ML13154A433: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 06/03/2013
| issue date = 06/03/2013
| title = RE-Notification of Inspection (NRC Inspection Report 05000483-13-004) and Request for Information
| title = RE-Notification of Inspection (NRC Inspection Report 05000483-13-004) and Request for Information
| author name = Gaddy V G
| author name = Gaddy V
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Heflin A C
| addressee name = Heflin A
| addressee affiliation = Union Electric Co
| addressee affiliation = Union Electric Co
| docket = 05000483
| docket = 05000483
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000483/2013004]]
See also: [[see also::IR 05000483/2013004]]


=Text=
=Text=
{{#Wiki_filter:June 3, 2013  
{{#Wiki_filter:UNITE D S TATE S
 
                                NUC LEAR RE GULATOR Y C OMMI S SI ON
Mr. Adam C. Heflin, Senior Vice
                                                    R E G IO N I V
   President and Chief Nuclear Officer  
                                              1600 EAST LAMAR BLVD
                                        AR L I NGTON , TEXAS 7 601 1- 4511
                                                June 3, 2013
Mr. Adam C. Heflin, Senior Vice
   President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:        CALLAWAY PLANT - RE-NOTIFICATION OF INSPECTION (NRC
                INSPECTION REPORT 05000483/2013004) AND REQUEST FOR
                INFORMATION
Dear Mr. Heflin:
In a letter, dated May 6, 2013, we informed you that inspectors from the Nuclear Regulatory
Commissions (NRC) Region IV office would be onsite to perform the baseline biennial
requalification inspection from June 24 through 28, 2013. Callaway Plant has since informed
the NRC that their annual requalification operating test cycle will be delayed by approximately
seven weeks. This letter establishes new dates for the NRCs onsite inspection and supersedes
our letter of May 6, 2013.
From August 26 through 30, 2013, inspectors from the NRCs Region IV office will perform the
baseline biennial requalification inspection at Callaway Plant using NRC Inspection
Procedure 71111.11B, Licensed Operator Requalification Program. Experience has shown
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
we have enclosed a request for documents needed for this inspection. These documents have
been divided into three groups. The first group (Section A of the enclosure) identifies
information to be provided prior to the inspection to ensure that the inspectors are adequately
prepared. The second group (Section B of the enclosure) identifies the information the
inspectors will need upon arrival at the site. The third group (Section C of the enclosure)
identifies the items which are necessary to close out the inspection and are usually sent a few
weeks after the team has left the site. It is important that all of these documents are up to date
and complete in order to minimize the number of additional documents requested during the
preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Juan Cortez of your training
organization. Our inspection dates are subject to change based on your updated schedule of
examination activities. If there are any questions about this inspection or the material
requested, please contact Thomas Farina, lead inspector, at 817-200-1117
(thomas.farina@nrc.gov) or Kelly Clayton at (817) 200-1216 (kelly.clayton@nrc.gov).


Union Electric Company P.O. Box 620 Fulton, MO  65251 
Mr. A. Heflin                               -2-
 
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, control
SUBJECT: CALLAWAY PLANT - RE-NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000483/2013004) AND REQUEST FOR INFORMATION
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
Dear Mr. Heflin:
requesting document displays a currently valid Office of Management and Budget control
 
number.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
In a letter, dated May 6, 2013, we informed you that inspectors from the Nuclear Regulatory Commission's (NRC) Region IV office would be onsite to perform the baseline biennial requalification inspection from June 24 through 28, 2013.  Callaway Plant has since informed
enclosure will be available electronically for public inspection in the NRC Public Document
the NRC that their annual requalification operating test cycle will be delayed by approximately seven weeks.  This letter establishes new dates for the NRC's onsite inspection and supersedes
Room or from the Publicly Available Records (PARS) component of NRCs document
our letter of May 6, 2013.
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
From August 26 through 30, 2013, inspectors from the NRC's Region IV office will perform the
rm/adams.html (the Public Electronic Reading Room).
 
                                                        Sincerely,
baseline biennial requalification inspecti
                                                        /RA/
on at Callaway Plant using NRC Inspection Procedure 71111.11B, "Licensed Operator Requalification Program."  Experience has shown
                                                        Vincent G. Gaddy, Chief
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  These documents have been divided into three groups.  The first group (Section A of the enclosure) identifies
                                                        Operations Branch
information to be provided prior to the inspection to ensure that the inspectors are adequately
                                                        Division of Reactor Safety
prepared.  The second group (Section B of the enclosure) identifies the information the
Docket: 50-483
inspectors will need upon arrival at the site.  The third group (Section C of the enclosure) identifies the items which are necessary to close out the inspection and are usually sent a few weeks after the team has left the site.  It is important that all of these documents are up to date
License: NPF-30
and complete in order to minimize the number of additional documents requested during the
Enclosure:
preparation and/or the onsite portions of the inspection.
Biennial Requalification Inspection Document Request
 
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Mr. Juan Cortez of your training
organization.  Our inspection dates are subject to change based on your updated schedule of
examination activities.  If there are any questions about this inspection or the material
requested, please contact Thomas Farina, lead inspector, at 817-200-1117
 
(thomas.farina@nrc.gov) or Kelly Clayton at (817) 200-1216 (kelly.clayton@nrc.gov
). UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511
Mr. A. Heflin - 2 -  
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
collection requirements were approved by the Office of Management and Budget, control  
number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget control  
number.  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
 
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Sincerely,  
/RA/   Vincent G. Gaddy, Chief  
Operations Branch
Division of Reactor Safety  
 
Docket:   50-483 License: NPF-30  
 
Enclosure:  
Biennial Requalification Inspection Document Request  
 




  ML13154A433 OE:OB C:OB   TFarina VGaddy   /RA/ /RA/   5/29/2013 5/29/2013    
ML13154A433
  - 1 - Enclosure BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
ADAMS          No  Yes      SUNSI Review Complete          Reviewer Initials: TJF
Publicly Available    Non-publicly Available    Sensitive        Non-sensitive
OE:OB               C:OB
TFarina             VGaddy
/RA/                 /RA/
5/29/2013           5/29/2013
   
   
TO: Juan Cortez Operations Training Manager, Callaway Plant  
            BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST
314-225-4642  
TO:             Juan Cortez
                Operations Training Manager, Callaway Plant
                314-225-4642
FROM:          Thomas Farina
                Operations Engineer, NRC RIV
                817-200-1117
SUBJECT:        INFORMATION REQUEST TO SUPPORT AUGUST 26-30, 2013, LICENSED
                OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)
A. The following information is requested in order to support inspection preparation
  activities. These items are listed by section as they appear in the inspection module
  (i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or
  hardcopy in order to arrive at the Region IV office no later than August 16, 2013.
  *    Electronically: TO: Thomas.Farina@nrc.gov
                        cc: Kelly.Clayton@nrc.gov
                              Chris.Steely@nrc.gov
  *    Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV
                        1600 E. Lamar Blvd
                        Arlington, TX 76011
                        ATTN: Thomas Farina
  General Requests:
        * Index of the materials provided in response to this request.
        * List of licensed operators (SRO & RO) by crew (operating & staff)
        * Training and Operations Department organization charts (with qualified LOR
            evaluators identified)
        * Procedures that identify process for revising and maintaining LO continuing training
            program up to date
        * List of outstanding LOR program changes
        * List of plant events and industry operating experience incorporated into LOR
            program since last BRQ
        * Audits and/or self-assessment reports addressing the licensed operator
            requalification training program
        * Last two years of simulator review committee (or equivalent) meeting minutes
        * Last two years of CRC (or equivalent) meeting minutes
  02.03: Biennial Requalification Written Examination Quality
        * The current and approved biennial written examination schedule
        * The current requalification cycle written examination results for both SRO & RO that
            have already been administered up to the week prior to the inspection team arrival
            onsite, if any.
                                            -1-                                    Enclosure


