| title = Response to NRC Request for Additional Information Regarding Operator Manual Actions and Notification of Followup Inspections
| title = Response to NRC Request for Additional Information Regarding Operator Manual Actions and Notification of Followup Inspections
| author name = Miller C G
| author name = Miller C
| author affiliation = NRC/RGN-I/DRS
| author affiliation = NRC/RGN-I/DRS
| addressee name = Ventosa J
| addressee name = Ventosa J
Line 12: Line 12:
| document type = Letter
| document type = Letter
| page count = 4
| page count = 4
| project =
| stage = RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES                         NUCLEAR REGULATORY COMMISSION                                                           REGION I                                                 475 ALLENDALE ROAD                           KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 22, 2012 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 22, 2012 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249


==SUBJECT:==
==SUBJECT:==
Line 23: Line 26:


Thank you for your letter dated March 1, 2012, (ADAMS Accession No. ML12074A028) that provided your response to a request for additional information regarding operator manual actions (OMA) of our letter dated February 1, 2012 (ML12031A176). Our review of your letter determined that you intend to achieve full compliance with Title 10 of the Code of Federal Regulations, (10 CFR) Part 50, Appendix R, Section III.G.2, because all reliance on denied OMAs will be eliminated.
Thank you for your letter dated March 1, 2012, (ADAMS Accession No. ML12074A028) that provided your response to a request for additional information regarding operator manual actions (OMA) of our letter dated February 1, 2012 (ML12031A176). Our review of your letter determined that you intend to achieve full compliance with Title 10 of the Code of Federal Regulations, (10 CFR) Part 50, Appendix R, Section III.G.2, because all reliance on denied OMAs will be eliminated.
We will begin a review of the implementation of your corrective actions to restore full compliance with Title 10 CFR, Part 50, Appendix R Section III.G.2, during an onsite inspection led by Mr. Dan Orr from the U.S. Nuclear Regulatory Commission (NRC) Region I Office. The inspection will be conducted in accordance with IP 71152, Problem Identification and Resolution, Section 02.03, Annual Follow-up of Selected Issues. The onsite inspection will occur the week of April 23, 2012. A specific objective of the inspection is to verify that your plans for achieving full compliance with fire protection regulations are entered into your corrective action program, compensatory measures remain in place and are appropriate, and the schedule for restoration to full compliance is commensurate with the risk significance. We will continue to follow your progress and completion of corrective actions with additional inspection. The NRC will inform Entergy of each additional inspection activity.
We will begin a review of the implementation of your corrective actions to restore full compliance with Title 10 CFR, Part 50, Appendix R Section III.G.2, during an onsite inspection led by Mr.
Dan Orr from the U.S. Nuclear Regulatory Commission (NRC) Region I Office. The inspection will be conducted in accordance with IP 71152, Problem Identification and Resolution, Section 02.03, Annual Follow-up of Selected Issues. The onsite inspection will occur the week of April 23, 2012. A specific objective of the inspection is to verify that your plans for achieving full compliance with fire protection regulations are entered into your corrective action program, compensatory measures remain in place and are appropriate, and the schedule for restoration to full compliance is commensurate with the risk significance. We will continue to follow your progress and completion of corrective actions with additional inspection. The NRC will inform Entergy of each additional inspection activity.
Mr. Dan Orr will contact you with specific document requests prior to the onsite inspection and to ensure the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact during the inspection. We request that during the on-site inspection, you ensure that copies of all corrective action documents, including associated analyses, evaluations or documentation regarding the actions necessary to restore full compliance with Title 10 CFR, Part 50, Appendix R Section III.G.2 be readily accessible for inspection.
Mr. Dan Orr will contact you with specific document requests prior to the onsite inspection and to ensure the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact during the inspection. We request that during the on-site inspection, you ensure that copies of all corrective action documents, including associated analyses, evaluations or documentation regarding the actions necessary to restore full compliance with Title 10 CFR, Part 50, Appendix R Section III.G.2 be readily accessible for inspection.
Personnel should be available at the site during the inspection to identify through circuit diagrams and walkdowns the circuits of concern for each unapproved OMA as it relates to a fire area or zone that is not currently in compliance.
Personnel should be available at the site during the inspection to identify through circuit diagrams and walkdowns the circuits of concern for each unapproved OMA as it relates to a fire area or zone that is not currently in compliance.
J. Ventosa 2


Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspector's information or logistical needs, please contact Mr. Dan Orr in the Region I Office at (610) 337-5048.
J. Ventosa                                          2 Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspectors information or logistical needs, please contact Mr. Dan Orr in the Region I Office at (610) 337-5048.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with Title 10 CFR, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Sincerely,  
In accordance with Title 10 CFR, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                        /RA/
Christopher G. Miller, Director Division of Reactor Safety Docket Nos.: 50-247, 50-286 License Nos.: DPR-26, DPR-64 cc: Distribution via ListServ


        /RA/        Christopher G. Miller, Director      Division of Reactor Safety Docket Nos.:  50-247, 50-286 License Nos.:  DPR-26, DPR-64 cc:  Distribution via ListServ 
ML120820384 X     Non-Sensitive                         X     Publicly Available X  SUNSI Review Sensitive                                  Non-Publicly Available OFFICE           RI/DRS                 RI/DRS                 RI/DRS NAME             DOrr*                 JRogge*               CMiller DATE             03/20/2012             03/20/2012             03/22/2012
 
                                      *prior concurrence J. Ventosa                             3 Distribution w/encl: (via E-mail)
ML120820384 X SUNSI Review X Non-Sensitive Sensitive X Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS   NAME DOrr* JRogge* CMiller   DATE 03/20/2012 03/20/2012 03/22/2012   *prior concurrence J. Ventosa 3  
W. Dean, RA         (R1ORAMAIL RESOURCE)
 
D. Lew, DRA         (R1ORAMAIL RESOURCE)
Distribution w/encl: (via E-mail) W. Dean, RA (R1ORAMAIL RESOURCE)
J. Tappert, DRP     (R1DRPMAIL RESOURCE)
D. Lew, DRA   (R1ORAMAIL RESOURCE) J. Tappert, DRP (R1DRPMAIL RESOURCE) J. Clifford, DRP   (R1DRPMAIL RESOURCE) C. Miller, DRS (R1DRSMAIL RESOURCE)
J. Clifford, DRP     (R1DRPMAIL RESOURCE)
P. Wilson, DRS   (R1DRSMAIL RESOURCE) L. Chang, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP M. Catts, SRI A. Ayegbusi, RI D. Hochmuth, AA RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPreport Resource}}
C. Miller, DRS       (R1DRSMAIL RESOURCE)
P. Wilson, DRS       (R1DRSMAIL RESOURCE)
L. Chang, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP M. Catts, SRI A. Ayegbusi, RI D. Hochmuth, AA RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPreport Resource}}

Latest revision as of 07:33, 12 November 2019

Response to NRC Request for Additional Information Regarding Operator Manual Actions and Notification of Followup Inspections
ML120820384
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 03/22/2012
From: Chris Miller
Division of Reactor Safety I
To: Ventosa J
Entergy Nuclear Operations
References
Download: ML120820384 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 March 22, 2012 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

INDIAN POINT ENERGY CENTER UNITS 2 AND 3 - RESPONSE TO NRC REQUEST FOR ADDITIONAL INFORMATION REGARDING OPERATOR MANUAL ACTIONS AND NOTIFICATION OF FOLLOWUP INSPECTIONS

Dear Mr. Ventosa:

Thank you for your letter dated March 1, 2012, (ADAMS Accession No. ML12074A028) that provided your response to a request for additional information regarding operator manual actions (OMA) of our letter dated February 1, 2012 (ML12031A176). Our review of your letter determined that you intend to achieve full compliance with Title 10 of the Code of Federal Regulations, (10 CFR) Part 50, Appendix R,Section III.G.2, because all reliance on denied OMAs will be eliminated.

We will begin a review of the implementation of your corrective actions to restore full compliance with Title 10 CFR, Part 50, Appendix R Section III.G.2, during an onsite inspection led by Mr.

Dan Orr from the U.S. Nuclear Regulatory Commission (NRC) Region I Office. The inspection will be conducted in accordance with IP 71152, Problem Identification and Resolution, Section 02.03, Annual Follow-up of Selected Issues. The onsite inspection will occur the week of April 23, 2012. A specific objective of the inspection is to verify that your plans for achieving full compliance with fire protection regulations are entered into your corrective action program, compensatory measures remain in place and are appropriate, and the schedule for restoration to full compliance is commensurate with the risk significance. We will continue to follow your progress and completion of corrective actions with additional inspection. The NRC will inform Entergy of each additional inspection activity.

Mr. Dan Orr will contact you with specific document requests prior to the onsite inspection and to ensure the availability of knowledgeable plant staff and licensing organization personnel to serve as points of contact during the inspection. We request that during the on-site inspection, you ensure that copies of all corrective action documents, including associated analyses, evaluations or documentation regarding the actions necessary to restore full compliance with Title 10 CFR, Part 50, Appendix R Section III.G.2 be readily accessible for inspection.

Personnel should be available at the site during the inspection to identify through circuit diagrams and walkdowns the circuits of concern for each unapproved OMA as it relates to a fire area or zone that is not currently in compliance.

J. Ventosa 2 Your cooperation and support during this inspection will be appreciated. If you have questions concerning this inspection, or the inspectors information or logistical needs, please contact Mr. Dan Orr in the Region I Office at (610) 337-5048.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with Title 10 CFR, Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Christopher G. Miller, Director Division of Reactor Safety Docket Nos.: 50-247, 50-286 License Nos.: DPR-26, DPR-64 cc: Distribution via ListServ

ML120820384 X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRS NAME DOrr* JRogge* CMiller DATE 03/20/2012 03/20/2012 03/22/2012

  • prior concurrence J. Ventosa 3 Distribution w/encl: (via E-mail)

W. Dean, RA (R1ORAMAIL RESOURCE)

D. Lew, DRA (R1ORAMAIL RESOURCE)

J. Tappert, DRP (R1DRPMAIL RESOURCE)

J. Clifford, DRP (R1DRPMAIL RESOURCE)

C. Miller, DRS (R1DRSMAIL RESOURCE)

P. Wilson, DRS (R1DRSMAIL RESOURCE)

L. Chang, RI OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, DRP M. Jennerich, DRP M. Catts, SRI A. Ayegbusi, RI D. Hochmuth, AA RidsNrrPMIndianPoint Resource RidsNrrDorlLpl1-1 Resource ROPreport Resource