| {{#Wiki_filter:July 25, 2013 | | {{#Wiki_filter:July 25, 2013 MEMORANDUM TO: Anthony Mendiola, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM: Michelle C. Honcharik, Senior Project Manager /RA/ |
| | | Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation |
| MEMORANDUM TO: | |
| Anthony Mendiola | |
| , Chief Licensing Processes Branch Division of Policy and Rulemaking | |
| | |
| Office of Nuclear Reactor Regulation FROM: Michelle C. Honcharik , Senior Project Manager /RA/ Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 30: |
Line 25: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| (RIS), "NRC STAFF POSITION ON THE RELATIONSHIP BETWEEN GDC | | (RIS), NRC STAFF POSITION ON THE RELATIONSHIP BETWEEN GDC [GENERAL DESIGN CRITERIA] |
| [GENERAL DESIGN CRITERIA] REQUIREMENTS AND TECHNICAL SPECIFICATION OPERABILITY" On August 8, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff met with the Technical Specifications Task Force (TSTF) representatives to discuss and seek public comment on the Draft RIS, "NRC Staff Position on the Relationship Between GDC Requirements and Technical Specification Operability | | REQUIREMENTS AND TECHNICAL SPECIFICATION OPERABILITY On August 8, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff met with the Technical Specifications Task Force (TSTF) representatives to discuss and seek public comment on the Draft RIS, NRC Staff Position on the Relationship Between GDC Requirements and Technical Specification Operability (Agencywide Documents Access and Management System (ADAMS) |
| " (Agencywide Documents Access and Management System (ADAMS) Accession No.
| | Accession No. ML12137A346). The meeting was held at NRC offices in Two White Flint North, 11545 Rockville Pike, Rockville, Maryland 20852. A list of the meeting attendees is enclosed. |
| ML12137A346 | | The meeting notice dated July 25, 2012, is available in the ADAMS under Accession No. ML12207A211. |
| ). The meeting was held at NRC offices in Two White Flint North, 115 45 Rockville Pike, Rockville, Maryland 20852. A list of the meeting attendees is enclosed. The meeting notice dated July 25, 2012, is available in the ADAMS under Accession No. ML12207A211 | | The draft RIS clarifies the NRC staffs position on the relationship between the GDC for nuclear power plants and technical specification operability. In addition, the RIS clarifies the process for addressing non-conformances with GDC as incorporated into a plants current licensing basis. |
| . The draft RIS clarifies the NRC staff's position on the relationship between the GDC for nuclear power plants and technical specification operability. In addition, the RIS clarifies the process for addressing non
| | After a short discussion on the NRC staffs position that the RIS does not establish any new positions, the industry agreed. There was no disagreement with the content of the RIS, but there will most likely be formal industry comments submitted in response to the Federal Register Notice (that provided the Draft RIS) requesting additional clarity on the current definition of operability and why it is being reemphasized in this RIS. The discussion also focused on issues contained in NRC Inspection Manual Chapter (IMC) Part 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components." |
| -conformances with GDC as incorporated into a plant's current licensing basis. | | The NRC staff indicated there will be a future workshop to discuss industry concerns with IMC Part 9900. |
| After a short discussion on the NRC staff's position that the RIS does not establish any new positions, the industry agreed. | | There were no questions received from the public. |
| There was no disagreement with the content of the RIS, but there will most likely be formal industry comments submitted in response to the Federal Register Notice (that provided the Draft RIS) requesting additional clarity on the current definition of "operability" and why it is being reemphasized in this RIS. | | Project No. 753 cc w/ encl: See next page |
| The discussion also focused on issues contained in NRC Inspection Manual Chapter (IMC) Part 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components." The NRC staff indicated there will be a future workshop to discuss industry concerns with IMC Part 9900. | |
| There were no questions received from the pub l ic. Project No. 753 | |
| | |
| c c w/ encl: See next page
| |
| | |
| s.: Package - ML13197A453; Summary
| |
| - ML13190A438
| |
| ; Draft RIS - ML12137A346
| |
| ; Notice - ML12207A211; *Concurred by e
| |
| -mail NRC-001 OFFICE PLPB/PM PLPB/LA STSB/BC PLPB/BC PLPB/PM NAME MHoncharik DBaxley RElliott* (MHoncharik for)
| |
| AMendiola (HCruz for) MHoncharik DATE 07/18/2013 07/18/2013 07/25/2013 07/25/2013 07/25/2013 Technical Specifications Task Force Mailing List cc: Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Brian Mann E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com
| |
| | |
| Richard A. Loeffler Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362
| |
| -9637 E-mail: richard.loeffler@xenuclear.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340
| |
| | |
| Kennett Square, PA 19348
| |
|
| |
|
| E-mail: wendi.croft@exeloncorp.com
| | Package - ML13197A453; Summary - ML13190A438; Draft RIS - ML12137A346; Notice - ML12207A211; *Concurred by e-mail NRC-001 OFFICE PLPB/PM PLPB/LA STSB/BC PLPB/BC PLPB/PM DBaxley RElliott* (MHoncharik for) (HCruz for) |
| | NAME MHoncharik AMendiola MHoncharik DATE 07/18/2013 07/18/2013 07/25/2013 07/25/2013 07/25/2013 |
|
| |
|
| Otto W. Gustafson Entergy Nuclear Operations, Inc. | | Technical Specifications Task Force Mailing List cc: |
| | Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Brian Mann E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com Richard A. Loeffler Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 E-mail: richard.loeffler@xenuclear.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc. |
| Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com | | Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com |
|
| |
|
| ENCLOSURE Attendees at the draft RIS , "NRC Staff Position on the Relationship between Requirements and Technical Specification Operability" Meeting August 8, 2012 Name Organization Robert Elliott NRC/Office of Nuclear Reactor Regulation (NRR)/Division of Safety Systems (DSS) / Technical Specifications Branch (STSB)
| | Attendees at the draft RIS, NRC Staff Position on the Relationship between Requirements and Technical Specification Operability Meeting August 8, 2012 Name Organization Robert Elliott NRC/Office of Nuclear Reactor Regulation (NRR)/Division of Safety Systems (DSS) / |
| Carl Schulten NRC/NRR/DSS/STSB Kristy Bucholtz NRC/NRR/DSS/STSB Theodore Tjader NRC/Office of New Reactors Regulation (NRO) | | Technical Specifications Branch (STSB) |
| Brian Mann Technical Specifications Task Force (TSTF) | | Carl Schulten NRC/NRR/DSS/STSB Kristy Bucholtz NRC/NRR/DSS/STSB Theodore Tjader NRC/Office of New Reactors Regulation (NRO) |
| Tony Browning TSTF Rick Loeffler TSTF Rob Slough TSTF Jana Bergman Scientech Jeff Thomas Duke Energy Larry Nicholson NextEra Jim Andruchek Westinghouse Robert Wanczyk Entergy - Vermont Yankee Ken Nicely Exelon Wendy Croft TSTF Greg Howard Exelon Jerry Bonanno NEI Lisa Williams Energy Northwest David Pelton NRR/DPR/PGCB Terry Beltz NRC/NRR/Division of Operating Reactor Licensing (DORL) Ned Tyler Constellation Nuclear Kevin Witt NRC/NRR/Japan Lessons Learned Directorate (JLD) Thomas Alexion NRC/NRR/Division of Policy and Rulemaking (DPR)/Generic Communications Branch (PGCB) Peter Bamford NRC/NRR/DORL Kenneth Schrader PG&E John Jolicoeur NRC/NRR/DPR/Licensing Processes Branch (PLPB) Michelle Honcharik NRC/NRR/DPR/PLPB Steve Myers STP Nancy Chapman Bechtel}} | | Brian Mann Technical Specifications Task Force (TSTF) |
| | Tony Browning TSTF Rick Loeffler TSTF Rob Slough TSTF Jana Bergman Scientech Jeff Thomas Duke Energy Larry Nicholson NextEra Jim Andruchek Westinghouse Robert Wanczyk Entergy - Vermont Yankee Ken Nicely Exelon Wendy Croft TSTF Greg Howard Exelon Jerry Bonanno NEI Lisa Williams Energy Northwest David Pelton NRR/DPR/PGCB Terry Beltz NRC/NRR/Division of Operating Reactor Licensing (DORL) |
| | Ned Tyler Constellation Nuclear Kevin Witt NRC/NRR/Japan Lessons Learned Directorate (JLD) |
| | Thomas Alexion NRC/NRR/Division of Policy and Rulemaking (DPR)/Generic Communications Branch (PGCB) |
| | Peter Bamford NRC/NRR/DORL Kenneth Schrader PG&E John Jolicoeur NRC/NRR/DPR/Licensing Processes Branch (PLPB) |
| | Michelle Honcharik NRC/NRR/DPR/PLPB Steve Myers STP Nancy Chapman Bechtel ENCLOSURE}} |
|
---|
Category:Meeting Summary
MONTHYEARML24324A1892024-12-12012 December 2024 Summary of Quarterly Public Meeting with the TSTF to Discuss Variety of Topic Related to Technical Specifications ML24324A1782024-12-11011 December 2024 Summary of Public Meeting with the TSTF TSTF-585 ML22256A2142022-09-20020 September 2022 Summary of September 12, 2022, Meeting with the Technical Specifications Task Force Revised Draft Traveler TSTF-588, Revise List of COLR Methods ML22056A2982022-03-0303 March 2022 Summary of Quarterly Meeting with Technical Specifications Task Force on 2/24/2022 ML22039A1992022-02-16016 February 2022 Summary of January 26, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML22041B5482022-02-16016 February 2022 Summary of February 1, 2022, Meeting with the Technical Specifications Task Force Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML21326A2572021-12-0101 December 2021 Summary of November 18, 2021, Quarterly Meeting with the Technical Specifications Task Force ML21221A1562021-08-23023 August 2021 Summary of Quarterly Meeting with Technical Specifications Task Force ML20357A5212021-06-24024 June 2021 November 5, 2020, Summary of Meeting with the Technical Specifications Task Force Proposal to Improve the Core Operating Limits Report ML21127A2752021-06-10010 June 2021 Summary of Quarterly Meeting with Technical Specifications Task Force ML21054A2822021-03-0101 March 2021 Summary of February 4, 2021, Meeting on the Conceptual Topical Report Implementation and Oversight (Trio) Process ML21012A3222021-01-15015 January 2021 Summary of January 7, 2021, Meeting with the Technical Specifications Task Force Re TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML19029A0162019-08-26026 August 2019 Summary of January 28, 2019, Teleconference with TSTF TSTF-542 Implementation Guidance ML19078A2692019-04-0909 April 2019 February 21, 2019, Summary of Quarterly Meeting with the Technical Specifications Task Force ML18221A5752018-08-0909 August 2018 August 9, 2018, Meeting Agenda Item 5.A Active Traveler Summary Report ML17341B0112017-12-11011 December 2017 Summary of 11/30/2017 Pre-Submittal Meeting TSTF-569, Revise Response Time Testing. ML17132A0932017-05-11011 May 2017 Attendees from May 11, 2017, TSTF Meeting ML17033A2582017-01-31031 January 2017 Pre-Submittal Meeting TSTF-567 Attendees ML16308A3852016-11-0101 November 2016 Attendee List for TSTF-564 Pre-submittal Meeting on 11/1/2016 ML16060A0442016-03-0303 March 2016 2/18/2016 - Summary of February 18, 2016, Public Quarterly Meeting with the Technical Specifications Task Force ML15041A7372015-04-28028 April 2015 Summary of Quarterly Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML13203A1642013-09-12012 September 2013 Summary of Quarterly Meeting with the Technical Specifications Task Force (TSTF) ML12303A0412013-07-25025 July 2013 Summary of Meeting with the Technical Specifications Task Force (TSTF) to Discuss Part 9900 ML13190A4382013-07-25025 July 2013 Summary of Public Meeting with Technical Specifications Task Force Draft Regulatory Issue Summary (Ris), NRC Staff Position on the Relationship Between Gds (General Design Criteria) Requirements and Technical Specification Operability ML12303A0402012-12-0404 December 2012 Summary of October 17, 2012, Meeting with the BWROG Members of the TSTF Pre-Submittal of Reactor Pressure Vessel (RPV) Water Inventory Traveler ML12121A6042012-05-25025 May 2012 Summary of the February 15, 2012, U.S. Nuclear Regulatory Commission Meeting with the Technical Specifications Task Force ML11326A3002011-12-13013 December 2011 November 10, 2011, Summary of Quarterly Meeting with TSTF ML1132201792011-11-30030 November 2011 Summary of Meeting with TSTF Revision to TSTF-523 ML1130400282011-11-10010 November 2011 Summary of Public Teleconference Call with the Technical Specifications Task Force Regarding Enforcement Guidance Memorandum Related to Surveillance Requirement 3.0.3 Application to the in Service Testing Program ML1122000252011-09-30030 September 2011 Summary of Meeting with TSTF Representatives to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML1122000212011-08-31031 August 2011 8/4/2011- Summary of Meeting with the Nuclear Energy Institute and the Technical Specifications Task Force Regarding Gas Accumulation Issues and TSTF-523 ML1113206242011-06-0808 June 2011 5/12/11, Summary of Meeting with NRC and the Technical Specifications Task Force ML1101408502011-02-14014 February 2011 Summary of the January 12, 2011, Meeting with the TSTF Traveler TSTF-523 ML1032102562010-12-0808 December 2010 November 4, 2010 Summary of Meeting with the TSTF ML1021705322010-08-20020 August 2010 7/15/2010 Summary of Public Meeting with the Technical Specifications Task Force ML0901305832009-02-0202 February 2009 Summary of Meeting with Pressurized Water Reactor and Boiling Water Reactor Owners Groups Regarding Selected Technical Specification Task Force Issues ML0832407802008-11-24024 November 2008 Summary of Category 2 Meeting with the BWROG and PWROG to Discuss Technical Specification Issues and TSTF-493, Clarify Application of Setpoint Methodology for LSSS Functions. ML0906404412005-12-0101 December 2005 Enclosure 7: Case Study 3: Rejection of TSTF-495, Bases Change to Address GE Part 21 SC05-03 - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf 2024-12-12
[Table view] Category:Memoranda
MONTHYEARML24324A1892024-12-12012 December 2024 Summary of Quarterly Public Meeting with the TSTF to Discuss Variety of Topic Related to Technical Specifications ML24324A1782024-12-11011 December 2024 Summary of Public Meeting with the TSTF TSTF-585 ML23222A2272023-08-10010 August 2023 Request for Additional Information Traveler TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22256A2142022-09-20020 September 2022 Summary of September 12, 2022, Meeting with the Technical Specifications Task Force Revised Draft Traveler TSTF-588, Revise List of COLR Methods ML22056A2982022-03-0303 March 2022 Summary of Quarterly Meeting with Technical Specifications Task Force on 2/24/2022 ML22041B5482022-02-16016 February 2022 Summary of February 1, 2022, Meeting with the Technical Specifications Task Force Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements ML22039A1992022-02-16016 February 2022 Summary of January 26, 2022, Meeting with the Technical Specifications Task Force Draft Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML21326A2572021-12-0101 December 2021 Summary of November 18, 2021, Quarterly Meeting with the Technical Specifications Task Force ML21221A1562021-08-23023 August 2021 Summary of Quarterly Meeting with Technical Specifications Task Force ML20357A5212021-06-24024 June 2021 November 5, 2020, Summary of Meeting with the Technical Specifications Task Force Proposal to Improve the Core Operating Limits Report ML21127A2752021-06-10010 June 2021 Summary of Quarterly Meeting with Technical Specifications Task Force ML21054A2822021-03-0101 March 2021 Summary of February 4, 2021, Meeting on the Conceptual Topical Report Implementation and Oversight (Trio) Process ML19136A1072019-07-15015 July 2019 OEDO-19-00114 - OIG-18-A-15 - Status of Recommendations for the Audit of the Nuclear Regulatory Commission'S Process for Modifying and Communicating Standard Technical Specifications (OIG-18-A-15) ML19078A2692019-04-0909 April 2019 February 21, 2019, Summary of Quarterly Meeting with the Technical Specifications Task Force ML17163A3672017-06-20020 June 2017 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement ML15288A4572015-11-20020 November 2015 Sept 23, 2015 Summary of Pre-Submittal Meeting TSTF-553 CREATCS Trains ML15300A4832015-10-30030 October 2015 Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML15243A3312015-09-10010 September 2015 Forthcoming Pre-Submittal Meeting with the TSTF TSTF-553, Add Action for Two Inoperable Creatcs Trains ML15041A7372015-04-28028 April 2015 Summary of Quarterly Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML15085A2002015-04-0202 April 2015 Notice of Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force ML15057A2482015-02-26026 February 2015 Notice of Forthcoming Public Meeting Between the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force TSTF-551 ML15015A5502015-01-20020 January 2015 Notice of Forthcoming Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML14307A8822014-11-0303 November 2014 Notice of Forthcoming Public Meeting Between NRC and the Technical Specifications Task Force to Discuss Technical Issues and Administrative Processes ML14252A4362014-09-11011 September 2014 Notice of Forthcoming Public Meeting Between the Us NRC and the TSTF Industry Guidance on Non-Conservative Technical Specifications ML14163A2462014-06-26026 June 2014 Meeting Notice with to Discuss Technical Issues and Administrative Processes Related to Technical Specifications Task Force (TSTF) Travelers ML14139A1282014-05-21021 May 2014 Notice of Forthcoming Public Meeting Between NRC and Technical Specifications Task Force TSTF-542, Revision 0, Reactor Pressure Vessel Water Inventory Control ML13351A4952013-12-24024 December 2013 1/9/2014 Forthcoming Public Meeting Between the U.S. Nuclear Commission and the Technical Specifications Task Force to Discuss Technical Issues and Administrative Processes Related to Technical Specifications Task Force Travelers ML13203A1642013-09-12012 September 2013 Summary of Quarterly Meeting with the Technical Specifications Task Force (TSTF) ML13246A4322013-09-12012 September 2013 9/24/2013, Notice of Forthcoming Pre-Submittal Meeting with the Technical Specifications Task Force (TSTF) TSTF-542, Reactor Pressure Vessel Water Inventory Control ML13248A5162013-09-12012 September 2013 Notice of Forthcoming Meeting with the Technical Specifications Task Force (TSTF) TSTF-531, Revision of Specifications 3.8.1, Required Actions B.3.1 and B.3.2 ML12303A0412013-07-25025 July 2013 Summary of Meeting with the Technical Specifications Task Force (TSTF) to Discuss Part 9900 ML13190A4382013-07-25025 July 2013 Summary of Public Meeting with Technical Specifications Task Force Draft Regulatory Issue Summary (Ris), NRC Staff Position on the Relationship Between Gds (General Design Criteria) Requirements and Technical Specification Operability ML13183A4452013-07-0303 July 2013 Forthcoming Public Meeting Between the NRC and the Technical Specifications Task Force ML13099A4032013-04-17017 April 2013 Notice of Forthcoming with NRC and the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML13031A1712013-01-31031 January 2013 2/12/2013 - Notice of Pre-submittal Meeting TSTF-542 on Reactor Pressure Vessel Water Inventory Control (RPVWIC) ML12353A4762012-12-20020 December 2012 1//17/2013 - Notice of Meeting with Technical Speciifactions Task Force (TSTF) ML12303A0402012-12-0404 December 2012 Summary of October 17, 2012, Meeting with the BWROG Members of the TSTF Pre-Submittal of Reactor Pressure Vessel (RPV) Water Inventory Traveler ML12270A4002012-10-0505 October 2012 Forthcoming Public Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to Travelers ML12270A1852012-10-0303 October 2012 Notice of Forthcoming Public Meeting with the U.S. Nuclear Regulatory Commission and the TSTF to Discuss Part 9900 ML12270A2612012-10-0303 October 2012 Notice of Forthcoming Meeting with the U.S. NRC and BWROG Members of the TSTF Pre-Submittal of RPV Water Inventory Traveler ML12270A2522012-10-0303 October 2012 Notice of Forthcoming Public Meeting with the U.S. Nuclear Regulatory Commission and the Technical Specifications Task Force (TSTF) TSTF-529 ML12207A5072012-07-26026 July 2012 Notice of Forthcoming Public Meeting to Discuss Technical Issues and Administrative Process Related to TSTF Travelers ML12207A2112012-07-25025 July 2012 August 8, 2012 Meeting Notice with Industry Stakeholders Draft Regulatory Issue Summary (Ris), NRC Staff Position on the Relationship Between General Design Criteria Requirements and Technical Specification Operability (Supersedes ML12188A4 ML12107A1962012-04-20020 April 2012 Forthcoming Public Meeting with the Technical Specifications Task Force (TSTF) ML12039A2012012-03-14014 March 2012 Memo Plant-Specific Adoption of Traveler TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML11326A3002011-12-13013 December 2011 November 10, 2011, Summary of Quarterly Meeting with TSTF ML1132201792011-11-30030 November 2011 Summary of Meeting with TSTF Revision to TSTF-523 ML1129403022011-10-24024 October 2011 Notice of Forthcoming Meeting with the TSTF Regarding TSTF 523, Rev 0, Generic Letter 2008-01, Managing Gas Accumulation. ML1128705382011-10-21021 October 2011 Notice of Meeting with the Technical Specifications Task Force (TSTF) to Discuss Technical Issues and Administrative Processes Related to TSTF Travelers ML1122000212011-08-31031 August 2011 8/4/2011- Summary of Meeting with the Nuclear Energy Institute and the Technical Specifications Task Force Regarding Gas Accumulation Issues and TSTF-523 2024-12-12
[Table view] |
Text
July 25, 2013 MEMORANDUM TO: Anthony Mendiola, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM: Michelle C. Honcharik, Senior Project Manager /RA/
Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF AUGUST 8, 2012, PUBLIC MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE RE: DRAFT REGULATORY ISSUE
SUMMARY
(RIS), NRC STAFF POSITION ON THE RELATIONSHIP BETWEEN GDC [GENERAL DESIGN CRITERIA]
REQUIREMENTS AND TECHNICAL SPECIFICATION OPERABILITY On August 8, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff met with the Technical Specifications Task Force (TSTF) representatives to discuss and seek public comment on the Draft RIS, NRC Staff Position on the Relationship Between GDC Requirements and Technical Specification Operability (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML12137A346). The meeting was held at NRC offices in Two White Flint North, 11545 Rockville Pike, Rockville, Maryland 20852. A list of the meeting attendees is enclosed.
The meeting notice dated July 25, 2012, is available in the ADAMS under Accession No. ML12207A211.
The draft RIS clarifies the NRC staffs position on the relationship between the GDC for nuclear power plants and technical specification operability. In addition, the RIS clarifies the process for addressing non-conformances with GDC as incorporated into a plants current licensing basis.
After a short discussion on the NRC staffs position that the RIS does not establish any new positions, the industry agreed. There was no disagreement with the content of the RIS, but there will most likely be formal industry comments submitted in response to the Federal Register Notice (that provided the Draft RIS) requesting additional clarity on the current definition of operability and why it is being reemphasized in this RIS. The discussion also focused on issues contained in NRC Inspection Manual Chapter (IMC) Part 9900, "Technical Guidance, Operability Determinations and Resolution of Nonconformances of Structures, Systems, and Components."
The NRC staff indicated there will be a future workshop to discuss industry concerns with IMC Part 9900.
There were no questions received from the public.
Project No. 753 cc w/ encl: See next page
Package - ML13197A453; Summary - ML13190A438; Draft RIS - ML12137A346; Notice - ML12207A211; *Concurred by e-mail NRC-001 OFFICE PLPB/PM PLPB/LA STSB/BC PLPB/BC PLPB/PM DBaxley RElliott* (MHoncharik for) (HCruz for)
NAME MHoncharik AMendiola MHoncharik DATE 07/18/2013 07/18/2013 07/25/2013 07/25/2013 07/25/2013
Technical Specifications Task Force Mailing List cc:
Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Brian Mann E-mail: brian.mann@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com Richard A. Loeffler Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 E-mail: richard.loeffler@xenuclear.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: wendi.croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 E-mail: ogustaf@entergy.com
Attendees at the draft RIS, NRC Staff Position on the Relationship between Requirements and Technical Specification Operability Meeting August 8, 2012 Name Organization Robert Elliott NRC/Office of Nuclear Reactor Regulation (NRR)/Division of Safety Systems (DSS) /
Technical Specifications Branch (STSB)
Carl Schulten NRC/NRR/DSS/STSB Kristy Bucholtz NRC/NRR/DSS/STSB Theodore Tjader NRC/Office of New Reactors Regulation (NRO)
Brian Mann Technical Specifications Task Force (TSTF)
Tony Browning TSTF Rick Loeffler TSTF Rob Slough TSTF Jana Bergman Scientech Jeff Thomas Duke Energy Larry Nicholson NextEra Jim Andruchek Westinghouse Robert Wanczyk Entergy - Vermont Yankee Ken Nicely Exelon Wendy Croft TSTF Greg Howard Exelon Jerry Bonanno NEI Lisa Williams Energy Northwest David Pelton NRR/DPR/PGCB Terry Beltz NRC/NRR/Division of Operating Reactor Licensing (DORL)
Ned Tyler Constellation Nuclear Kevin Witt NRC/NRR/Japan Lessons Learned Directorate (JLD)
Thomas Alexion NRC/NRR/Division of Policy and Rulemaking (DPR)/Generic Communications Branch (PGCB)
Peter Bamford NRC/NRR/DORL Kenneth Schrader PG&E John Jolicoeur NRC/NRR/DPR/Licensing Processes Branch (PLPB)
Michelle Honcharik NRC/NRR/DPR/PLPB Steve Myers STP Nancy Chapman Bechtel ENCLOSURE