  *  All written examinations that have been approved for administration up to and
FROM: Thomas Farina
      including the week before the inspection team is onsite, if any. This will need to have
Operations Engineer, NRC RIV  817-200-1117
      adequate password protection if e-mailed or double envelope protection if mailed via
      regular mail per NUREG-1021.
SUBJECT: INFORMATION REQUEST TO SU
  *  The current requalification cycle examination methodology (sample plan)
PPORT AUGUST 26-30, 2013, LICENSED OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)  
02.04: Annual Requalification Operating Test Quality
  * The schedule for the operating tests (JPMs & scenarios) to be given the week of
A. The following information is requested in order to support inspection preparation activities. These items are listed by section as they appear in the inspection module
      August 26, 2013.
(i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or
  * The operating tests (JPMs & scenarios) (password protected and provide separately
hardcopy in order to arrive at the Region IV office no later than August 16, 2013.
      via telephone at later date) to be given the week of August 26, 2013.
* Electronically: TO:  Thomas.Farina@nrc.gov 
  * Current requalification cycle operating tests (SRO & RO) and results up to the week
cc:  Kelly.Clayton@nrc.gov       Chris.Steely@nrc.gov
      prior to the inspection team arrival onsite.
* Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV 1600 E. Lamar Blvd Arlington, TX 76011
  * All of the previous years NRC required annual operating tests.
  * Current requalification cycle operating test methodology (sample plan)
  * All portions of the UFSAR that identify operator response times for time critical
      operator actions
02.05: Licensee Admin of Requalification Exams
  *  All procedures used to administer the annual operating test
  *  All procedures used to assess operator performance
  *  All procedures that describe conduct of simulator training
  *  All procedures used to test, operate, and maintain the simulator
  *  An index for referencing the above procedures.
02.06: Requalification Examination Security
  * Submit any tracking tools that you use as a means to prevent excessive overlap on
      the written examinations and also meet the intent of sampling all required topics on a
      periodic basis.
  * Submit any tracking tools that you use as a means to prevent excessive overlap on
      the operating tests and also meet the intent of sampling all required malfunctions
      (including major events, instrument/component malfunctions, TS calls, etc.) on a
      periodic basis.
  * All Procedures that describe examination security, including procedures used to
      develop the examinations that include guidelines on overlap between examinations
      in current exam cycle tests and prior year examinations
  * List of all Condition Reports since the last biennial requalification inspection related
       to examination security and overlap
02.07: Licensee Remedial Training Program
  * List of remedial training conducted or planned since last requalification exams
      (includes training provided to operators to enable passing requalification exams and
      training provided to correct generic or individual weaknesses observed during
      previous requalification exam cycle)
  * Remediation plans (lesson plans, reference materials, and attendance
      documentation)
                                        -2-                                        Enclosure


ATTN: Thomas Farina
  02.08: Conformance with Operator License Conditions
General Requests:
      * All Procedures and Program documentation for maintaining active operator licenses,
* Index of the materials provided in response to this request.
          tracking training attendance, and ensuring medical fitness of licensed operators
* List of licensed operators (SRO & RO) by crew (operating & staff)  
      * All Procedures and associated documentation that supports reactivation of any
* Training and Operations Department organization charts (with qualified LOR evaluators identified)
          SRO/RO license (operating or staff crew) since the last biennial inspection
* Procedures that identify process for revising and maintaining LO continuing training
  02.09: Simulator Performance
program up to date
      * All Simulator Management and Configuration Procedures if not already provided for
* List of outstanding LOR program changes
          section 02.05 above.
* List of plant events and industry operating experience incorporated into LOR
      * Simulator Discrepancy Report summary list for all open DRs. For closed DRs,
program since last BRQ
          summary list for those items closed between June 25, 2011, and August 25, 2013.
* Audits and/or self-assessment reports addressing the licensed operator requalification training program
  02.10: Problem Identification and Resolution
* Last two years of simulator review committee (or equivalent) meeting minutes
      * A summary report of all condition reports related to operator actions/errors in the
* Last two years of CRC (or equivalent) meeting minutes
          control room
02.03: Biennial Requalification Written Examination Quality
      * Any revised requalification training that was based on licensed operator performance
* The current and approved biennial written examination schedule 
          issues
* The current requalification cycle written examination results for both SRO & RO that have already been administered up to the week prior to the inspection team arrival onsite, if any.   
B. The following information is requested in order to support the onsite inspection
   - 2 - Enclosure
  activities. Requested materials should be available to the inspection team, either
* All written examinations that have been approved for administration up to and including the week before the inspection team is onsite, if any. This will need to have adequate password protection if e-mailed or double envelope protection if mailed via
  electronically or hardcopy, upon site arrival on August 26, 2013.
  02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality
      * All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after
          onsite week
      * All results up to the day the team leaves the site.
  02.08: Conformance with Operator License Conditions
      *  Access to licensed operators records (operating and staff crews)
      *  Access to licensed operators training attendance records
      *  Access to licensed operators medical records
   02.09: Simulator Performance
      * Simulator discrepancies (DRs) from June 25, 2011, to August 25, 2013. This should
          include all open DRs and DRs that have been closed, including the
          documentation/justification for closure.
      * Acceptance test documentation, including hardware and software model revisions at
          the time of acceptance (as available).
      * Documentation that validates current models, including the thermal-hydraulics and
          neutronics models, to the actual plant.
      * All current model deficiencies, including FSAR vs. Design differences in the simulator
          (any documentation on this)
      * Summary list of modifications from June 25, 2011, to August 25, 2013.
      * Plant Modifications (both hardware and software) completed on the Simulator by due
          date from June 25, 2011, to August 25, 2013.
                                            -3-                                     Enclosure


