| | issue date = 03/07/2012 | | | issue date = 03/07/2012 |
| | title = Response to Notice of Violation in NRC Inspection Report 05000416/2011006 | | | title = Response to Notice of Violation in NRC Inspection Report 05000416/2011006 |
| | author name = Alexander R D | | | author name = Alexander R |
| | author affiliation = NRC/RGN-IV/DRS | | | author affiliation = NRC/RGN-IV/DRS |
| | addressee name = Perito M | | | addressee name = Perito M |
Line 9: |
Line 9: |
| | docket = 05000416 | | | docket = 05000416 |
| | license number = NPF-029 | | | license number = NPF-029 |
| | contact person = Deese R W | | | contact person = Deese R |
| | case reference number = EA-2012-015, IR-11-006 | | | case reference number = EA-2012-015, IR-11-006 |
| | document type = Letter | | | document type = Letter |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 7, 2012 EA-2012-015 | | {{#Wiki_filter:UNITE D S TATE S |
| Mr. Michael Perito Vice President Operations Entergy Operations, Inc. Grand Gulf Nuclear Station
| | NUC LEAR RE GULATOR Y C OMMI S SI ON |
| P.O. Box 756 Port Gibson, MS 39150 SUBJECT: RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT 05000416/2011006 Dear Mr. Perito: Thank you for your letter on February 13, 2012, in response to our January 13, 2012, letter and Notice of Violation regarding the failure to correct an oil leak on the Division II emergency diesel | | RE G IO N I V |
| generator lube oil storage tank sump. We will review the implementation of your corrective actions during a future inspection to determine that full compliance be achieved and will be maintained. Sincerely, /RA/ D. Powers for | | 1600 EAST LAMAR BLVD |
| Ryan D. Alexander, Acting Chief Technical Support Branch Division of Reactor Safety | | AR L INGTON , TEXAS 7 60 11 - 4511 |
| Dockets: 50-416 Licenses: NPF-29 Electronic Distribution for Grand Gulf Nuclear Station | | March 7, 2012 |
| UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
| | EA-2012-015 |
| M. Perito - 2 - Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Art.Howell@nrc.gov ) DRP Director (Kriss.Kennedy@nrc.gov ) DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Tom.Blount@nrc.gov) Senior Resident Inspector (Rich.Smith@nrc.gov ) Resident Inspector (Blake.Rice@nrc.gov) Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov) Senior Enforcement Specialist, ACES (Ray.Kellar@nrc.gov) GG Administrative Assistant (Alley.Farrell@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Alan.Wang@nrc.gov) Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource
| | Mr. Michael Perito |
| DRS/TSB STA (Dale.Powers@nrc.gov)
| | Vice President Operations |
|
| | Entergy Operations, Inc. |
| R:_REACTORS\_GG\2011\GG2011006 Letter NOV reply.doc ML12067A132 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RWDPublicly Avail Yes No Sensitive Yes No Sens. Type Initials RWDSPE:DRP/PBF C:DRS/TSB RWDeese DPowers for RDAlexander /RA/ /RA/ 3/05/2012 3/07/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
| | Grand Gulf Nuclear Station |
| | P.O. Box 756 |
| | Port Gibson, MS 39150 |
| | SUBJECT: RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT |
| | 05000416/2011006 |
| | Dear Mr. Perito: |
| | Thank you for your letter on February 13, 2012, in response to our January 13, 2012, letter and |
| | Notice of Violation regarding the failure to correct an oil leak on the Division II emergency diesel |
| | generator lube oil storage tank sump. We will review the implementation of your corrective |
| | actions during a future inspection to determine that full compliance be achieved and will be |
| | maintained. |
| | Sincerely, |
| | /RA/ D. Powers for |
| | Ryan D. Alexander, Acting Chief |
| | Technical Support Branch |
| | Division of Reactor Safety |
| | Dockets: 50-416 |
| | Licenses: NPF-29 |
| | Electronic Distribution for Grand Gulf Nuclear Station |
|
| |
|
| | M. Perito -2- |
| | Electronic distribution by RIV: |
| | Regional Administrator (Elmo.Collins@nrc.gov ) |
| | Deputy Regional Administrator (Art.Howell@nrc.gov ) |
| | DRP Director (Kriss.Kennedy@nrc.gov ) |
| | DRP Deputy Director (Troy.Pruett@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| | DRS Deputy Director (Tom.Blount@nrc.gov) |
| | Senior Resident Inspector (Rich.Smith@nrc.gov ) |
| | Resident Inspector (Blake.Rice@nrc.gov) |
| | Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov) |
| | Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) |
| | Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) |
| | Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov) |
| | Senior Enforcement Specialist, ACES (Ray.Kellar@nrc.gov) |
| | GG Administrative Assistant (Alley.Farrell@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | Project Manager (Alan.Wang@nrc.gov) |
| | Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | OEMail Resource |
| | DRS/TSB STA (Dale.Powers@nrc.gov) |
| | R:_REACTORS\_GG\2011\GG2011006 Letter NOV reply.doc ML12067A132 |
| | SUNSI Rev Compl. ;Yes No ADAMS ;Yes No Reviewer Initials RWD |
| | Publicly Avail ;Yes No Sensitive Yes ; No Sens. Type Initials RWD |
| | SPE:DRP/PBF C:DRS/TSB |
| | RWDeese DPowers for |
| | RDAlexander |
| | /RA/ /RA/ |
| | 3/05/2012 3/07/2012 |
| | OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
See also: IR 05000416/2011006
Text
UNITE D S TATE S
NUC LEAR RE GULATOR Y C OMMI S SI ON
RE G IO N I V
1600 EAST LAMAR BLVD
AR L INGTON , TEXAS 7 60 11 - 4511
March 7, 2012
EA-2012-015
Mr. Michael Perito
Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT: RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT
05000416/2011006
Dear Mr. Perito:
Thank you for your letter on February 13, 2012, in response to our January 13, 2012, letter and
Notice of Violation regarding the failure to correct an oil leak on the Division II emergency diesel
generator lube oil storage tank sump. We will review the implementation of your corrective
actions during a future inspection to determine that full compliance be achieved and will be
maintained.
Sincerely,
/RA/ D. Powers for
Ryan D. Alexander, Acting Chief
Technical Support Branch
Division of Reactor Safety
Dockets: 50-416
Licenses: NPF-29
Electronic Distribution for Grand Gulf Nuclear Station
M. Perito -2-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Art.Howell@nrc.gov )
DRP Director (Kriss.Kennedy@nrc.gov )
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Tom.Blount@nrc.gov)
Senior Resident Inspector (Rich.Smith@nrc.gov )
Resident Inspector (Blake.Rice@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov)
Senior Enforcement Specialist, ACES (Ray.Kellar@nrc.gov)
GG Administrative Assistant (Alley.Farrell@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
DRS/TSB STA (Dale.Powers@nrc.gov)
R:_REACTORS\_GG\2011\GG2011006 Letter NOV reply.doc ML12067A132
SUNSI Rev Compl. ;Yes No ADAMS ;Yes No Reviewer Initials RWD
Publicly Avail ;Yes No Sensitive Yes ; No Sens. Type Initials RWD
SPE:DRP/PBF C:DRS/TSB
RWDeese DPowers for
RDAlexander
/RA/ /RA/
3/05/2012 3/07/2012
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax