| number = ML12117A240
| number = ML12117A240
| issue date = 04/24/2012
| issue date = 04/24/2012
| title = Farley Inspection Report 2012403 Revision 1 - OUO Removed
| title = Inspection Report 2012403 Revision 1 - OUO Removed
| author name = Desai B B
| author name = Desai B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Lynch T A
| addressee name = Lynch T
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000348, 05000364
| docket = 05000348, 05000364
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 24, 2012 Mr. T. A. Lynch Vice President Southern Nuclear Operating Company, Inc.
- SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
Joseph M. Farley Nuclear Plant P.O. Drawer 470, BIN B500 Ashford, AL 36312
-1257   April 24, 2012 Enclosure transmitted herewith contain SUNSI. When separated from enclosure, this transmittal document is decontrolled.
LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION Mr. T. A. Lynch
 
Vice President Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant
 
P.O. Drawer 470 , BIN B500 Ashford, AL 36312


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT  
JOSEPH M. FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000348/2012403 AND 05000364/2012403
- NRC SECURITY INSPECTION REPORT 05000348/2012403 AND 0500036 4/2012403


==Dear Mr. Lynch:==
==Dear Mr. Lynch:==
On April 5 , 201 2 , the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Joseph M. Farley Nuclear Plant.
The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were initially discussed onsite on March 15, 2012, with you and other members of your staff. A final exit meeting was conducted by telephone on April 5, 2012, with Mr. W. Oldfield
. The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents two finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process).
The deficiencies were corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site.
The first finding had a cross-cutting aspect in the area of Human Performance H.
4.(b) because the licensee did not define and effectively communicate expectations regarding procedural compliance and personnel did not follow procedures.
The second finding had a cross
-cutting aspect in the area of Human Performance H.2 (d) because the licensee did not ensure that equipment was available to assure nuclear security
. Additionally, one licensee
-identified violation which was determined to be of very low safety significance is listed in this report. However , because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non
-cited violation consistent OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION SNC 2  OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION with Section 2.3.2 of the NRC Enforcement Policy. If you contest these non
-cited violations, you should provide a respons e within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, D.C. 20555
-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C.
20555-0001; and the NRC Resident Inspector at the Joseph M. Farley Nuclear Plant.
In addition, if you disagree with the cross
-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, RII, and the NRC Senior Resident Inspector at the Joseph M. Farley Nuclear Plant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). However, because of the securi ty-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
's enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements fo r your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information BWithhold Under 10 CFR 2.390
On April 5, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Joseph M. Farley Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
@ and follow the instructions for withholding in 10 CFR 2.390(b)(1)
The enclosed Inspection Report documents the inspection results, which were initially discussed onsite on March 15, 2012, with you and other members of your staff. A final exit meeting was conducted by telephone on April 5, 2012, with Mr. W. Oldfield.
. Sincerely, /RA/  Binoy Desai, Chief
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
This report documents two finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The first finding had a cross-cutting aspect in the area of Human Performance H.4.(b) because the licensee did not define and effectively communicate expectations regarding procedural compliance and personnel did not follow procedures. The second finding had a cross-cutting aspect in the area of Human Performance H.2 (d) because the licensee did not ensure that equipment was available to assure nuclear security. Additionally, one licensee-identified violation which was determined to be of very low safety significance is listed in this report.
However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation consistent Enclosure transmitted herewith contain SUNSI. When separated from enclosure, this transmittal document is decontrolled.
LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


Plant Support Branch 2 Division of Reactor Safety Docket Nos.
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION SNC                                                2 with Section 2.3.2 of the NRC Enforcement Policy. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C.
50-348, 50-364 License Nos.
20555-0001; and the NRC Resident Inspector at the Joseph M. Farley Nuclear Plant. In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, RII, and the NRC Senior Resident Inspector at the Joseph M. Farley Nuclear Plant.
NPF-2, NPF-8
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
                                                /RA/
Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8


==Enclosure:==
==Enclosure:==


Inspection Report 05000348/2012403  
Inspection Report 05000348/2012403 and 05000364/2012403 w/Att.: Supplemental Information (OUO) cc w/encl.: (See page 3)
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION


and 05000364/2012403 w/A tt.: Supplemental Information (OUO)  cc w/encl.:  (See page 3)
ML12117A240                X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE             RII: DRS       RII:DRS         RII:DRS         RII: DRP       RII: DRS SIGNATURE         RA/AT           RA/BD For IH     RA/RP           RA/FE           RA/BD NAME               A. True         I. Hall         R. Patterson   F. Ehrhardt     B. Desai DATE                 04/27/2012       04/19/2012     04/19/2012     04/19/2012     04/23/2012 E-MAIL COPY?         YES       NO   YES         NO YES         NO YES         NO YES         NO YES     NO
 
ML 12117A240 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII:DRS RII:DRS RII: DRP RII: DRS SIGNATURE RA/AT RA/BD For IH RA/RP RA/FE RA/BD NAME A. True I. Hall R. Patterson F. Ehrhardt B. Desai DATE 04/27/2012 04/19/2012 04/19/2012 04/19/2012 04/23/2012 E-MAIL COPY?
YES NO       YES NO       YES NO       YES NO       YES NO       YES NO OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION SNC 3 OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION cc w/Encl.:


OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC                                      3 cc w/Encl.:
Keith Wooten Project Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.
Keith Wooten Project Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway Birmingham, AL   35242 David Burford Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway Birmingham, AL 35242 David Burford Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.
40 Iverness Center Parkway Birmingham, AL   35242
40 Iverness Center Parkway Birmingham, AL 35242 L. B. Hogg Nuclear Licensing Southern Nuclear Operating Company, Inc.
 