regular mail per NUREG-1021. 
      *  Simulator Differences lesson plan used in training (current to August 25, 2013).
* The current requalification cycle examination methodology (sample plan)
      *   The complete book of all Simulator annual performance test packages (usually in a
02.04:  Annual Requalification Operating Test Quality
          single book, but may be electronic or in single test packages), complete with all
* The schedule for the operating tests (JPMs & scenarios) to be given the week of August 26, 2013.
          transient tests, steady state tests, and malfunction tests. This should also include the
* The operating tests (JPMs & scenarios) (password protected and provide separately via telephone at later date) to be given the week of August 26, 2013.
          test procedures for each test, the acceptance criteria, and results. For each transient
* Current requalification cycle operating tests (SRO & RO) and results up to the week prior to the inspection team arrival onsite.
          test, the reference chart should be included or an equivalent subject matter expert
* All of the previous year's NRC required annual operating tests.    
          review versus the simulator results with a write-up for any differences beyond the
* Current requalification cycle operating test methodology (sample plan)
          ANSI 3.5 standard requirements.
* All portions of the UFSAR that identify operator response times for time critical
      *   All test packages used to verify core physics parameters (such as MTC, IRW). The
operator actions
          applicable reference graphs from the Plant physics data book (electronic or other
02.05:  Licensee Admin of Requalification Exams
          means as available) should also be included as well as the test procedures used and
* All procedures used to administer the annual operating test
          the acceptance criteria with results.
* All procedures used to assess operator performance
      *   All Simulator test, configuration management, and related documents available in the
* All procedures that describe conduct of simulator training
          room for inspectors to review. This includes training needs analysis packages,
* All procedures used to test, operate, and maintain the simulator
          simulator review committee meeting minutes, etc.
* An index for referencing the above procedures.
      *   Current copy of ANSI 3.5 standard you are committed to for Simulator testing.
02.06:  Requalification Examination Security
  02.10: Problem Identification and Resolution
* Submit any tracking tools that you use as
      * All condition reports related to operator actions/errors in the control room
a means to prevent excessive overlap on the written examinations and also meet the intent of sampling all required topics on a periodic basis. 
C. Callaway Plant is required to send the final results summary and any remaining
* Submit any tracking tools that you use as
  exams and operating tests that have not been reviewed to the regional office lead
a means to prevent excessive overlap on the operating tests and also meet the intent of sampling all required malfunctions (including major events, instrument/component malfunctions, TS calls, etc.) on a periodic basis.
  inspector for this inspection for final review and comparison against the Significance
* All Procedures that describe examination security, including procedures used to develop the examinations that include guidelines on overlap between examinations
  Determination Tools in order to communicate the exit results for the inspection.
in current exam cycle tests and prior year examinations
                                          -4-                                        Enclosure
* List of all Condition Reports since the last biennial requalification inspection related to examination security and overlap
02.07:  Licensee Remedial Training Program
* List of remedial training conducted or planned since last requalification exams (includes training provided to operators to enable passing requalification exams and training provided to correct generic or individual weaknesses observed during previous requalification exam cycle)
* Remediation plans (lesson plans, reference materials, and attendance
documentation)
 
