak-by of 2-FW-8B, the "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
* Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
* A tag clearance to accomplish the inspection has been prepared on the tagging computer, which is NOT available now.
Initiating Cues:
* Your task is to review the printed Tag Clearance and determine if it can be approved and authorized as written.
o If the Tag Clearance cannot be approved and authorized as written, determine the changes required to approve and authorize Tag Clearance Sheet.
Page 8 of 8
 
SeCtion CovefSheet                                 Millstriiiestation
'Tagout: " 2C2:1.
iSeCtion: 2322X00-OO2A                                                                                     :1.0/03/:1.:1. :1.935 Component to be Worked 2-FW-8B 2_TB       _00106_ AFRV AREA_
Notes:
Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructionsl Cautions:
Additional Information:
Additional Information:
25203-26005 SH.3, Condensate Storage and Aux Feed '25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4) Section Attributes:
25203-26005 SH.3, Condensate Storage and Aux Feed
Work Order List: "Number I Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:
'25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)
Status Prepare<:! " Approve<:!
Section Attributes:
* Authorized Work Released To Clear System Restored Description Pre.pare.d
Work Order List:
[3y: , ApprovedBy: , Aythorized By: , yY(JrkReleaseg E3Y: : Authorize Tags to clear: Restoration Complete Name "Qualified Qperator ll .1 .. "Ihi:iMornif'\g'f JPM-Al.2S JPM-Al.2S ANSWER Section Coversheet Millstone Station ragout: 2C21 Section: 2322X00-002A Tag Tag Equipment Pia Placement Place. 1st Ver; Pia Restoration ,Serial, Type Seq :Configuration Verif Req
"Number I Equipment ID                                                 Description 2-FW-SB                     Perform Check Valve Inspection Section Verification:
____ _ No.
Status                         Description                        Name Prepare<:!                 Pre.pare.d[3y:                           "Qualified Qperatorl l .1 . "Ihi:iMornif'\g'f
* Equipment Description  
" Approve<:!                  , ApprovedBy:
*-Notes---------. Time/Date
* Authorized                , Aythorized By:
* Notes ,* Equipment Yellow ,P9B-HS 1
Work Released            , yY(JrkReleaseg E3Y:
* HANDSWITCH FOR "B" l* BREAKER RACKED AUXIUARY FEEDWATER PUMP DOWN* 2_CB _03606_ CNTRl RM COS Red A 406 IV 2 !RACKED DOWN 'RACKED UP r -----------
To Clear                  : Authorize Tags to clear:
...-,------'----'-----,
System Restored            Restoration Complete ANSWERKEY JPM-Al.2S JPM-Al.2S                                                                                                       Page~~of3J
* 4.I6KV This is the correct FEEDWATER PUMP 2405-2 breaker to be Red
 
* 2_TB _OS606_UPR_
ANSWER KEY                                                                                                                  ~
tagged for "B" SWGR_SUS 240' AFWPump.lted 3 :CLOSED 2 OPEN * "6" AUX FEED PUMP STOP IV 3 !CLOSED  
Section Coversheet                                                                       Millstone Station ragout: 2C21 Section: 2322X00-002A                                                                                                                                                                         10/03/111935 Tag       Tag     Equipment                                             Pia Placement                             Place. 1st Ver; Pia Restoration                                 As Left  . Rest. 1st Rest. 2nd
* "S" AUX FEED PUMP RECIRCULATION STOP .
,Serial, Type                                                                 Seq :Configuration                           Verif   Req :Seq'~'!~~!.I!c.!!.i~.!1____ _               Configuration; Verif , Verif No.
* 2_TB 00 Red 2-(N-29B IV 3 !CLOSED 2 'OPEN--------_.
* Equipment Description                                 *-Notes---------.                     Time/Date
* "B" AUX FEED PUMP
* Notes                                               Ttme/DateTime/Dat~
* 2_TB _00106_AFW RM Red 2-FiRE=94S' ...
                      ,*   Equipment Location Yellow   ,P9B-HS                                                 1 ;N/A                                                                                                'N/A
tv 3 :CLOSED 2 CLOSED * "B" AUX FEED PUMP EMERGEN r i suction valve that FIRE WATER SUPPLY VALVE must be Red
* HANDSWITCH FOR "B"                                   ~----.----------.
* 2_TB _00106_ AFW RM i l i Red  
l*   BREAKER RACKED AUXIUARY FEEDWATER PUMP DOWN
.. ****Ti\!*r*
* 2_CB     _03606_ CNTRl RM COS Red         A 406                                           IV   2 !RACKED DOWN r - - - - - - - - - - - ...-,------'----'-----,
1 /CLOSED/CAPPED , 1 I i *"6" AUXfEEQPUMP CASING j I ; VENTVALVE.  
                                                                                                                                              'RACKED UP
.'. ..*..*.. ..*...t I Ii ..w ****
* 4.I6KV 6REA~                                ~
..  
This is the correct FEEDWATER PUMP 2405-2                                                               breaker to be Red
.. __...______....._., ...._.................L. __......_,...._ ....._ .......................... lPM-A1.2S ANSWER KEY 10/03/111935 As Left . Rest. 1st Rest. 2nd Configuration; Verif , Verif
* 2_TB             _OS606_UPR_                                                         tagged for "B" SWGR_SUS 240' AFWPump.
'N/A :OPEN OPEN CLOSED 'cLOSED Page 2 of3 ANSWER Red '2-CN-329  
lted                                                             3 :CLOSED                                                 2 OPEN                                     :OPEN
* "S" AUX FEED PUMP CASING VENT VALVE _00106_ * "S" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE 2_TB _00106_ . "6" AUX FEED PUMP SUCTION HEADER DRAIN _00106_ 4 jOPEN/UNCAPPED 4 \OPEN/UNCAPPED ANSWER KEY Page 3 0'3 Sectit\n Coversheet Millstone Station Tagout: 2C21 Section: 2322X00-002A 10/03/111935 Component to be Worked: FOR TRAINING ONLY 2-FW-SB 2_TB _00106_ AFRV AREA_ Notes: Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions!
                                                                                                                                              ~--~-'-----------
Cautions:
                          * "6" AUX FEED PUMP DISCHARGE STOP VALVE IV   3 !CLOSED                                                                                             OPEN
                                                                                  ~---------------.
                          * "S" AUX FEED PUMP RECIRCULATION STOP VALVE
                      .*    2_TB      00I06_ABOVE
                                            ~"*:=~*'~*"~~;*~~,*r~*~+**"*~4."'~-"~"~'
Red         2-(N-29B                                       IV   3 !CLOSED                                                 2 'OPEN
                                                                                                --------_.
                          * "B" AUX FEED PUMP SUCTION ISOLATION
* 2_TB         _00106_AFW RM Red         2-FiRE=94S'                 ...
                                      ~~.' w****~***r tv                       3 :CLOSED                                                 2 CLOSED                                   CLOSED r
i
                          *   "B" AUX FEED PUMP EMERGEN suction valve that FIRE WATER SUPPLY VALVE                       l
* 2_TB           _00106_ AFW RM                   i     i                             must be Red Red      !i-CN:330****"*****~~**'"****          .. ****Ti\!*r* 4*jOP~N/UNCAPPED                                            1 /CLOSED/CAPPED                           'cLOSED
                      ,                                               1 I       i *"6" AUXfEEQPUMP CASING                       j     I I       ;     VENTVALVE.         .'. ..*..*.. ..*...t         I    I Ii . w **** _L~w~.~. .L~_3=]].::c'-~~.~;~.c:.L.::~~!E~=._::h~~L.~.J. ~_l__~ ..._~~___.~___....._., . . _........~.........L. __.. :.~...._,.... _ ..... _ ..........................
lPM-A1.2S                                                                                                         ANSWER KEY                                                                           Page 2 of3
 
                                                                            .
ANSWER KEY Red   '2-CN-329                       4 jOPEN/UNCAPPED
        * "S" AUX FEED PUMP CASING VENT VALVE
_00106_
4 \OPEN/UNCAPPED
        * "S" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
* 2_TB               _00106_
      . * "6" AUX FEED PUMP SUCTION HEADER DRAIN
_00106_
  .2S                                                  ANSWER KEY Page 3 0'3
 
Sectit\n Coversheet                               Millstone Station Tagout: 2C21 Section: 2322X00-002A                                                                       10/03/111935 Component to be Worked:
FOR TRAINING ONLY 2-FW-SB 2_TB     _00106_ AFRV AREA_
Notes:
Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions! Cautions:
Additional Information:
Additional Information:
25203-26005 SH.31 Condensate Storage and Aux 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D Section Attributes:
25203-26005 SH.31 Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)
Work Order List: Number I Equipment ID Description
Section Attributes:
Work Order List:
Number I Equipment ID                                               Description
:Section Verification:
:Section Verification:
Status Name Verification Date Prepared "This Mqrning" Approved Authorized Work Released To Clear System. Restored FOR TRAINING M-A12S ***Page4of3 FOR TRAINING ONLY Section Coversheet Millstone Station ragout: 2C21 .Section:
Status                                                           Name       Verification Date Prepared                                                                             "This Mqrning" Approved Authorized Work Released To Clear System. Restored FOR TRAINING ONLY M-A12S                                                                                       ***Page4of3
10/03/111935 Tag Tag Rest. 1st, Rest. 2nd Serial Type Configuration; Verif Verif No.
 
* Equipment Description . :Time/Dateiime/Datei
FOR TRAINING ONLY Section Coversheet                                                                   Millstone Station ragout: 2C21
* Equipment  
.Section: 2322X00-002A                                                                                                                                                        10/03/111935 Tag         Tag     Equipment                                                                                                                                                      Rest. 1st, Rest. 2nd Serial Type                                                                                                                                                         Configuration; Verif           Verif No.
&#xa5;ellow
* Equipment Description                                                                                                                   .               :Time/Dateiime/Datei
* HANDSWITCH FOR"B" AUXIUARY FEEDWATER _03606_ CNTRL ......
* Equipment location
* 4.16KV BREAKER P9A FEEDWATER PUMP 2_TB SWGR_BUS Red 2-FW-9B {CLOSED * "B" AUX FEED PUMP STOP 1* 2.3B '.. .
          &#xa5;ellow       'P9B-HS'"
RM j i. .1.. .' . '.i .. .. ,.. ...i .-..-......
* HANDSWITCH FOR"B" AUXIUARY FEEDWATER PUMP
..;
_03606_ CNTRL RM
__________
                                                                                                                  . . . "'~ '~'~-'~3~f~~~p~~i'~'~~~_ ~..
_-'I'W'l 3' .T CLOSED---"
                                                                                                                  ~~ ~                                                :RACKEDUP~~~~"~'
* "6" AUX FEED RECIRCULATION STOP
* 4.16KV BREAKER P9A AUXILAR&#xa5; FEEDWATER PUMP 24C~32
* 2_TB _ OOI06_ABOVE
* 2_TB                   _03106_L~
__  
SWGR_BUS 24C Red             2-FW-9B                                         3 {CLOSED
..
                          * "B" AUX FEED PUMP DISCHARGE STOP VALVE
... ...,....... 2-CN-29B ; 3 iClOSED 2 OPEN * "6" AUX FEED PUMP SUCTION ......, ....... ....  
      .'f{;d"~"'T1*2~fW:52C-    2.3B '.. . ...,OOl06~AFW RM j
... ..4  
                                            '~""-"'~~"""--~~-'~' -'I 'W'
******,--*':CLOSEO**********
: i. .1..       .'         . '. i                             ...i l 3' .TCLOSED ---" -..-.. ....
Red ! 2-CN-330 * "B" AUX FEED PUMP VENT I I FOR TRAINING ONLY Page 2 0'3 FOR TRAINING Red ,2-CN-329 lV 4 ,OPEN/UNCAPPED 1 CLOSED ,CLOSED * "8" AUX FEED PUMP CASING VENT VALVE
                                                                                              -~    ~      .,~-.,~ ... . .. ,..;
* 2_TB _00106_ Red e-CN-331 'lV 4 :OPEN/UNCAPPED  
                                                                                                                        ~~"        '-"-";-'2~"p!~ __________ _
* "8" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE _00106_ Red 2-CN-332 4 ;OPEN/UNCAPPED  
                                                                                ~---------------.
*"8" AUXFEEDPUMP SUCITON HEADER DRAIN
                          * "6" AUX FEED PUMP RECIRCULATION STOP VALVE
* 2_TB* I: FOR TRAINING ONLY JPM-Al.2S Page 3 of3 JOB PERFORMANCE MEASURE APPROVAL I. JPM Title: JPM Number: JPM-A2S Revision:
* 2_TB             _ OOI06_ABOVE =~~~.",.,+" __ "'_.+~ ..,_~,  ... ~.~...,.. . ..
1II. Initiated:
          ~ed            2-CN-29B                                       ; 3 iClOSED                                                   2 OPEN                       ;OPEN
R. J. Ashey Developer 09/14/2011 Date III. Reviewed:
                                                                                ~----~----~-----.
Technical Reviewer Date IV. Approved:
                          * "6" AUX FEED PUMP SUCTION ISOLATION
Cognizant Plant Supervisor (optional)
        ~ ......,.......;.*~ . . ~=I!l... ~~.,.. _,._-=~~!2~=~~.~M              ,
Date Nuclear Training Supervisor Date Page 1 of 8 JOB PERFORMANCE MEASURE  
Red            ! 2-CN-330                                          4 'iOPEN'iuN'CAPPED~"-~"'-'-""""""'-'-"~"""****J-i**~LOSEii'**--*******      ******,--*':CLOSEO**********
                          * "B" AUX FEED PUMP CASING VENT VALVE I
I JPM-Al.2S                                                                            FOR TRAINING ONLY                                                                                     Page 2 0'3
 
FOR TRAINING ONLY Red   ,2-CN-329                         lV 4 ,OPEN/UNCAPPED       1 CLOSED   ,CLOSED
            * "8" AUX FEED PUMP CASING VENT VALVE
* 2_TB             _00106_
Red   e-CN-331                         'lV 4 :OPEN/UNCAPPED
            * "8" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
_00106_
Red     2-CN-332                           4 ;OPEN/UNCAPPED
            * "8" AUXFEEDPUMP SUCITON HEADER DRAIN
* 2_TB*
I
:                                                     FOR TRAINING ONLY JPM-Al.2S                                                                                 Page 3 of3
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:             JPM-A2S                 Revision:     1
                                                                --
II. Initiated:
R. J. Ashey                         09/14/2011 Developer                            Date III. Reviewed:
Technical Reviewer                         Date IV. Approved:
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor                   Date Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 02/03/11 Created JPM for LOIT 2011 NRC Exam 0/0 9/1412011 Revised JPM to incorporate NRC comments.
OF CHANGES:
1/0 Page 2 of 8
All & DATE                   DESCRIPTION           REV/CHANGE 02/03/11 Created JPM for LOIT 2011 NRC Exam           0/0 9/1412011 Revised JPM to incorporate NRC comments. 1/0 Page 2 of 8
------------------------------------
 
----------------JPM Number: JPM-A2S Rev. ____1/_0__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                          JPM-A2S                                Rev. ____1/_0_ _
Facility:
JOB PERFORMANCE MEASURE WORKSHEET (continued)
MP-2 Examinee:
Facility:      MP-2                  Examinee:
JPM Number: JPM-A2S Rev. _____ System: Administrative Time Critical Task: Yes No X Validated Time (minutes):
                                                    ------------------------------------
15 Task Applicable To: SRO X RO KIA No. 2.2.40 KIA Rating 3.4/4.7 Method of Testing: Simulated Performance:
JPM Number:                           JPM-A2S                                     Rev. ___1~__
System:       Administrative Time Critical Task:     Yes                       X
                                --- No Validated Time (minutes):                   15 Task No.(s):
Applicable To:             SRO         X         RO             PEO KIA No.                 2.2.40                   KIA Rating       3.4/4.7 Method of Testing:
Simulated Performance:               X              Actual Performance:        X
                              -~~-                                          ----
Location:
Location:
Classroom:
Classroom:        X                Simulator:                    In-Plant:
X Task Standards:
                ----                            ---                        ------
Reguired Materials (procedures, equipment etc.): General  
Task Standards:                     At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and surveillancE~.
Reguired Materials
* Plant Technical Specifications Manual (procedures, equipment etc.):
* AOP-2556; CEA Malfunctions
* SP-2619A-001; Control Room Daily Surveillance, Mode 1 & 2 General  


==References:==
==References:==
 
* Plant Tel::hnical Specifications Manual
X Actual Performance:
X Simulator:
In-Plant:
At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and
* Plant Technical Specifications Manual
* AOP-2556; CEA Malfunctions
* AOP-2556; CEA Malfunctions
* SP-2619A-001; Control Room Daily Surveillance, Mode 1 & 2
                                    * * *
* Plant Tel::hnical Specifications Manual
* AOP-2556; CEA Malfunctions
* * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, wj1ich step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
* I will explain the initial conditions, wj1ich step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfiE~d. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Page 3 of 8
-----JPM Number: Rev. 1/0 JOB PERFORMANCE MEASURE WORKSHEET (continued)
 
Initial Conditions: The plant has just returned t0100% power after Control Valve Testing at 90% Group 7 CEAs were inserted 10 steps for the power reduction, but have all just been fully withdrawn, as indicated by the Core Mimic. As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7. CEA Pulse Counting, the Backup Scanner, and the Core Mimic aI/ tracked motion as designed. I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input to CEAPDS from CEA #1 is not capable of tracking motion of this CEA at this time. I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C-05, needs to be replaced with a spare from the warehouse. Testing and replacement will take approximately five (5) hours. Initiating Cues: You are the on-shift US. Determine what Tech Spec LCO(s) is (are) applicable and what ACTION(s) is (are) required.
JPM Number:                           JPM-A2S                              Rev.         1/0
Simulator NJA Requirements: * *
                                                                                ---        --
* NOTES TO EVALUATOR * * *
JOB PERFORMANCE MEASURE WORKSHEET (continued)
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve satisfactory grade, critical steps must be completed When the student states what hislher simulated action/observation would be, read appropriate If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: STEP 1 . Cue: Comments:
Initial Conditions:
Given a copy of the plant Technical Specifications Manual and, if requested, AOP 2556, CEA Malfunctions: Review the Initial Conditions and Initiating Cue. Review Tech. Specs. and, as needed, AOP 2556 for any required entries and additional surveillance reQuirements.
* The plant has just returned t0100% power after completing Control Valve Testing at 90% power.
STANDARD
* Group 7 CEAs were inserted 10 steps for the power reduction, but have all just been fully withdrawn, as indicated by the Core Mimic.
__ Examinee reviews the following: A copy of the Unit 2 Technical N Specifications Manual If desired, a copy of AOP 2556, CEA N Malfunctions, and/or SP 2619A-001, Control Room Daily Surveillance.
o As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
Page 5 of 8 PERFORMANCE JPM Number: JPM-A2S PERFORMANCE Explain the necessary Tech. Spec. entry requirements and the Tech. Spec. surveillance that must be performed.
o CEA Pulse Counting, the Backup Scanner, and the Core Mimic aI/ tracked motion as designed.
STANDARD During the review of Unit 2 Technical Y Specifications, the examinee states the need to enter into Tech. Spec.LCO 3.1.3.1B (8.1 or B.2) and 3.1.3.1C. The examinee may state the need to N enter into Tech. Spec.LCO 3.1.3.60. The examinee states the need to y record CEA Position Indication within the first hour and at least once every four (4) hours per the Tech Spec. ACTIONs of 3.1.3.1 B (B.1 or B.2) and 3.1.3.1 C. (The CEA positions are be recorded on SP Control Room Daily Section 49, which includes the time inoperability and the time of return OPERABILITY. The examinee must NOT enter Tech Y Spec LCO 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.
* I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input to CEAPDS from CEA #1 is not capable of tracking motion of this CEA at this time.
Comments: Although Tech. Spec. 3.1.3.6.0 applies and must be logged, it is NOT a Critical item because the requirement of this Tech Spec ACTION requires logging CEA positions every 12 hours, which is less restrictive than the Tech Spec ACTIONs of 3.1.3.1 B (B.1 or B.2) or 3.1.3.1 C.
* I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C-05, needs to be replaced with a spare from the warehouse.
* LCO 3.1.3.1 B.1 would NOT applv if the malfunction cannot be repaired and tested within 6 hours. TERMINATION CUE: The evaluation for this JPM is concluded.
* Testing and replacement will take approximately five (5) hours.
___ Page 6 of 8
Initiating Cues:
-----JPM Number: JPM-A2S Rev. 1 VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
* You are the on-shift US.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes No X Validated Time (minutes):
* Determine what Tech Spec LCO(s) is (are) applicable and what ACTION(s) is (are) required.
15 Actual Time to Complete (minutes):
Simulator                     NJA Requirements:
Overall Result of JPM: SAT UNSAT (circle one) Page 7 of 8
                                  * *
-----JPM Number: Rev. 1 Initial Conditions:
* NOTES TO EVALUATOR * * * *
Initiating Cues: STUDENT The plant has just returned t0100% power after completing Control Valve Testing at 90% power. Group 7 CEAs were inserted 10 steps for the power reduction, but have all just been fully withdrawn, as indicated by the Core Mimic. As the RO fully withdrew all Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7. CEA Pulse Counting, the Backup Scanner, and the Core Mimic all tracked motion as designed. I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input to CEAPDS from CEA #1 is not capable of tracking motion of this CEA at this time. I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C-05, needs to be replaced with a spare from the warehouse. Testing and replacement will take approximately five (5) hours. You are the on-shift US. Determine what Tech Spec LCO{s) is (are) applicable and what ACTION(s) is (are) required.
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ~ critical steps must be completed correctly.
Page 8 of 8 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: JPM Number: JPM-A3S Revision:
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
0II. Initiated:
: 3. If necessary, question the student for details of simulated actions/observations   (i.e. "What are you looking at?" or "What are you observing?").
Robert L. Cimmino. Jr. Developer 09/14/11 Date III. Reviewed:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Technical Reviewer Date IV. Approved:
Page 4 of 8
Cognizant Plant Supervisor (optional)
 
Date Nuclear Training Supervisor Date Page 1 of 8 JOB PERFORMANCE  
PERFORMANCE INFORMATION JPM Number:   JPM-A2S STEP                   PERFORMANCE                              STANDARD
                                                                                          ~~~m~~~,--' __
: 1.     Given a copy of the plant Technical     Examinee reviews the following:
Specifications Manual and, if requested,
* A copy of the Unit 2 Technical          N AOP 2556, CEA Malfunctions:                 Specifications Manual
* Review the Initial Conditions and
* If desired, a copy of AOP 2556, CEA      N Initiating Cue.                         Malfunctions, and/or SP 2619A-001,
* Review Tech. Specs. and, as needed,       Control Room Daily Surveillance.
AOP 2556 for any required entries and additional surveillance reQuirements.
Cue:
Comments:
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:       JPM-A2S STEP                    PERFORMANCE                                   STANDARD
: 2.      Explain the necessary Tech. Spec. entry
* During the review of Unit 2 Technical         Y requirements and the Tech. Spec.                  Specifications, the examinee states surveillance that must be performed.              the need to enter into Tech.
Spec.LCO 3.1.3.1B (8.1 or B.2) and 3.1.3.1C.
* The examinee may state the need to             N enter into Tech. Spec.LCO 3.1.3.60.
* The examinee states the need to               y record CEA Position Indication within the first hour and at least once every four (4) hours per the Tech Spec.
ACTIONs of 3.1.3.1 B (B.1 or B.2) and 3.1.3.1 C. (The CEA positions are to be recorded on SP 2619A-001, Control Room Daily Surveillance, Section 49, which includes the time of inoperability and the time of return to OPERABILITY. )
* The examinee must NOT enter Tech               Y Spec LCO 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.
Comments:
* Although Tech. Spec. 3.1.3.6.0 applies and must be logged, it is NOT a Critical item because the requirement of this Tech Spec ACTION requires logging CEA positions every 12 hours, which is less restrictive than the Tech Spec ACTIONs of 3.1.3.1 B (B.1 or B.2) or 3.1.3.1 C.
* LCO 3.1.3.1 B.1 would NOT applv if the malfunction cannot be repaired and tested within 6 hours.
TERMINATION CUE: The evaluation for this JPM is concluded.
i'~tf.U~1--*_ __
Page 6 of 8
 
JPM Number:                     JPM-A2S                           Rev.       1
                                                                          ---      --
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes           No     X
                              -
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Page 7 of 8
 
JPM Number:             JPM-A2S                            Rev.
                                                                  - - -
STUDENT HANDOUT Initial Conditions:
* The plant has just returned t0100% power after completing Control Valve Testing at 90% power.
* Group 7 CEAs were inserted 10 steps for the power reduction, but have all just been fully withdrawn, as indicated by the Core Mimic.
o As the RO fully withdrew all Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.
o CEA Pulse Counting, the Backup Scanner, and the Core Mimic all tracked motion as designed.
* I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input to CEAPDS from CEA #1 is not capable of tracking motion of this CEA at this time.
* I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C-05, needs to be replaced with a spare from the warehouse.
* Testing and replacement will take approximately five (5) hours.
Initiating Cues:
* You are the on-shift US.
* Determine what Tech Spec LCO{s) is (are) applicable and what ACTION(s) is (are) required.
Page 8 of 8
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM-A3S                 Revision:
JPM Number:
                                                                - -0 II. Initiated:
Robert L. Cimmino. Jr.                     09/14/11 Developer                            Date III. Reviewed:
Technical Reviewer                         Date IV. Approved:
Cognizant Plant Supervisor (optional)             Date Nuclear Training Supervisor                   Date Page 1 of 8
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE DESCRIPTION REV/CHANGE 12/07/10 Created JPM for LOIT 2011 NRC Exam 010 09/06/2011 Corrected Minimum value for LHRA from 1000 mrem/hr 0/1 to 1001 mremlhr 09/14/11 Minor changes to incorporate NRC validation comments 012 Page 2 of 8
OF CHANGES:
-----------------------------
All & DATE                     DESCRIPTION                     REV/CHANGE 12/07/10 Created JPM for LOIT 2011 NRC Exam                       010 09/06/2011 Corrected Minimum value for LHRA from 1000 mrem/hr       0/1 to 1001 mremlhr 09/14/11 Minor changes to incorporate NRC validation comments     012 Page 2 of 8
-----------------JPM Number:
 
Rev. __
JPM Number:                            .JPM-A3S                                          Rev. _ _..;;.;O/~O_ _
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Facility:
Facility:      MP-2                    Examinee:
MP-2 Examinee:
                                                  -----------------------------
JPM Number: Rev. 0 Task System:
JPM Number:                            JPM-A3S                                                Rev.            0
Time Critical Task: Yes No x Validated Time (minutes):
                                                                                                        -----
Task No.(s}: __________
Task Title:
_ Applicable To: SRO X RO PEO __ KIA No. 2.3.12 KIA Rating
System:       Administrative Time Critical Task:     Yes               No     x Validated Time (minutes):
__ Method of Simulated Performance:
Task No.(s}: _ _ _ _ _ _ _ _ _ __
X Actual Performance:
Applicable To:             SRO         X       RO                 PEO _ _
Classroom:
                                                    ---
X Simulator: ----Task At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each. Required Materials If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities. (procedures.
KIA No.                 2.3.12                   KIA Rating _......;;;.;3.=2/~3.;..;...7__
equipment.
Method of Testing:
etc.): General  
Simulated Performance:               X           Actual Performance:                      X
                              -----                                                    ----
Location:
Classroom:         X               Simulator:                       In-Plant:
                --~-                            ----                                     ---
Task Standards:                    At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each.
Required Materials               If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities.
(procedures. equipment. etc.):
General  


==References:==
==References:==
* RPM 5.2.2; Basic Radiation Worker Responsibilities
* RPM 5.2.2; Basic Radiation Worker Responsibilities
* Radiation Worker CBT * * *
* Radiation Worker CBT
                                    * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
* I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 8
Page 3 of 8 JPM Number: Rev. __
 
__ JOB PERFORMANCE MEASURE WORKSHEET (continued)
JPM Number:                                             JPM-A3S                              Rev. _ _~Ol-=O_ _
JOB PERFORMANCE MEASURE WORKSHEET (continued)
Initial Conditions:
Initial Conditions:
* You are! the Work Control SRO. The plant has been shut down to repair a leak in the CVCS Regeneirative Heat Exchanger. The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups. The following additional conditions exist: The area around the Heat Exchanger has been posted as a "Locked High Radiation Area". The area is at the minimum radiation level to meet the required posting. All valves on the valve lineup are in the posted area. There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup. PEO #1, an experienced Operator, has 400 mRem of remaining exposure. PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure. It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task. It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification.
* You are! the Work Control SRO.
It will take PEO #2 approximately 25 minutes of stay time to perform the same task . .:.:.In=it=ia=ti
* The plant has been shut down to repair a leak in the CVCS Regeneirative Heat Exchanger.
......n=a....;:C:;.::u=e=s.:...:
* The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
__ Determine the following: Which PEO (#1 or #2) will be directed to clear the tag-out and perform the initial valve lineup? Which PEO (#1 or #2) will be directed to perform the required valve lineup Independent Verification? What specific dose will each PEO get in performing their task? Simulator N/A Requirements: * *
* The following additional conditions exist:
* NOTES TO EVALUATOR  
* The area around the Heat Exchanger has been posted as a "Locked High Radiation Area".
* * *
* The area is at the minimum radiation level to meet the required posting.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read appropriate If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?"). Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 8 PERFORMANCE JPM Number: STEP 1 . Cue: Comments: Review the Initial Conditions and Initiating Cue. Using known exposure rate in the area, calculate the maximum available stay time for each PEO. Based on available stay time, decide which PEO must perform each task. STANDARD
* All valves on the valve lineup are in the posted area.
___ PEO #1 only has 400 mR of exposure N left and PEO #2 has 850 mR of exposure left. The minimum radiation level for a N Locked High Radiation area is 1001 mrem/hr. Therefore, based on the available exposure for each PEO and the N expected radiation levels at the job site, the maximum stay time for PEO #1 is <1= 24 minutes. (400 mR /1001 mRlhr.
* There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
* 60 min/hr. = 23.976 And <1= 51 minutes for PEO (850 mR 11001 mRlhr
* PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
* 60 min/hr. 50.949 Page 5 of 8 PERFORMANCE JPM Number: PERFORMANCE
* PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
* PEO #1 does not have enough exposure left to clear the tags and perform the initial valve lineup. PEO #2 has enough exposure to clear the tags and perform the initial valve lineup. Then, PEO #1 will have enough exposure left to perform the valve lineup Independent Verification.
* It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
The examinee may also state the following, but it is not required: PEO #2 does not have enough exposure left to perform both tasks, clearing the tag out and performing both valve lineups (this would also not meet the "Independent Verification" Administrative STANDARD Based on the calculated stay times for each PEO and the individual task time requirements: PEO #2 is assigned to clear the tags and perform the initial valve lineup. PEO #1 is assigned to perform the valve lineup Independent Verification. PEO #1 dose received -250 mrem. PEO #2 dose received -750 mrem. y y y TERMINATION CUE: The evaluation for this JPM is concluded.
* It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification. It will take PEO #2 approximately 25 minutes of stay time to perform the same task .
Page 6 of 8 
.:.:.In=it=ia=ti......
-----JPM Number: JPM-A3S Rev. o VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
n=a....;:C:;.::u=e=s.:...:__ Determine the following:
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes Validated Time (minutes):
: 1. Which PEO (#1 or #2) will be directed to clear the tag-out and perform the initial valve lineup?
Actual Time to Complete (minutes):
: 2. Which PEO (#1 or #2) will be directed to perform the required valve lineup Independent Verification?
No X 15 Overall Result of JPM: SAT UNSAT (circle one) Areas for ImprovemenUComments:
: 3. What specific dose will each PEO get in performing their task?
Page 7 of 8
Simulator                                       N/A Requirements:
-----, , JPM Number: Rev. 0 Initial Conditions:
                                                      * *
Initiating Cues: STUDENT You are the Work Control SRO. The plant has been shut down to repair a leak in the CVCS Regenerative Heat Exchanger. The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups., The following additional conditions exist: The area around the Heat Exchanger has been posted as "Locked High Radiation The area is at the minimum radiation level to meet the required posting. All valves on the valve lineup are in the posted area. There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup. PEO #1, an experienced Operator, has 400 mRem of remaining exposure. PEO #2,61 newly qualified Operator, has 850 mRem of remaining exposure. It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task. It will take PEO #1 approximately 15 minutes of stay time in the posted arSia to perform the valve lineup Independent Verification.
* NOTES TO EVALUATOR * * * *
It will take PEG #2 approximately 25 minutes of stay time to perform the same task. Determine the following: Which PEO (#1 or #2) will be directed to clear the tag-out and perform the initial valve lineup? Which PEO (#1 or #2) will be directed to perform the required valve lineup Independent Verification? What specific dose will each PEO get in performing their task? Page 8 of 8 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: JPM Number: JPM-A4S Revision:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
oII. Initiated:
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
R. J. Ashey Developer 12/15/10 Date III. Reviewed:
: 3. If necessary, question the student for details of simulated actions/observations               (Le. "What are you looking at?" or "What are you observing?").
Technical Reviewer Date IV. Approved:
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Cognizant Plant Supervisor (optional)
Page 4 of 8
Date Nuclear Training Supervisor Date Page 1 of 11 JOB PERFORMANCE MEASURE  
 
PERFORMANCE INFORMATION JPM Number:   JPM-A3S STEP                 PERFORMANCE                                STANDARD
                                                                                              ~3T4Rlilllf.',--:_ __
: 1.
* Review the Initial Conditions and
* PEO #1 only has 400 mR of exposure            N Initiating Cue.                           left and PEO #2 has 850 mR of
* Using known exposure rate in the area,   exposure left.
calculate the maximum available stay
* The minimum radiation level for a            N time for each PEO.                       Locked High Radiation area is 1001
* Based on available stay time, decide     mrem/hr.
which PEO must perform each task.
* Therefore, based on the available exposure for each PEO and the                N expected radiation levels at the job site, the maximum stay time for PEO
                                                        #1 is <1= 24 minutes.
(400 mR /1001 mRlhr.
* 60 min/hr. =
23.976 minutes)
And <1= 51 minutes for PEO #2 (850 mR 11001 mRlhr
* 60 min/hr.     =
50.949 Cue:
Comments:
Page 5 of 8
 
PERFORMANCE INFORMATION JPM Number:
STEP                    PERFORMANCE                                 STANDARD
: 2.
* PEO #1 does not have enough               Based on the calculated stay times for exposure left to clear the tags and       each PEO and the individual task time perform the initial valve lineup.        requirements:
: 1. PEO #2 is assigned to clear the tags  y
* PEO #2 has enough exposure to clear          and perform the initial valve lineup.
the tags and perform the initial valve lineup. Then, PEO #1 will have enough     2. PEO #1 is assigned to perform the     y exposure left to perform the valve lineup    valve lineup Independent Verification.
Independent Verification.                3. PEO #1 dose received - 250 mrem.      y PEO #2 dose received - 750 mrem.
The examinee may also state the following, but it is not required:
* PEO #2 does not have enough exposure left to perform both tasks, clearing the tag out and performing both valve lineups (this would also not meet the "Independent Verification" Administrative Cue:
Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
Page 6 of 8
 
JPM Number:                      JPM-A3S                            Rev.
                                                                          ---    o--
VERIFICATION OF JPM COMPLETION Title:
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?       Yes           No    X
                              -
Validated Time (minutes):                   15 Actual Time to Complete (minutes):
Overall Result of JPM:                       SAT           UNSAT                     (circle one)
Areas for ImprovemenUComments:
Page 7 of 8
 
, ,
Rev.
JPM Number:                    JPM-A3S
                                                                            - - -
STUDENT HANDOUT Initial Conditions:
* You are the Work Control SRO.
* The plant has been shut down to repair a leak in the CVCS Regenerative Heat Exchanger.
* The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.,
* The following additional conditions exist:
* The area around the Heat Exchanger has been posted as a "Locked High Radiation Area".
* The area is at the minimum radiation level to meet the required posting.
* All valves on the valve lineup are in the posted area.
* There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
* PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
* PEO #2,61 newly qualified Operator, has 850 mRem of remaining exposure.
* It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
* It will take PEO #1 approximately 15 minutes of stay time in the posted arSia to perform the valve lineup Independent Verification.
It will take PEG #2 approximately 25 minutes of stay time to perform the same task.
Initiating Cues:    Determine the following:
: 1. Which PEO (#1 or #2) will be directed to clear the tag-out and perform the initial valve lineup?
: 2. Which PEO (#1 or #2) will be directed to perform the required valve lineup Independent Verification?
: 3. What specific dose will each PEO get in performing their task?
Page 8 of 8
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:
JPM Number:               JPM-A4S                 Revision:
                                                                --- o -
II. Initiated:
R. J. Ashey                             12/15/10 Developer                                Date III. Reviewed:
Technical Reviewer                            Date IV. Approved:
Cognizant Plant Supervisor (optional)                Date Nuclear Training Supervisor                      Date Page 1 of 11
 
JOB PERFORMANCE MEASURE


==SUMMARY==
==SUMMARY==
OF CHANGES: All & DATE 12/13/10 DESCRIPTION Create for use on LOIT-2011 NRC Exam REV/CHANGE 0 Page 2 of 11
OF CHANGES:
------------------------------------
All & DATE                     DESCRIPTION      REV/CHANGE 12/13/10 Create for use on LOIT-2011 NRC Exam     0 Page 2 of 11
-------------------Facility:
 
MP-2 Examinee:
Facility:      MP-2                  Examinee:
JPM Number: Revision:
                                                  ------------------------------------
o Task Title: System: Emergency Plan Time Critical Task: Yes X No Validated Time (minutes):
JPM Number:                          JPM-A4S                                Revision:
20 Task No.(s): NUTIMS #000-05-205 Applicable SRO X RO PEO KJA No. 2.4.41 KJA Rating __2._9/_4_.6
                                                                                          - - -o- - -
__ Method of Testing: Simulated Actual Performance:
Task Title:
x Location:
System:       Emergency Plan Time Critical Task:     Yes       X     No Validated Time (minutes):                 20 Task No.(s):           NUTIMS #000-05-205 Applicable To:            SRO       X         RO             PEO
Classroom:
                                                    ---                ---
X Simulator:
KJA No.                 2.4.41                 KJA Rating _ _  2._9/_4_.6__
X In-Plant:
Method of Testing:
X
Simulated Performance:                            Actual Performance:       x
------Task At the completion ,of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.
                                                                                          -------
Location:
Classroom:           X           Simulator:         X           In-Plant:     X
                              --'------                    ------                       -----
Task Standards:          At the completion ,of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.
Required Materials
Required Materials
* MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment.
* MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment. etc.):         Levels
etc.): Levels MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations. MP-26-EPI-FAP06, Classification and PARs MP-26-EPI-FAP07-001, Incident Report Forms Student Handout, Critical Plant Parameters General  
* MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
* MP-26-EPI-FAP06, Classification and PARs
* MP-26-EPI-FAP07-001, Incident Report Forms
* Student Handout, Critical Plant Parameters General  


==References:==
==References:==
MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations. MP-26-EPI-FAP06, Classification and PARs * * *
* MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels
* MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
* MP-26-EPI-FAP06, Classification and PARs
                                  * * *
* READ TO THE EXAMINEE * * *
* READ TO THE EXAMINEE * * *
* 1 will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied.
* 1 will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.
Page 3 of 11
Page 3 of 11 Initial Conditions:
 
See attached form for Critical Plant Parameters.
Initial Conditions:     See attached form for Critical Plant Parameters.
Initiating Cues:
Initiating Cues:
* You are the on-duty SM. Your task is to determine the NRC and state posture code classification and PAR, if applicable, for the event described on the attached form. (Time Critical) Fill in the data for steps 1 and steps 4 through 8. If applicable, provide the required Protective Action Recommendation that would be given to the state. Determine Potassium Iodide (KI) strategy, if applicable.
* You are the on-duty SM.
Simulator N/A Reguirements: * *
* Your task is to determine the NRC and state posture code classification and PAR, if applicable, for the event described on the attached form. (Time Critical) o Fill in the data for steps 1 and steps 4 through 8.
* NOTES TO EVALUATOR * * *
o If applicable, provide the required Protective Action Recommendation that would be given to the state.
* Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. When the student states what hislher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"), Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only). Page 4 of 11 PERFORMANCE JPM Number: JPM-A4S Rev. _0_ EALClassification,'an"dPARs""*, STEP PERFORMANCE STANDARD ';'Qi'tA"
o Determine Potassium Iodide (KI) strategy, if applicable.
.....___ 1 . The examinee obtains Millstone 2 N EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue: Comments:
Simulator               N/A Reguirements:
I The 15 minute time for classification starts when the examinee completes hisl her review of the Critical Plant Parameters.
                                  * *
: 2. I Perform the initia.1 for this I Based on a "top to bottom, left right' Y event, per the eXisting conditions. , technique, the examinee determines that all three barriers are lost and this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA. (See Answer Cue: Comments:
* NOTES TO EVALUATOR * * * *
Page 5 of 11 PERFORMANCE JPM Number: Rev. 0 STEP STANDARD MP-26-EPI-FAP06, Step 2.4 For Control Room PARs, Refer To FAP06-005, "Control Room Action recommendations" and the proper Comments:
: 1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
I References are provided in step The 15 minute clock for the PAR starts when the examinee classifies the I (Flowchart) . I Examin.ee determines that all 3 Fission Are All Three FIssion Product Barners I Product Barriers are
: 2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
: 5. Cue: Comments:
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"),
I Examinee may determine that there is a release in progress, but will determine the release is NOT controlled, which will lead to the same conclusion. Is the release controlled?
: 4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).
Examinee determines that the release is NOT Examinee determines that a State Code Alpha exists that requires a Cue: Comments:
Page 4 of 11
I Examinee may determine that there is a release in progress, but will determine the release is NOT controlled, which will lead to the same conclusion.
 
Page 6 of 11 PERFORMANCE JPM Number: STEP STANDARD Check the appropriate wind direction from
PERFORMANCE INFORMATION JPM Number:       JPM-A4S                                                                                                                     Rev. _0_
* Examinee observes wind direction 142 ft. level for zone( s) to table and checks 340 0 -029&deg;. Examinee determines from the wind Y direction table that zones A and Band Plum Island must be evacuated.
EALClassification,'an"dPARs""*,
STEP                     PERFORMANCE                                       STANDARD
                                                                                                            ';'Qi'tA"
                                                                                                                    ';B'~~~I<iji:::~;!!i
                                                                                                            ;,~I;.> .~~:.i*'.::.l~!;~.! .....~_ __
: 1.                                                       The examinee obtains Millstone 2 MP-26                      N EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue:
Comments: I The 15 minute time for classification starts when the examinee completes hisl her review of the Critical Plant Parameters.
: 2.     I Perform the initia.1 c.lassifica~i?n for this I Based on a "top to bottom, left t~ right'                   Y event, per the eXisting conditions.           , technique, the examinee determines that all three barriers are lost and this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA. (See Answer Cue:
Comments:
Page 5 of 11
 
PERFORMANCE INFORMATION JPM Number:         JPM-A4S                                                                                          Rev. 0
                                                                                                                          ,-.
                    'EALQlassificational'}dPA~s~
STEP                     PERFORMANCE                                  STANDARD
: 3.        MP-26-EPI-FAP06, Step 2.4                                                                     N For Control Room PARs, Refer To EPI FAP06-005, "Control Room Protective Action recommendations" and determine the proper PAR Cue:
Comments: I References are provided in step 1.
The 15 minute clock for the PAR starts when the examinee classifies the event.
: 4.      I MP-26-FAP06.~O~ (Flowchart) .             I Examin.ee determines that all 3 Fission           Y Are All Three FIssion Product Barners     I Product Barriers are lost.
Lost?
Cue:
Comments:
5.
Cue:
Comments: I Examinee may determine that there is a release in progress, but will determine the release is NOT controlled, which will lead to the same conclusion.
: 6.        Is the release controlled?                   Examinee determines that the release is           y NOT controlled.
Examinee determines that a State Posture Code Alpha exists that requires a 10-mile PAR Cue:
Comments: I Examinee may determine that there is a release in progress, but will determine the release is NOT controlled, which will lead to the same conclusion.
Page 6 of 11
 
PERFORMANCE INFORMATION JPM Number:
STEP                   PERFORMANCE                                  STANDARD
: 7.      Check the appropriate wind direction from
* Examinee observes wind direction                                     y 142 ft. level for zone( s) to evacuate:      table and checks 340 0 -029&deg;.
* Examinee determines from the wind                                     Y direction table that zones A and Band Plum Island must be evacuated.
Cue:                                                                    (:~,;t~:; ::>;2~;::;:~>t?', :~i:~it~ ::~~~;
Comments:
8.
Cue:
Comments:
Shelter all other zones."
: 9.                                                Examinee determines that Dose                                            y Projections or actual dose is NOT available at this time; therefore, KI strategy cannot be determined.
Cue:
Comments:
Comments:
: 8. Cue: Comments:
Shelter all other zones." yExaminee determines that Projections or actual dose is available at this time; therefore, KI cannot be Cue: Comments:
TERMINATION CUE: The evaluation for this JPM is concluded.
TERMINATION CUE: The evaluation for this JPM is concluded.
STOP TIME:i:r ______ Page 7 of 11
STOP TIME:i:r ______
----JPM Number: JPM-A4S Revision:
Page 7 of 11
o VERIFICATION OF JPM COMPLETION Date For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
 
If task is Time Critical.
JPM Number:                     JPM-A4S                             Revision:
it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? Yes X No Validated Time (minutes):
                                                                                - - -o-VERIFICATION OF JPM COMPLETION Title:
20 Actual Time to Complete (minutes):
Date Performed:
Overall Result of JPM: During the TPE, the trainee SAT UNSAT (circle one) Evaluation performed the task correctly and in accordance with procedure usage Pass / Fail and adherence requirements.
Student:
never put anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass / Fail never violated radiological work practices.
Evaluator:
Pass / Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for ImprovemenUComments:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical. it MUST be completed within the specified time to achieve a satisfactory grade.
Page 8 of 11
Time Critical Task?       Yes     X       No
------JPM Number: Revision:
                                              --
o Initial Conditions:
Validated Time (minutes):                   20 Actual Time to Complete (minutes):
Initiating Cues: STUDENT HANDOUT See attached form for Critical Plant Parameters. You are the on-duty SM. Your task is to determine the NRC and state posture code classification and PAR" if applicable.
Overall Result of JPM:                       SAT          UNSAT                    (circle one)
for the event described on the attached form. (Time Critical) Fill in the data for steps 1 and steps 4 through 8. If applicable.
During the TPE, the trainee                                                     Evaluation performed the task correctly and in accordance with procedure usage             Pass / Fail and adherence requirements.
provide the required Protective Recommendation that would be given to the Determine Potassium Iodide (KI) strategy.
neverput anyone's safety at risk.                                               Pass / Fail never put equipment reliability at risk.                                       Pass / Fail never violated radiological work practices.                                     Pass / Fail demonstrated effective use of event-free human performance tools.               Pass I Fail Areas for ImprovemenUComments:
if applicable.
Page 8 of 11
Page 9 of 11
 
------JPM Number: JPM-A4S Revision:
JPM Number:                    JPM-A4S                              Revision:
o Initial Conditions:
                                                                              - - -o- - -
The plant is operating at 100% power. Bus 24E is aligned to Bus 24C. 'B' LPSI Pump is 005. Wind at the site is from 15 deg at 3 mph.
STUDENT HANDOUT Initial Conditions: See attached form for Critical Plant Parameters.
PLAN,.. PARAMETERS SOURCE The following information is provided at the completion of EOP 2525, Standard Post Trip US actions: The BOP reports the following:
Initiating Cues:
BOP
* You are the on-duty SM.
* Your task is to determine the NRC and state posture code classification and PAR" if applicable. for the event described on the attached form. (Time Critical) o Fill in the data for steps 1 and steps 4 through 8.
o If applicable. provide the required Protective Action Recommendation that would be given to the state.
o Determine Potassium Iodide (KI) strategy. if applicable.
Page 9 of 11
 
JPM Number:                         JPM-A4S                         Revision:
                                                                                - - -o- - -
Initial Conditions: The plant is operating at 100% power. Bus 24E is aligned to Bus 24C. 'B' LPSI Pump is 005. Wind at the site is from 15 deg at 3 mph.
CRI"'I~~.~. PLAN,.. PARAMETERS SOURCE The following information is provided at the completion of EOP 2525, Standard Post Trip             US actions:
The BOP reports the following:                                                                     BOP
* Buses 25A1B, 24A1B, and 24C de-energized
* Buses 25A1B, 24A1B, and 24C de-energized
* Bus 24D energized by the 'B' DIG
* Bus 24D energized by the 'B' DIG
* S/G press: #1 is 745 psia, #2 is 740 psia, both slowly lowering
* S/G press: #1 is 745 psia, #2 is 740 psia, both slowly lowering
* Th is 289&deg;F, Tc is 262&deg;F, both slowly lowering
* Th is 289&deg;F, Tc is 262&deg;F, both slowly lowering
* S/G levels: #1 is 18%, #2 is 16%, both rising slowly * 'B' AFP supplying both S/Gs The RO reports the following:
* S/G levels: #1 is 18%, #2 is 16%, both rising slowly
PPO
      * 'B' AFP supplying both S/Gs The RO reports the following:                                                                       PPO
* Pressurizer level is 0%
* Pressurizer level is 0%
* Reactor vessel level (RVLMS) is 0%. (Both #8 string HJTCs are OPERABLE)
* Reactor vessel level (RVLMS) is 0%. (Both #8 string HJTCs are OPERABLE)
* Pressurizer pressure is 53 psia and slowly lowering
* Pressurizer pressure is 53 psia and slowly lowering
* CETS are 84rF and slowly rising
* CETS are 84rF and slowly rising
* Subcooling (CET) indicates  
* Subcooling (CET) indicates -478&deg;F and becoming more negative
-478&deg;F and becoming more negative
* Facility 2 SIAS, CIAS, EBFS actuated
* Facility 2 SIAS, CIAS, EBFS actuated
* CTMT pressure is 3 psig, lowering
* CTMT pressure is 3 psig, lowering
Line 731: Line 1,581:
* CTMT Personnel Access Area, RM-7890, is off scale high
* CTMT Personnel Access Area, RM-7890, is off scale high
* Facility 2 CTMT atmosphere, RM-8262A1B show pre CIAS spikes and alarm
* Facility 2 CTMT atmosphere, RM-8262A1B show pre CIAS spikes and alarm
* RMs outside CTMT are reading as follows: o RM-8132B, MP2 Vent (Normal) is reading 4.0E+01 cpm and lowering o RM-8168, MP2 Vent (Mid/High) is reading 1.3E-02 IlCi/cc and rising o RM-8169, Millstone Stack is reading 4.7E+01 IlCi/cc and rising Trends shows the following:
* RMs outside CTMT are reading as follows:
STA
o RM-8132B, MP2 Vent (Normal) is reading 4.0E+01 cpm and lowering o   RM-8168, MP2 Vent (Mid/High) is reading 1.3E-02 IlCi/cc and rising o   RM-8169, Millstone Stack is reading 4.7E+01 IlCi/cc and rising Trends shows the following:                                                                         STA
* MSL: RM-4299A1B were reading 0.7 Rlhr, RM-4299C is 0.9 Rlhr, 15 minutes
* MSL: RM-4299A1B were reading 0.7 Rlhr, RM-4299C is 0.9 Rlhr, 15 minutes ago
* CTMT Hi Range, RM-8240 / 8241 were reading 350Rlhr 1 370 Rlhr, 15 minutes
* CTMT Hi Range, RM-8240 / 8241 were reading 350Rlhr 1 370 Rlhr, 15 minutes ago
* Rad Monitors outside of CTMT started rising about 15 minutes
* Rad Monitors outside of CTMT started rising about 15 minutes ago.
* Containment pressure was 42 psig15 minutes Transition to EOP 2532 Classification Level NRC: State Posture Code: _________ Protective Action Reconnnendation, if applicable:
* Containment pressure was 42 psig15 minutes ago.
KI Strategy, If applicable:
Transition to EOP 2532                                                                               US Classification Level NRC:
Page 10 of 11
State Posture Code: _ _ _ _ _ _ _ __
--------JPM Number: JPM-A4S Revision:
Protective Action Reconnnendation, if applicable:                       KI Strategy, If applicable:
o 3/5/08 3114/08 Approval Date Effective Date Incident Repol't Form (IRF) NOTE: FOR AN INITIAL CLASSIFICATION OR A CLASSIFICATION CHA 'VGE, COMPLETE t---.-----'I:..::T='E:..:..M.;:;...S:..:..l;:;.... ..:.:...:;.A=N...;:D::...-.;;.L;;...?-,;;:,.1;;...50_=F...;:O=R..;..U..;..P;:..;'D;:;...A;..;;,..:;....:TE;;;:,.*
Page 10 of 11
.,;;..M=E;:;...*
 
