Lr - FW: DB High Strength Bolt Inspection Deferrals
ML13016A507
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/20/2012
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML13016A507 (2)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, December 20, 2012 11:32 AM To: dorts@firstenergycorp.com; Davis-BesseHearingFile Resource

Subject:

RE: FW: DB High Strength Bolt Inspection Deferrals Youre welcome Steve From: dorts@firstenergycorp.com [1]

Sent: Thursday, December 20, 2012 11:16 AM To: CuadradoDeJesus, Samuel

Subject:

Re: FW: DB High Strength Bolt Inspection Deferrals Thanks, Sam.

Steve Dort Davis-Besse License Renewal From: "CuadradoDeJesus, Samuel" <Samuel.CuadradoDeJesus@nrc.gov>

To: "Larry S. Hinkle" <larry.hinkle@embarqmail.com>

Cc: Davis-BesseHearingFile Resource <Davis-BesseHearingFile.Resource@nrc.gov>, "Doutt, Clifford" <Clifford.Doutt@nrc.gov>,

"dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Date: 12/20/2012 11:04 AM

Subject:

FW: DB High Strength Bolt Inspection Deferrals

Larry, Below is the staffs position.

From: Holston, William Sent: Wednesday, December 19, 2012 3:52 PM To: CuadradoDeJesus, Samuel

Subject:

DB High Strength Bolt Inspection Deferrals Sam - our position is that if evidence of contamination is found, a deferral of the UT inspections until he next refueling outage would only be acceptable if visual inspections of the coatings demonstrate that the liquid could not have penetrated to the base metal of the stud. For example, coatings are intact on the stud and nut on all surfaces, coatings on the base plate are intact between the wall/column and the base plate.


The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.

1

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 4000 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0B954F8A376)

Subject:

RE: FW: DB High Strength Bolt Inspection Deferrals Sent Date: 12/20/2012 11:31:52 AM Received Date: 12/20/2012 11:31:53 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2257 12/20/2012 11:31:53 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: