ML13191A252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13191A252
| number = ML13191A252
| issue date = 07/18/2013
| issue date = 07/18/2013
| title = Beaver Valley Power Station, Units 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit 1 - Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report (TAC MF2162, MF2163 &
| title = Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report (TAC MF2162, MF2163 & MF2229)
| author name = Bamford P J
| author name = Bamford P
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name = Sena P P
| addressee name = Sena P
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000334, 05000346, 05000412, 05000440
| docket = 05000334, 05000346, 05000412, 05000440
| license number =  
| license number =  
| contact person = Bamford P J
| contact person = Bamford P
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
| page count = 6
| page count = 6
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 18, 2013 Mr. Peter P. Sena, III President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron,OH 44320 BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; NUCLEAR POWER STATION, UNIT NO.1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. MF2162, MF2163, MF2186, AND MF2229)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2013 Mr. Peter P. Sena, III President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron,OH 44320
 
==SUBJECT:==
BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS~BESSE NUCLEAR POWER STATION, UNIT NO.1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. MF2162, MF2163, MF2186, AND MF2229)


==Dear Mr. Sena:==
==Dear Mr. Sena:==
By letter dated March 25,2013 (Agencywide Documents Access and Management System Accession Number ML 13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1 Besse), and Perry Nuclear Power Plant, Unit No.1 (Perry). This report provided the decommissioning funding status for the FENOC plants for the year ending December 31,2012. The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on July 2,2013, to Mr. Phil Lashley, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed.
 
The questions were discussed in a teleconference with your staff on July 11, 2013. In that teleconference, it was agreed that draft RAI #2 for BVPS and draft RAI #2 for Perry would be deleted. This letter incorporates the RAI changes discussed in the teleconference on July 11, 2013, and thus supersedes the draft questions previously sent to Mr. Lashley by electronic correspondence.
By letter dated March 25,2013 (Agencywide Documents Access and Management System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Davis~
Further, in the teleconference, it was agreed that a response to this RAI would be submitted within 45 days of the date of this letter.
Besse), and Perry Nuclear Power Plant, Unit No.1 (Perry). This report provided the decommissioning funding status for the FENOC plants for the year ending December 31,2012.
P.Sena -2 Please contact me at 301-415-2833, if you have any questions.
The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on July 2,2013, to Mr. Phil Lashley, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The questions were discussed in a teleconference with your staff on July 11, 2013. In that teleconference, it was agreed that draft RAI #2 for BVPS and draft RAI #2 for Perry would be deleted. This letter incorporates the RAI changes discussed in the teleconference on July 11, 2013, and thus supersedes the draft questions previously sent to Mr. Lashley by electronic correspondence. Further, in the teleconference, it was agreed that a response to this RAI would be submitted within 45 days of the date of this letter.
Sincerely, Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334,50-412,50-346 and 50-440 Enclosure 1 -RAI for BVPS Enclosure 2 -RAI for Davis-Besse   -RAI for Perry cc w/encls: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated March 25, 2013 (Agencywide Documents Access and Management System Accession Number ML 13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, as required under Section 50. 75(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review. Per 10 CFR 50.75(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report." This actual amount is dedicated for activities that relate to the definition of "decommission," as specified in 10 CFR 50.2, "Definitions." By letter dated March 25, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c). The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOe should indicate whether any of the $250,935,980 for BVPS, Unit No.1, and $320,196,005 for BVPS, Unit No.2, is for non-radiological decommissioning costs such as spent fuel management or other non-radiological decommissioning activities.
 
