ML12067A132: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/07/2012
| issue date = 03/07/2012
| title = Response to Notice of Violation in NRC Inspection Report 05000416/2011006
| title = Response to Notice of Violation in NRC Inspection Report 05000416/2011006
| author name = Alexander R D
| author name = Alexander R
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Perito M
| addressee name = Perito M
Line 9: Line 9:
| docket = 05000416
| docket = 05000416
| license number = NPF-029
| license number = NPF-029
| contact person = Deese R W
| contact person = Deese R
| case reference number = EA-2012-015, IR-11-006
| case reference number = EA-2012-015, IR-11-006
| document type = Letter
| document type = Letter
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITE D S TATE S
[[Issue date::March 7, 2012]]
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
                                                    RE G IO N I V
                                              1600 EAST LAMAR BLVD
                                        AR L INGTON , TEXAS 7 60 11 - 4511
                                            March 7, 2012
EA-2012-015
Mr. Michael Perito
Vice President Operations
Entergy Operations, Inc.
Grand Gulf Nuclear Station
P.O. Box 756
Port Gibson, MS 39150
SUBJECT:       RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT
              05000416/2011006
Dear Mr. Perito:
Thank you for your letter on February 13, 2012, in response to our January 13, 2012, letter and
Notice of Violation regarding the failure to correct an oil leak on the Division II emergency diesel
generator lube oil storage tank sump. We will review the implementation of your corrective
actions during a future inspection to determine that full compliance be achieved and will be
maintained.
                                                Sincerely,
                                                  /RA/ D. Powers for
                                                Ryan D. Alexander, Acting Chief
                                                Technical Support Branch
                                                Division of Reactor Safety
Dockets: 50-416
Licenses: NPF-29
Electronic Distribution for Grand Gulf Nuclear Station


EA-2012-015 Mr. Michael Perito Vice President Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
M. Perito                                     -2-
 
Electronic distribution by RIV:
SUBJECT: RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT 05000416/2011006
Regional Administrator (Elmo.Collins@nrc.gov )
 
Deputy Regional Administrator (Art.Howell@nrc.gov )
==Dear Mr. Perito:==
DRP Director (Kriss.Kennedy@nrc.gov )
Thank you for your letter on February 13, 2012, in response to our January 13, 2012, letter and Notice of Violation regarding the failure to correct an oil leak on the Division II emergency diesel generator lube oil storage tank sump. We will review the implementation of your corrective actions during a future inspection to determine that full compliance be achieved and will be maintained.
DRP Deputy Director (Troy.Pruett@nrc.gov)
 
DRS Director (Anton.Vegel@nrc.gov)
Sincerely,/RA/ D. Powers for Ryan D. Alexander, Acting Chief Technical Support Branch Division of Reactor Safety Dockets: 50-416 Licenses: NPF-29 Electronic Distribution for Grand Gulf Nuclear Station Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Art.Howell@nrc.gov ) DRP Director (Kriss.Kennedy@nrc.gov ) DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Tom.Blount@nrc.gov) Senior Resident Inspector (Rich.Smith@nrc.gov ) Resident Inspector (Blake.Rice@nrc.gov) Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov) Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov) Senior Enforcement Specialist, ACES (Ray.Kellar@nrc.gov) GG Administrative Assistant (Alley.Farrell@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Alan.Wang@nrc.gov) Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource DRS/TSB STA (Dale.Powers@nrc.gov)  
DRS Deputy Director (Tom.Blount@nrc.gov)
 
Senior Resident Inspector (Rich.Smith@nrc.gov )
R:_REACTORS\_GG\2011\GG2011006 Letter NOV reply.doc  ML12067A132 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials RWDPublicly Avail Yes No Sensitive Yes No Sens. Type Initials RWDSPE:DRP/PBF C:DRS/TSB RWDeese DPowers for RDAlexander /RA/ /RA/ 3/05/2012 3/07/2012 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Resident Inspector (Blake.Rice@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov)
Senior Enforcement Specialist, ACES (Ray.Kellar@nrc.gov)
GG Administrative Assistant (Alley.Farrell@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
DRS/TSB STA (Dale.Powers@nrc.gov)
R:_REACTORS\_GG\2011\GG2011006 Letter NOV reply.doc                         ML12067A132
  SUNSI Rev Compl. ;Yes No               ADAMS       ;Yes No       Reviewer Initials   RWD
Publicly Avail         ;Yes No       Sensitive   Yes ; No     Sens. Type Initials RWD
SPE:DRP/PBF             C:DRS/TSB
RWDeese                 DPowers for
                        RDAlexander
/RA/                     /RA/
3/05/2012               3/07/2012
OFFICIAL RECORD COPY                                 T=Telephone       E=E-mail     F=Fax
}}
}}

Latest revision as of 08:07, 12 November 2019

Response to Notice of Violation in NRC Inspection Report 05000416/2011006
ML12067A132
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/07/2012
From: Ryan Alexander
Division of Reactor Safety IV
To: Mike Perito
Entergy Operations
Deese R
References
EA-2012-015, IR-11-006
Download: ML12067A132 (2)


See also: IR 05000416/2011006

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

RE G IO N I V

1600 EAST LAMAR BLVD

AR L INGTON , TEXAS 7 60 11 - 4511

March 7, 2012

EA-2012-015

Mr. Michael Perito

Vice President Operations

Entergy Operations, Inc.

Grand Gulf Nuclear Station

P.O. Box 756

Port Gibson, MS 39150

SUBJECT: RESPONSE TO NOTICE OF VIOLATION IN NRC INSPECTION REPORT

05000416/2011006

Dear Mr. Perito:

Thank you for your letter on February 13, 2012, in response to our January 13, 2012, letter and

Notice of Violation regarding the failure to correct an oil leak on the Division II emergency diesel

generator lube oil storage tank sump. We will review the implementation of your corrective

actions during a future inspection to determine that full compliance be achieved and will be

maintained.

Sincerely,

/RA/ D. Powers for

Ryan D. Alexander, Acting Chief

Technical Support Branch

Division of Reactor Safety

Dockets: 50-416

Licenses: NPF-29

Electronic Distribution for Grand Gulf Nuclear Station

M. Perito -2-

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Art.Howell@nrc.gov )

DRP Director (Kriss.Kennedy@nrc.gov )

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Tom.Blount@nrc.gov)

Senior Resident Inspector (Rich.Smith@nrc.gov )

Resident Inspector (Blake.Rice@nrc.gov)

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov)

Senior Enforcement Specialist, ACES (Ray.Kellar@nrc.gov)

GG Administrative Assistant (Alley.Farrell@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource

DRS/TSB STA (Dale.Powers@nrc.gov)

R:_REACTORS\_GG\2011\GG2011006 Letter NOV reply.doc ML12067A132

SUNSI Rev Compl. ;Yes No ADAMS ;Yes No Reviewer Initials RWD

Publicly Avail ;Yes No Sensitive Yes ; No Sens. Type Initials RWD

SPE:DRP/PBF C:DRS/TSB

RWDeese DPowers for

RDAlexander

/RA/ /RA/

3/05/2012 3/07/2012

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax