|
|
(8 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML13198A121 | | | number = ML13198A121 |
| | issue date = 07/22/2013 | | | issue date = 07/22/2013 |
| | title = Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information Concerning 2013 Decommissioning Funding Status Report (TAC No. MF2250) | | | title = Request for Additional Information Concerning 2013 Decommissioning Funding Status Report |
| | author name = Martin R E | | | author name = Martin R |
| | author affiliation = NRC/NRR/DORL/LPLII-1 | | | author affiliation = NRC/NRR/DORL/LPLII-1 |
| | addressee name = Crosby M R | | | addressee name = Crosby M |
| | addressee affiliation = South Carolina Public Service Authority | | | addressee affiliation = South Carolina Public Service Authority |
| | docket = 05000395 | | | docket = 05000395 |
| | license number = | | | license number = |
| | contact person = Martin R E, NRR/DORL/LPLII-1, 415-1493 | | | contact person = Martin R, NRR/DORL/LPLII-1, 415-1493 |
| | case reference number = TAC MF2250 | | | case reference number = TAC MF2250 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF2250 | | | project = TAC:MF2250 |
| | | stage = RAI |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 22, 2013 Mr. Michael R. Crosby Vice President, Nuclear Operations and Construction South Carolina Public Service Authority One Riverwood Drive Moncks Corner, SC. 29461-2901 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 (VCSNS-1) -REQUEST FOR ADDITIONAL INFORMATION CONCERNING 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NO. MF2250) Dear Mr. Crosby: By letter dated March 28, 2013 (Agencywide Documents Access and Management System Accession No. ML 13091A074), South Carolina Public Service Authority (a licensee for VCSNS-1), submitted the 2013 Decommissioning Funding Status Report for VCSNS-1, as required under Section 50. 75{f){1) to Title 10 of the Code of Federal Regulations. A response to the enclosed Request for Additional Information is needed before the Nuclear Regulatory Commission staff can complete the review. This request was discussed with Mr. Bruce Thompson on July 16, 2013, and it was understood that a response will be submitted to these questions within thirty (30) days of the issuance of this letter. Sincerely Plant Licensing Branch 11-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-395 Enclosure: RAI cc w/encl: Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION 2013 DECOMMISSIONING FUNDING STATUS REPORT SOUTH CAROLINA ELECTRIC &GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395 1. As stated in Section 50.75(f)(1) to Title 10 to the Code of Federal Regulations: the information in [the Decommissioning Funding Status (DFS)] report must include ... the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections... On March 28, 2013, Santee Cooper reported the following: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2013 Mr. Michael R. Crosby Vice President, Nuclear Operations and Construction South Carolina Public Service Authority One Riverwood Drive Moncks Corner, SC. 29461-2901 |
| | |
| | ==SUBJECT:== |
| | VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 (VCSNS-1) - REQUEST FOR ADDITIONAL INFORMATION CONCERNING 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NO. MF2250) |
| | |
| | ==Dear Mr. Crosby:== |
| | |
| | By letter dated March 28, 2013 (Agencywide Documents Access and Management System Accession No. ML13091A074), South Carolina Public Service Authority (a licensee for VCSNS-1), submitted the 2013 Decommissioning Funding Status Report for VCSNS-1, as required under Section 50. 75{f){1) to Title 10 of the Code of Federal Regulations. |
| | A response to the enclosed Request for Additional Information is needed before the Nuclear Regulatory Commission staff can complete the review. This request was discussed with Mr. Bruce Thompson on July 16, 2013, and it was understood that a response will be submitted to these questions within thirty (30) days of the issuance of this letter. |
| | Sincerely |
| | ~~~!nager Plant Licensing Branch 11-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-395 |
| | |
| | ==Enclosure:== |
| | |
| | RAI cc w/encl: Distribution via Listserv |
| | |
| | REQUEST FOR ADDITIONAL INFORMATION 2013 DECOMMISSIONING FUNDING STATUS REPORT SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395 |
| | : 1. As stated in Section 50.75(f)(1) to Title 10 to the Code of Federal Regulations: |
| | the information in [the Decommissioning Funding Status (DFS)] |
| | report must include ... the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections... |
| | On March 28, 2013, Santee Cooper reported the following: |
| * 3.1 percent rate of escalation in labor costs, | | * 3.1 percent rate of escalation in labor costs, |
| * 6.0 percent rate of escalation in equipment and materials costs, | | * 6.0 percent rate of escalation in equipment and materials costs, |
| * 2.9 percent rate of escalation in waste burial costs, | | * 2.9 percent rate of escalation in waste burial costs, |
| * 5.0 percent rate of escalation in "other" costs, and | | * 5.0 percent rate of escalation in "other" costs, and |
| * 4.9 percent rate of earnings on decommissioning funds. Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed as stated within the DFS report. Enclosure Mr. Michael R. Crosby Vice President, Nuclear Operations and Construction South Carolina Public Service Authority One Riverwood Drive Moncks Corner, SC. 29461-2901 VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 (VCSNS-1) -REQUEST FOR ADDITIONAL INFORMATION CONCERNING 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NO. MF2250) Dear Mr. Crosby: By letter dated March 28, 2013 (Agencywide Documents Access and Management System Accession No. ML 13091A074), South Carolina Public Service Authority (a licensee for VCSNS-1), submitted the 2013 Decommissioning Funding Status Report for VCSNS-1, as required under Section 50.75(f)(1) to Title 10 of the Code of Federal Regulations. A response to the enclosed Request for Additional Information is needed before the Nuclear Regulatory Commission staff can complete the review. This request was discussed with Mr. Bruce Thompson on July 16, 2013, and it was understood that a response will be submitted to these questions within thirty (30) days of the issuance of this letter. Sincerely Robert Martin, Senior Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-395 Enclosure: RAI cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC RidsNrrDirsResource RidsRgn2MailCenter JUan LPL2-1 R/F RidsNrrDorlLpl2-1 RidsNrrLASFigueroa MBarillias RidsAcrsAcnwMailCenter RidsNrrPMSummer RidsNrrDirslfib RMartin JSimpson ADAMS Accession No.: ML13198A121 OFFICE LPL2-1/PM LPL2-1/PM LPL2-1/BC Regan by memo 113 5/24/13 071 OFFICIAL RECORD COPY | | * 4.9 percent rate of earnings on decommissioning funds. |
| }} | | Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed as stated within the DFS report. |
| | Enclosure |
| | |
| | ML13198A121 OFFICE LPL2-1/PM LPL2-1/PM LPL2-1/BC Regan by memo 113 5/24/13 071}} |
|
---|
Category:Letter
MONTHYEARML24278A2832024-11-0707 November 2024 Letter to E. Carr Environmental Impact Statement Scoping Summary Report for Virgil C. Summer Nuclear Station Unit 1 IR 05000395/20240032024-11-0606 November 2024 – Integrated Inspection Report 05000395/2024003 ML24305A1302024-10-31031 October 2024 Submittal of 30 Day Report Per 10 CFR 26.719(c) Blind Performance Testing ML24308A0052024-10-28028 October 2024 10-28-24 NRC V.C. Summer Nuclear Station SLR Cherokee Nation Letter to USNRC ML24308A0062024-10-25025 October 2024 Subsequent License Renewal Application Area of Potential Effect (Ape) Clarification Fairfield County, South Carolina SHPO Project No. 22-EJ0147 ML24302A1442024-10-24024 October 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 4 and Requested Information Formation in Response to Limited Aging Management Audit ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves ML24256A2322024-10-22022 October 2024 Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24087A2262024-03-26026 March 2024 License Amendment Request - Inverter Allowed Outage Time Extension Response to Request for Additional Information 2024-09-26
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24232A1812024-08-19019 August 2024 Summer_2024-04_RP Information Request ML24190A0412024-07-0505 July 2024 Notification of Inspection and Request for Information ML24156A0032024-06-0303 June 2024 VC Summer SLRA - Requests for Additional Information - Set 2 ML24075A1872024-03-15015 March 2024 NRR E-mail Capture - Draft RAIs for Alternative Request RR-5-V2 (L-2023-LLR-0068) ML24067A0672024-03-0707 March 2024 NRR E-mail Capture - Draft RAIs for Inverter CT License Amendment Request TS 3.8.3.1, Onsite Power Distribution - Operating, (L-2023-LLA-0157) ML24052A0102024-02-16016 February 2024 NRR E-mail Capture - Draft RAIs for Emergency Plan (EP) Changes License Amendment Request (LAR) (L-2023-LLA-0083) ML23270B8712023-09-27027 September 2023 NRR E-mail Capture - Draft RAIs for License Amendment Request (LAR) to Revise the Virgil C. Summer Nuclear Station (VCSNS) Unit 1 Emergency Plan (L-2023-LLA-0083) ML22263A0502022-09-19019 September 2022 NRR E-mail Capture - Draft Request for Additional Information for Proposed Alternative Request RR-4-26 Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval V.C. Summer Unit 1 ML22194A9422022-07-13013 July 2022 NRC 50.59 Inspection (IP 71111.17T) Information Request ML22075A0482022-03-16016 March 2022 V.C. Summer Nuclear Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000395/2022401 ML21333A1892021-11-29029 November 2021 NRR E-mail Capture - Draft RAI for Summer LAR Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, (TSTF-425) ML21253A1352021-09-0808 September 2021 Document Request for VC Summer Nuclear Station - Radiation Protection Inspection - Inspection Report 2021-04 ML21154A2792021-06-0303 June 2021 Requalification Program Inspection 05000395/2021003 - Virgil C. Summer Nuclear Station, Unit 1, ML21145A0222021-05-24024 May 2021 003 Radiation Safety Baseline Inspection Information Request ML21131A0402021-05-11011 May 2021 NRR E-mail Capture - V.C. Summer, Unit 1 - Final RAI for the Spring 2020 RFO Sgtir Review ML21020A0562021-01-20020 January 2021 Email Capture Upcoming V.C. Summer POV Inspection (IP71111.21N.02) Information Request ML20342A1822020-12-0707 December 2020 NRR E-mail Capture - Final RAI for Summer LAR - TS 3.6.4 ML20342A3822020-12-0707 December 2020 NRR E-mail Capture - Final RAIs for Summer Fs LOCA LAR ML20321A2112020-11-16016 November 2020 NRR E-mail Capture - Summer, Unit 1 - Final RAIs for the SG Tube Inspection Report Review ML20196L7782020-07-13013 July 2020 Notification of Virgil C. Summer Nuclear Station Design Bases Assurance Inspection U.S. Nuclear Regulatory Commission Inspection Report 05000395/2020010 ML20106E8902020-04-15015 April 2020 Program Inspection RFI ML20056E3042020-02-25025 February 2020 VC Summer 2020-002 Radiation Safety Baseline Inspection Information Request ML19211D5102019-07-30030 July 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 (Supplement to PRA RAI 03) ML19179A1262019-06-27027 June 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19095A6532019-04-0404 April 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information NFPA-805 Program Revisions LAR ML19072A1442019-03-13013 March 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-16-01490 NFPA-805 Program Revisions ML19009A1052019-01-0909 January 2019 NRR E-mail Capture - Virgil C. Summer Nuclear Station, Unit No. 1 - Request for Additional Information LAR-10-02395, TS 3.8.2, D.C. Sources - Operating ML18249A1932018-09-0505 September 2018 TS 4.3.3.6 SR LAR - Request for Additional Information ML18225A0932018-08-13013 August 2018 Notification of Inspection and Request for Information ML18218A2622018-08-0101 August 2018 Emergency Preparedness Program Inspection Request for Information ML18066A0002018-03-0808 March 2018 Request for Additional Information Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change ML18023B0692018-02-15015 February 2018 Request for Additional Information Relief Request (RR-4-13), Use of Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds ML17095A2842017-05-11011 May 2017 Request for Additional Information License Amendment Request for Implementation of TSTF-411 (WCAP-15376-P-A), Revision 1 ML17067A5322017-03-0808 March 2017 Notification of Radiation Protection Baseline Inspection and Request for Information ML17059C5382017-02-23023 February 2017 Notification of Inspection and Request for Information