IR 05000483/2012406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12158A275
| number = ML12158A275
| issue date = 06/06/2012
| issue date = 06/06/2012
| title = Callaway Plant - NRC Security Inspection Procedure 95001 Supplemental Inspection Report 05000483-12-406
| title = NRC Security Inspection Procedure 95001 Supplemental Inspection Report 05000483-12-406
| author name = Blount T B
| author name = Blount T
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483
| license number = NPF-030
| license number = NPF-030
| contact person = vlm/Buchanan J L
| contact person = vlm/Buchanan J
| document report number = IR-12-406
| document report number = IR-12-406
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " June 6, 2012  
{{#Wiki_filter:UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON une 6, 2012


Mr. Adam C. Heflin, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
==SUBJECT:==
 
CALLAWAY PLANT - NRC SECURITY INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000483/2012406
SUBJECT: CALLAWAY PLANT - NRC SECURITY INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000483/2012406


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==
On April 27, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection, pursuant to Inspection Procedure 95001, at your Callaway Plant. The enclosed inspection report documents the inspection results, which were discussed on April 27, 2012, with you and other members of your staff.
On April 27, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection, pursuant to Inspection Procedure 95001, at your Callaway Plant. The enclosed inspection report documents the inspection results, which were discussed on April 27, 2012, with you and other members of your staff.


In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue which occurred in the second quarter of 2011. This issue was previously documented and assessed in NRC Inspection Report 05000483/2011404. The NRC was informed on March 5, 2012, of your staff's readiness for this inspection.
In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue which occurred in the second quarter of 2011. This issue was previously documented and assessed in NRC Inspection Report 05000483/2011404. The NRC was informed on March 5, 2012, of your staffs readiness for this inspection.


The objectives of this supplemental inspection were to provide assurance that: (1) the root causes and the contributing causes for the significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.
The objectives of this supplemental inspection were to provide assurance that: (1) the root causes and the contributing causes for the significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.
Line 33: Line 32:
Based on the results of this inspection, no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Based on the results of this inspection, no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html . If Security-Related Information is necessary to provide an acceptable response, please mark your entire response, Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html . If Security-Related Information is necessary to provide an acceptable response, please mark your entire response, Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,/RA/ Louden for Tom Blount, Acting Director Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Nonpublic
 
===Enclosure:===
Inspection Report 05000483/2012406
 
===w/attachment:===
Supplemental Information Electronic Distribution for Callaway Plant


ML12158A278 SUNSI Review Completed: JLB ADAMS: Yes Initials: JLB Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 BC:DRP/B C:PSB D/DRS JLBuchanan MLChambers NOKeefe MCHay TBlount /RA/ /RA/ E /RA/ E LMW /RA/ /RA/ Louden for 5/23/12 5/23/12 5/31/12 6/4/12 6/06/12
Sincerely,
/RA/ Louden for Tom Blount, Acting Director Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Nonpublic Enclosure:
Inspection Report 05000483/2012406 w/attachment: Supplemental Information Electronic Distribution for Callaway Plant ML12158A278 SUNSI Review Completed: JLB ADAMS: Yes Initials: JLB Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 BC:DRP/B C:PSB D/DRS JLBuchanan MLChambers NOKeefe MCHay TBlount
/RA/ /RA/ E /RA/ E LMW /RA/ /RA/ Louden for 5/23/12 5/23/12 5/31/12 6/4/12 6/06/12
}}
}}

Latest revision as of 02:42, 12 November 2019

NRC Security Inspection Procedure 95001 Supplemental Inspection Report 05000483-12-406
ML12158A275
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/06/2012
From: Blount T
Division of Reactor Safety IV
To: Heflin A
Union Electric Co
vlm/Buchanan J
References
IR-12-406
Download: ML12158A275 (3)


Text

UNITE D S TATE S NUC LEAR REGULATOR Y C OMMI S SI ON une 6, 2012

SUBJECT:

CALLAWAY PLANT - NRC SECURITY INSPECTION PROCEDURE 95001 SUPPLEMENTAL INSPECTION REPORT 05000483/2012406

Dear Mr. Heflin:

On April 27, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a supplemental inspection, pursuant to Inspection Procedure 95001, at your Callaway Plant. The enclosed inspection report documents the inspection results, which were discussed on April 27, 2012, with you and other members of your staff.

In accordance with the NRC Reactor Oversight Process Action Matrix, this supplemental inspection was performed to follow-up on a performance issue which occurred in the second quarter of 2011. This issue was previously documented and assessed in NRC Inspection Report 05000483/2011404. The NRC was informed on March 5, 2012, of your staffs readiness for this inspection.

The objectives of this supplemental inspection were to provide assurance that: (1) the root causes and the contributing causes for the significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified; and (3) corrective actions were or will be sufficient to address and preclude repetition of the root and contributing causes.

Based on the results of this inspection, no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html . If Security-Related Information is necessary to provide an acceptable response, please mark your entire response, Security-Related Information in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/ Louden for Tom Blount, Acting Director Division of Reactor Safety Docket No. 50-483 License No. NPF-30 Nonpublic Enclosure:

Inspection Report 05000483/2012406 w/attachment: Supplemental Information Electronic Distribution for Callaway Plant ML12158A278 SUNSI Review Completed: JLB ADAMS: Yes Initials: JLB Publicly Available Non-Sensitive PSI:PSB1 PSI:PSB1 BC:DRP/B C:PSB D/DRS JLBuchanan MLChambers NOKeefe MCHay TBlount

/RA/ /RA/ E /RA/ E LMW /RA/ /RA/ Louden for 5/23/12 5/23/12 5/31/12 6/4/12 6/06/12