  - 3 - Enclosure
  02.08:  Conformance with Operator License Conditions
* All Procedures and Program documentation for maintaining active operator licenses, tracking training attendance, and ensuring medical fitness of licensed operators
* All Procedures and associated documentation that supports reactivation of any SRO/RO license (operating or staff crew) since the last biennial inspection
02.09:  Simulator Performance
* All Simulator Management and Configuration Procedures if not already provided for section 02.05 above.
* Simulator Discrepancy Report
summary list for all open DR's. For closed DR's, summary list for those items closed between June 25, 2011, and August 25, 2013. 
02.10:  Problem Identification and Resolution
* A summary report of all condition reports related to operator actions/errors in the
control room
* Any revised requalification training that was based on licensed operator performance
issues  B. The following information is requested in order to support the onsite inspection activities.  Requested materials should be available to the inspection team, either
electronically or hardcopy, upon site arrival on August 26, 2013.
02.02:  Exam Results  /  02.03 and 02.04:  Written Exam and Op Test Quality
* All Operating tests (JPMs & scenarios)
to be given in all subsequent weeks after
onsite week
* All results up to the day the team leaves the site. 
02.08:  Conformance with Operator License Conditions
* Access to licensed operators' records (operating and staff crews)
* Access to licensed operators' training attendance records
* Access to licensed operators' medical records
02.09:  Simulator Performance
* Simulator discrepancies (DR's) from June 25, 2011, to August 25, 2013.  This should include all open DR's and DR's that have been closed, including the documentation/justification for closure. 
* Acceptance test documentation, including hardware and software model revisions at the time of acceptance (as available).
* Documentation that validates current models, including the thermal-hydraulics and neutronics models, to the actual plant. 
* All current model deficiencies, including FSAR vs. Design differences in the simulator (any documentation on this)
* Summary list of modifications from June 25, 2011, to August 25, 2013.
* Plant Modifications (both hardware and software) completed on the Simulator by due date from June 25, 2011, to August 25, 2013. 
  - 4 - Enclosure
* Simulator Differences lesson plan used in training (current to August 25, 2013).  
* The complete book of all Simulator annual performance test packages (usually in a single book, but may be electronic or in single test packages), complete with all transient tests, steady state tests, and malfunction tests. This should also include the  
test procedures for each test, the acceptance criteria, and results. For each transient  
test, the reference chart should be included or an equivalent subject matter expert review versus the simulator results with a write-up for any differences beyond the  
ANSI 3.5 standard requirements.  
* All test packages used to verify core physics parameters (such as MTC, IRW). The applicable reference graphs from the Plant physics data book (electronic or other means as available) should also be included as well as the test procedures used and  
the acceptance criteria with results.  
* All Simulator test, configuration management, and related documents available in the room for inspectors to review. This includes training needs analysis packages, simulator review committee meeting minutes, etc.  
* Current copy of ANSI 3.5 standard you are committed to for Simulator testing.  
02.10: Problem Identification and Resolution
* All condition reports related to operator actions/errors in the control room  
C. Callaway Plant is required to send the final results summary and any remaining exams and operating tests that have not been reviewed to the regional office lead  
inspector for this inspection for final review and comparison against the Significance  
Determination Tools in order to communicate the exit results for the inspection.
}}
}}

Latest revision as of 18:24, 4 November 2019

RE-Notification of Inspection (NRC Inspection Report 05000483-13-004) and Request for Information
ML13154A433
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/03/2013
From: Vincent Gaddy
Operations Branch IV
To: Heflin A
Union Electric Co
References
IR-13-004
Download: ML13154A433 (7)


See also: IR 05000483/2013004

Text

UNITE D S TATE S

NUC LEAR RE GULATOR Y C OMMI S SI ON

R E G IO N I V

1600 EAST LAMAR BLVD

AR L I NGTON , TEXAS 7 601 1- 4511

June 3, 2013

Mr. Adam C. Heflin, Senior Vice

President and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - RE-NOTIFICATION OF INSPECTION (NRC

INSPECTION REPORT 05000483/2013004) AND REQUEST FOR

INFORMATION

Dear Mr. Heflin:

In a letter, dated May 6, 2013, we informed you that inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office would be onsite to perform the baseline biennial

requalification inspection from June 24 through 28, 2013. Callaway Plant has since informed

the NRC that their annual requalification operating test cycle will be delayed by approximately

seven weeks. This letter establishes new dates for the NRCs onsite inspection and supersedes

our letter of May 6, 2013.

From August 26 through 30, 2013, inspectors from the NRCs Region IV office will perform the

baseline biennial requalification inspection at Callaway Plant using NRC Inspection

Procedure 71111.11B, Licensed Operator Requalification Program. Experience has shown

that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.

In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents needed for this inspection. These documents have

been divided into three groups. The first group (Section A of the enclosure) identifies

information to be provided prior to the inspection to ensure that the inspectors are adequately

prepared. The second group (Section B of the enclosure) identifies the information the

inspectors will need upon arrival at the site. The third group (Section C of the enclosure)

identifies the items which are necessary to close out the inspection and are usually sent a few

weeks after the team has left the site. It is important that all of these documents are up to date

and complete in order to minimize the number of additional documents requested during the

preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. Juan Cortez of your training

organization. Our inspection dates are subject to change based on your updated schedule of

examination activities. If there are any questions about this inspection or the material

requested, please contact Thomas Farina, lead inspector, at 817-200-1117

(thomas.farina@nrc.gov) or Kelly Clayton at (817) 200-1216 (kelly.clayton@nrc.gov).

Mr. A. Heflin -2-

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, control

number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Enclosure:

Biennial Requalification Inspection Document Request

ML13154A433

ADAMS No Yes SUNSI Review Complete Reviewer Initials: TJF

Publicly Available Non-publicly Available Sensitive Non-sensitive

OE:OB C:OB

TFarina VGaddy

/RA/ /RA/

5/29/2013 5/29/2013

BIENNIAL REQUALIFICATION INSPECTION DOCUMENT REQUEST

TO: Juan Cortez

Operations Training Manager, Callaway Plant

314-225-4642

FROM: Thomas Farina

Operations Engineer, NRC RIV

817-200-1117

SUBJECT: INFORMATION REQUEST TO SUPPORT AUGUST 26-30, 2013, LICENSED

OPERATOR REQUALIFICATION PROGRAM INSPECTION (IP 71111.11B)

A. The following information is requested in order to support inspection preparation

activities. These items are listed by section as they appear in the inspection module

(i.e., 2.02, 2.04, etc). Requested materials should be sent either electronically or

hardcopy in order to arrive at the Region IV office no later than August 16, 2013.

  • Electronically: TO: Thomas.Farina@nrc.gov

cc: Kelly.Clayton@nrc.gov

Chris.Steely@nrc.gov

  • Hardcopy to: U.S. Nuclear Regulatory Commission, Region IV

1600 E. Lamar Blvd

Arlington, TX 76011

ATTN: Thomas Farina

General Requests:

  • Index of the materials provided in response to this request.
  • List of licensed operators (SRO & RO) by crew (operating & staff)
  • Training and Operations Department organization charts (with qualified LOR

evaluators identified)

  • Procedures that identify process for revising and maintaining LO continuing training

program up to date

  • List of outstanding LOR program changes
  • List of plant events and industry operating experience incorporated into LOR

program since last BRQ

  • Audits and/or self-assessment reports addressing the licensed operator

requalification training program

  • Last two years of simulator review committee (or equivalent) meeting minutes
  • Last two years of CRC (or equivalent) meeting minutes

02.03: Biennial Requalification Written Examination Quality

  • The current and approved biennial written examination schedule
  • The current requalification cycle written examination results for both SRO & RO that

have already been administered up to the week prior to the inspection team arrival

onsite, if any.

-1- Enclosure

  • All written examinations that have been approved for administration up to and

including the week before the inspection team is onsite, if any. This will need to have

adequate password protection if e-mailed or double envelope protection if mailed via

regular mail per NUREG-1021.

  • The current requalification cycle examination methodology (sample plan)

02.04: Annual Requalification Operating Test Quality

  • The schedule for the operating tests (JPMs & scenarios) to be given the week of

August 26, 2013.

  • The operating tests (JPMs & scenarios) (password protected and provide separately

via telephone at later date) to be given the week of August 26, 2013.

  • Current requalification cycle operating tests (SRO & RO) and results up to the week

prior to the inspection team arrival onsite.

  • All of the previous years NRC required annual operating tests.
  • Current requalification cycle operating test methodology (sample plan)
  • All portions of the UFSAR that identify operator response times for time critical

operator actions

02.05: Licensee Admin of Requalification Exams

  • All procedures used to administer the annual operating test
  • All procedures used to assess operator performance
  • All procedures that describe conduct of simulator training
  • All procedures used to test, operate, and maintain the simulator
  • An index for referencing the above procedures.

02.06: Requalification Examination Security

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the written examinations and also meet the intent of sampling all required topics on a

periodic basis.

  • Submit any tracking tools that you use as a means to prevent excessive overlap on

the operating tests and also meet the intent of sampling all required malfunctions

(including major events, instrument/component malfunctions, TS calls, etc.) on a

periodic basis.

  • All Procedures that describe examination security, including procedures used to

develop the examinations that include guidelines on overlap between examinations

in current exam cycle tests and prior year examinations

  • List of all Condition Reports since the last biennial requalification inspection related

to examination security and overlap

02.07: Licensee Remedial Training Program

  • List of remedial training conducted or planned since last requalification exams

(includes training provided to operators to enable passing requalification exams and

training provided to correct generic or individual weaknesses observed during

previous requalification exam cycle)

  • Remediation plans (lesson plans, reference materials, and attendance

documentation)

-2- Enclosure

02.08: Conformance with Operator License Conditions

  • All Procedures and Program documentation for maintaining active operator licenses,

tracking training attendance, and ensuring medical fitness of licensed operators

  • All Procedures and associated documentation that supports reactivation of any

SRO/RO license (operating or staff crew) since the last biennial inspection

02.09: Simulator Performance

  • All Simulator Management and Configuration Procedures if not already provided for

section 02.05 above.

  • Simulator Discrepancy Report summary list for all open DRs. For closed DRs,

summary list for those items closed between June 25, 2011, and August 25, 2013.

02.10: Problem Identification and Resolution

  • A summary report of all condition reports related to operator actions/errors in the

control room

  • Any revised requalification training that was based on licensed operator performance

issues

B. The following information is requested in order to support the onsite inspection

activities. Requested materials should be available to the inspection team, either

electronically or hardcopy, upon site arrival on August 26, 2013.

02.02: Exam Results / 02.03 and 02.04: Written Exam and Op Test Quality

  • All Operating tests (JPMs & scenarios) to be given in all subsequent weeks after

onsite week

  • All results up to the day the team leaves the site.

02.08: Conformance with Operator License Conditions

  • Access to licensed operators records (operating and staff crews)
  • Access to licensed operators training attendance records
  • Access to licensed operators medical records

02.09: Simulator Performance

  • Simulator discrepancies (DRs) from June 25, 2011, to August 25, 2013. This should

include all open DRs and DRs that have been closed, including the

documentation/justification for closure.

  • Acceptance test documentation, including hardware and software model revisions at

the time of acceptance (as available).

  • Documentation that validates current models, including the thermal-hydraulics and

neutronics models, to the actual plant.

  • All current model deficiencies, including FSAR vs. Design differences in the simulator

(any documentation on this)

  • Summary list of modifications from June 25, 2011, to August 25, 2013.
  • Plant Modifications (both hardware and software) completed on the Simulator by due

date from June 25, 2011, to August 25, 2013.

-3- Enclosure

  • Simulator Differences lesson plan used in training (current to August 25, 2013).
  • The complete book of all Simulator annual performance test packages (usually in a

single book, but may be electronic or in single test packages), complete with all

transient tests, steady state tests, and malfunction tests. This should also include the

test procedures for each test, the acceptance criteria, and results. For each transient

test, the reference chart should be included or an equivalent subject matter expert

review versus the simulator results with a write-up for any differences beyond the

ANSI 3.5 standard requirements.

  • All test packages used to verify core physics parameters (such as MTC, IRW). The

applicable reference graphs from the Plant physics data book (electronic or other

means as available) should also be included as well as the test procedures used and

the acceptance criteria with results.

  • All Simulator test, configuration management, and related documents available in the

room for inspectors to review. This includes training needs analysis packages,

simulator review committee meeting minutes, etc.

  • Current copy of ANSI 3.5 standard you are committed to for Simulator testing.

02.10: Problem Identification and Resolution

  • All condition reports related to operator actions/errors in the control room

C. Callaway Plant is required to send the final results summary and any remaining

exams and operating tests that have not been reviewed to the regional office lead

inspector for this inspection for final review and comparison against the Significance

Determination Tools in order to communicate the exit results for the inspection.

-4- Enclosure