S...;:'S..;..'A;..;;,..:;....::..::......:...C=O..;..M=P=L:.;;;E:....:;T..;;:;'E:....:;A..;..;L=L;;...I:....:;T...=;'E:..:...
JPM Number:                                                                        JPM-A4S                                                                                                                                      Revision:
l l1.;;:..S,-'
                                                                                                                                                                                                                                                                      --------
1=---;;:..1'-50
o 3/ 5/08                                                                                                                                                                                                           3114/08 Approval Date                                                                                                                                                                                                       Effective Date Incident Repol't Form (IRF)
__----1 I (?) IRF Number: DSEO EHIlI C1assificlltlon Incident 4 D Millstone Un it 1 D Millstone Unit 2 D Millstone U nit Incid ent Classiil c ation: Po s ture D An Unusual Event D Delta-One D Delta -Two D An Alert D Charlie -O ne D A Site Area Emergency D Charlie -D A General Emergency D Bravo D Alpha RadioloRicnl Relen s e Statu s: Routine relea s es nre ou!!,oill!!, to plant operatiollAdditional radiological releases associated with the D No radiological release due to event D Terminated radiological release due to D Radiological release in progress due to Me teorolo gica l D Current Site Wind: At __ hours (mili t ary time) from the _ into the at _ 7 (i ll degree s) (ill degreeD Not Major EAL Heading: Minor EAL MP-26-EPI-FAP07-00 1 R ev. 001-02 Page 1 of I}}
NOTE: FOR AN INITIAL CLASSIFICATION OR A CLASSIFICATION CHA 'VGE, COMPLETE t---.-----'I:..::T='E:..:..M.;:;...S:..:..l;:;..... :.:. .:;.A=N.. ;:D::.. -.;;.L;;.. ?-,;;:,.1;;.. 50_=F.. ;:O=R..;. U. ;. P;:..;'D;:;.. A;..;;,. :;.. .:TE;;;:,.*.,;;..M=E;:;.S.. *. ;:'S. ;. 'A;..;;,. :;.. .::..::.. . .:. .C=O..;. M=P=L:.;;;E:.. .:;T..;;:;'E:.. .:;A..;. ;L=L;;.. I:.. .:;T.. =;'E:..ll1.;;:..S,-'
:. . 1=---;;:..1'-50_ _----1 I(?)
IRF Number:                                                                                                                                               DSEO EHIlI C1assificlltlon Incident Locatioll:
4 D     Millstone Unit 1                                                 D           Millstone Unit 2                                                     D               Millstone Unit 3 Incident Classiilcation:                                                                                                                                 Posture Code D     An Unusual Event                                                                                                                                   D             Delta-One                                                   D             Delta - Two 5        D     An Alert                                                                                                                                           D             Charlie - One D     A Site Area Emergency                                                                                                                             D             Charlie - Two D     A General Emergency                                                                                                                               D             Bravo                                                       D             Alpha RadioloRicnl Relense Status: Routine releases nre ou!!,oill!!,                                                     du~      to plant operatiolls.
Additional radiological releases associated with the event 6
D     No radiological release due to event                                                                                                                                                     D             Terminated radiological release due to event D     Radiological release in progress due to event Meteorologica l Data:
D     Current Site Wind: At _ _ hours (military time) from the _                                                                                                                                                                 into the                                                           at _       mph.
7                                                                                                                                                                                                         (ill degrees)                                                   (ill degrees)
D      Not Available Major EAL Heading:                                                                                                                                                                         Minor EAL Heading:
8 MP-26-EPI-FAP07-00 1 Rev. 001-02 Page 1 of I}}

Revision as of 12:26, 12 November 2019

Final Operating Exam (Sections a, B, and C) (Folder 3)
ML113340098
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/29/2011
From: Peter Presby
Operations Branch I
To: Armstrong L
Dominion Nuclear Connecticut
JACKSON D RGN-I/DRS/OB/610-337-5306
Shared Package
ML102850247 List:
References
TAC U01834
Download: ML113340098 (373)


Text

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

..IPM Number: JPM-A1.1R Revision: -~-

1 II. Initiated:

R. J. Ashey 9/14112011 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training SupE~rvisor Date Page 1 of 10

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 9/14/2011 Updated JPM to include NRC comments. 1/0 Page 2 of 10

JPM Number: JPM-A1.1R Rev.

- - - -

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: _M_P_2_ _ Examinee:

JPM Number: JPM-A1.1R


Rev. ____0=---__

Task Title:

System: Auxiliary Feedwater Time Critical Task: Yes No X Validated Time (minutes): 25 Task No.(s): _ _ _ _ _ _ _ _ _ _ __

Applicable To: SRO RO X PEO

--- ---

KIA No. 2.2.13 KIA Rating _ _ 4_.1_/4_._3__

Method of Testing:

Simulated Performance: Actual Performance: X


-~~-

Location:

Classroom: X Simulator: In-Plant:


--- ----

Task Standards: At the completion of this JPM, examinee determines the required configuration of system components to provide boundary isolation for maintenance on 2-FW-BB.

Required Materials

  • 25203-26005 SH.3 (Condensate Storage and Aux Feed).

(procedures, equipment. etc.>:

  • 25203-30005 (Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C, 24D (A3/ A4))
  • OP-M-200, Equipment Clearance
  • Non-Electronic Tagging Process, Attachment 2.
  • * *
  • READ TO "fHE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 10

JPM I\lumber: JPM-A1:1 R Rev. _ _ _1_ __

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • Unit 2 is in lVIode 5 for a refueling outage.
  • There is evidence that 2-FW-8B, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve, may be leaking by. The Maintenance Department will be performing a seating surface and general condition inspection of this valve.

Initiating Cues:

  • Determine thE! proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-8B, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
  • The tagging computer is NOT available; therefore, a manual clearance must be initiated.
  • The clearancE! must include:

o Tag type (color) o Component ID o Component description o Tagged position o Tagging order o Restoration position o Restoration order Simulator

  • Not applicablEL Reguirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must thl:! student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1R Rev.. _1_

STEP PERFORMANCE STANDARD 1~~~1~.:__________

1. Obtain the required material for Examinee reviews the material provided N determination of clearance boundary. for determination of clearance boundary:
  • P&ID 25203-26005 SH.3 (Condensate Storage and Aux Feed).
  • P&ID25203-30005 (Single Line Meter

& Relay Diagram 4.16KV Emerg.

Buses 24C, 240)

  • Aux Feed Valve line-up, OP 2322-001

.in.....anr Clearance Cue:

Comments:

Page 5 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1R Rev.. _1_

STEP PERFORMANCE STANDARD

2. (OP-AA-200 3.2.29). Examinee establishes a clearance ESTABLISH the tagging sequence. WHEN boundary with the following components procedural guidance exists, THEN the and sequencing. (See attached Answer procedure takes precedence over the Key) normal sequence of isolation. The normal sequence of isolation is as follows:

1 . POSITION control switch

  • Examinee CAUTION tags "P9B-HS N (HANDSWITCH FOR "B" AUXILAIRY FEEDWATER PUMP" control switch indicating that the breaker is racked down
  • Examinee removes power from "B" y
2. REMOVE power from component(s)

MDAFP by "RACKING DOWN" 4160VAC breaker (A406) and placing a Red Tag on the breaker.

Cue:

Comments: I. The Yellow CAUTION tag on P9B-HS is for information use and is NOT required to be sequenced first, but would typically be Order #1. (Order #2, if the breaker is first)

  • The Red Tag on the breaker is the first component required to be tagged; therefore, this would be Order #2.
  1. 1, if the handswitch was NOT first.). (See Answer Page 6 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1R Rev.. _1_

STEP PERFORMANCE STANDARD

3. 3. ISOLATE component/system from high ISOLATE component/system from high pressure side to low pressure side pressure side to low pressure side by Danger Tagging "CLOSED":

2-FW-98 ("8" AUX FEED DISCHARGE y STOP VALVE) 2-FW-52C ("8" AUX FEED y*

RECIRCULATION STOP VALVE) 2-CN-298 ( "8" AUX FEED PUMP y*

SUCTION ISOLATION) 2-FIRE-948 ("8" AUX FEED PUMP y*

EMERGENCY FIRE WATER SUPPLY VALVE)

Cue:

Comments: I The discharge stop must be closed prior to closing the suction or minimum flow recirculation valves. (Order #3)

  • The exact sequence of suction side/recirculation alignment is NOTcritical. (Order #4, #5, and #6) (See Answer Key)

Page 7 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1R Rev.. _1_

STEP PERFORMANCE STANDARD

4. 4. OPEN drain valve(s) Examinee tags open one or both of the following drain valves and one or both of
5. OPEN vent valve(s) the following vent valves:

2-CN-332 ( "B" AUX FEED PUMP Y*

SUCTION HEADER DRAIN) 2-CN 331 ( "B" AUX FEED PUMP y*

DISCHARGE HEADER DRAIN VALVE) 2-CN-330 ("B" AUX FEED PUMP CASING r y*

VENT VALVE) 2-CN-329 ("B" AUX FEED PUMP CASING , y*

VENT VALVE)

Comments: I. It is NOT critical to open both vent and drain valves. To provide proper depressurization and draining, only one vent and one drain are required to be open.

  • If only one vent and drain valve are opened, the Order Number is #7 and #8. Either the vent or the drain may be opened first. (See Answer Key)
  • The restoration order and position are NOT critical.

TERMINATION CUE: The evaluation for this JPM is concluded.

~. ';~J~'\~"'fW.rr~*,.iw (0~~~~N~;t.;,l!!I~~;S--,~~;,-. _ _ _ __

Page 8 of 10

JPM Number: JPM-A1.1R Rev.

- - -

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, Abb critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 25 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put equipment reliabili!Jt at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 9 of 10

JPM Number: JPM-A1.1R Rev.

- - -

STUDENT HANDOUT Initial Conditions:

  • Unit 2 is in Mode 5 for a refueling outage.
  • There is evidence that 2-FW-SB, uB" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve, may be leaking by. The Maintenance Department will be performing a seating surface and general condition inspection of this valve.

Initiating Cues:

  • Determine the proper safety clearance boundary for an inspection and possible repair/replacement of 2-FW-SB, "B" Motor Driven Auxiliary Feedwater Pump Discharge Check Valve.
  • The tagging computer is NOT available; therefore, a manual clearance must be initiated on OP-AA-200, Equipment Clearance, Attachment 2.
  • The clearance must include:

o Tag type (color) o Component 10 o Component description o Tagged position o Tagging order o Restoration position o Restoration order Page 100f10

sectiiJ!!,Coriiitsheet~ . Millstone StatiiJii

ragout
2C19

!section: 2322X00-002A 09/20/111935 Component to be Worked 2-FW-SB 2_TB _00106_ AFRV AREA_

Notes:

.Reason Tagged 2-FW-SB CHECK VALVE INSPECTION

,Instructionsl Cautions:

Additional Information:

25203-26005 SH.31 Condensate Storage and Aux Feed

.25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)

Section Attributes:

Work Order List:

Number I Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:

Status DescriJ)~ion Name Verification Date

,Prep~rf:q :prePilredBy:

Appr()\ff:d . . . . . . Appr,ovf:qBy:

Authorized , AutQ(lri?t:!clI3Y:

ii Work Released 0."~ _00m

! Work~elea~f:cIBy:

To Clear , Authorize Tags t()c1f:arL I System Restored Restoration C:0l11plete  !

'I, The Answer Key denotes the MINIMUM tagging required to safely isolate the component for the work to be performed.

Addition components may be tagged, but are NOT required.

ANSWERKEY lPM-Al.1R I

            • Page 1 ofa J

ANSWER KEY Section Coversheet Millstone Station ragout: 2C19

$ection: 2322XOO-OO2A 09/20/111935 Tag 'Equipment "Tv;~Tpl;'fpl~'~;;;;;t'-- Place. 1st Ver i Pia ;R~!];tnratinn As Left i Rest. 1st Rest. 2nd Type :Req : Seq ;Configuration I . ~ _______________

  • Verit  : Req lSeq~~,!~¥!:,~!i~!I____ _ Configuration! Verit I Verit
  • Equipment DeSCription i* Notes Time/Date ,* Notes iTime/DateTime/Date
  • Equipment Location

,", ,~""".,.~_,_u~, .. ,~

'T' .~

pgB-HS 1 INJA iN/A i

  • HANDSWITCH FOR "S" 5 !N/A

--~----- ... -- ---

....

AUXILIARY FEEDWATER PUMP

'" 2_CB _03606_ CNTRL RM COS A 406 2 ******4*1RiCKED UP

~-------~---~---.

,*~t*" ,

3 iCLOSED .OPEN OPEN

~-----------~-~-.

  • "S"AUX fEED PUMP DISCHARGE STOPYAlVE

.

I

. . ~ ..L~~.~'!I=.i.;.c...._=~cg.~96.:::..~.F!1 . ~~~.*j._, i .....J ....... -.~ . ~... ~_.. ~_. . . . . .~j._ ............. _.... _ ......... L ....... j~ ***.*******_ ....... ~ .*.******..*. ~*.*.*** ... *.* i**.... **...**-*.-**..*******...-,.** ........

Red  ! 2_FW-S2C *llV.. I 4 !CLOSED 2* 'l.OCKEDOPEN :LOCKED OPEN L* "S"AUXFEEDPUMP ., r.,.-------,.-----.,.* -----------'----

.. .

I RECIRCULATION STOP VAlVE

  • 2_TB ",b-*'_"=-"",00l06_ABOVE"S"AFP m,,,,"",,. u"', """"_'~'"' __

'"""'""'Y' WM"; _

,,,,,,,,,,,,,,,,,,,,,,,.;,;,,~>,,~~,,,)_,,,;.,y~,,,,,;, ~,~ _ _ ,,_,", n__ '. ,,__ ,.*~___ .___ +~___."" .." Y.~_,~ __ *** ,",H~ .. ,,,,~.=",~,, ~,",, __. ,,'._"_~,,_,,_ +

Red 2-CN-29S IV 4 lCLOSED 2~~~~ __________ _ lOPEN

  • B" AUX FEED PUMP SUCTION ~.---------~----~

.. ISOLATION " i

. I i
  • 2 TB 00106 AFW RM i  ! I , , I i iL~ ~. ".~. 'R.;I'-"'T*2~A~94B~""**~:::*'*~'**'~~***~*~'riV .~ 4*ta.OSED*~-~*~**~~*****~t* ... -- .-.. ~"+"""-"~2~LOSED"""-'" .~~ -£LOSED* .. *~*-y*
  • "B/1 AUXFEED PUMP EMERGENCY j FIRE WATER SUPPlY VALVE 23B _00106_ AFW =RM

.ve,' - , _ .___._ ._ __, , ....___ '0'._""'* _ --___",,-.

1,"~"~;J"'~;-CN~331

-~¥,- "'~

1 !cLOSED ;CLOSED ANSWER KEY Page 2 0'3

ANSWER KEY

  • ~ed IV 1 Ca.oseD CLOSED
  • "sn AUXFEED pUMP SUCTION HEADER DRAIN 5 ,OPEN

~'"~-.

1* .'CLOSED ;CLOSED

  • Only one vent and one drain are required to be open to provide proper venting and draining.

ANSWER KEY Page 3 of3

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A2R~ Revision: 0

--=-

II. Initiated:

Robert L. Cimmino, Jr. 09/15/11 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 11

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 0/0 09/15/11 Minor changes to incorporate NRC validation comments. 011 Page 2 of 11

JPM Number: JPM-A2R Rev. ___0,--__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A2R Rev.

Task Title:

°


System: Equipment Control Time Critical Task: Yes

-- No x Validated Time (minutes): 15 Task No.(s):

Applicable To: SRO RO X PEO

--- ---

KIA No. 2.2.37 KIA Rating _ _ 3._6/_4_.6__

Method of Testing:

Simulated Performance: Actual Performance:


- -X- -

Location:

Classroom: X Simulator: In-Plant:

_c:..:-_


----

Task Standards: At the completion of this JPM the examinee will have successfully determined SFP Heatup Rate and time to reach 150°F.

Required Materials OU-M2-201 Section 3.2, " Heatup Calculations" (procedures, equipment. etc.): OU-M2-201 Attachment 3, Millstone Unit 2 SFP Time to II 150°F Calculation" General

References:

OU-M2-201 "Shutdown Safety Assessment Checklist" TRM 3.9.3.2 Spent Fuel Pool Temperature

'" '" '" '" READ TO THE EXAMINEE'" '" '" '"

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 11

JPM Number: JPM-A2R Rev.

--- o--

JOB PERFORMANCE. MEASURE WORKSHEET (continued)

Initial Conditions:

  • Unit-2 is in day 12 of a refueling outage.
  • Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
  • Unit 2 has just experienced a Station Blackout.
  • Present Spent Fuel Pool temperature as read on TR-7030 is 93°F.

Initiating Cues:

  • The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.

Simulator

  • N/A Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are inclicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 11

PERFORMANCE INFORMATION JPM Number: JPM-A2R STEP PERFORMANCE STANDARD

!if p'Ei~r.fi:~\

IJt'~;If,,,JiWH,, ' i . . . . . - '_ __

1. NOTE: The SSA Checklist or Heatup Examinee reads and acknowledges notes N Calculations may be completed by any I licensed Operator (except the on-duty SM) or the STA using, at a minimum, the main control board system status.

NOTE: Systems planned to be removed from service in the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> may be assumed to be out of service, and, therefore, not credited.

NOTE: Attachment 4 through Attachment 8 provide further guidance while performing SSA Checklist.

NOTE: SSA Checklists are completed as follows:

  • Daily
  • Prior to removing any equipment required to support the KSFs unless daily review already assumed equipment is out of service
  • Equipment available to support the KSFs unexpectedly becomes unavailable
  • Prior to performing plant MODE changes when shutdown.
  • system/component is restored to A

available status and is desired to either immediately credit the system/component for Shutdown Risk or it is more than six hours until the next SSA Checklist is to be performed Page 5 of 11

PERFORMANCE INFORMATION JPM Number: JPM-A2R STEP PERFORMANCE STANDARD Cue:

Com

2. 3.2 Heatup Calculations 3.2.1 IF a Time to Core Boil determination Examinee determines that this step is not N is desired, THEN PERFORM the applicable.

following:

a. REFER to Attachment 2, Millstone Unit 2 RCS Time to Boil Calculation, and FOLLOW instructions.
b. RECORD results on Attachment 2.

3.2.2 IF a time to reach 150°F SFP design temperature determination is desired THEN PERFORM the following:

a. REFER to Attachment 3, Millstone Examinee refers to Attachment 3, N Unit 2 SFP Time to 150°F Millstone Unit 2 SFP Time to 150°F Calculation, and FOLLOW Calculation.

instructions.

b. RECORD results on Attachment 3.

Cue:

Comments:

Page 6 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

3. NOTE: SFP temperature should be I Examinee reads and acknowledges note. N obtained from TR-7030 pt 1. Otherwise, portable dip probe may be used (if TR-7030 is unavailable). If SFP temperature is expected to increase, a SFP temperature of up to 5°F greater than the current SFP temperature can be used to bound 1--_ _ _-+I"'"""'~xr*?"7'"""<e~f"rte"1l!""~ conditions.

Cue:

Comments: I Examinee may choose to add up to 5°F to current SFP temperature based on the above note and expected SFP temoerature rise. It is acceotable to use a startino temoerature of 98"F for the calculation.

4. I Instructions:
1. Record time after reactor shutdown (in I Examinee records 12 days after shutdown on Attachment 3 N

days), and current SFP temperature (OF). I Examinee records current Spent Fuel pool N temperature of 93°F or 98°F on Attachment 3

5. Examinee refers to Table 1 to obtain SFP N Heatup Rate Page 7 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

6. Table 1 SFP Heatup Rates NOTE: When using this table, the more Examinee reads and acknowledges note N conservative value should be used, so interpolation is not necessary (i.e., on the 23rd day shutdown, use day 20 heatup Comments:
7. I Record SFP Heatup Rate Examinee records a SFP Heatup Rate of y 17.7°F/Hr based on End-of-Cycle Core Offload using Time from Shutdown (days) of 10 days (most conservative value) on Attachment 3.

Cue:

8. 3. Calculate and record SFP Time to Examinee performs the following 1500 F Calculation: calculation to determine SFP temperature

=

SFP Time to 1500 F {(150°F - SFP to 150°F:

Temperature (OF)) I SFP Heatup Rate (OF/hour)} {(150°F - 98°F) I 17.7°F/hour} =-2.9 Hrs.

OR

{(150°F - 98°F) I 17.rF/hour} = -2.9 Hrs. {(150°F - 93°F) I 17.7°F/hour} =-3.2 Hrs.

OR

{(150°F - 93°F) I 17.7°F/hour} = -3.2 Hrs. y Page 8 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

9. Sign Performed by (STA or Licensed Examinee signs "Performed by" block on Attachment 3 TERMINATION CUE: The evaluation for this JPM is concluded.

"'~~.itialll"W1il.

t-9:~:'t~~-~~JD!i~-~lj,-~~-

_ _ _ __

Page 9 of 11

JPM Number: JPM-A2R Rev. ___0'--__

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Areas for Improvement/Comments:

Page 10 of 11

JPM Number: JPM-A2R Rev. 0

--- --

STUDENT HANDOUT Initiating Cues:

  • Unit-2 is in day 12 of a refueling outage.
  • Unit-2 is in Mode 6 performing a full core offload with 105 fuel assemblies currently transferred to the Spent Fuel Pool.
  • Unit-2 has just experienced a Station Blackout.
  • Present Spent Fuel Pool temperature as read on TR-7030 is 93°F.

Initial Conditions:

  • The US has directed you to calculate when the Spent Fuel Pool will reach the Technical Specification temperature limit.

Page 11 of 11

Calculation:

SFP Time to 150°F= {(150°F-SF=P Temperature (OF)/ SFP Heatup Rate (OF/Hour))

Time From SFP SFP Heatup Shutdown Temperature Rate SFP Time to Date/Time (Days) (OF) (OF/hour) 150 of Today/now. 12 . 93 17.7 ~ 3.2 examinee

. Today/now 12 98 examinee

'~~~~

JPIVI;,-t\~~'R

,,, ,!j{ <, '-:;};":- ~7A~}

Answer Key

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A3R Revision:


0 II. Initiated:

Marc R. Pucel 02/01/11 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE:

2006-317 Update JPM to include HUP evaluations and new format Page 2 of 8

JPM Number: JPM-A3R Rev. °


JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A3R Rev. ___-:.0::...-__

Task Title:

System: Radiation Protection Time Critical Task: Yes No x Validated Time (minutes): 15 Task No.{s):

Applicable To: SRO RO X PEO

--- ----

KiA No. 2.3.7 KiA Rating _ _ 3._5/_3_.6_ _

Method of Testing:

Simulated Performance: Actual Performance: X


---'--

Location:

Classroom: X Simulator: In-Plant:


------

Task Standards: At the completion of this JPM, the examinee has determined all of the requested radiological requirements for entering the CLRW filter skid area to assist the Radwaste Coordinator Reguired Materials Health Physics Survey Map (procedures. equipment. etc.): Operations blanket RWP General

References:

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: JPM-A3R Rev.

- - -o- - -

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid.
  • The PEO being briefed has 450 mrem of annual dose exposure remaining.

The examiner will act as Health Physics (HP) for any related questions.

Initiating Cues:

  • State the radiological requirements for entering this area. Include in your discussion:

o Which RWP task Gob step) is appropriate for this assignment o Highest loose contamination level in the work area o Protective clothing required in the work area o Highest general area radiation level in the work area o Dose rate alarm setting o Maximum time that the operator can remain at the filter skid (and NO other area) without exceeding any dose limit Simulator N/A Reguirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what his/her simulated action/observation would be, read the appropriate "Cue".
3. Ifnecessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

1~lIfI1r*

1. I Which RWP task Gob step) is appropriate Examinee states that the appropriate RWP N for this assignment task ( job step) for this assignment is Job Ste01 Comments:
3. I Protective clothing required in the work Examinee states that the protective y area clothing required in the work area is "Full PC's" (consisting of Cotton liners, Booties, Coveralls, Shoe covers, Rubber gloves, Comments:

5.

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

6. Maximum time that the operator can remain Examinee states that the maximum at the filter skid without exceeding any dose allowed stay time at the filter skid without 1--------41 limit exceedina any dose limit is 30 minutes.

Cue:

Comments: I The RWP Dose Alarm is set at 50 mrem in a 100 mrem/hr field. 50/100=0.5 hrs TERMINATION CUE: The evaluation for this JPM is concluded.

~llllJ"~:IMI;~t~' - - - - - -

Page 60f8

JPM Number: JPM-A3R Rev. ___0,,--__

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical. it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never-.2ut anyone's safejy at risk. Pass I Fail never put equipment reliability at risk. Pass I Fail never violated radiolo~ical work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 7 of 8

JPM Number: JPM-A3R Rev.

- - -o - -

STUDENT HANDOUT Initial Conditions:

  • You are preparing a brief for a PEO who will assist the Radwaste Coordinator by performing valve manipulations on the Clean Liquid Radwaste Filter Skid.
  • The PEO being briefed has 450 mrem of annual dose exposure remaining.

The examiner will act as Health Physics (HP) for any related questions.

Initiating Cues:

  • State the radiological requirements for entering this area. Include in your discussion:

o Which RWP task Gob step) is appropriate for this assignment o Highest loose contamination level in the work area o Protective clothing required in the work area o Highest general area radiation level in the work area o Dose rate alarm setting o Maximum time that the operator can remain at the filter skid (and NO other area) without exceeding any dose limit Page 8 of 8

JPM-A3R RADIATION WORK PERMIT

SUMMARY

2110205 Millstone Station PLANT CODE YEAR RWP NUMBER REV. RWPSTART TYPE CATEGORY RWP EXPIRATION 2 11 2110205 0 01-AUG-2011 00:00 S RO I 30-0CT-2011 23:59 RWP DESCRIPTION Operations RWP TASK

SUMMARY

DOSE ALARM 1 ({HRA) Operations activities in RCAs. Radiation Areas. and High Radiation Areas 50 2 (LHRA) Operations activities in Locked High Radiation Areas. 75 ALARA INFORMATION ALARA Review No. Hours-Estimated Person-mrem 21132 :5400 5150 SPECIAL INSTRUCTIONS:

Access to RCAs to perform routine and special Operations activities RCA access includes Containment Health Physics supervision may change teledosimetry req atus. radiological conditions, or required coverage.

Activities may include, but are not limited to:

  • Routine and special rounds
  • Tagging
  • Inspections
  • Surveillances
  • Venting or draining of systems
  • System alignments and restorati9ps Entry on this RWP req .
    • Be knowledgeable of
    • Adhere to the requi

.. Notify HP before e

    • Monitor electronic lIy in high noise areas
    • Unless specifically TE alarm sounds, move to a lower dose area and notify HP "If DOSE otify HP HP BEFORE logging out enever PCs are worn Supervision DATE: 41" ,,/. tJ2tJ// DATE:

DATE: DATE:

JPM-A3R Job Steps 1 OF 2 VALID FROM 01-AUG-2011 00:00 TO 30-0CT-2011 23:59 RWP 2110205-1 REV. NO 0 DOSE RA"rE ALARM: 300 mrem/Hr BUDGETED DOSE: 1000 mrem DOSE LIMIT ALARM: 50 mrem ALARA EVALUATION NO: 21132 JOB LOCATIONS:

JOB DESCRIPTION: (HRA) Operations activities in RCAs, Radiation Areas, and High Radiation*

RADIOLOGICAL CONDITIONS:

  • Indicates estimated value for RWP Preparation. "~i:ill'UI GENERAL AREA RADIATION LEVELS (mrem/hr):

Review latest radiological surveys or historical data prior to entering RCA.

CONTACT/HOT SPOT RADIATION LEVELS (mrem/hr):

CONTAMINATION LEVELS (dpm/100cm2):

AIRBORNE RADIOACTIVITY (DAC):

All areas, < 0.3 DOSIMETRY REQUIREMENTS:

ED TLD PROTECTIVE CLOTHING REQUIREMENTS:

A RWP PRE-JOB BRIEFING IS REQU\

WORKER INSTRUCTIONS:

NO entry to Locked High Radiation\~

HP supervision may adju

  • Heat stress evalua
  • FME cont entries:

simeter AND knowledge of area dose rates, OR continuous HP coverage

  • worn for inspection-related tasks only; no physical work in contaminated areas may be performed.

A briefing from required before venting or draining any contaminated systems, to ensure proper drainage is established and that adequate radiological controls are used.

Ends of hoses shall be capped or bagged when disconnecting from contaminated systems.

A minimum of lab coat and rubber gloves shall be worn when hoses are connected to or disconnected from contaminated systems.

JPM-A3R Job Steps 2 OF 2 VALID FROM 01-AUG-2011 00:00 TO 30-0CT-2011 23:59 RWP 2110205-2 REV. NO 0 DOSE RATE ALARM: 500 mremlHr BUDGETED DOSE: 75 mrem DOSE LIMIT ALARM: 75 mrem ALARA EVALUATION NO: 21132 JOB LOCATIONS:

JOB DESCRIPTION: (LHRA) Operations activities in Locked High Radiation Areas.

RADIOLOGICAL CONDITIONS: *Indicates estimated value for RWP Preparati~n.

GENERAL AREA RADIA1"ION LEVELS (mrem/hr):

Solid Rad Waste: 5 - 1500 CONTACT/HOT SPOT RADIATION LEVELS (mrem/hr):

CONTAMINATION LEVELS (dpm/100cm2):

Solid Rad Waste: < 1K AIRBORNE RADIOACTIVITY (DAC):

~j ,

DOSIMETRY REQUIREMENTS:

ED TELEDOSIMETRY TLD DOSIMETRY COMMENTS:

loves " Modesty garments clothing requirements based on any of the following:

"

.. F .,;0'i\;",

Requiremen~Jor Locked High Radiation Area entry:

.. Dose rate meter or alarming dosimeter AND knowledge of area dose rates, OR continuous HP coverage

.. Area MUST be'la~ked or guarded at ALL times

" Health Physics briefing for Locked High Radiation Areas

" If dose rate fields in work area are> 1000 mremlhr OR dose per entry is > 500 mrem, continuous HP coverage and Stay Time are required.

Lab coats may be wom for inspection-related tasks only; no physical work in contaminated areas may be performed.

A briefing from HP is required before venting or draining any contaminated systems, to ensure proper drainage is established and that adequate radiological controls are used.

Ends of hoses shall be capped or bagged when disconnecting from contaminated systems.

A minimum of lab coats and rubber gloves shall be wom when hoses are connected to or disconnected from contaminated systems.

MILl:.STONE NUCLEAR POWER STATION- RADIATION SURVEY FIGURE NO.23 UNIT 2 DATE SURVEY By REVIEWED BY Type Of Survey 10/03/11 SIGNATURE o Routine TIME  % REACTOR POWER I!!I Special 0812 PRINT NAME John E. Tech 80 o RWP# /

Type Instrument Type Serial Number 1IEffIcIency Background calibration Due Date y RO*20 1273 NlA NlA 2112 f\+y L*177 207213 10 <80 CPM 3/12 a L*2241 I 43*2 217619 I 22171 6.1 0 1112 J 2/12

-5 Aux Bldg. Clean Waste Temp. Filter Room Smear Results NUMBER DPM/100cm2 1-7 <1000 8 6000 9 22000 Vent 100 10 18000 11 9000 0

alpha 80 G) 1*11 <20 60 100 @

RBAST r-- 95 I SOP 100

<V G)

I 45 I

L ___

G)

~-;tJ RAD CONTRL. AREA

~A RAD MAT. AREA I .::::3*

CONTAMINATED AREA 100 - gamma(r) at waist level in mremlhr RAD AREA t * * * * * *'

HIGH RAD AREA 100'" - gamma(r) contact in mremlhr

( ******)

LHRA ,---- verified on: 09/30/2011 GRAVE DANGER AREA ~

25n - neutron(on 1) in mremlhr NEUTRON

<9 -contamination survey point 50 mrad - beta (P) reading in mradlhr

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A4R Revision: _-=O=---_

II. Initiated:

Robert L. Cimmino, Jr. 09/14/11 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 13

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 010 09/14/11 Minor changes to incorporate NRC validation comments 011 Page 2 of 13

JPM Number: JPM-A4R Rev. ____0'---__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP2 Examinee:


JPM Number: JPM-A4R Rev.

Task Title:


° System: Reactivity Control Time Critical Task: Yes No x Validated Time (minutes):

Task No.(s):

Applicable To: SRO _ _ RO X PEO _ __

KIA No. KIA Rating _______

Method of Testing:

Simulated Performance: Actual Performance: X


-----'-~-

Location:

Classroom: X Simulator: In-Plant:

-- - --- -----

Task Standards: At the completion of this JPM the examinee will have successfully determined whether SDM is being satisfied for a postulated SBO eVt:mt.

Reguired Materials EOP 2530 " Station Blackout" (procedures. equipment. etc.): EOP 2541, Appendix 17 "Shutdown Margin" "Reactor Engineering Curve and Data Book ( Cycle 21)

General

References:

........ READ TO THE EXAMINEE" ......

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make a/1 written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 13

JPM Number: JPM-A4.R Rev. ___0,,---__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • Unit 2 has experienced a plant trip with a concurrent Station Blackout 30 minutes ago.
  • Unit 2 had been operating at 100% power for one month prior to the trip.
  • The crew is performing EOP 2530. Station Blackout.
  • The BOP is making preparations to restore power to Unit 2 from the SBO Diesel when it becomes available.
  • Tavg is being maintained at 532°F.
  • Chemistry has determined present RCS Boron concentration is 670 ppm.
  • Present Core Burnup is 6500 MWD/MTU.
  • All CEAs are fully inserted.