ML16302A1252016-11-0808 November 2016 Request for Additional Information License Amendment Request for Implementation of TSTF-411 and WCAP-15376-P-A, Revision 1 RC-16-0112, NRC Request Information Baseline Radiation Safety Inspection2016-07-0707 July 2016 NRC Request Information Baseline Radiation Safety Inspection ML16111A0912016-05-0303 May 2016 Request for Additional Information Regarding the Station Physical Security Plan, Revision 14 ML16097A0812016-04-0808 April 2016 Request for Additional Information ML16064A0332016-03-0303 March 2016 NRR E-mail Capture - Request for Additional Information Related to the March 1, 2016, Exigent Amendment Request ML16042A4712016-02-18018 February 2016 Request for Additional Information ML15320A3382015-12-0101 December 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis RC-15-0177, Submits LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Response to Response for Additional Information2015-11-0505 November 2015 Submits LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Response to Response for Additional Information ML15261A0512015-09-22022 September 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis ML15118A4592015-05-19019 May 2015 Request for Additional Information Regarding Alternative Request ML15118A3802015-05-0505 May 2015 Request for Additional Information Regarding Snubber Program Alternative Request ML15076A1182015-04-13013 April 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis ML15079A0992015-03-26026 March 2015 Request for Additional Information ML14339A0302015-01-0909 January 2015 Request for Additional Information Regarding License Basis Changes in Steam Generator Tube Rupture Analysis ML14268A5162014-10-23023 October 2014 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Re-evaluation Related to Southeastern Catalog Changes 2024-08-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2013 Mr. Michael R. Crosby Vice President, Nuclear Operations and Construction South Carolina Public Service Authority One Riverwood Drive Moncks Corner, SC. 29461-2901
SUBJECT:
VIRGIL C. SUMMER NUCLEAR STATION, UNIT NO.1 (VCSNS-1) - REQUEST FOR ADDITIONAL INFORMATION CONCERNING 2013 DECOMMISSIONING FUNDING STATUS REPORT (TAC NO. MF2250)
Dear Mr. Crosby:
By letter dated March 28, 2013 (Agencywide Documents Access and Management System Accession No. ML13091A074), South Carolina Public Service Authority (a licensee for VCSNS-1), submitted the 2013 Decommissioning Funding Status Report for VCSNS-1, as required under Section 50. 75{f){1) to Title 10 of the Code of Federal Regulations.
A response to the enclosed Request for Additional Information is needed before the Nuclear Regulatory Commission staff can complete the review. This request was discussed with Mr. Bruce Thompson on July 16, 2013, and it was understood that a response will be submitted to these questions within thirty (30) days of the issuance of this letter.
Sincerely
~~~!nager Plant Licensing Branch 11-1 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation Docket No. 50-395
Enclosure:
RAI cc w/encl: Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION 2013 DECOMMISSIONING FUNDING STATUS REPORT SOUTH CAROLINA ELECTRIC & GAS COMPANY VIRGIL C. SUMMER NUCLEAR STATION, UNIT 1 DOCKET NO. 50-395
- 1. As stated in Section 50.75(f)(1) to Title 10 to the Code of Federal Regulations:
the information in [the Decommissioning Funding Status (DFS)]
report must include ... the assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections...
On March 28, 2013, Santee Cooper reported the following:
- 3.1 percent rate of escalation in labor costs,
- 6.0 percent rate of escalation in equipment and materials costs,
- 2.9 percent rate of escalation in waste burial costs,
- 5.0 percent rate of escalation in "other" costs, and
- 4.9 percent rate of earnings on decommissioning funds.
Provide the citation (e.g., an Order by the rate-regulatory authority) by the regulatory entity that allows for the assumptions used regarding rates of escalation in decommissioning costs, rate of earnings on decommissioning funds and rates of other factors assumed as stated within the DFS report.
Enclosure
ML13198A121 OFFICE LPL2-1/PM LPL2-1/PM LPL2-1/BC Regan by memo 113 5/24/13 071