ML18072A372: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(14 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18072A372
| number = ML18072A372
| issue date = 04/10/2018
| issue date = 04/10/2018
| title = Peach Bottom Atomic Power Station, Units 2 and 3 - Regulatory Audit Summary Regarding License Amendment Request to Adopt Title 10 of the Code of Federal Regulations Section 50.69 (EPID L-2017-LLA-0281)
| title = Regulatory Audit Summary Regarding License Amendment Request to Adopt Title 10 of the Code of Federal Regulations Section 50.69
| author name = Tobin J
| author name = Tobin J
| author affiliation = NRC/NRR/DORL/LPLI
| author affiliation = NRC/NRR/DORL/LPLI
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000277, 05000278
| docket = 05000277, 05000278
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 10, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


=Text=
==SUBJECT:==
{{#Wiki_filter:}}
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -
REGULATORY AUDIT
 
==SUMMARY==
REGARDING LICENSE AMENDMENT REQUEST TO ADOPT TITLE 10 OF THE CODE OF FEDERAL REGULATIONS SECTION 50.69 (EPID L-2017-LLA-0281)
 
==Dear Mr. Hanson:==
 
By letter dated August 30, 2017, as supplemented by letter dated October 24, 2017 (Agencywide Documents Access and Management System Accession Nos. ML17243A014 and ML172978521, respectively), Exelon Generation Company, LLC (Exelon) requested an amendment to the Renewed Facility Operating License for Peach Bottom Atomic Power Station, Units 2 and 3, to adopt Title 10 of the Code of Federal Regulations Section 50.69 for risk-informed categorization and treatment of structures, systems, and components.
To support its review, the U.S. Nuclear Regulatory Commission staff conducted a regulatory audit that started January 31, 2018, and ended February 1, 2018, at the Exelon office, 300 Exelon Way, Kennett Square, PA 19348. The staff reviewed documents and held discussions with members of Exelon and its contractors. The regulatory audit summary is enclosed with this letter.
If you have any questions, please contact me at (301) 415-2328 or Jennifer.Tobin@nrc.gov.
Sincerely, Jennifer Tobin, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278
 
==Enclosure:==
 
Regulatory Audit Summary cc: Listseiv
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF NUCLEAR REACTOR REGULATION REGULATORY AUDIT
 
==SUMMARY==
FOR JANUARY 31 -FEBRUARY 11 2018. AUDIT IN SUPPORT OF LICENSE AMENDMENT REQUEST TO ADOPT 10 CFR 50.69 EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278
 
==1.0    BACKGROUND==
 
By letter dated August 30, 2017 (Reference 1), as supplemented by letter dated October 24, 2017 (Reference 2), Exelon Generation Company, LLC (Exelon) requested an amendment to the Renewed Facility Operating License for Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3, to adopt Title 1O of the Code of Federal Regulations Section 50.69 (10 CFR 50.69) for risk informed categorization and treatment of structures, systems, and components (SSCs ). The proposed license amendment would modify the licensing basis by the addition of a license condition to allow for the implementation of the provisions of 10 CFR 50.69, which allow adjustment of the scope of equipment subject to special treatment controls (e.g., quality assurance, testing, inspection, condition monitoring, assessment, and evaluation).
This voluntary risk-informed alternative rule allows power reactor licensees and license applicants to apply a risk-informed categorization process to categorize SSCs based on their safety significance. The final rule was published in the Federal Register on November 22, 2004 (69 FR 68008) (Reference 3). The U.S. Nuclear Regulatory Commission (NRC or the Commission) staff issued Regulatory Guide 1.201, Revision 1, "Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to Their Safety Significance," in May 2006 (Reference 4).
The NRC staff's review of the application has commenced in accordance with the Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-101, "License Amendment Review Procedures." The NRC staff determined that a regulatory audit of Exelon's 10 CFR 50.69 application should be conducted in accordance with NRR Office Instruction LIC-111, "Regulatory Audits," for the staff to gain a better understanding of the licensee's proposed risk-informed categorization process.
The regulatory audit was a planned license or regulation-related activity that included the examination and evaluation of primarily non-docketed information. The regulatory audit was conducted with the intent to gain understanding, to verify information, and/or to identify information that will require docketing to support the basis of a licensing or regulatory decision.
Performing a regulatory audit of the licensee's information is expected to assist the staff in Enclosure
 
efficiently conducting its review or gain insights on the licensee's processes or procedures.
Information that the NRC staff relies upon to make the safety determination must be submitted on the docket. However, the NRC staff may review supporting information retained as records under 10 CFR 50.71 and/or 10 CFR 54.37, which, although not required to be submitted as part of the licensing action, would help the staff better understand the licensee's submitted information.
The purpose of the audit was to gain an understanding of the information needed to support the staff's licensing decision regarding the license amendment request (LAR) and to develop appropriate requests for additional information (RAls), as needed. The information submitted in support of the Peach Bottom LAR is under review, and additional information needed to support the LAR review will be formally communicated by the NRC staff using the RAI process in accordance with NRR Office Instruction LIC-101.
An audit team, which consisted of the NRC staff and NRC contractor from Pacific Northwest National Laboratories (PNNL), conducted the regulatory audit from January 31, 2018, through February 1, 2018, at the Exelon office, 300 Exelon Way, Kennett Square, PA 19348.
2.0      AUDIT ACTIVITIES The NRC audit team consisted of five staff from the Division of Risk Assessment, Probabilistic Risk Assessment (PRA) Licensing Branch and one PNNL contractor. Several NRC observers including staff from the Division of Operating Reactor Licensing, Division of Engineering, and NRC Region 1 were in attendance for Exelon's Integrated Decision-Making Panel (IDP) meeting which occurred during the morning hours of January 31, 2018. Attachment 1 provides the list of attendees from NRC, PNNL, Exelon, and other participants.
On January 31, Exelon conducted a four-hour demonstration of the IDP associated with the Peach Bottom 10 CFR 50.69 categorization for the residual heat removal (RHR) system. The IDP primarily consisted of presentations and technical discussion of the categorization results from the PRA, non-PRA, passive, defense-in-depth, and qualitative categorization elements of process for each of the functions associated with RHR including final conclusions of how each function translates into categorization of system safety components. For the PRA results, Exelon's 10 CFR 50.69 team presented results of categorization based both on internal events and fire core damage frequency and large early release frequency. The NRC staff were observers and mostly in listening mode for the entire IDP session.
The regulatory audit started in the afternoon immediately following the IDP session, with the NRC audit team and the licensee's staff and contractors. During the audit, team members participated in technical discussions according to the audit plan available in NRC's Agencywide Documents Access and Management System (ADAMS) (Reference 5). Technical discussions focused on the following major review areas: technical adequacy of the internal events and fire PRA, categorization process overview, and review of the audit questions with the licensee's 10 CFR 50.69 team. In addition to reviewing the audit questions, NRC discussed lessons learned from 10 CFR 50.69 audits for other licensees. During the audit, the NRC staff discussed several questions associated with the LAR, some of which will be formally sent as RAls.
At the conclusion of the audit, the team participated in a summary exit meeting with the Exelon audit team on February 1, 2018. The NRC staff provided a brief conclusion of the audit objectives that were met and details on the path forward. There were no open items in the
 
discussion and no deviation from the audit plan. Attachment 2 contains a list of documents reviewed by the team during the audit.
3.0    RESULTS OF THE AUDIT The RAls were issued to the licensee on April 6, 2018 (ADAMS Accession No. ML180968506),
with a request to submit the response within 30 days.
 
==4.0    REFERENCES==
: 1.      Letter from J. Barstow, Exelon, to NRC, "Peach Bottom Atomic Power Station, Units 2 and 3 - Application to Adopt 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems, and Components (SSCs) for Nuclear Power Plants,"'
dated August 30, 2017 (ADAMS Accession No. ML17243A014).
: 2.      Letter from J. Barstow, Exelon, to NRC, "Peach Bottom Atomic Power Station, Units 2 and 3 - Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors,"
dated October 24, 2017 (ADAMS Accession No. ML172978521).
: 3.      Federal Register Notice (69 FR 68008), "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants," dated November 22, 2004 (ADAMS Accession No. ML042960073).
: 4.      NRC Regulatory Guide 1.201, Revision 1, "Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants according to Their Safety Significance," issued May 2006 (ADAMS Accession No. ML061090627).
: 5.      Peach Bottom Atomic Power Station, Units 2 and 3, Regulatory Audit Plan - License Amendment Request to Adopt 10 CFR Section 50.69, dated January 2018 (ADAMS Accession No. ML18005A077).
 
List of Participants U.S. Nuclear Regulatory Commission (NRC) Audit Team
* Stacey Rosenberg    NRC          Branch Chief
* Leslie Fields        NRC          Audit Team Leader
* Mihaela Biro        NRC          Audit Technical Lead
* Jonathan Evans      NRC          Probabilistic Risk Assessment (PRA)
* Michael Levine      NRC          PRA Pacific Northwest National Laboratory (PNNL) Team
* Garill Coles        PNNL          PRA NRC Integrated Decision-Making Panel Observation Team
* Jesse Quichocho      NRC          Branch Chief
* Ali Rezai            NRC          Electrical Engineer
* Hari Kodali          NRC          Materials Engineer
* Ed Miller            NRC          Project Manager
* Jenny Tobin          NRC          Licensing Project Manager NRC Regional Staff in Attendance
* Frank Arner          RI            Senior Resident Analyst
* Chris Cahill        RI            Senior Resident Analyst Exelon Generation Company, LLC - Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom) Team
* Glenn Stewart                      Licensing Lead
* Shannon Rafferty-Czincila          Risk Management Senior Manager
* Eugene Kelly                      Risk Management Senior Engineer
* Preeti Furtado                    Engineering Manager
* Kirk Lindemen                      10 CFR 50.69 Engineer
* Joe Janssen                        10 CFR 50.69 Engineer
* Mark Lefever                      Engineering
* Stephanie Hanson                  Peach Bottom
* Tom LaMontague                    Peach Bottom
* Charlotte Couger                  10 CFR 50.69 Engineer
* Monica Hurley                      Exelon
* Mark Uhrich                        Exelon
* Chris Thomas                      Exelon
* Chris Weichler                    Peach Bottom Attachment 1
* Amy Huber                      Peach Bottom
* Travis Bement                  Exelon
* Richard Gropp                  Exelon Jensen Hughes 10 CFR 50.69 Support Team
* Barry Sloane                    Director, Exelon Risk Management Program
* David Passehl                  Technical Lead, 10 CFR 50.69 PRA Categorization
* Ken Saunders                    10 CFR 50.69 Engineer
* Charlie Young                  Operations Support
* Brian Albinson                  Internal Events/Internal Flooding PRA Model Owner
* Greg Zucal                      Risk Management Engineer
* Chris Pupek                    Risk Management Engineer
 
List of Documents Reviewed During the Audit Peach Bottom Atomic Power Station, Units 2 and 3, Documents Available for Review on the Exelon Generation Company, LLC Portal/Laptop The licensee provided an extensive list of supporting documents (e.g., analyses, calculations, reports, drawings, and procedures) on the Limerick document portal available during the week of the audit.
Additional Documents/Procedures Reviewed on Site
* ER-AA-569, 10 CFR 50.69 Program Description
* PB-5069-10-003, Revision 0, Peach Bottom Atomic Po\/\er Station, Units 2 and 3, Residual Heat Removal (RHR) 50.69 Categorization
* PB-MISC-032, Revision 0, Peach Bottom RHR Passive 50.69 Categorization
* PB-PRA-10, Component Data Notebook
* PB-LAR-DIS, PRA Technical Adequacy in Support of the License Amendment Request to Implement 10 CFR 50.69 as \/\ell as the License Amendment Request to Implement the Risk Informed Completion Time (RICT) Program
* PB-LAR-015, Revision 2, PRA Technical Adequacy- Table 5.1 Peer Review and Peer Review Findings
* 032299-RPT-001, Peach Bottom Atomic Po\/\er Station PRA Finding Level F&O Technical Review and Focused Scope Peer Review Attachment 2
 
ML18072A372 OFFICE    DORL/LPL 1/PM  DORL/LPL 1/LA      DORL/LPL 1/BC  DORL/LPL 1/PM NAME      JTobin          IBetts            JDanna        JTobin DATE      03/12/18        03/19/18          04/10/18      04/10/18}}

Latest revision as of 20:31, 7 November 2019

Regulatory Audit Summary Regarding License Amendment Request to Adopt Title 10 of the Code of Federal Regulations Section 50.69
ML18072A372
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/10/2018
From: Jennifer Tobin
Plant Licensing Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Ennis R, NRR/DORL/LPL1, 415-1420
References
EPID L-2017-LLA-0281
Download: ML18072A372 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 10, 2018 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 -

REGULATORY AUDIT

SUMMARY

REGARDING LICENSE AMENDMENT REQUEST TO ADOPT TITLE 10 OF THE CODE OF FEDERAL REGULATIONS SECTION 50.69 (EPID L-2017-LLA-0281)

Dear Mr. Hanson:

By letter dated August 30, 2017, as supplemented by letter dated October 24, 2017 (Agencywide Documents Access and Management System Accession Nos. ML17243A014 and ML172978521, respectively), Exelon Generation Company, LLC (Exelon) requested an amendment to the Renewed Facility Operating License for Peach Bottom Atomic Power Station, Units 2 and 3, to adopt Title 10 of the Code of Federal Regulations Section 50.69 for risk-informed categorization and treatment of structures, systems, and components.

To support its review, the U.S. Nuclear Regulatory Commission staff conducted a regulatory audit that started January 31, 2018, and ended February 1, 2018, at the Exelon office, 300 Exelon Way, Kennett Square, PA 19348. The staff reviewed documents and held discussions with members of Exelon and its contractors. The regulatory audit summary is enclosed with this letter.

If you have any questions, please contact me at (301) 415-2328 or Jennifer.Tobin@nrc.gov.

Sincerely, Jennifer Tobin, Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278

Enclosure:

Regulatory Audit Summary cc: Listseiv

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 OFFICE OF NUCLEAR REACTOR REGULATION REGULATORY AUDIT

SUMMARY

FOR JANUARY 31 -FEBRUARY 11 2018. AUDIT IN SUPPORT OF LICENSE AMENDMENT REQUEST TO ADOPT 10 CFR 50.69 EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 DOCKET NOS. 50-277 AND 50-278

1.0 BACKGROUND

By letter dated August 30, 2017 (Reference 1), as supplemented by letter dated October 24, 2017 (Reference 2), Exelon Generation Company, LLC (Exelon) requested an amendment to the Renewed Facility Operating License for Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3, to adopt Title 1O of the Code of Federal Regulations Section 50.69 (10 CFR 50.69) for risk informed categorization and treatment of structures, systems, and components (SSCs ). The proposed license amendment would modify the licensing basis by the addition of a license condition to allow for the implementation of the provisions of 10 CFR 50.69, which allow adjustment of the scope of equipment subject to special treatment controls (e.g., quality assurance, testing, inspection, condition monitoring, assessment, and evaluation).

This voluntary risk-informed alternative rule allows power reactor licensees and license applicants to apply a risk-informed categorization process to categorize SSCs based on their safety significance. The final rule was published in the Federal Register on November 22, 2004 (69 FR 68008) (Reference 3). The U.S. Nuclear Regulatory Commission (NRC or the Commission) staff issued Regulatory Guide 1.201, Revision 1, "Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants According to Their Safety Significance," in May 2006 (Reference 4).

The NRC staff's review of the application has commenced in accordance with the Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-101, "License Amendment Review Procedures." The NRC staff determined that a regulatory audit of Exelon's 10 CFR 50.69 application should be conducted in accordance with NRR Office Instruction LIC-111, "Regulatory Audits," for the staff to gain a better understanding of the licensee's proposed risk-informed categorization process.

The regulatory audit was a planned license or regulation-related activity that included the examination and evaluation of primarily non-docketed information. The regulatory audit was conducted with the intent to gain understanding, to verify information, and/or to identify information that will require docketing to support the basis of a licensing or regulatory decision.

Performing a regulatory audit of the licensee's information is expected to assist the staff in Enclosure

efficiently conducting its review or gain insights on the licensee's processes or procedures.

Information that the NRC staff relies upon to make the safety determination must be submitted on the docket. However, the NRC staff may review supporting information retained as records under 10 CFR 50.71 and/or 10 CFR 54.37, which, although not required to be submitted as part of the licensing action, would help the staff better understand the licensee's submitted information.

The purpose of the audit was to gain an understanding of the information needed to support the staff's licensing decision regarding the license amendment request (LAR) and to develop appropriate requests for additional information (RAls), as needed. The information submitted in support of the Peach Bottom LAR is under review, and additional information needed to support the LAR review will be formally communicated by the NRC staff using the RAI process in accordance with NRR Office Instruction LIC-101.

An audit team, which consisted of the NRC staff and NRC contractor from Pacific Northwest National Laboratories (PNNL), conducted the regulatory audit from January 31, 2018, through February 1, 2018, at the Exelon office, 300 Exelon Way, Kennett Square, PA 19348.

2.0 AUDIT ACTIVITIES The NRC audit team consisted of five staff from the Division of Risk Assessment, Probabilistic Risk Assessment (PRA) Licensing Branch and one PNNL contractor. Several NRC observers including staff from the Division of Operating Reactor Licensing, Division of Engineering, and NRC Region 1 were in attendance for Exelon's Integrated Decision-Making Panel (IDP) meeting which occurred during the morning hours of January 31, 2018. Attachment 1 provides the list of attendees from NRC, PNNL, Exelon, and other participants.

On January 31, Exelon conducted a four-hour demonstration of the IDP associated with the Peach Bottom 10 CFR 50.69 categorization for the residual heat removal (RHR) system. The IDP primarily consisted of presentations and technical discussion of the categorization results from the PRA, non-PRA, passive, defense-in-depth, and qualitative categorization elements of process for each of the functions associated with RHR including final conclusions of how each function translates into categorization of system safety components. For the PRA results, Exelon's 10 CFR 50.69 team presented results of categorization based both on internal events and fire core damage frequency and large early release frequency. The NRC staff were observers and mostly in listening mode for the entire IDP session.

The regulatory audit started in the afternoon immediately following the IDP session, with the NRC audit team and the licensee's staff and contractors. During the audit, team members participated in technical discussions according to the audit plan available in NRC's Agencywide Documents Access and Management System (ADAMS) (Reference 5). Technical discussions focused on the following major review areas: technical adequacy of the internal events and fire PRA, categorization process overview, and review of the audit questions with the licensee's 10 CFR 50.69 team. In addition to reviewing the audit questions, NRC discussed lessons learned from 10 CFR 50.69 audits for other licensees. During the audit, the NRC staff discussed several questions associated with the LAR, some of which will be formally sent as RAls.

At the conclusion of the audit, the team participated in a summary exit meeting with the Exelon audit team on February 1, 2018. The NRC staff provided a brief conclusion of the audit objectives that were met and details on the path forward. There were no open items in the

discussion and no deviation from the audit plan. Attachment 2 contains a list of documents reviewed by the team during the audit.

3.0 RESULTS OF THE AUDIT The RAls were issued to the licensee on April 6, 2018 (ADAMS Accession No. ML180968506),

with a request to submit the response within 30 days.

4.0 REFERENCES

1. Letter from J. Barstow, Exelon, to NRC, "Peach Bottom Atomic Power Station, Units 2 and 3 - Application to Adopt 10 CFR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems, and Components (SSCs) for Nuclear Power Plants,"'

dated August 30, 2017 (ADAMS Accession No. ML17243A014).

2. Letter from J. Barstow, Exelon, to NRC, "Peach Bottom Atomic Power Station, Units 2 and 3 - Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors,"

dated October 24, 2017 (ADAMS Accession No. ML172978521).

3. Federal Register Notice (69 FR 68008), "Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Plants," dated November 22, 2004 (ADAMS Accession No. ML042960073).
4. NRC Regulatory Guide 1.201, Revision 1, "Guidelines for Categorizing Structures, Systems, and Components in Nuclear Power Plants according to Their Safety Significance," issued May 2006 (ADAMS Accession No. ML061090627).
5. Peach Bottom Atomic Power Station, Units 2 and 3, Regulatory Audit Plan - License Amendment Request to Adopt 10 CFR Section 50.69, dated January 2018 (ADAMS Accession No. ML18005A077).

List of Participants U.S. Nuclear Regulatory Commission (NRC) Audit Team

  • Stacey Rosenberg NRC Branch Chief
  • Garill Coles PNNL PRA NRC Integrated Decision-Making Panel Observation Team
  • Jesse Quichocho NRC Branch Chief
  • Jenny Tobin NRC Licensing Project Manager NRC Regional Staff in Attendance
  • Chris Cahill RI Senior Resident Analyst Exelon Generation Company, LLC - Peach Bottom Atomic Power Station, Units 2 and 3 (Peach Bottom) Team
  • Glenn Stewart Licensing Lead
  • Shannon Rafferty-Czincila Risk Management Senior Manager
  • Preeti Furtado Engineering Manager
  • Mark Lefever Engineering
  • Stephanie Hanson Peach Bottom
  • Tom LaMontague Peach Bottom
  • Monica Hurley Exelon
  • Mark Uhrich Exelon
  • Chris Thomas Exelon
  • Chris Weichler Peach Bottom Attachment 1
  • Amy Huber Peach Bottom
  • Travis Bement Exelon
  • Richard Gropp Exelon Jensen Hughes 10 CFR 50.69 Support Team
  • Barry Sloane Director, Exelon Risk Management Program
  • Charlie Young Operations Support
  • Brian Albinson Internal Events/Internal Flooding PRA Model Owner
  • Greg Zucal Risk Management Engineer
  • Chris Pupek Risk Management Engineer

List of Documents Reviewed During the Audit Peach Bottom Atomic Power Station, Units 2 and 3, Documents Available for Review on the Exelon Generation Company, LLC Portal/Laptop The licensee provided an extensive list of supporting documents (e.g., analyses, calculations, reports, drawings, and procedures) on the Limerick document portal available during the week of the audit.

Additional Documents/Procedures Reviewed on Site

  • PB-5069-10-003, Revision 0, Peach Bottom Atomic Po\/\er Station, Units 2 and 3, Residual Heat Removal (RHR) 50.69 Categorization
  • PB-MISC-032, Revision 0, Peach Bottom RHR Passive 50.69 Categorization
  • PB-PRA-10, Component Data Notebook
  • PB-LAR-DIS, PRA Technical Adequacy in Support of the License Amendment Request to Implement 10 CFR 50.69 as \/\ell as the License Amendment Request to Implement the Risk Informed Completion Time (RICT) Program
  • PB-LAR-015, Revision 2, PRA Technical Adequacy- Table 5.1 Peer Review and Peer Review Findings
  • 032299-RPT-001, Peach Bottom Atomic Po\/\er Station PRA Finding Level F&O Technical Review and Focused Scope Peer Review Attachment 2

ML18072A372 OFFICE DORL/LPL 1/PM DORL/LPL 1/LA DORL/LPL 1/BC DORL/LPL 1/PM NAME JTobin IBetts JDanna JTobin DATE 03/12/18 03/19/18 04/10/18 04/10/18