Initiating Cues:

  • The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied at this time.
  • Additionally. if it is determined that SDM is NOT being satisfied. then calculate the amount of boric acid that must be added to the RCS.

Simulator

  • N/A Requirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

~tAattlMlJ;L-'_ __

1. EOP 2530 Step 30 Examinee obtains Appendix 17, Shutdown N Check Shutdown Margin is satisfied. Refer Margin.

to Appendix 17, Shutdown f - - - - -....l "..."

2. EOP 2541, Appendix 17
1. IF desired to calculate required Examinee refers to EOP 2541, Appendix N shutdown boron concentration, 17-A to calculate required shutdown boron PERFORM Attachment 17-A, concentration.

"Required Shutdown Boron Concentration."

Examinee determines that this step is Not N

2. If boration to the RCS to maintain shutdown margin is desired, PERFORM Applicable.

Attachment 17-B "Boration to the RCS from the BAST."

Com

3. Attachment 17A, Required Shutdown Boron Concentration NOTE Examinee reads and acknowledges note N The initial calculation is used to determine about initial and subsequent calculations that SOM is met at the current conditions. ofSOM.

The subsequent calculation determines if SOM will be met for anticipated temoeratures when coolina down the RCS . .",..,,.,,.,,,,,..,,,,..,,,,,.,,,,,,,...,,

Cue:

Comments:

Page 5 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

4. REQUEST Chemistry to sample the Examinee states from Initial Conditions RCS for boron. that RCS Boron concentration is 670 Cue:

Comments:

6. 3. RECORD core burnup from ONE of the following: Examinee records core burnup as y
  • "CVBURNUP" (PPC) 6500 MWD/MTU as given in Initial
  • Control Room Daily Surveillance Conditions.
  • Reactor Engineering D/MTU Page 6 of 13

PERFORMANCE INFORMATION JPM Number: JPM-A4R STEP PERFORMANCE STANDARD

7. 4. Refer To the applicable curve in Reactor Engineering Curve and Data Book and DETERMINE the required shutdown boron concentration for the core burnup and the current TAVE as follows:
a. IF directed to this Appendix by SBO Examinee uses "1.0% Shutdown Boron y or Functional Recovery EOPs use Concentration VS. Moderator Temperature" "1.0% Shutdown Boron (RE-B-02) and determines the required Concentration vs. Moderator shutdown boron concentration for the core Temperature" (RE-B-02) burnup and the current TAVE is 719 ppm,
  • IF more than one CEA is not if data is taken from the table and fully inserted, INCREASE the interpolated. (710-730 ppm, if data is taken required shutdown boron from the curve) concentration 350 ppm per CEA, y Examinee determines that there is no greater than one, not fully indication that more than one CEA is NOT inserted.

fully inserted and that this step is Not Applicable.

Cue:

Comments:

Page 7 of 13

PERFORMANCE INFORMATION JPM Number: JPM-A4R STEP PERFORMANCE STANDARD

8. b. IF directed to this Appendix by any Examinee states that this step is Not y other EOP use "3.6% Shutdown Applicable.

Boron Concentration vs. Moderator Temperature" (RE-B-01)

  • IF any CEA is not fully inserted, INCREASE the required shutdown boron concentration 350 ppm per CEA not fully inserted.
9. 5. RECORD the required shutdown boron Examinee records the required shutdown N concentration and the T AVE for which it boron concentration and the T AVE for was calculated. which it was calculated.

_ _ _ppm 719 ppm (710-730 ppm)

Cue:

Comments:

10. 6. DETERMINE Inverse Boron Worth at y present core burnup. Refer To Reactor Examinee determines Inverse Boron Engineering Curve and Data Book. (RE Worth at present core burnup (6500 F-02) MWD/MTU ) is 112.7 ppm/%..1.p, if data is

_ _ MWD/MTU (step 3.) taken from the table and interpolated.

_ _ IBW (112.5-112.9 ppm/%Ap, if data is taken from the curve)

Cue:

Comments:

Page 8 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD 11 . 7. DETERM IN E smallest xenon reactivity Using "Reactor Engineering Curve and y worth expected within the time frame Data Book (Xenon Worth vs. Time After being evaluated. Refer To ANY of the Reactor Shutdown From Various following: Equilibrium Power Levels Cycle 21, MOC,

  • "Xenon-Samarium Post Trip Report" RE-C-01)" the examinee determines that
  • Reactor Engineering Curve and the smallest xenon reactivity worth Data Book (RE-C-01) expected for the first hour after shutdown
  • "XENON-SAMARIUM DEMAND" is 2.682 %ap, if data is taken from the program on PPC table and interpolated. (2.670-2.750 %~p, Reactor if data is taken from the curve)

Page 9 of 13

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

13. I 9. CALCULATE Boron Equivalent of Examinee calculates Boron Equivalent of Xenon Reactivity Worth (BE of XRW) as Xenon Reactivity Worth (BE of XRW) as follows: follows:

2.682 %ilp 112.7I2pm/%ilp 302.3 ppm y Xenon X Inverse Boron Xenon X Inverse Boron Equivalent Reactivity Worth Boron Worth Equivalent of Reactivity Worth Boron Worth of Xenon Xenon Reactivity Reactivity Worth Worth Using minimum values:

2.670 x 112.5 = 300.4 ppm Using maximum values:

2.750 x 112.9 = 310.5 ppm Cue:

Comments:

14. 10. CALCULATE Xenon Corrected Examinee calculates Xenon Corrected y Required Shutdown Boron Required Shutdown Boron 719 ppm 302.3 ppm Required Shutdown Boron Concentration Boron Equivalent of Xenon Reactivity

= Required Shutdown Boron Concentration Boron Equivalent of Xenon Reactivity

=

Worth Worth 416.7 Xenon Corrected Required Xenon Corrected Required Shutdown Boron Concentration Shutdown Boron Concentration Minimum value: 710 - 310.5 399.5 ppm =

Maximum value: 730 - 300.4 429.6 ppm =

Cue:

Comments:

Page 10 of 13

PERFORMANCE INFORMATION JPM Number: JPM-A4R STEP PERFORMANCE STANDARD

15. 11. Record ANY of the following: I

of the reactor trip (Due to Station Blackout, RCS boron

_ _ _ ppm at time of Rx trip at the tinme of the trip must be the

  • RCS boron sample results obtained same as RCS boron results recently from Chemistry obtained from Chemistry.)

_ _ _ ppm from Chemistry I

  • Examinee records RCS boron sample y sample results obtained from Chemistry sample as 670 ppm. (Obtained from Initial Cond Cue:

Comments:

16. 12. CHECK RCS boron concentration Examinee compares the Xenon Corrected y greater than Xenon Corrected Required Required Shutdown Boron Concentration Shutdown Boron concentration. calculated in step 10 with the present RCS boron concentration and determines that the present RCS boron concentration is greater than Xenon Corrected Required Shutdown Boron concentration (Le.,

Shutdown Margin is satisfied.); therefore, Emeraencv Boration is NOT Com TERMINATION CUE: The evaluation for this JPM is concluded.

.:e.C!T.*.*"da 1MiltE" }i0 .%

~~! Wf;' :;rJ,-:;!'~;'0'~' ;~{E~. ' - - - -

Page 11 of 13

JPM-A4R Rev. o JPM Number:


VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

--

Validated Time (minutes):

Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never put e_quipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 12 of 13

, . JPM Number: JPM-A4R Rev.

- - -

STUDENT HANDOUT Initial Conditions:

  • Unit 2 has experienced a plant trip with a concurrent Station Blackout 30 minutes ago.
  • Unit 2 had been operating at 100% power for one month prior to the trip.
  • The crew is performing EOP 2530, Station Blackout.
  • The BOP is making preparations to restore power to Unit 2 from the SBO Diesel when it becomes available.
  • Tavg is being maintained at 532"F.
  • Chemistry has determined present RCS Boron concentration is 670 ppm.
  • Present Core Burnup is 6500 MWD/MTU.
  • All CEAs are fully inserted.

Initiating Cues:

  • The Unit Supervisor has directed you to perform EOP 2530 (Step 30) and determine if SDM is being satisfied at this time.
  • Additionally, if it is determined that SDM is NOT being satisfied, then calculate the amount of boric acid that must be added to the RCS.

Page 13 of 13

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Shift$taffitigBased on\~.all1if1i$tl'ative Requirements

..IPM Number: JPM-A1.1S Revision: 1

--

II. Initiated:

R. J. Ashey 9/15/2011 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 10

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 11/30/2011 Created JPM for LOIT 2011 NRC Exam 0/0 9/1512011 Revised JPM based on NRC comments. 1/0 Page 2 of 10

Facility: MP-2 Examinee:


JPM Number: JPM-A1.1 S Rev. 1


~----------

Task Title: $hiftStafflngS~sedon Admini:strative~egUirefnents System: Conduct of Operations Time Critical Task: Yes N

- - No Validated Time (minutes): 15 Task No.(s): N/A Applicable To: SRO X RO PEO KJA No. 2.1.5 KJA Rating 2.9/3.9 Method of Testing:

Simulated Performance:

- -X- - Actual Performance:


Location:

Classroom: X Simulator: In-Plant:

--....;,...:..- ------ -------

Task Standards: At the completion of this JPM, the SRO will determine who is fit for duty and can be called in for shift coverage when the on shift RO becomes incapacitated (cannot perform licensed activities).

Required Materials Unit 2 Technical Specifications (procedures, equipment, etc.): U-AA-700 (Rev. 4-00), Fatigue Management and Work Hour Limits for Covered Workers SY-AA-FFD-101 (Rev. 6-00), Fitness For Duty Operator Schedule (Handout)

General

References:

Unit 2 Technical Specifications, Administrative Section U-AA-700700 (Rev. 4-00), Fatigue Management and Work Hour Limits for Covered Workers SY-AA-FFD-101 (Rev. 6-00), Fitness For Duty

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 10

Initial Conditions:

  • The plant is in MODE 1 and stable at 100% power
  • The crew began its 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift at 1800
  • Current time and Date is 1830 on Wednesday, October 5, 2011.
  • The Balance of Plant Operator has become ill early (1830) on his last night of Night Shift and has been sent home, which places the shift below minimum staffing levels. (Prior to the BOP becoming ill, the crew was at minimum staffing.)

Initiating Cues:

  • You are the Night Crew Shift Manager.
  • Based on Administrative requirements, determine the following from the attached list of available operators:

o How soon must a relief be found?

o From the list provided, who is immediately eligible to assume shift duties?

o For those who are NOT eligible, what is the reason?

  • NO other Shift Managers are available to assist with your decision.
  • All other qualified operators are unavailable.

Available Response Operator 1 "I came in for Work Control coverage at 0600 this morning for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> today and I'm scheduled for vacation tomorrow. My plans fell through, so I can easily reschedule my vacation. If you really need someone, I could .

probably be there in about 30 minutes."

.

Operator 2 "It's the last day of my SeVE!n days off. We just got back from Atlantic City, New Jersey, a half hour ago. I only got a few hours of sleep while my wife drove. I really don't want to come in, but I can be there in about an hour if y~'re_ in a bind."

Operator 3 "I've been on day shift for the last few days, including a makeup day of Training yesterday. I'm on vacation for a couple of days starting tomorrow. I don't have plans for vacation, so I can be there in about an hour or so."

Operator 4 "I'm on the last day of my seven days off. I had a couple of beers with dinner, but I'll come in if you want me to. It usually takes me 50 minutes to get to work, but I can be there in about 35 minutes, if I hurry and there's no traffic."

Operator 5 I'm scheduled to come in tomorrow night for my first night of midnights. I'm just getting over a pretty nasty coOld and I'd don't want to infect anyone, but, if you really need me, I'll come in. I just took a double dose of Nyquil about an hour ago, so I don't feel too bad right now. I can be there in about an hour. I just need to jump in the shower to wake up a little before I leave."

See Operator Schedules on next page.

Simulator N/A Reguirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 10

Operator Wed Thurs Fri Sat Sun Mon Tues Wed Thurs Fri Sat Sun Mon Tues Wed 9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8 10/9 10/10 10/11 10/12

  1. 1 Day OFF OFF OFF Day Day Day we Vac. Vac. Night Night Night OFF OFF (12) (12) (12) (12) (0600- (6) (12) (6) 1400)
  1. 2 Day OFF OFF I OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6)
  1. 3 OFF Day Day Day Day Day T OFF Vac. Vac. OFF OFF Night Night Night (12) (12) (12) (12) (12) (8) (6) (12) (12)
  1. 4 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12)

-

(6)

  1. 5 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) _._._.- __ ~61 __ - .... _(12)

.... - .... - _ .... _ _ _ - _ J~2! _ _ _ _ _ -

(12)

.... .... .. ....

(6)

.... .... ... ~.--.--

--

=

Day (12) 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Day Shift WC = Work Control

=

Night (12) 12 Hour Night Shift

=

Night (6) 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> on the first evening or last morning of Night Shift

=

T (8) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of Training OFF = Scheduled day off Vac. = Vacation Page 5 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1S Rev. _1_.

Shift Staffing Based on AdministrativeR~quirerrients STEP PERFORMANCE STANDARD STARTTJMEf


1. How soon must a relief be found? Examinee determines that another RO must y Determines from Technical report within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (Technical Specifications Section 6.2 Table 6.2-1, Specifications, Table 6.2-1).

that the crew composition may be less than minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to Cue:

  • *. . 6~'1liriO~~~~r~a~~~itl1!$s.*for'outy RrQg~am~'.D*~A~*~£~5.
  • . OPEu~tQ~'*S.~tJEf~iije{a~cbed hal11out~'****~.,,',* "'; '.

Comments:

2. I From the list provided, who is eligible ,- Examinee refers to the list of available Y to assume shift duties? operators, reviews their responses, and determines that, although Operator 2 may NOT want to work a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift, he/she is the only individual eligible to assume shift duties without condition.

Cue: lit the~xami~e~.~~~rn.Pts to contact other;'a~~i~i~l1al'.indiv!ti~als,~il1(or.n-lliin1herthat none9t!tJ'i~liji!Will answer; the phoni.:or.reply to the page. - ' ' . ' , ," "

Comments:

Page 6 of 10

PERFORMANCE INFORMATION JPM Number: JPM-A1.1 S Rev.

Shift Staffing~~~_d_on Administrative Reguiref!le!:!ts_ .~._

STEP PERFORMANCE STANDARD

3. For those who are NOT eligible, what
  • Examinee determines that Operator #1 is I Y is the reason? NOT eligible because he/she would NOT have a break of at least 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> between work periods. He/she would also exceed more than 16 work hours in a rolling 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period. (LI-AA-700, step 3.3.1)
  • Examinee determines that Operator #3 is Y NOT eligible because he/she would work more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 7 day period. (LI AA-700, step 3.3.1)
  • Examinee determines that Operator #4 is Y NOT eligible due to the consumption of alcoholic beverages within the past 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. (SY-AA-FFD-101, step 3.19)
  • Examinee determines that Operator #5 is Y NOT eligible due to the use of over-the counter medication that may affect his/her ability to perform required duties. SY-AA FFD-1 01, step 3.19)

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

Page 7 of 10

Rev.

JPM Number: JPM-A1.1S

- - -

VERIFICATION OF JPM COMPLETION Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Areas for ImprovemenVComments:

Page 8 of 10

JPM Number: JPM-A1.1S Rev. ___1_ __

STUDENT HANDOUT Initial Conditions:

  • The plant is in MODE 1 and stable at 100% power
  • The crew began its 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> shift at 1800
  • Current time and Date is 1830 on Wednesday, October 5, 2011.
  • The Balance of Plant Operator has become ill early (1830) on his last night of Night Shift and has been sent home, which places the shift below minimum staffing levels. (Prior to the BOP becoming ill, the crew was at minimum staffing.)

Initiating Cues:

  • You are the Night Crew Shift Manager.
  • Based on Administrative requirements, determine the following from the attached list of available operators:

o How soon must a relief be found?

o From the list provided, who is immediately eligible to assume shift duties?

o For those who are NOT eligible, what is the reason?

  • NO other Shift Managers are available to assist with your decision.
  • All other qualified operators are unavailable.

Available Response Operator 1 "I came in for Work Control coverage at 0600 this morning for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> today and I'm scheduled for vacation tomorrow. My plans fell through, so , can easily reschedule my vaca!ion. If you really need someone, I could probably be there in about 30 minutes."

Operator 2 "It's the last day of my seven days off. We just got back from Atlantic City, New Jersey, a half hour ago. I only got a few hours of sleep while my wife drove. I really don't want to come in, but I can be there in about an hour if you're in a bind.>>

Operator 3 "I've been on day shift for the last few days, including a makeup day of Training yesterday. I'm on vacation for a couple of days starting tomorrow. I don't have plans for vacation, so I can be there in about an hour or so."

Operator 4 "I'm on the last day of my seven days off. I had a couple of beers with dinner, but I'll come in if you want me to. It usually takes me 50 minutes to get to work, but I can be there in about 35 minutes, if I hurry and there's no traffic."

Operator 5 "I'm scheduled to come in tomorrow night for my first night of midnights. I'm just getting over a pretty nasty cold and I'd don't want to infect anyone, but, if you really need me, I'll come in. I just took a double dose of Nyquil about an hour ago, so , don't feel too bad right now. 'can be there in about an hour. I just need to jump in the shower to wake up a little before I leave."

(See Operator Schedule on next page)

Page 9 of 10

JPM Number: JPM-A1.1S Rev. 1 Operator Schedule Operator Wed Thurs Fri Sat Sun Mon Tues Wed Thurs Fri Sat Sun Mon Tues Wed 9/28 9/29 9/30 10/1 10/2 10/3 10/4 10/5 10/6 10/7 10/8 10/9 10/10 10/11 10/12

  1. 1 Day OFF OFF OFF Day Day Day we Vac. Vac. Night Night Night OFF OFF (12) (12) (12) (12) (0600 (6) (12) (6) 1400)
  1. 2 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6)

-

  1. 3 OFF Day Day Day Day Day T OFF Vac. Vac. OFF OFF Night Night Night (12) (12) (12) (12) (12) (8) (6) (12) (12) 1--
  1. 4 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6)
  1. 5 Day OFF OFF OFF OFF OFF OFF OFF Night Night Night Night Night OFF OFF (12) (6) (12) (12) (12) (6)

Day (12) = 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Day Shift

=

WC Work Control Night (12) = 12 Hour Night Shift

=

Night (6) 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> on the first evening or last morning of Night Shift

=

T (8) 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> of Training OFF = Scheduled day off Vac. =Vacation Page 10 of 10

T JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

..IPM Number: JPM-A1.2S Revision: 1

--

II. Initiated:

R. J. Ashey 9/14/2011 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 8

JOB PER.FORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 2006-317 Update JPM to include HUP evaluations and new format 9/14/2011 Revised to include NRC comments. 1/0 Page 2 of 8

.JPM Number: JPM-A1.2S Rev. ___1......--.__

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: _M~P.;;:..2_ _ Examinee:

JPM Number: JPM-A1.2S


Rev. 1


Task Title:

System: Auxiliary Feedwater Time Critical Task: Yes No x Validated Time (minutes):

Task No.(s): _ _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO PEO KiA No. 2.2.14 KiA Rating 3.9/4.3 Method of Testing:

Simulated Performance: Actual Performance: X Location:

Classroom: X Simulator: In-Plant:

Task Standards: At the completion of this JPM, the examinee will determine whether the Tag Clearance can be approved and authorized and if not, why.

Required Materials

  • The following P&ID's (procedures, equipment. etc.):

o 25203-26005 SH.3, Condensate Storage and Aux Feed),

o 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)

General

References:

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: JPM-A1.2S Rev. 1


JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • Unit 2 is in Mode 5
  • Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
  • A tag clearance to accomplish the inspection has been prepared on the tagging computer, which is NOT available now.

Initiating Cues:

  • Your task is to review the printed Tag Clearance and determine if it can be approved and authorized as written.

o If the Tag Clearance cannot be approved and authorized as written, determine the changes required to approve and authorize Tag Clearance Sheet.

Simulator

  • N/A Reguirements:
  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ~ critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

1. OP-AA-200 "Equipment Clearance"
  • Examinee reviews the completed N Tagging Clearance for accuracy and 3.2.3c. REVIEW the completed Tagging completeness, using the following Record for accuracy and controlled drawings:

completeness, referencing o 25203-26005 SH.3, Condensate controlled documents as necessary. Storage and Aux Feed The reviewing SRO or designee o 25203-30005 Single Line Meter &

shall: Relay Diagram 4.16KV Emerg.

  • ENSURE that the tag-out is Buses 24C,24D (A3,A4 adequate for the tasks and
  • Examinee identifies that the incorrect y hazards involved. 4160 VAC breaker (A307) is Red
  • ENSURE that the proper Tagged and that the correct breaker sequence of component (A406) is required to be Red Tagged in alignment and tag placement is the "Racked Down" position.

specified.

  • Examinee identifies that 2-FIRE-94B, y
  • ENSURE that the appropriate "B" AUX FEED PUMP EMERGENCY entries have been made in the FIRE WATER SUPPLY VALVE" has comment section of the Tagging been incorrectly omitted from the Record. tagging sheet and that this valve is
  • DETERMINE if support is required to be Red Tagged in the required from Maintenance "Closed" position.

Personnel to execute the tag

  • Examinee determines that this tag y out. clearance CANNOT be approved or authorized as written for the task to be performed.

Cue:

Comments: I. Examinee may determine that only one casing vent valve one header drain valve (2-CN-331 or 2-CN-332). At least one casing vent valve and one header drain valve must be tagged open.

  • Examinee may desire to tag open the motor heater breaker for "B" MDAFW pump. This is NOT necessary, but may be considered for the clearance. (See Answer Key)

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD TERMINATION CUE: The evaluation for this JPM is concluded.

Page 6 of 8

JPM Number: JPM-A1.2S Rev.

- - -

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 10 min.

Actual Time to Complete (minutes):

JPM Work Practice Evaluation: SAT UNSAT NA (circle one)

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass I Fail and adherence requirements.

never put anyone's safety at risk. Pass I Fail never-'put equipment reliability at risk. Pass I Fail never violated radiological work practices. Pass I Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for Improvement/Comments:

Page 7 of 8

JPM Number: JPM-A1.2S Rev. _~_1___.

STUDENT HANDOUT Initial Conditions:

  • Unit 2 is in Mode 5
  • Mechanical Maintenance will be inspecting the overall condition and seating surfaces of the valve and making recommendations for repair or replacement of the valve.
  • A tag clearance to accomplish the inspection has been prepared on the tagging computer, which is NOT available now.

Initiating Cues:

  • Your task is to review the printed Tag Clearance and determine if it can be approved and authorized as written.

o If the Tag Clearance cannot be approved and authorized as written, determine the changes required to approve and authorize Tag Clearance Sheet.

Page 8 of 8

SeCtion CovefSheet Millstriiiestation

'Tagout: " 2C2:1.

iSeCtion: 2322X00-OO2A :1.0/03/:1.:1. :1.935 Component to be Worked 2-FW-8B 2_TB _00106_ AFRV AREA_

Notes:

Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructionsl Cautions:

Additional Information:

25203-26005 SH.3, Condensate Storage and Aux Feed

'25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)

Section Attributes:

Work Order List:

"Number I Equipment ID Description 2-FW-SB Perform Check Valve Inspection Section Verification:

Status Description Name Prepare<:! Pre.pare.d[3y: "Qualified Qperatorl l .1 . "Ihi:iMornif'\g'f

" Approve<:! , ApprovedBy:

  • Authorized , Aythorized By:

Work Released , yY(JrkReleaseg E3Y:

To Clear  : Authorize Tags to clear:

System Restored Restoration Complete ANSWERKEY JPM-Al.2S JPM-Al.2S Page~~of3J

ANSWER KEY ~

Section Coversheet Millstone Station ragout: 2C21 Section: 2322X00-002A 10/03/111935 Tag Tag Equipment Pia Placement Place. 1st Ver; Pia Restoration As Left . Rest. 1st Rest. 2nd

,Serial, Type Seq :Configuration Verif Req :Seq'~'!~~!.I!c.!!.i~.!1____ _ Configuration; Verif , Verif No.

  • Equipment Description *-Notes---------. Time/Date
  • Notes Ttme/DateTime/Dat~

,* Equipment Location Yellow ,P9B-HS 1 ;N/A 'N/A

  • HANDSWITCH FOR "B" ~----.----------.

l* BREAKER RACKED AUXIUARY FEEDWATER PUMP DOWN

  • 2_CB _03606_ CNTRl RM COS Red A 406 IV 2 !RACKED DOWN r - - - - - - - - - - - ...-,------'----'-----,

'RACKED UP

  • 4.I6KV 6REA~ ~

This is the correct FEEDWATER PUMP 2405-2 breaker to be Red

  • 2_TB _OS606_UPR_ tagged for "B" SWGR_SUS 240' AFWPump.

lted 3 :CLOSED 2 OPEN :OPEN

~--~-'-----------

  • "6" AUX FEED PUMP DISCHARGE STOP VALVE IV 3 !CLOSED OPEN

~---------------.

  • "S" AUX FEED PUMP RECIRCULATION STOP VALVE

.* 2_TB 00I06_ABOVE

~"*:=~*'~*"~~;*~~,*r~*~+**"*~4."'~-"~"~'

Red 2-(N-29B IV 3 !CLOSED 2 'OPEN


_.

  • "B" AUX FEED PUMP SUCTION ISOLATION
  • 2_TB _00106_AFW RM Red 2-FiRE=94S' ...

~~.' w****~***r tv 3 :CLOSED 2 CLOSED CLOSED r

i

  • "B" AUX FEED PUMP EMERGEN suction valve that FIRE WATER SUPPLY VALVE l
  • 2_TB _00106_ AFW RM i i must be Red Red !i-CN:330****"*****~~**'"**** .. ****Ti\!*r* 4*jOP~N/UNCAPPED 1 /CLOSED/CAPPED 'cLOSED

, 1 I i *"6" AUXfEEQPUMP CASING j I I  ; VENTVALVE. .'. ..*..*.. ..*...t I I Ii . w **** _L~w~.~. .L~_3=]].::c'-~~.~;~.c:.L.::~~!E~=._::h~~L.~.J. ~_l__~ ..._~~___.~___....._., . . _........~.........L. __.. :.~...._,.... _ ..... _ ..........................

lPM-A1.2S ANSWER KEY Page 2 of3

.

ANSWER KEY Red '2-CN-329 4 jOPEN/UNCAPPED

  • "S" AUX FEED PUMP CASING VENT VALVE

_00106_

4 \OPEN/UNCAPPED

  • "S" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE
  • 2_TB _00106_

. * "6" AUX FEED PUMP SUCTION HEADER DRAIN

_00106_

.2S ANSWER KEY Page 3 0'3

Sectit\n Coversheet Millstone Station Tagout: 2C21 Section: 2322X00-002A 10/03/111935 Component to be Worked:

FOR TRAINING ONLY 2-FW-SB 2_TB _00106_ AFRV AREA_

Notes:

Reason Tagged 2-FW-SB CHECK VALVE INSPECTION Instructions! Cautions:

Additional Information:

25203-26005 SH.31 Condensate Storage and Aux Feed 25203-30005 Single Line Meter & Relay Diagram 4.16KV Emerg. Buses 24C,24D (A3,A4)

Section Attributes:

Work Order List:

Number I Equipment ID Description

Section Verification:

Status Name Verification Date Prepared "This Mqrning" Approved Authorized Work Released To Clear System. Restored FOR TRAINING ONLY M-A12S ***Page4of3

FOR TRAINING ONLY Section Coversheet Millstone Station ragout: 2C21

.Section: 2322X00-002A 10/03/111935 Tag Tag Equipment Rest. 1st, Rest. 2nd Serial Type Configuration; Verif Verif No.

  • Equipment Description . :Time/Dateiime/Datei
  • Equipment location

¥ellow 'P9B-HS'"

_03606_ CNTRL RM

. . . "'~ '~'~-'~3~f~~~p~~i'~'~~~_ ~..

~~ ~ :RACKEDUP~~~~"~'

  • 2_TB _03106_L~

SWGR_BUS 24C Red 2-FW-9B 3 {CLOSED

  • "B" AUX FEED PUMP DISCHARGE STOP VALVE

.'f{;d"~"'T1*2~fW:52C- 2.3B '.. . ...,OOl06~AFW RM j

'~""-"'~~"""--~~-'~' -'I 'W'

i. .1.. .' . '. i ...i l 3' .TCLOSED ---" -..-.. ....

-~ ~ .,~-.,~ ... . .. ,..;

~~" '-"-";-'2~"p!~ __________ _

~---------------.

  • "6" AUX FEED PUMP RECIRCULATION STOP VALVE
  • 2_TB _ OOI06_ABOVE =~~~.",.,+" __ "'_.+~ ..,_~, ... ~.~...,.. . ..

~ed 2-CN-29B  ; 3 iClOSED 2 OPEN ;OPEN

~----~----~-----.

  • "6" AUX FEED PUMP SUCTION ISOLATION

~ ......,.......;.*~ . . ~=I!l... ~~.,.. _,._-=~~!2~=~~.~M ,

Red  ! 2-CN-330 4 'iOPEN'iuN'CAPPED~"-~"'-'-""""""'-'-"~"""****J-i**~LOSEii'**--******* ******,--*':CLOSEO**********

  • "B" AUX FEED PUMP CASING VENT VALVE I

I JPM-Al.2S FOR TRAINING ONLY Page 2 0'3

FOR TRAINING ONLY Red ,2-CN-329 lV 4 ,OPEN/UNCAPPED 1 CLOSED ,CLOSED

  • "8" AUX FEED PUMP CASING VENT VALVE
  • 2_TB _00106_

Red e-CN-331 'lV 4 :OPEN/UNCAPPED

  • "8" AUX FEED PUMP DISCHARGE HEADER DRAIN VALVE

_00106_

Red 2-CN-332 4 ;OPEN/UNCAPPED

  • "8" AUXFEEDPUMP SUCITON HEADER DRAIN
  • 2_TB*

I

FOR TRAINING ONLY JPM-Al.2S Page 3 of3

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A2S Revision: 1

--

II. Initiated:

R. J. Ashey 09/14/2011 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 02/03/11 Created JPM for LOIT 2011 NRC Exam 0/0 9/1412011 Revised JPM to incorporate NRC comments. 1/0 Page 2 of 8

JPM Number: JPM-A2S Rev. ____1/_0_ _

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP-2 Examinee:


JPM Number: JPM-A2S Rev. ___1~__

System: Administrative Time Critical Task: Yes X

--- No Validated Time (minutes): 15 Task No.(s):

Applicable To: SRO X RO PEO KIA No. 2.2.40 KIA Rating 3.4/4.7 Method of Testing:

Simulated Performance: X Actual Performance: X

-~~- ----

Location:

Classroom: X Simulator: In-Plant:


--- ------

Task Standards: At the completion of this JPM, the SRO should analyze the given conditions and state the required Tech. Spec. entry and surveillancE~.

Reguired Materials

  • Plant Technical Specifications Manual (procedures, equipment etc.):
  • SP-2619A-001; Control Room Daily Surveillance, Mode 1 & 2 General

References:

  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, wj1ich step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfiE~d. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: JPM-A2S Rev. 1/0

--- --

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • The plant has just returned t0100% power after completing Control Valve Testing at 90% power.
  • Group 7 CEAs were inserted 10 steps for the power reduction, but have all just been fully withdrawn, as indicated by the Core Mimic.

o As the RO withdrew Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.

o CEA Pulse Counting, the Backup Scanner, and the Core Mimic aI/ tracked motion as designed.

  • I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input to CEAPDS from CEA #1 is not capable of tracking motion of this CEA at this time.
  • I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C-05, needs to be replaced with a spare from the warehouse.
  • Testing and replacement will take approximately five (5) hours.

Initiating Cues:

  • You are the on-shift US.
  • Determine what Tech Spec LCO(s) is (are) applicable and what ACTION(s) is (are) required.

Simulator NJA Requirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ~ critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number: JPM-A2S STEP PERFORMANCE STANDARD

~~~m~~~,--' __

1. Given a copy of the plant Technical Examinee reviews the following:

Specifications Manual and, if requested,

  • A copy of the Unit 2 Technical N AOP 2556, CEA Malfunctions: Specifications Manual
  • Review the Initial Conditions and
  • If desired, a copy of AOP 2556, CEA N Initiating Cue. Malfunctions, and/or SP 2619A-001,
  • Review Tech. Specs. and, as needed, Control Room Daily Surveillance.

AOP 2556 for any required entries and additional surveillance reQuirements.

Cue:

Comments:

Page 5 of 8

PERFORMANCE INFORMATION JPM Number: JPM-A2S STEP PERFORMANCE STANDARD

2. Explain the necessary Tech. Spec. entry
  • During the review of Unit 2 Technical Y requirements and the Tech. Spec. Specifications, the examinee states surveillance that must be performed. the need to enter into Tech.

Spec.LCO 3.1.3.1B (8.1 or B.2) and 3.1.3.1C.

  • The examinee may state the need to N enter into Tech. Spec.LCO 3.1.3.60.
  • The examinee states the need to y record CEA Position Indication within the first hour and at least once every four (4) hours per the Tech Spec.

ACTIONs of 3.1.3.1 B (B.1 or B.2) and 3.1.3.1 C. (The CEA positions are to be recorded on SP 2619A-001, Control Room Daily Surveillance, Section 49, which includes the time of inoperability and the time of return to OPERABILITY. )

  • The examinee must NOT enter Tech Y Spec LCO 3.1.3.3 or 3.0.3 as they are NOT applicable with the Backup Scanner operating as designed.

Comments:

  • Although Tech. Spec. 3.1.3.6.0 applies and must be logged, it is NOT a Critical item because the requirement of this Tech Spec ACTION requires logging CEA positions every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, which is less restrictive than the Tech Spec ACTIONs of 3.1.3.1 B (B.1 or B.2) or 3.1.3.1 C.
  • LCO 3.1.3.1 B.1 would NOT applv if the malfunction cannot be repaired and tested within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

TERMINATION CUE: The evaluation for this JPM is concluded.

i'~tf.U~1--*_ __

Page 6 of 8

JPM Number: JPM-A2S Rev. 1

--- --

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Page 7 of 8

JPM Number: JPM-A2S Rev.

- - -

STUDENT HANDOUT Initial Conditions:

  • The plant has just returned t0100% power after completing Control Valve Testing at 90% power.
  • Group 7 CEAs were inserted 10 steps for the power reduction, but have all just been fully withdrawn, as indicated by the Core Mimic.

o As the RO fully withdrew all Group 7 CEAs, he noted that CEAPDS did not track the last couple steps of CEA #1 in Group 7.

o CEA Pulse Counting, the Backup Scanner, and the Core Mimic all tracked motion as designed.

  • I&C investigated the problem and explained that the CEAPDS computer is operating as designed, but the input to CEAPDS from CEA #1 is not capable of tracking motion of this CEA at this time.
  • I&C testing indicates the reed switch input card to CEAPDS for CEA #1, located on the rear of C-05, needs to be replaced with a spare from the warehouse.
  • Testing and replacement will take approximately five (5) hours.

Initiating Cues:

  • You are the on-shift US.
  • Determine what Tech Spec LCO{s) is (are) applicable and what ACTION(s) is (are) required.

Page 8 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM-A3S Revision:

JPM Number:

- -0 II. Initiated:

Robert L. Cimmino. Jr. 09/14/11 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 8

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 12/07/10 Created JPM for LOIT 2011 NRC Exam 010 09/06/2011 Corrected Minimum value for LHRA from 1000 mrem/hr 0/1 to 1001 mremlhr 09/14/11 Minor changes to incorporate NRC validation comments 012 Page 2 of 8

JPM Number: .JPM-A3S Rev. _ _..;;.;O/~O_ _

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Facility: MP-2 Examinee:


JPM Number: JPM-A3S Rev. 0


Task Title:

System: Administrative Time Critical Task: Yes No x Validated Time (minutes):

Task No.(s}: _ _ _ _ _ _ _ _ _ __

Applicable To: SRO X RO PEO _ _

---

KIA No. 2.3.12 KIA Rating _......;;;.;3.=2/~3.;..;...7__

Method of Testing:

Simulated Performance: X Actual Performance: X


----

Location:

Classroom: X Simulator: In-Plant:

--~- ---- ---

Task Standards: At the completion of this JPM, the SRO should analyze the given conditions and designate which PEO should perform each of the two specified tasks, based on the radiological concerns of each.

Required Materials If requested, RPM 5.2.2; Basic Radiation Worker Responsibilities.

(procedures. equipment. etc.):

General

References:

  • RPM 5.2.2; Basic Radiation Worker Responsibilities
  • Radiation Worker CBT
  • * *
  • READ TO THE EXAMINEE * * *
  • I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 8

JPM Number: JPM-A3S Rev. _ _~Ol-=O_ _

JOB PERFORMANCE MEASURE WORKSHEET (continued)

Initial Conditions:

  • You are! the Work Control SRO.
  • The plant has been shut down to repair a leak in the CVCS Regeneirative Heat Exchanger.
  • The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.
  • The following additional conditions exist:
  • The area is at the minimum radiation level to meet the required posting.
  • All valves on the valve lineup are in the posted area.
  • There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
  • PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
  • PEO #2, a newly qualified Operator, has 850 mRem of remaining exposure.
  • It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
  • It will take PEO #1 approximately 15 minutes of stay time in the posted area to perform the valve lineup Independent Verification. It will take PEO #2 approximately 25 minutes of stay time to perform the same task .

.:.:.In=it=ia=ti......

n=a....;:C:;.::u=e=s.:...:__ Determine the following:

1. Which PEO (#1 or #2) will be directed to clear the tag-out and perform the initial valve lineup?
2. Which PEO (#1 or #2) will be directed to perform the required valve lineup Independent Verification?
3. What specific dose will each PEO get in performing their task?

Simulator N/A Requirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?" or "What are you observing?").
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 8

PERFORMANCE INFORMATION JPM Number: JPM-A3S STEP PERFORMANCE STANDARD

~3T4Rlilllf.',--:_ __

1.
  • Review the Initial Conditions and
  • PEO #1 only has 400 mR of exposure N Initiating Cue. left and PEO #2 has 850 mR of
  • Using known exposure rate in the area, exposure left.

calculate the maximum available stay

  • Based on available stay time, decide mrem/hr.

which PEO must perform each task.

  • Therefore, based on the available exposure for each PEO and the N expected radiation levels at the job site, the maximum stay time for PEO
  1. 1 is <1= 24 minutes.

(400 mR /1001 mRlhr.

  • 60 min/hr. =

23.976 minutes)

And <1= 51 minutes for PEO #2 (850 mR 11001 mRlhr

  • 60 min/hr. =

50.949 Cue:

Comments:

Page 5 of 8

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

2.
  • PEO #1 does not have enough Based on the calculated stay times for exposure left to clear the tags and each PEO and the individual task time perform the initial valve lineup. requirements:
1. PEO #2 is assigned to clear the tags y
  • PEO #2 has enough exposure to clear and perform the initial valve lineup.

the tags and perform the initial valve lineup. Then, PEO #1 will have enough 2. PEO #1 is assigned to perform the y exposure left to perform the valve lineup valve lineup Independent Verification.

Independent Verification. 3. PEO #1 dose received - 250 mrem. y PEO #2 dose received - 750 mrem.

The examinee may also state the following, but it is not required:

  • PEO #2 does not have enough exposure left to perform both tasks, clearing the tag out and performing both valve lineups (this would also not meet the "Independent Verification" Administrative Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

Page 6 of 8

JPM Number: JPM-A3S Rev.

--- o--

VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes No X

-

Validated Time (minutes): 15 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

Areas for ImprovemenUComments:

Page 7 of 8

, ,

Rev.

JPM Number: JPM-A3S

- - -

STUDENT HANDOUT Initial Conditions:

  • You are the Work Control SRO.
  • The plant has been shut down to repair a leak in the CVCS Regenerative Heat Exchanger.
  • The work is complete and the Heat Exchanger is ready to be returned to service, following the clearing of the tags and subsequent required valve lineups.,
  • The following additional conditions exist:
  • The area is at the minimum radiation level to meet the required posting.
  • All valves on the valve lineup are in the posted area.
  • There are two PEOs available to do the tag removal, initial valve lineup and the second check of the valve lineup.
  • PEO #1, an experienced Operator, has 400 mRem of remaining exposure.
  • PEO #2,61 newly qualified Operator, has 850 mRem of remaining exposure.
  • It will take PEO #1 approximately 30 minutes of stay time in the posted area to clear the tags and perform the initial valve lineup. It will take PEO #2 approximately 45 minutes of stay time to perform the same task.
  • It will take PEO #1 approximately 15 minutes of stay time in the posted arSia to perform the valve lineup Independent Verification.

It will take PEG #2 approximately 25 minutes of stay time to perform the same task.

Initiating Cues: Determine the following:

1. Which PEO (#1 or #2) will be directed to clear the tag-out and perform the initial valve lineup?
2. Which PEO (#1 or #2) will be directed to perform the required valve lineup Independent Verification?
3. What specific dose will each PEO get in performing their task?

Page 8 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:

JPM Number: JPM-A4S Revision:

--- o -

II. Initiated:

R. J. Ashey 12/15/10 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supervisor Date Page 1 of 11

JOB PERFORMANCE MEASURE

SUMMARY

OF CHANGES:

All & DATE DESCRIPTION REV/CHANGE 12/13/10 Create for use on LOIT-2011 NRC Exam 0 Page 2 of 11

Facility: MP-2 Examinee:


JPM Number: JPM-A4S Revision:

- - -o- - -

Task Title:

System: Emergency Plan Time Critical Task: Yes X No Validated Time (minutes): 20 Task No.(s): NUTIMS #000-05-205 Applicable To: SRO X RO PEO

--- ---

KJA No. 2.4.41 KJA Rating _ _ 2._9/_4_.6__

Method of Testing:

Simulated Performance: Actual Performance: x


Location:

Classroom: X Simulator: X In-Plant: X

--'------ ------ -----

Task Standards: At the completion ,of this JPM, the examinee has correctly classified the proposed event and provided the appropriate Protective Action Recommendation.

Required Materials

  • MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action (procedures, equipment. etc.): Levels
  • MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
  • MP-26-EPI-FAP06, Classification and PARs
  • MP-26-EPI-FAP07-001, Incident Report Forms
  • Student Handout, Critical Plant Parameters General

References:

  • MP-26-EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels
  • MP-26-EPI-FAP06-005, Control Room Protective Action Recommendations.
  • MP-26-EPI-FAP06, Classification and PARs
  • * *
  • READ TO THE EXAMINEE * * *
  • 1 will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this JPM will be satisfied. You may use any approved reference materials normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgments, and log entries as if the evolution was actually being performed.

Page 3 of 11

Initial Conditions: See attached form for Critical Plant Parameters.

Initiating Cues:

  • You are the on-duty SM.
  • Your task is to determine the NRC and state posture code classification and PAR, if applicable, for the event described on the attached form. (Time Critical) o Fill in the data for steps 1 and steps 4 through 8.

o If applicable, provide the required Protective Action Recommendation that would be given to the state.

o Determine Potassium Iodide (KI) strategy, if applicable.

Simulator N/A Reguirements:

  • *
  • NOTES TO EVALUATOR * * * *
1. Critical steps for this JPM are indicated by checking "Y". For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
2. When the student states what hislher simulated action/observation would be, read the appropriate "Cue".
3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?"),
4. Under NO circumstances must the student be allowed to manipulate any devices during the performance of this JPM (in-plant only).

Page 4 of 11

PERFORMANCE INFORMATION JPM Number: JPM-A4S Rev. _0_

EALClassification,'an"dPARs""*,

STEP PERFORMANCE STANDARD

';'Qi'tA"

';B'~~~I<iji:::~;!!i

,~I;.> .~~
.i*'.::.l~!;~.! .....~_ __
1. The examinee obtains Millstone 2 MP-26 N EPI-FAP06-002, Millstone Unit 2 Emergency Action Levels Cue:

Comments: I The 15 minute time for classification starts when the examinee completes hisl her review of the Critical Plant Parameters.

2. I Perform the initia.1 c.lassifica~i?n for this I Based on a "top to bottom, left t~ right' Y event, per the eXisting conditions. , technique, the examinee determines that all three barriers are lost and this event is classified as a GENERAL EMERGENCY, State Posture Code, ALPHA. (See Answer Cue:

Comments:

Page 5 of 11

PERFORMANCE INFORMATION JPM Number: JPM-A4S Rev. 0

,-.

'EALQlassificational'}dPA~s~

STEP PERFORMANCE STANDARD

3. MP-26-EPI-FAP06, Step 2.4 N For Control Room PARs, Refer To EPI FAP06-005, "Control Room Protective Action recommendations" and determine the proper PAR Cue:

Comments: I References are provided in step 1.

The 15 minute clock for the PAR starts when the examinee classifies the event.

4. I MP-26-FAP06.~O~ (Flowchart) . I Examin.ee determines that all 3 Fission Y Are All Three FIssion Product Barners I Product Barriers are lost.

Lost?

Cue:

Comments:

5.

Cue:

Comments: I Examinee may determine that there is a release in progress, but will determine the release is NOT controlled, which will lead to the same conclusion.

6. Is the release controlled? Examinee determines that the release is y NOT controlled.

Examinee determines that a State Posture Code Alpha exists that requires a 10-mile PAR Cue:

Comments: I Examinee may determine that there is a release in progress, but will determine the release is NOT controlled, which will lead to the same conclusion.

Page 6 of 11

PERFORMANCE INFORMATION JPM Number:

STEP PERFORMANCE STANDARD

7. Check the appropriate wind direction from
  • Examinee observes wind direction y 142 ft. level for zone( s) to evacuate: table and checks 340 0 -029°.
  • Examinee determines from the wind Y direction table that zones A and Band Plum Island must be evacuated.

Cue: (:~,;t~:; ::>;2~;::;:~>t?', :~i:~it~ ::~~~;

Comments:

8.

Cue:

Comments:

Shelter all other zones."

9. Examinee determines that Dose y Projections or actual dose is NOT available at this time; therefore, KI strategy cannot be determined.

Cue:

Comments:

TERMINATION CUE: The evaluation for this JPM is concluded.

STOP TIME:i:r ______

Page 7 of 11

JPM Number: JPM-A4S Revision:

- - -o-VERIFICATION OF JPM COMPLETION Title:

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical. it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? Yes X No

--

Validated Time (minutes): 20 Actual Time to Complete (minutes):

Overall Result of JPM: SAT UNSAT (circle one)

During the TPE, the trainee Evaluation performed the task correctly and in accordance with procedure usage Pass / Fail and adherence requirements.

neverput anyone's safety at risk. Pass / Fail never put equipment reliability at risk. Pass / Fail never violated radiological work practices. Pass / Fail demonstrated effective use of event-free human performance tools. Pass I Fail Areas for ImprovemenUComments:

Page 8 of 11

JPM Number: JPM-A4S Revision:

- - -o- - -

STUDENT HANDOUT Initial Conditions: See attached form for Critical Plant Parameters.

Initiating Cues:

  • You are the on-duty SM.
  • Your task is to determine the NRC and state posture code classification and PAR" if applicable. for the event described on the attached form. (Time Critical) o Fill in the data for steps 1 and steps 4 through 8.

o If applicable. provide the required Protective Action Recommendation that would be given to the state.

o Determine Potassium Iodide (KI) strategy. if applicable.

Page 9 of 11

JPM Number: JPM-A4S Revision:

- - -o- - -

Initial Conditions: The plant is operating at 100% power. Bus 24E is aligned to Bus 24C. 'B' LPSI Pump is 005. Wind at the site is from 15 deg at 3 mph.

CRI"'I~~.~. PLAN,.. PARAMETERS SOURCE The following information is provided at the completion of EOP 2525, Standard Post Trip US actions:

The BOP reports the following: BOP

  • Buses 25A1B, 24A1B, and 24C de-energized
  • Bus 24D energized by the 'B' DIG
  • S/G press: #1 is 745 psia, #2 is 740 psia, both slowly lowering
  • Th is 289°F, Tc is 262°F, both slowly lowering
  • S/G levels: #1 is 18%, #2 is 16%, both rising slowly
  • 'B' AFP supplying both S/Gs The RO reports the following: PPO
  • Pressurizer level is 0%
  • Reactor vessel level (RVLMS) is 0%. (Both #8 string HJTCs are OPERABLE)
  • Pressurizer pressure is 53 psia and slowly lowering
  • CETS are 84rF and slowly rising
  • Subcooling (CET) indicates -478°F and becoming more negative
  • Facility 2 SIAS, CIAS, EBFS actuated
  • CTMT pressure is 3 psig, lowering
  • CTMT temperature is not available
  • MSL: RM-4299A1B are 1.6 Rlhr, RM-4299C is 1.8 Rlhr, all are rising
  • CTMT Hi Range, RM-8240 18241: 20,OOORlhr 121,000 Rlhr, both are rising
  • CTMT Personnel Access Area, RM-7890, is off scale high
  • Facility 2 CTMT atmosphere, RM-8262A1B show pre CIAS spikes and alarm
  • RMs outside CTMT are reading as follows:

o RM-8132B, MP2 Vent (Normal) is reading 4.0E+01 cpm and lowering o RM-8168, MP2 Vent (Mid/High) is reading 1.3E-02 IlCi/cc and rising o RM-8169, Millstone Stack is reading 4.7E+01 IlCi/cc and rising Trends shows the following: STA

  • MSL: RM-4299A1B were reading 0.7 Rlhr, RM-4299C is 0.9 Rlhr, 15 minutes ago
  • CTMT Hi Range, RM-8240 / 8241 were reading 350Rlhr 1 370 Rlhr, 15 minutes ago
  • Rad Monitors outside of CTMT started rising about 15 minutes ago.
  • Containment pressure was 42 psig15 minutes ago.

Transition to EOP 2532 US Classification Level NRC:

State Posture Code: _ _ _ _ _ _ _ __

Protective Action Reconnnendation, if applicable: KI Strategy, If applicable:

Page 10 of 11

JPM Number: JPM-A4S Revision:


o 3/ 5/08 3114/08 Approval Date Effective Date Incident Repol't Form (IRF)

NOTE: FOR AN INITIAL CLASSIFICATION OR A CLASSIFICATION CHA 'VGE, COMPLETE t---.-----'I:..::T='E:..:..M.;:;...S:..:..l;:;..... :.:. .:;.A=N.. ;:D::.. -.;;.L;;.. ?-,;;:,.1;;.. 50_=F.. ;:O=R..;. U. ;. P;:..;'D;:;.. A;..;;,. :;.. .:TE;;;:,.*.,;;..M=E;:;.S.. *. ;:'S. ;. 'A;..;;,. :;.. .::..::.. . .:. .C=O..;. M=P=L:.;;;E:.. .:;T..;;:;'E:.. .:;A..;. ;L=L;;.. I:.. .:;T.. =;'E:..ll1.;;:..S,-'

. . 1=---;;:..1'-50_ _----1 I(?)

IRF Number: DSEO EHIlI C1assificlltlon Incident Locatioll:

4 D Millstone Unit 1 D Millstone Unit 2 D Millstone Unit 3 Incident Classiilcation: Posture Code D An Unusual Event D Delta-One D Delta - Two 5 D An Alert D Charlie - One D A Site Area Emergency D Charlie - Two D A General Emergency D Bravo D Alpha RadioloRicnl Relense Status: Routine releases nre ou!!,oill!!, du~ to plant operatiolls.

Additional radiological releases associated with the event 6

D No radiological release due to event D Terminated radiological release due to event D Radiological release in progress due to event Meteorologica l Data:

D Current Site Wind: At _ _ hours (military time) from the _ into the at _ mph.

7 (ill degrees) (ill degrees)

D Not Available Major EAL Heading: Minor EAL Heading:

8 MP-26-EPI-FAP07-00 1 Rev. 001-02 Page 1 of I