40 Inverness Center Parkway Birmingham, AL 35242 S. P. McGavin Security Manager Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
L. B. Hogg Nuclear Licensing Southern Nuclear Operating Company, Inc.
 
40 Inverness Center Parkway Birmingham, AL   35242 S. P. McGavin Security Manager Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL   36319


OFFICIAL USE ONLY  
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION 3
- SECURITY-RELATED INFORMATION 3 OFFICIAL USE ONLY
Letter to T. A. Lynch from Binoy Desai on April 24, 2012.
- SECURITY-RELATED INFORMATION Letter to T. A. Lynch from Binoy Desai on April 24, 2012.


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY NUCLEAR PLANT  
JOSEPH M. FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000348/2012403 AND 05000364/2012403 Distribution w/encl:
- NRC SECURITY INSPECTION REPORT 05000348/2012403 AND 05000364/2012403 RidsNrrPMFarley Resource Distribution w/encl:
RidsNrrPMFarley Resource C. Evans, RII EICS (Part 72 Only)
C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
L. Douglas, RII EICS (Linda Douglas)
B. Westreich, NSIR (hard copy w/ encl)
B. Westreich, NSIR (hard copy w/ encl)
OE Mail (email address if applicable)
OE Mail (email address if applicable)
RIDSNRRDIRS PUBLIC}}
RIDSNRRDIRS PUBLIC OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION}}

Latest revision as of 05:26, 12 November 2019

Inspection Report 2012403 Revision 1 - OUO Removed
ML12117A240
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/24/2012
From: Binoy Desai
NRC/RGN-II/DRS/PSB2
To: Lynch T
Southern Nuclear Operating Co
References
IR-12-403
Download: ML12117A240 (5)


Text

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 24, 2012 Mr. T. A. Lynch Vice President Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant P.O. Drawer 470, BIN B500 Ashford, AL 36312

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000348/2012403 AND 05000364/2012403

Dear Mr. Lynch:

On April 5, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Joseph M. Farley Nuclear Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed Inspection Report documents the inspection results, which were initially discussed onsite on March 15, 2012, with you and other members of your staff. A final exit meeting was conducted by telephone on April 5, 2012, with Mr. W. Oldfield.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents two finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The first finding had a cross-cutting aspect in the area of Human Performance H.4.(b) because the licensee did not define and effectively communicate expectations regarding procedural compliance and personnel did not follow procedures. The second finding had a cross-cutting aspect in the area of Human Performance H.2 (d) because the licensee did not ensure that equipment was available to assure nuclear security. Additionally, one licensee-identified violation which was determined to be of very low safety significance is listed in this report.

However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation consistent Enclosure transmitted herewith contain SUNSI. When separated from enclosure, this transmittal document is decontrolled.

LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION SNC 2 with Section 2.3.2 of the NRC Enforcement Policy. If you contest these non-cited violations, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C.

20555-0001; and the NRC Resident Inspector at the Joseph M. Farley Nuclear Plant. In addition, if you disagree with the cross-cutting aspect assigned to any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the Regional Administrator, RII, and the NRC Senior Resident Inspector at the Joseph M. Farley Nuclear Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Binoy Desai, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-348, 50-364 License Nos. NPF-2, NPF-8

Enclosure:

Inspection Report 05000348/2012403 and 05000364/2012403 w/Att.: Supplemental Information (OUO) cc w/encl.: (See page 3)

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

ML12117A240 X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII: DRS RII:DRS RII:DRS RII: DRP RII: DRS SIGNATURE RA/AT RA/BD For IH RA/RP RA/FE RA/BD NAME A. True I. Hall R. Patterson F. Ehrhardt B. Desai DATE 04/27/2012 04/19/2012 04/19/2012 04/19/2012 04/23/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION SNC 3 cc w/Encl.:

Keith Wooten Project Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway Birmingham, AL 35242 David Burford Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway Birmingham, AL 35242 L. B. Hogg Nuclear Licensing Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Birmingham, AL 35242 S. P. McGavin Security Manager Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319 OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION 3

Letter to T. A. Lynch from Binoy Desai on April 24, 2012.

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NRC SECURITY INSPECTION REPORT 05000348/2012403 AND 05000364/2012403 Distribution w/encl:

RidsNrrPMFarley Resource C. Evans, RII EICS (Part 72 Only)

L. Douglas, RII EICS (Linda Douglas)

B. Westreich, NSIR (hard copy w/ encl)

OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION