ML17264A342: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/09/1996
| issue date = 02/09/1996
| title = Forwards Application for Amend to License DPR-18,revising Table 3.3.2-1,Function 5b, Feedwater Isolation,Sg Water Level - High to Raise Allowable Value & Trip Setpoint
| title = Forwards Application for Amend to License DPR-18,revising Table 3.3.2-1,Function 5b, Feedwater Isolation,Sg Water Level - High to Raise Allowable Value & Trip Setpoint
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A R
| addressee name = Johnson A
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 5
| page count = 5
| project =
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULATOR INFORMATION DISTRIBUTION 6TEM(RIDS)ACCESSION NBR:9602130452 DOC.DATE:96/02/09NOTARIZED:
{{#Wiki_filter:CATEGORY 1 REGULATOR                      INFORMATION DISTRIBUTION 6              TEM (RIDS)
NOFACIL!50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAY,EAUTHORAFFILIATION'EGREDY>R.C.
ACCESSION NBR: 9602130452                                     DOC. DATE: 96/02/09  NOTARIZED: NO          DOCKET FACIL!50-244 Robert Emmet                        Ginna Nuclear Plant, Unit 1, Rochester                 G 05000244 AUTH. NAY,E          AUTHOR Rochester Gas  AFFILIATION'EGREDY>R.C.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPiENT APFILIATION JOHNSON,A.R.
6 Electric Corp.
RECIP.NAME           RECIPiENT APFILIATION JOHNSON,A.R.


==SUBJECT:==
==SUBJECT:==
Forwardsapplication foramendtolicenseDPR-18,revising Table3.3.2-$,Function 5b,"Feedwater Isolation,SG WaterLevel-High"toraiseallowable value&tripsetpoint.
Forwards application for                                amend to license DPR-18,revising Table 3.3.2-$ ,Function 5b, "Feedwater Isolation,SG Water Level  High" to raise allowable value & trip setpoint.
DISTRIBUTION CODE:A001DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:ORSubmittal:
DISTRIBUTION CODE: A001D                          COPIES RECEIVED:LTR               ENCL      SIZE:
GeneralDistribution NOTES:License Expdateinaccordance with10CFR2,2.109(9/19/72).
TITLE:   OR  Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).                                           05000244 RECIPIENT                                    COPIES          RECIPIENT          COPIES ID CODE/NAME                                    LTTR ENCL      ID CODE/NAME       LTTR ENCL PD1-1 LA                                            1    1    PD1-1 PD              1      1 JOHNSON,A                                           1    1 CENTER            1                          1    1    NRR/DE/EMCB           1      1 CH  HICB                                    1    1    NRR/DSSA/SPLB         1      1 NRR/DSSA/SRXB                                      1    1    NUDOCS-ABSTRACT       1      1
DOCKET0500024405000244RECIPIENT IDCODE/NAME PD1-1LAJOHNSON,A CENTER1CHHICBNRR/DSSA/SRXB
                            'GC/HDS3 1    0 EXTERNAL: NOAC                                                  1    1    NRC PDR                1    .1 NOTE TO ALL "RIDS" RECIPIENTS:
'GC/HDS3EXTERNAL:
PLEASE HELP US TO REDUCE WASTE( CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
NOACCOPIESLTTRENCL11111111111011RECIPIENT IDCODE/NAME PD1-1PDNRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRCPDRCOPIESLTTRENCL111111111.1NOTETOALL"RIDS"RECIPIENTS:
  'D>TAL NUMBER OF COPIES REQUIRED: LTTR                                      12  ENCL    ll
PLEASEHELPUSTOREDUCEWASTE(CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5D"5(EXT.
 
415-2083)
0 t'
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!'D>TALNUMBEROFCOPIESREQUIRED:
 
LTTR12ENCLll 0t' ANDROCHESTER GASANDElECTRICCORPORATION
AND ROCHESTER GAS ANDElECTRIC CORPORATION ~ 89EASTAVENUE, ROCHESTER, N. Y ldbf9 0001    AREA CODE7I6 546-2700 ROBERT C. MECREDY Vice President Nvcfeor operations February 9, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-1 Washington, D.C. 20555
~89EASTAVENUE, ROCHESTER, N.Yldbf90001AREACODE7I6546-2700ROBERTC.MECREDYVicePresident Nvcfeoroperations February9,1996U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-1Washington, D.C.20555


==Subject:==
==Subject:==
Application forAmendment toFacilityOperating LicenseSteamGenerator WaterLevel-HighInstrumentation SetpointChangeR.E.GinnaNuclearPowerPlantDocketNo.50-244
Application for Amendment to Facility Operating License Steam Generator Water Level - High Instrumentation Setpoint Change R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr. Johnson:==
 
The enclosed License Amendment Request (LAR) proposes to revise the Ginna Station Technical Specifications (TS) setpoints for the Steam Generator Water Level - High feedwater isolation function (TS Table 3.3.2-1, Function Sb).
This LAR is being proposed to take advantage of the greater allowable operating band for steam generator water level afforded by the replacement steam generators being installed at Ginna Station during the 1996 Refueling Outage. The replacement steam generators show no appreciable degradation in steam separator performance with water levels up to 100% narrow range level. Therefore, the accident analyses have been evaluated to demonstrate acceptable limits continue to be met with a higher setpoint value for feedwater isolation.
Since the setpoint change can only be made with respect to the new steam generators, RGRE desires to make this change prior to startup from the 1996 Refueling Outage. Therefore, we request NRC consideration of this LAR in order to support a planned startup date of May 30, 1996. RGB also requests a 30 day implementation period for necessary setpoint and procedure changes following NRC approval (i.e., RGEcE must receive NRC acceptance of this LAR by April 30, 1996 in order to implement during the 1996 Refueling Outage).
Very truly yours, Robert C. Mecredy cytct02g>0452            oo0244


==DearMr.Johnson:==
0 9 805'8JF xc:   U.S. Nuclear Regulatory Commission Mr. Allen R. Johnson (Mail Stop 14B2)
TheenclosedLicenseAmendment Request(LAR)proposestorevisetheGinnaStationTechnical Specifications (TS)setpoints fortheSteamGenerator WaterLevel-Highfeedwater isolation function(TSTable3.3.2-1,FunctionSb).ThisLARisbeingproposedtotakeadvantage ofthegreaterallowable operating bandforsteamgenerator waterlevelaffordedbythereplacement steamgenerators beinginstalled atGinnaStationduringthe1996Refueling Outage.Thereplacement steamgenerators shownoappreciable degradation insteamseparator performance withwaterlevelsupto100%narrowrangelevel.Therefore, theaccidentanalyseshavebeenevaluated todemonstrate acceptable limitscontinuetobemetwithahighersetpointvalueforfeedwater isolation.
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr. F. William Vallentino, President New York State Energy, Research, and Development Authority 2 Rockefeller Plaza Albany, NY 1223-1253}}
Sincethesetpointchangecanonlybemadewithrespecttothenewsteamgenerators, RGREdesirestomakethischangepriortostartupfromthe1996Refueling Outage.Therefore, werequestNRCconsideration ofthisLARinordertosupportaplannedstartupdateofMay30,1996.RGBalsorequestsa30dayimplementation periodfornecessary setpointandprocedure changesfollowing NRCapproval(i.e.,RGEcEmustreceiveNRCacceptance ofthisLARbyApril30,1996inordertoimplement duringthe1996Refueling Outage).Verytrulyyours,RobertC.Mecredycytct02g>0452 oo0244 09  805'8JFxc:U.S.NuclearRegulatory Commission Mr.AllenR.Johnson(MailStop14B2)ProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector Mr.F.WilliamVallentino, President NewYorkStateEnergy,Research, andDevelopment Authority 2Rockefeller PlazaAlbany,NY1223-1253}}

Latest revision as of 08:04, 10 November 2019

Forwards Application for Amend to License DPR-18,revising Table 3.3.2-1,Function 5b, Feedwater Isolation,Sg Water Level - High to Raise Allowable Value & Trip Setpoint
ML17264A342
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/09/1996
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A343 List:
References
NUDOCS 9602130452
Download: ML17264A342 (5)


Text

CATEGORY 1 REGULATOR INFORMATION DISTRIBUTION 6 TEM (RIDS)

ACCESSION NBR: 9602130452 DOC. DATE: 96/02/09 NOTARIZED: NO DOCKET FACIL!50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAY,E AUTHOR Rochester Gas AFFILIATION'EGREDY>R.C.

6 Electric Corp.

RECIP.NAME RECIPiENT APFILIATION JOHNSON,A.R.

SUBJECT:

Forwards application for amend to license DPR-18,revising Table 3.3.2-$ ,Function 5b, "Feedwater Isolation,SG Water Level High" to raise allowable value & trip setpoint.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 LA 1 1 PD1-1 PD 1 1 JOHNSON,A 1 1 CENTER 1 1 1 NRR/DE/EMCB 1 1 CH HICB 1 1 NRR/DSSA/SPLB 1 1 NRR/DSSA/SRXB 1 1 NUDOCS-ABSTRACT 1 1

'GC/HDS3 1 0 EXTERNAL: NOAC 1 1 NRC PDR 1 .1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE( CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D"5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

'D>TAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL ll

0 t'

AND ROCHESTER GAS ANDElECTRIC CORPORATION ~ 89EASTAVENUE, ROCHESTER, N. Y ldbf9 0001 AREA CODE7I6 546-2700 ROBERT C. MECREDY Vice President Nvcfeor operations February 9, 1996 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-1 Washington, D.C. 20555

Subject:

Application for Amendment to Facility Operating License Steam Generator Water Level - High Instrumentation Setpoint Change R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Johnson:

The enclosed License Amendment Request (LAR) proposes to revise the Ginna Station Technical Specifications (TS) setpoints for the Steam Generator Water Level - High feedwater isolation function (TS Table 3.3.2-1, Function Sb).

This LAR is being proposed to take advantage of the greater allowable operating band for steam generator water level afforded by the replacement steam generators being installed at Ginna Station during the 1996 Refueling Outage. The replacement steam generators show no appreciable degradation in steam separator performance with water levels up to 100% narrow range level. Therefore, the accident analyses have been evaluated to demonstrate acceptable limits continue to be met with a higher setpoint value for feedwater isolation.

Since the setpoint change can only be made with respect to the new steam generators, RGRE desires to make this change prior to startup from the 1996 Refueling Outage. Therefore, we request NRC consideration of this LAR in order to support a planned startup date of May 30, 1996. RGB also requests a 30 day implementation period for necessary setpoint and procedure changes following NRC approval (i.e., RGEcE must receive NRC acceptance of this LAR by April 30, 1996 in order to implement during the 1996 Refueling Outage).

Very truly yours, Robert C. Mecredy cytct02g>0452 oo0244

0 9 805'8JF xc: U.S. Nuclear Regulatory Commission Mr. Allen R. Johnson (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector Mr. F. William Vallentino, President New York State Energy, Research, and Development Authority 2 Rockefeller Plaza Albany, NY 1223-1253