ML13016A507: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, December 20, 2012 11:32 AM To: dorts@firstenergycorp.com; Davis-BesseHearingFile Resource
{{#Wiki_filter:Davis-BesseNPEm Resource From:                                   CuadradoDeJesus, Samuel Sent:                                   Thursday, December 20, 2012 11:32 AM To:                                     dorts@firstenergycorp.com; Davis-BesseHearingFile Resource


==Subject:==
==Subject:==
RE: FW: DB High Strength Bolt Inspection DeferralsYou're welcome Steve From: dorts@firstenergycorp.com
RE: FW: DB High Strength Bolt Inspection Deferrals Youre welcome Steve From: dorts@firstenergycorp.com [mailto:dorts@firstenergycorp.com]
[mailto:dorts@firstenergycorp.com
Sent: Thursday, December 20, 2012 11:16 AM To: CuadradoDeJesus, Samuel
Sent: Thursday, December 20, 2012 11:16 AM To: CuadradoDeJesus, Samuel  


==Subject:==
==Subject:==
Re: FW: DB High Strength Bolt Inspection Deferrals Thanks, Sam. _____ Steve Dort Davis-Besse License Renewal
Re: FW: DB High Strength Bolt Inspection Deferrals Thanks, Sam.
 
_____
From:       "CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov
Steve Dort Davis-Besse License Renewal From:     "CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov>
To:       "Larry S. Hinkle" <larry.hinkle@embarqmail.com
To:     "Larry S. Hinkle" <larry.hinkle@embarqmail.com>
Cc:       Davis-BesseHearingFile Resource <Davis-BesseHearingFile.Resource@nrc.gov>, "Doutt, Clifford" <Clifford.Doutt@nrc.gov
Cc:     Davis-BesseHearingFile Resource <Davis-BesseHearingFile.Resource@nrc.gov>, "Doutt, Clifford" <Clifford.Doutt@nrc.gov>,
>, "dorts@firstenergycorp.com" <dorts@firstenergycorp.com
"dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Date:       12/20/2012 11:04 AM
Date:     12/20/2012 11:04 AM


==Subject:==
==Subject:==
FW: DB High Strength Bolt Inspection Deferrals
FW: DB High Strength Bolt Inspection Deferrals
 
: Larry, Below is the staffs position.
Larry,   Below is the staff's position.
From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel
From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel


==Subject:==
==Subject:==
DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.
DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.
  ------------------
----------------------------------------- The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
----------------------- The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intende d recipient, you are hereby notif ied that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
1
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 4000   Mail Envelope Properties   (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A376)
 
Hearing Identifier:     Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:           4000 Mail Envelope Properties     (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A376)


==Subject:==
==Subject:==
RE: FW: DB High Strength Bolt Inspection Deferrals Sent Date:   12/20/2012 11:31:52 AM Received Date: 12/20/2012 11:31:53 AM From:   CuadradoDeJesus, Samuel Created By:   Samuel.CuadradoDeJesus@nrc.gov Recipients:     "dorts@firstenergycorp.com" <dorts@firstenergycorp.com> Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov> Tracking Status: None Post Office:   HQCLSTR01.nrc.gov
RE: FW: DB High Strength Bolt Inspection Deferrals Sent Date:             12/20/2012 11:31:52 AM Received Date:         12/20/2012 11:31:53 AM From:                   CuadradoDeJesus, Samuel Created By:             Samuel.CuadradoDeJesus@nrc.gov Recipients:
 
"dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Files     Size     Date & Time MESSAGE   2257     12/20/2012 11:31:53 AM
Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
 
Tracking Status: None Post Office:           HQCLSTR01.nrc.gov Files                         Size                     Date & Time MESSAGE                       2257                     12/20/2012 11:31:53 AM Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Recipients Received:}}

Revision as of 17:24, 11 November 2019

2012/12/20 Davis-Besse Lr - FW: DB High Strength Bolt Inspection Deferrals
ML13016A507
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML13016A507 (2)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, December 20, 2012 11:32 AM To: dorts@firstenergycorp.com; Davis-BesseHearingFile Resource

Subject:

RE: FW: DB High Strength Bolt Inspection Deferrals Youre welcome Steve From: dorts@firstenergycorp.com [1]

Sent: Thursday, December 20, 2012 11:16 AM To: CuadradoDeJesus, Samuel

Subject:

Re: FW: DB High Strength Bolt Inspection Deferrals Thanks, Sam.

_____

Steve Dort Davis-Besse License Renewal From: "CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov>

To: "Larry S. Hinkle" <larry.hinkle@embarqmail.com>

Cc: Davis-BesseHearingFile Resource <Davis-BesseHearingFile.Resource@nrc.gov>, "Doutt, Clifford" <Clifford.Doutt@nrc.gov>,

"dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Date: 12/20/2012 11:04 AM

Subject:

FW: DB High Strength Bolt Inspection Deferrals

Larry, Below is the staffs position.

From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel

Subject:

DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.


The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 4000 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A376)

Subject:

RE: FW: DB High Strength Bolt Inspection Deferrals Sent Date: 12/20/2012 11:31:52 AM Received Date: 12/20/2012 11:31:53 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2257 12/20/2012 11:31:53 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: