| number = ML12146A423 | | number = ML12146A423 | ||
| issue date = 05/25/2012 | | issue date = 05/25/2012 | ||
| title = IR 05000346-12-008 ( | | title = IR 05000346-12-008 (Drs), on 05/24/12 Davis-Besse Nuclear Power Station Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection | ||
| author name = Stone A | | author name = Stone A | ||
| author affiliation = NRC/RGN-III/DRS/EB2 | | author affiliation = NRC/RGN-III/DRS/EB2 | ||
| addressee name = Allen B | | addressee name = Allen B | ||
Line 14: | Line 14: | ||
| page count = 8 | | page count = 8 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000346/2012008]] | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION III | |||
2443 WARRENVILLE ROAD, SUITE 210 | |||
LISLE, IL 60532-4352 | |||
May 25, 2012 | |||
Mr. Barry Allen | |||
Site Vice President | |||
FirstEnergy Nuclear Operating Company | |||
Davis-Besse Nuclear Power Station | |||
5501 North State Route 2, Mail Stop A-DB-3080 | |||
Oak Harbor, OH 43449-9760 | |||
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION REQUEST FOR INFORMATION | |||
FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES | |||
INSPECTION (CDBI) INSPECTION REPORT 05000346/2012008 (DRS) | |||
Dear Mr. Allen: | |||
On August 13, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial | |||
baseline Component Design Bases Inspection (CDBI) at Davis-Besse Nuclear Power Station. A | |||
team of six inspectors will perform this 3-week inspection. This inspection will be performed in | |||
accordance with NRC Baseline Inspection Procedure (IP) 71111.21. | |||
The CDBI focuses on the design, maintenance, and operation of risk significant components | |||
associated with one or more accident scenario. The components to be reviewed during this | |||
baseline inspection will be identified during the in office preparation week that occurs prior to the | |||
first on-site inspection week. In addition, operating experience issues, associated with the | |||
component samples, will also be selected for review. | |||
The inspection will include three weeks on-site. The inspection team will consist of six NRC | |||
inspectors, of which five will focus on engineering/maintenance and one on operations. The | |||
current inspection schedule is as follows: | |||
* On-site weeks: August 13 - 17, 2012; | |||
August 27 - 31, 2012; and | |||
September 10 - 14, 2012. | |||
The team will be preparing for the inspection, mainly during the week of August 6, 2012, as | |||
discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the | |||
inspection team during the week of August 13, 2012, to review probabilistic risk assessment | |||
data, and assist in identifying risk significant components and/or specific component functions, | |||
which will be reviewed during the inspection. | |||
Experience with previous baseline design inspections of similar depth and length has shown | |||
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the | |||
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive | |||
inspection for both parties, we have enclosed a request for information needed for the | |||
inspection. | |||
It is important that all of these documents are up to date and complete in order to minimize the | |||
number of additional documents requested during the preparation and/or the on-site portions of | |||
the inspection. Insofar as possible, this information should be provided electronically to the lead | |||
inspector. The information request has been divided into three groups: | |||
B. Allen -2- | |||
* The first group lists information necessary for our initial inspection scoping activities. | |||
This information should be provided to the lead inspector no later than July 2, 2012. By | |||
July 13, 2012, the lead inspector will communicate the initial selected set of approximately 20 | |||
components. | |||
* The second group of documents requested is those items needed to support our in-office | |||
preparation activities. This set of documents, including the calculations associated with the | |||
initial selected components, should be provided to the lead inspector at the Regional Office no | |||
later than August 1, 2012. During the in-office preparation activities, the team may identify | |||
additional information needed to support the inspection. | |||
* The last group includes the additional information above, as well as plant specific reference | |||
material. This information should be available to the team onsite on August 13, 2012. It is also | |||
requested that corrective action documents and/or questions developed during the inspection | |||
be provided to the lead inspector as the documents are generated. | |||
The lead inspector for this inspection is Andrew Dunlop. If you have questions regarding the | |||
information requested, please contact Mr. Dunlop at (630) 829-9726 or via e-mail at | |||
andrew.dunlop@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the | |||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, control number 3150-0011. | |||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for | |||
information or an information collection requirement unless the requesting document displays a | |||
currently valid Office of Management and Budget control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its | |||
enclosure will be available electronically for public inspection in the NRC Public Document Room | |||
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public | |||
Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Ann Marie Stone, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50-346 | |||
License No. NPF-3 | |||
Enclosure: INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION | |||
cc w/encl: Distribution via ListServ' | |||
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION | |||
Inspection Report: 05000346/2012008(DRS) | |||
Inspection Dates: August 13 - 17, 2012; August 27 - 31, 2012; and | |||
September 10 - 14, 2012 | |||
Inspection Procedure: Inspection Procedure (IP) 71111.21 Component Design Bases | |||
Inspection | |||
Lead Inspector: Andrew Dunlop, Lead Inspector | |||
(630) 829-9726 | |||
andrew.dunlop@nrc.gov | |||
I. Information Requested Prior to the On-site Information Gathering/Inspection Week | |||
The following information is requested by July 2, 2012, or sooner, to facilitate inspection | |||
preparation. If you have any questions regarding this information, please call the team | |||
leader as soon as possible. (Please provide the information electronically in pdf files, | |||
Excel, or other searchable formats, preferably on some portable electronic media (e.g., | |||
CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive | |||
names, and be indexed and hyperlinked to facilitate ease of use. Information in lists | |||
should contain enough information to be easily understood by someone who has | |||
knowledge of light water reactor technology). | |||
1. Risk ranking of top 250 components from your site specific probabilistic safety | |||
analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for | |||
Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV) (as | |||
applicable). | |||
2. Risk ranking of top 100 containment-related components from your site specific PSA | |||
sorted by Large Early Release Frequency (LERF). | |||
3. Provide a list of the top 200 cut-sets from your PSA. | |||
4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that | |||
contributes more than 5 percent to the baseline plant core damage frequency | |||
(CDF). | |||
5. Copies of PSA system notebooks and latest PSA summary document. | |||
6. List of time critical operator actions. Identify those actions that do not have job | |||
performance measures (JPMs). | |||
7. Provide copies of the emergency operating procedures (EOPs). | |||
8. If you have an External Events or Fire PSA Model, provide the information | |||
requested in Items 1 and 2 for external events and fire. Provide narrative | |||
description of each coded event (including fire, flood zone description). | |||
1 Enclosure | |||
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION | |||
9. Electronic copy of the site IPEEE, if available. | |||
10. Any pre-existing evaluation or list of components and associated calculations with | |||
low design margins, (i.e., pumps closest to the design limit for flow or pressure, | |||
diesel generator close to design required output, heat exchangers close to rated | |||
design heat removal etc.). | |||
11. List of available design (setup) margins in both the open and closed direction | |||
(identify safety-related direction) for valves in the motor-operated valve (MOV) and | |||
air-operated valve (AOV) programs. Identify the basis for how the margin was | |||
determined. | |||
12. List of high risk Maintenance Rule systems/components based on engineering or | |||
expert panel judgment (i.e., those systems/components not identified in the PRA). | |||
13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) | |||
category for the last 3 years. | |||
14. Site top ten issues list (if applicable). | |||
15. A list of operating experience evaluations for the last three years. | |||
16. Information of any common cause failure of components experienced in the last 5 | |||
years at your facility. | |||
17. List of Root Cause Evaluations associated with component failures or design issues | |||
initiated/completed in the last 5 years. | |||
18. List of open operability evaluations. | |||
19. List of components/systems considered operable but degraded/nonconforming. | |||
20. Current management and engineering organizational chart. | |||
21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, | |||
Technical Specifications Bases, and Technical Requirements Manual. | |||
22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies). | |||
23. Electronic copy of P&IDs (if available). | |||
2 Enclosure | |||
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION | |||
II. Information Requested (For The Approx. 20 Selected Components) to be Available | |||
By August 1, 2012, (Will Be Reviewed by the Team in the Regional Office During the | |||
Week of August 6, 2012) | |||
This information should be separated for each selected component, especially if provided | |||
electronically (e.g., folder with component name that includes calculations, condition | |||
reports, maintenance history, etc.). | |||
1. List of condition reports (corrective action documents) associated with each of the | |||
selected components for the last four years. | |||
2. The maintenance history (corrective, preventive, and elective) associated with each | |||
of the selected components for the last 10 years. Identify frequency of preventive | |||
maintenance activities. | |||
3. Copies of calculations associated with each of the selected components (if not | |||
previously provided), excluding data files. Please review the calculations and also | |||
provide copies of important referenced material (such as drawings, engineering | |||
requests, and vendor letters). | |||
4. System Health Reports, System Descriptions, Design Basis Documents, and/or | |||
Training Lesson Plans that are associated with each of the selected components. | |||
5. A list of modifications, including equivalency evaluations and setpoint changes, | |||
associated with each of the selected components. This list should include a | |||
descriptive paragraph on the purpose of the modification. Please ensure this list | |||
only includes design completed (not canceled) modifications. | |||
6. Copies of operability evaluations (open/closed for last three years) associated with | |||
each of the selected components and plans for restoring operability, if applicable. | |||
7. Copies of selected operator work-around evaluations associated with each of the | |||
selected components and plans for resolution, if applicable. | |||
8. Copies of any open temporary modifications associated with each of the selected | |||
components, if applicable. | |||
9. Trend data on the selected electrical/mechanical components performance for last | |||
three years (For example, pumps performance including in-service testing, other | |||
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate | |||
results, etc.). | |||
10. Copy of latest completed surveillance tests for each component (for example, for | |||
pumps this would include: comprehensive test, quarterly test, flow balance, etc., for | |||
valves: stroke time testing, diagnostic testing, leak testing, etc.). Acceptance criteria | |||
basis calculations should also be included. | |||
11. Provide copies of the normal and abnormal operating procedures associated with | |||
the selected components and selected scenarios. | |||
3 Enclosure | |||
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION | |||
12. A copy of any internal/external self-assessments and associated corrective action | |||
documents generated in preparation for the inspection. | |||
13. A copy of engineering/operations related audits completed in the last two years. | |||
III. Additional Information to be Provided on August 13, 2012, On-Site (for final selected | |||
Components) | |||
During the in-office preparation activities, the team will be making final selections and may | |||
identify additional information needed to support the inspection. The lead inspector will | |||
provide a list of the additional information needed during the week of August 6, 2012. | |||
IV. Information Requested to be Provided Throughout the Inspection | |||
1. Copies of any corrective action documents generated as a result of the teams | |||
questions or queries during this inspection. | |||
2. Copies of the list of questions submitted by the team members and the | |||
status/resolution of the information requested (provide daily during the inspection to | |||
each team member). | |||
3. One complete set of P&IDs (paper copies). | |||
4. Reference materials. (make available if needed during all on-site weeks): | |||
* IPE/PRA report; | |||
* Procurement documents for components selected (verify retrievable); | |||
* Plant procedures (normal, abnormal, emergency, surveillance, etc.); and | |||
* Vendor manuals. | |||
The lead inspector for this inspection is Andrew Dunlop. If there are any questions about the | |||
inspection or the material requested in the enclosure, please contact the lead inspector at | |||
(630) 829-9726 or via e-mail at andrew.dunlop@nrc.gov. | |||
4 Enclosure | |||
B. Allen -2- | |||
* The first group lists information necessary for our initial inspection scoping activities. This information should | |||
be provided to the lead inspector no later than July 2, 2012. By July 13, 2012, the lead inspector will | |||
communicate the initial selected set of approximately 20 components. | |||
* The second group of documents requested is those items needed to support our in-office preparation | |||
activities. This set of documents, including the calculations associated with the initial selected components, | |||
should be provided to the lead inspector at the Regional Office no later than August 1, 2012. During the in- | |||
office preparation activities, the team may identify additional information needed to support the inspection. | |||
* The last group includes the additional information above, as well as plant specific reference material. This | |||
information should be available to the team onsite on August 13, 2012. It is also requested that corrective | |||
action documents and/or questions developed during the inspection be provided to the lead inspector as the | |||
documents are generated. | |||
The lead inspector for this inspection is Andrew Dunlop. If you have questions regarding the information | |||
requested, please contact Mr. Dunlop at (630) 829-9726 or via e-mail at andrew.dunlop@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork | |||
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by | |||
the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a | |||
person is not required to respond to, a request for information or an information collection requirement unless the | |||
requesting document displays a currently valid Office of Management and Budget control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be | |||
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available | |||
Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Ann Marie Stone, Chief | |||
Engineering Branch 2 | |||
Division of Reactor Safety | |||
Docket No. 50-346 | |||
License No. NPF-3 | |||
cc w/encl: Distribution via ListServ' | |||
DISTRIBUTION: | |||
See next page | |||
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 052412 DavisBesse CDBI RFI AXD.docx | |||
Publicly Available Non-Publicly Available Sensitive Non-Sensitive | |||
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy | |||
OFFICE RIII RIII | |||
NAME ADunlop:ls AMStone | |||
DATE 05/24/12 05/24/12 | |||
OFFICIAL RECORD COPY | |||
Letter to Mr. Barry Allen from Ms. Ann Marie Stone dated May 24, 2012. | |||
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION REQUEST FOR INFORMATION | |||
FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES | |||
INSPECTION (CDBI) INSPECTION REPORT 05000346/2012008 (DRS) | |||
DISTRIBUTION: | |||
RidsNrrDorlLpl3-2 Resource | |||
Shawn Williams | |||
RidsNrrPMDavisBesse Resource | |||
RidsNrrDirsIrib Resource | |||
Chuck Casto | |||
Cynthia Pederson | |||
Steven Orth | |||
Jared Heck | |||
Allan Barker | |||
Carole Ariano | |||
Linda Linn | |||
DRPIII | |||
DRSIII | |||
Patricia Buckley | |||
Tammy Tomczak | |||
}} | }} |
Latest revision as of 03:09, 12 November 2019
ML12146A423 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 05/25/2012 |
From: | Ann Marie Stone NRC/RGN-III/DRS/EB2 |
To: | Allen B FirstEnergy Nuclear Operating Co |
References | |
IR-12-008 | |
Download: ML12146A423 (8) | |
See also: IR 05000346/2012008
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
2443 WARRENVILLE ROAD, SUITE 210
LISLE, IL 60532-4352
May 25, 2012
Mr. Barry Allen
Site Vice President
FirstEnergy Nuclear Operating Company
Davis-Besse Nuclear Power Station
5501 North State Route 2, Mail Stop A-DB-3080
Oak Harbor, OH 43449-9760
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION REQUEST FOR INFORMATION
FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES
INSPECTION (CDBI) INSPECTION REPORT 05000346/2012008 (DRS)
Dear Mr. Allen:
On August 13, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial
baseline Component Design Bases Inspection (CDBI) at Davis-Besse Nuclear Power Station. A
team of six inspectors will perform this 3-week inspection. This inspection will be performed in
accordance with NRC Baseline Inspection Procedure (IP) 71111.21.
The CDBI focuses on the design, maintenance, and operation of risk significant components
associated with one or more accident scenario. The components to be reviewed during this
baseline inspection will be identified during the in office preparation week that occurs prior to the
first on-site inspection week. In addition, operating experience issues, associated with the
component samples, will also be selected for review.
The inspection will include three weeks on-site. The inspection team will consist of six NRC
inspectors, of which five will focus on engineering/maintenance and one on operations. The
current inspection schedule is as follows:
- On-site weeks: August 13 - 17, 2012;
August 27 - 31, 2012; and
September 10 - 14, 2012.
The team will be preparing for the inspection, mainly during the week of August 6, 2012, as
discussed in the attached enclosure. A Region III Senior Reactor Analyst may accompany the
inspection team during the week of August 13, 2012, to review probabilistic risk assessment
data, and assist in identifying risk significant components and/or specific component functions,
which will be reviewed during the inspection.
Experience with previous baseline design inspections of similar depth and length has shown
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
inspection for both parties, we have enclosed a request for information needed for the
inspection.
It is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the on-site portions of
the inspection. Insofar as possible, this information should be provided electronically to the lead
inspector. The information request has been divided into three groups:
B. Allen -2-
- The first group lists information necessary for our initial inspection scoping activities.
This information should be provided to the lead inspector no later than July 2, 2012. By
July 13, 2012, the lead inspector will communicate the initial selected set of approximately 20
components.
- The second group of documents requested is those items needed to support our in-office
preparation activities. This set of documents, including the calculations associated with the
initial selected components, should be provided to the lead inspector at the Regional Office no
later than August 1, 2012. During the in-office preparation activities, the team may identify
additional information needed to support the inspection.
- The last group includes the additional information above, as well as plant specific reference
material. This information should be available to the team onsite on August 13, 2012. It is also
requested that corrective action documents and/or questions developed during the inspection
be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is Andrew Dunlop. If you have questions regarding the
information requested, please contact Mr. Dunlop at (630) 829-9726 or via e-mail at
andrew.dunlop@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public
Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
Enclosure: INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
cc w/encl: Distribution via ListServ'
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
Inspection Report: 05000346/2012008(DRS)
Inspection Dates: August 13 - 17, 2012; August 27 - 31, 2012; and
September 10 - 14, 2012
Inspection Procedure: Inspection Procedure (IP) 71111.21 Component Design Bases
Inspection
Lead Inspector: Andrew Dunlop, Lead Inspector
(630) 829-9726
andrew.dunlop@nrc.gov
I. Information Requested Prior to the On-site Information Gathering/Inspection Week
The following information is requested by July 2, 2012, or sooner, to facilitate inspection
preparation. If you have any questions regarding this information, please call the team
leader as soon as possible. (Please provide the information electronically in pdf files,
Excel, or other searchable formats, preferably on some portable electronic media (e.g.,
CDROM, DVD, flash drive, etc.). The portable electronic media should contain descriptive
names, and be indexed and hyperlinked to facilitate ease of use. Information in lists
should contain enough information to be easily understood by someone who has
knowledge of light water reactor technology).
1. Risk ranking of top 250 components from your site specific probabilistic safety
analysis (PSA) sorted by Risk Achievement Worth (RAW). Include values for
Birnbaum Importance, Risk Reduction Worth (RRW), and Fussell-Veseley (FV) (as
applicable).
2. Risk ranking of top 100 containment-related components from your site specific PSA
sorted by Large Early Release Frequency (LERF).
3. Provide a list of the top 200 cut-sets from your PSA.
4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA that
contributes more than 5 percent to the baseline plant core damage frequency
(CDF).
5. Copies of PSA system notebooks and latest PSA summary document.
6. List of time critical operator actions. Identify those actions that do not have job
performance measures (JPMs).
7. Provide copies of the emergency operating procedures (EOPs).
8. If you have an External Events or Fire PSA Model, provide the information
requested in Items 1 and 2 for external events and fire. Provide narrative
description of each coded event (including fire, flood zone description).
1 Enclosure
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
9. Electronic copy of the site IPEEE, if available.
10. Any pre-existing evaluation or list of components and associated calculations with
low design margins, (i.e., pumps closest to the design limit for flow or pressure,
diesel generator close to design required output, heat exchangers close to rated
design heat removal etc.).
11. List of available design (setup) margins in both the open and closed direction
(identify safety-related direction) for valves in the motor-operated valve (MOV) and
air-operated valve (AOV) programs. Identify the basis for how the margin was
determined.
12. List of high risk Maintenance Rule systems/components based on engineering or
expert panel judgment (i.e., those systems/components not identified in the PRA).
13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
category for the last 3 years.
14. Site top ten issues list (if applicable).
15. A list of operating experience evaluations for the last three years.
16. Information of any common cause failure of components experienced in the last 5
years at your facility.
17. List of Root Cause Evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
18. List of open operability evaluations.
19. List of components/systems considered operable but degraded/nonconforming.
20. Current management and engineering organizational chart.
21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications,
Technical Specifications Bases, and Technical Requirements Manual.
22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
23. Electronic copy of P&IDs (if available).
2 Enclosure
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
II. Information Requested (For The Approx. 20 Selected Components) to be Available
By August 1, 2012, (Will Be Reviewed by the Team in the Regional Office During the
Week of August 6, 2012)
This information should be separated for each selected component, especially if provided
electronically (e.g., folder with component name that includes calculations, condition
reports, maintenance history, etc.).