P.Sena                                     -2 Please contact me at 301-415-2833, if you have any questions.
Sincerely,
                                          ~~
Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334,50-412,50-346 and 50-440 - RAI for BVPS - RAI for Davis-Besse - RAI for Perry cc w/encls: Distribution via Listserv
 
REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated March 25, 2013 (Agencywide Documents Access and Management System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, as required under Section 50. 75(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review.
: 1. Per 10 CFR 50.75(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report." This actual amount is dedicated for activities that relate to the definition of "decommission," as specified in 10 CFR 50.2, "Definitions." By letter dated March 25, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c).
The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOe should indicate whether any of the $250,935,980 for BVPS, Unit No.1, and
        $320,196,005 for BVPS, Unit No.2, is for non-radiological decommissioning costs such as spent fuel management or other non-radiological decommissioning activities.
Enclosure 1
Enclosure 1
REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 DOCKET NO. 50-346 By letter dated March 25, 2013 (Agencywide Documents Access and System Accession Number ML 13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for the Davis-Besse Nuclear Power Station (DBNPS), Unit No.1, as required under Section 50.75(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review. Per 10 CFR 50.75(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report.>> This actual amount is dedicated for activities that relate to the definition of "decommission,>>
 
as specified in 1 0 CFR 50.2, "Definitions." By letter dated March 25, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c). The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOC should indicate whether any of the $478,270,692 for DBNPS is for non-radiological decommissioning costs such as spent fuel management or other non-radiological decommissioning activities. Per 10 CFR 50.75(f)(3), "each power reactor licensee shall at or about 5 years prior to the projected end of operations submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission." As presently scheduled, termination of operations for the DBNPS is currently set for April 2017. Submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission the DBNPS. Enclosure 2
REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 DOCKET NO. 50-346 By letter dated March 25, 2013 (Agencywide Documents Access and Man~gement System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for the Davis-Besse Nuclear Power Station (DBNPS), Unit No.1, as required under Section 50.75(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review.
REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT, UNIT NO.1 DOCKET NO. S0-440 By letter dated March 2S, 2013 (Agencywide Documents Access and Management System Accession Number ML 13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Perry Nuclear Power Plant (PNPP), Unit No.1, as required under Section SO.7S(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review. Per 10 CFR SO.7S(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report." This actual amount is dedicated for activities that relate to the definition of "decommission," as specified in 10 CFR SO.2, "Definitions." By letter dated March 2S, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR SO.7S(b) and (c). The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOC should indicate whether any of the $462,378,077 for PNPP is for non-radiological decommisSioning costs such as spent fuel management or other non-radiological decommissioning activities.
1    Per 10 CFR 50.75(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report.>> This actual amount is dedicated for activities that relate to the definition of "decommission,>> as specified in 10 CFR 50.2, "Definitions." By letter dated March 25, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c).
The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOC should indicate whether any of the $478,270,692 for DBNPS is for non-radiological decommissioning costs such as spent fuel management or other non-radiological decommissioning activities.
: 2. Per 10 CFR 50.75(f)(3), "each power reactor licensee shall at or about 5 years prior to the projected end of operations submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission." As presently scheduled, termination of operations for the DBNPS is currently set for April 2017.
Submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission the DBNPS.
Enclosure 2
 
REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT, UNIT NO.1 DOCKET NO. S0-440 By letter dated March 2S, 2013 (Agencywide Documents Access and Management System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Perry Nuclear Power Plant (PNPP), Unit No.1, as required under Section SO.7S(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review.
: 1. Per 10 CFR SO.7S(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report." This actual amount is dedicated for activities that relate to the definition of "decommission," as specified in 10 CFR SO.2, "Definitions." By letter dated March 2S, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR SO.7S(b) and (c).
The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOC should indicate whether any of the $462,378,077 for PNPP is for non-radiological decommisSioning costs such as spent fuel management or other non-radiological decommissioning activities.
Enclosure 3
Enclosure 3
P.Sena Please contact me at 301-415-2833, jf you have any Sincerely, /ra! Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 and 50-440 Enclosure 1 -RAI for BVPS Enclosure 2 -RAI for Davis-Besse   -RAI for Perry cc w/encls: Distribution via Listserv DISTRIBUTION:
 
PUBLIC RidsNrrDorlLpl3-2 Resource LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDirslfib Resource RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce RTurtil, NRR RidsNrrPMBeaverValley Resource RidsNrrLAABaxter Resource BPumell, NRR EBrown. NRR RidsNrrPMDavisBesse Resouce RidsNrrDorlLpl3-2 Resource RidsNrrPMPerry Resource ADAMS Accession Number: ML 13191A252
P.Sena                                               -2 Please contact me at 301-415-2833, jf you have any questions.
*via memo **via email OFFICE LPLI-2/PM LPLIII*2/PM LPLI*21LA**
Sincerely,
I NRRlIFIB/BC LPLI-21BC LPLII 1-21BC NAME PBamford EBrown ABaxter I CRegan* VRodriguez JBowen DATE 07/11/13 7117113 07/16/13 I 614/13 7/17/13 7/18/13 OFFICIAL RECORD COpy}}
                                                /ra!
Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 and 50-440 - RAI for BVPS - RAI for Davis-Besse - RAI for Perry cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC                                                                   RidsNrrDorlLpl3-2 Resource LPLI-2 R/F                                                               RidsAcrsAcnw_MailCTR Resource RidsNrrDirslfib Resource                                                 RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource                                             RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce                                               RTurtil, NRR RidsNrrPMBeaverValley Resource                                           RidsNrrLAABaxter Resource BPumell, NRR                                                             EBrown. NRR RidsNrrPMDavisBesse Resouce                                             RidsNrrDorlLpl3-2 Resource RidsNrrPMPerry Resource ADAMS Accession Number: ML13191A252                  *via memo         **via email OFFICE       LPLI-2/PM   LPLIII*2/PM   LPLI*21LA**   I NRRlIFIB/BC   LPLI-21BC     LPLII1-21BC NAME         PBamford     EBrown         ABaxter       I CRegan*       VRodriguez     JBowen DATE         07/11/13     7117113       07/16/13       I 614/13         7/17/13       7/18/13 OFFICIAL RECORD COpy}}

Latest revision as of 17:11, 4 November 2019

Request for Additional Information Regarding the 2013 Decommissioning Funding Status Report (TAC MF2162, MF2163 & MF2229)
ML13191A252
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 07/18/2013
From: Peter Bamford
Plant Licensing Branch 1
To: Sena P
FirstEnergy Nuclear Operating Co
Bamford P
References
Download: ML13191A252 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2013 Mr. Peter P. Sena, III President and Chief Nuclear Officer FirstEnergy Nuclear Operating Company 76 South Main Street Akron,OH 44320

SUBJECT:

BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2; DAVIS~BESSE NUCLEAR POWER STATION, UNIT NO.1; AND PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING THE 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NOS. MF2162, MF2163, MF2186, AND MF2229)

Dear Mr. Sena:

By letter dated March 25,2013 (Agencywide Documents Access and Management System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Davis~

Besse), and Perry Nuclear Power Plant, Unit No.1 (Perry). This report provided the decommissioning funding status for the FENOC plants for the year ending December 31,2012.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). The questions were sent via electronic transmission on July 2,2013, to Mr. Phil Lashley, of your staff. The draft questions were sent to ensure that the questions were understandable, the regulatory basis was clear, and to determine if the information was previously docketed. The questions were discussed in a teleconference with your staff on July 11, 2013. In that teleconference, it was agreed that draft RAI #2 for BVPS and draft RAI #2 for Perry would be deleted. This letter incorporates the RAI changes discussed in the teleconference on July 11, 2013, and thus supersedes the draft questions previously sent to Mr. Lashley by electronic correspondence. Further, in the teleconference, it was agreed that a response to this RAI would be submitted within 45 days of the date of this letter.

P.Sena -2 Please contact me at 301-415-2833, if you have any questions.

Sincerely,

~~

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334,50-412,50-346 and 50-440 - RAI for BVPS - RAI for Davis-Besse - RAI for Perry cc w/encls: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY BEAVER VALLEY POWER STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-334 AND 50-412 By letter dated March 25, 2013 (Agencywide Documents Access and Management System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Beaver Valley Power Station (BVPS), Unit Nos. 1 and 2, as required under Section 50. 75(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review.

1. Per 10 CFR 50.75(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report." This actual amount is dedicated for activities that relate to the definition of "decommission," as specified in 10 CFR 50.2, "Definitions." By letter dated March 25, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c).