1. List of condition reports (corrective action documents) associated with each of the
selected components for the last four years.
2. The maintenance history (corrective, preventive, and elective) associated with each
of the selected components for the last 10 years. Identify frequency of preventive
maintenance activities.
3. Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and also
provide copies of important referenced material (such as drawings, engineering
requests, and vendor letters).
4. System Health Reports, System Descriptions, Design Basis Documents, and/or
Training Lesson Plans that are associated with each of the selected components.
5. A list of modifications, including equivalency evaluations and setpoint changes,
associated with each of the selected components. This list should include a
descriptive paragraph on the purpose of the modification. Please ensure this list
only includes design completed (not canceled) modifications.
6. Copies of operability evaluations (open/closed for last three years) associated with
each of the selected components and plans for restoring operability, if applicable.
7. Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
8. Copies of any open temporary modifications associated with each of the selected
components, if applicable.
9. Trend data on the selected electrical/mechanical components performance for last
three years (For example, pumps performance including in-service testing, other
vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
results, etc.).
10. Copy of latest completed surveillance tests for each component (for example, for
pumps this would include: comprehensive test, quarterly test, flow balance, etc., for
valves: stroke time testing, diagnostic testing, leak testing, etc.). Acceptance criteria
basis calculations should also be included.
11. Provide copies of the normal and abnormal operating procedures associated with
the selected components and selected scenarios.
3 Enclosure
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION
12. A copy of any internal/external self-assessments and associated corrective action
documents generated in preparation for the inspection.
13. A copy of engineering/operations related audits completed in the last two years.
III. Additional Information to be Provided on August 13, 2012, On-Site (for final selected
Components)
During the in-office preparation activities, the team will be making final selections and may
identify additional information needed to support the inspection. The lead inspector will
provide a list of the additional information needed during the week of August 6, 2012.
IV. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to
each team member).
3. One complete set of P&IDs (paper copies).
4. Reference materials. (make available if needed during all on-site weeks):
- IPE/PRA report;
- Procurement documents for components selected (verify retrievable);
- Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
- Vendor manuals.
The lead inspector for this inspection is Andrew Dunlop. If there are any questions about the
inspection or the material requested in the enclosure, please contact the lead inspector at
(630) 829-9726 or via e-mail at andrew.dunlop@nrc.gov.
4 Enclosure
B. Allen -2-
- The first group lists information necessary for our initial inspection scoping activities. This information should
be provided to the lead inspector no later than July 2, 2012. By July 13, 2012, the lead inspector will
communicate the initial selected set of approximately 20 components.
- The second group of documents requested is those items needed to support our in-office preparation
activities. This set of documents, including the calculations associated with the initial selected components,
should be provided to the lead inspector at the Regional Office no later than August 1, 2012. During the in-
office preparation activities, the team may identify additional information needed to support the inspection.
- The last group includes the additional information above, as well as plant specific reference material. This
information should be available to the team onsite on August 13, 2012. It is also requested that corrective
action documents and/or questions developed during the inspection be provided to the lead inspector as the
documents are generated.
The lead inspector for this inspection is Andrew Dunlop. If you have questions regarding the information
requested, please contact Mr. Dunlop at (630) 829-9726 or via e-mail at andrew.dunlop@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by
the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a
person is not required to respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available
Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket No. 50-346
License No. NPF-3
cc w/encl: Distribution via ListServ'
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 052412 DavisBesse CDBI RFI AXD.docx
Publicly Available Non-Publicly Available Sensitive Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII RIII
NAME ADunlop:ls AMStone
DATE 05/24/12 05/24/12
OFFICIAL RECORD COPY
Letter to Mr. Barry Allen from Ms. Ann Marie Stone dated May 24, 2012.
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION REQUEST FOR INFORMATION
FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES
INSPECTION (CDBI) INSPECTION REPORT 05000346/2012008 (DRS)
DISTRIBUTION:
RidsNrrDorlLpl3-2 Resource
RidsNrrPMDavisBesse Resource
RidsNrrDirsIrib Resource
Chuck Casto
Cynthia Pederson
DRPIII
DRSIII
Patricia Buckley