The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOe should indicate whether any of the $250,935,980 for BVPS, Unit No.1, and

$320,196,005 for BVPS, Unit No.2, is for non-radiological decommissioning costs such as spent fuel management or other non-radiological decommissioning activities.

Enclosure 1

REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1 DOCKET NO. 50-346 By letter dated March 25, 2013 (Agencywide Documents Access and Man~gement System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for the Davis-Besse Nuclear Power Station (DBNPS), Unit No.1, as required under Section 50.75(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review.

1 Per 10 CFR 50.75(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report.>> This actual amount is dedicated for activities that relate to the definition of "decommission,>> as specified in 10 CFR 50.2, "Definitions." By letter dated March 25, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR 50.75(b) and (c).

The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOC should indicate whether any of the $478,270,692 for DBNPS is for non-radiological decommissioning costs such as spent fuel management or other non-radiological decommissioning activities.

2. Per 10 CFR 50.75(f)(3), "each power reactor licensee shall at or about 5 years prior to the projected end of operations submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission." As presently scheduled, termination of operations for the DBNPS is currently set for April 2017.

Submit a preliminary decommissioning cost estimate which includes an up-to-date assessment of the major factors that could affect the cost to decommission the DBNPS.

Enclosure 2

REQUEST FOR ADDITIONAL INFORMATION REGARDING 2013 DECOMMISSIONING FUNDING STATUS REPORT FIRSTENERGY NUCLEAR OPERATING COMPANY PERRY NUCLEAR POWER PLANT, UNIT NO.1 DOCKET NO. S0-440 By letter dated March 2S, 2013 (Agencywide Documents Access and Management System Accession Number ML13084A374), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted the 2013 Decommissioning Funding Status report for Perry Nuclear Power Plant (PNPP), Unit No.1, as required under Section SO.7S(f)(1) to Title 10 of the Code of Federal Regulations (10 CFR). The U.S. Nuclear Regulatory Commission (NRC) staff is currently reviewing the submittal and has determined that the additional information requested below is needed to complete its review.

1. Per 10 CFR SO.7S(f)(1), licensees must identify "the amount accumulated to the end of the calendar year preceding the date of the report." This actual amount is dedicated for activities that relate to the definition of "decommission," as specified in 10 CFR SO.2, "Definitions." By letter dated March 2S, 2013, FENOC provided the amount accumulated in the decommissioning trust fund at the end of the calendar year preceding the date of the report for items included in 10 CFR SO.7S(b) and (c).

The NRC staff requests that FENOC indicate what portion of the accumulated fund balances are for radiological decommissioning activities only. Specifically, FENOC should indicate whether any of the $462,378,077 for PNPP is for non-radiological decommisSioning costs such as spent fuel management or other non-radiological decommissioning activities.

Enclosure 3

P.Sena -2 Please contact me at 301-415-2833, jf you have any questions.

Sincerely,

/ra!

Peter Bamford, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334, 50-412, 50-346 and 50-440 - RAI for BVPS - RAI for Davis-Besse - RAI for Perry cc w/encls: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorlLpl3-2 Resource LPLI-2 R/F RidsAcrsAcnw_MailCTR Resource RidsNrrDirslfib Resource RidsRgn3MailCenter Resource RidsRgn1 MailCenter Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl1-2 Resouce RTurtil, NRR RidsNrrPMBeaverValley Resource RidsNrrLAABaxter Resource BPumell, NRR EBrown. NRR RidsNrrPMDavisBesse Resouce RidsNrrDorlLpl3-2 Resource RidsNrrPMPerry Resource ADAMS Accession Number: ML13191A252 *via memo **via email OFFICE LPLI-2/PM LPLIII*2/PM LPLI*21LA** I NRRlIFIB/BC LPLI-21BC LPLII1-21BC NAME PBamford EBrown ABaxter I CRegan* VRodriguez JBowen DATE 07/11/13 7117113 07/16/13 I 614/13 7/17/13 7/18/13 OFFICIAL RECORD COpy