ML13204A116: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13204A116
| number = ML13204A116
| issue date = 06/26/2013
| issue date = 06/26/2013
| title = McGuire SLC Manual Update
| title = SLC Manual Update
| author name = Beaver B
| author name = Beaver B
| author affiliation = Duke Energy Corp
| author affiliation = Duke Energy Corp
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:W$POSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY      Normal            THE TRANSMITTAL SIGNATURE UNLESS RECIPIENIT IS                                  Date:      06/26113 OTHERWISE IDENTIFIED BELOW Document Transmittal #:            DUK131770042
: 1) 02546 WC LIBRARY - MG01WC
: 2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy                  QA CONDITION                                [:  Yes  E  No
: 3) 03379 D E CALDWELL MG01MM                                                                                    OTHER ACKNOWLEDGEMENT REQUIRED              N    Yes DOCUMENT TRANSMITTAL FORM
: 4) 03447 DON R MILLER MG01RP                                                                                      IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
: 5) 03614 MCG OPS PROCEDURE GP MG010P                                                                              ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
REFERENCE
: 6) 03744 OPS TRNG MGR. MG03OT
: 7) 03759 U S NUC REG WASHINGTON, DC                                        MCGUIRE NUCLEAR STATION Duke Energy
: 8) 04809 MCG PLANT ENG. LIBR. MG05SE                                                                                        McGuire
: 9) 09460 W C SPENCER MG01RP                                                                                                DCRM MGO2DM SELECTED LICENSEE COMMITMENTS
: 10) 09665 JON HTHOMPSON, USNRC                                                                                              13225 Hagers Ferry Road MANUAL (SLC)                                    Huntersville, N.C. 28078 RECORD RETENTION # 581188 Rec'd By Page 2 of 2 Date DOCUMENT NO                                          QACOND      REV #/ DATE    DISTR CODE    1  2 3  4  5  6-7      -  8    9      10 11    12 13  14  15  TOTAL V1 SLC MEMORANDUM [1 pg.]                                  NA      136 05/06/13    MADM-03A          X  v1 V1 V1 V2    V1i Vi      Vi      ýVi                            24 SLC 16.7.3 [2 pgs.]                                    NA      136 05/06/13 LIST OF EFFECTIVE SECTIONS [3 pgs.]                    NA      118 05/06/13 REMARKS: PLEASE UPDATE ACCORDINGLY.                                                                                              S D CAPPS REPRO: 3 HOLE PUNCH COPIES                                                                                      VICE PRESIDENT MCGUIRE NUCLEAR STATION RECIPIENT #03044 PREVIOUSLY COMPLETED                                                                BY:
BCBEAVER            MG01RC    BCB/BRG
 
May 6, 2013 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders
 
==Subject:==
McGuire SLC Manual Update Please revise your copy of the manual as follows:
REMOVE                                      INSERT List of Effective Sections (Rev 117)        List of Effective Sections (Rev 118)
SLC 16.7.3 (entire section) (Rev 134)        SLC 16.7.3 (entire section) (Rev 136)
Revisions may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 980-875-4180 I
 
SELECTED LICENSEE COMMITMENTS (SLC)
LOES SLCs ARE REVISED PER SECTION SECTION        T      REVISION NUMBER                DATE 16.1                    REVISION 32                12/2/02 16.2                    REVISION 134                3/6/13 16.3                    REVISION 134                3/6/13 16.4                    Not Issued 16.5.1                  REVISION 115                0308/10 16.5.2                  REVISION 0                  12/14/99 16.5.3                  REVISION 0                  12/14/99 16.5.4                  REVISION 55                3/23/04 16.5.5                  REVISION 0                  12/14/99 16.5.6                  DELETED - REVISION 120      12/30/10 16.5.7                  REVISION 53                1/13/04 16.5.8                  REVISION 0                  12/14/99 16.5.9                  REVISION 108                06/10/09 16.5.10                REVISION 134                3/6/13 16.6.1                  REVISION 0                  12/14/99 16.6.2                  DELETED - REVISION 43      6/11/03 16.6.3                  REVISION 134                3/6/13 16.6.4                  REVISION 27                06/12/02 16.7.1                  REVISION 134                3/6/13 16.7.2                  REVISION 134                3/6/13 16.7.3                  REVISION 136                4/26/13 16.7.4                  REVISION 134                3/6/13 16.7.5                  REVISION 134                3/6/13 16.7.6                  REVISION 134                3/6/13 16.7.7                  REVISION 134                3/6/13 16.7.8                  REVISION 134                3/6/13 16.7.9                  REVISION 134                3/6/13 16.7.10                REVISION 134                3/6/13 16.7.11                REVISION 134                3/6/13 16.8.1                  REVISION 135                3/18/13 16.8.2                  REVISION 0                12/14/99 16.8.3                  REVISION 121              12/30/10 16.9.1                  REVISION 134              3/6/13 16.9.2                  REVISION 134              3/6/13 16.9.3                  REVISION 134              3/6/13 16.9.4                  REVISION 134              3/6/13 16.9.5                  REVISION 134              3/6/13 16.9.6                  REVISION 134              3/6/13 16.9.7                  REVISION 133                12/23/12 16.9.8                  REVISION 134              3/6/13 16.9.9                  REVISION 101              4/02/08 16.9.10                  DELETED - REVISION 13      2/26/01 16.9.11                  REVISION 22                2/25/02 16.9.12                  REVISION 101              4/02/08 McGuire Units 1 and 2                  I                          Revision 118
 
SELECTED LICENSEE COMMITMENTS (SLC)
LOES SLCs ARE REVISED PER SECTION SECTION              REVISION NUMBER                DATE 16.9.13                DELETED - REVISION 13      2/26/01 16.9.14                REVISION 22                2/25/02 16.9.15                REVISION 134                3/6/13 16.9.16                REVISION 111                09/09/09 16.9.17                REVISION 86                1/17/07 16.9.18                REVISION 0                  12/14/99 16.9.19                REVISION 134                3/6/13 16.9.20                REVISION 8                  11/30/00 16.9.21                REVISION 0                  12/14/99 16.9.22                REVISION 109                8/13/09 16.9.23                REVISION 134                3/6/13 16.9.24                DELETED - REVISION 74      6/27/05 16.9.25                REVISION 87                1/17/07 16.10.1                REVISION 56                4/6/04 16.11.1                REVISION 112                2/4/10 16.11.2                REVISION 134                3/6/13 16.11.3                REVISION 0                  12/14/99 16.11.4                REVISION 134                3/6/13 16.11.5                REVISION 0                  12/14/99 16.11.6                REVISION 112                2/4/10 16.11.7                REVISION 134                3/6/13 16.11.8                REVISION 0                  12/14/99 16.11.9                REVISION 0                  12/14/99 16.11.10              REVISION 134                3/6/13 16.11.11              REVISION 134                3/6/13 16.11.12              REVISION 67                2/28/05 16.11.13              REVISION 91                3/22/07 16.11.14              REVISION 21                1/17/02 16.11.15              REVISION 21                1/17/02 16.11.16              REVISION 134                3/6/13 16.11.17              REVISION 118                10/19/10 16.11.18              REVISION 0                  12/14/99 16.11.19              REVISION 0                  12/14/99 16.11.20              REVISION 0                  12/14/99 16.12.1                REVISION 0                  12/14/99 16.12.2                REVISION 0                  12/14/99 16.13.1                REVISION 51                10/1/03 16.13.2                DELETED - REVISION 75      7/20/05 16.13.3                DELETED - REVISION 75      7/20/05 16.13.4                REVISION 134              3/6/13 16.14.1                REVISION 0                  12/14/99 16.14.2                REVISION 104                3/18/09 McGuire Units 1 and 2                2                          Revision 118
 
Meteorological Instrumentation 16.7.3 16.7 INSTRUMENTATION 16.7.3 Meteorological Instrumentation COMMITMENT                  The meteorological monitoring instrumentation channels shown in Table 16.7.3-1 shall be FUNCTIONAL.
APPLICABILITY:              At all times.
REMEDIAL ACTIONS CONDITION                          REQUIRED ACTION                COMPLETION TIME A.        One or more required            A. 1    Restore non-functional        7 days Meteorological                        channel(s) to monitoring channels                    FUNCTIONAL status.
non-functional.
OR A.2    Prepare and submit a          17 days Special Report outlining the cause of the malfunction and plans for restoring the channel(s) to FUNCTIONAL status.
TESTING REQUIREMENTS
--------------------------                      NOTE--------------------------------
Refer to Table 16.7.3-1 to determine which TRs apply for each meteorological monitoring instrumentation.
TEST                                        FREQUENCY TR 16.7.3.1        Perform CHANNEL CHECK.                                          24 hours TR 16.7.3.2        Perform a CHANNEL CALIBRATION.                                  6 months.
TR 16.7.3.3        Perform a CHANNEL VERIFICATION.                                Weekly McGuire Units 1 and 2                          16.7.3-1                            Revision 136
 
Meteorological Instrumentation 16.7.3 TABLE 16.7.3-1 METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT AND LOCATION                    REQUIRED TESTING CHANNELS REQUIREMENTS
: 1. Wind Speed 1.a Meteorological Tower Nominal            1  TR 16.7.3.1 Elev. 801.88'                              TR 16.7.3.2 TR 16.7.3.3 1.b Meteorological Tower Nominal            1  TR 16.7.3.1 Elev. 964.88'                              TR 16.7.3.2 TR 16.7.3.3
: 2. Wind Direction 2.a Meteorological Tower Nominal            1  TR 16.7.3.1 Elev. 801.88'                              TR 16.7.3.2 TR 16.7.3.3 2.b Meteorological Tower Nominal            I  TR 16.7.3.1 Elev. 964.88'                              TR 16.7.3.2 TR 16.7.3.3
: 3. Air Temperature - Delta T 3.a Meteorological Tower Nominal            1  TR 16.7.3.1 Elev. 798.46' - 962.22'                    TR 16.7.3.2 TR 16.7.3.3 McGuire Units 1 and 2                16.7.3-2                    Revision 136
 
Meteorological Instrumentation 16.7.3 BASES The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
TESTING REQUIREMENTS CHANNEL CHECK The daily channel check consists of a qualitative assessment, by observation, of each instrument channel's behavior based upon knowledge of current and previous weather conditions. Each channel is verified to have power, indicating on scale, and updating normally.
CHANNEL VERIFICATION The weekly channel verification combines a more extensive channel check with limited calibration checks and parameter adjustments as necessary. Visual inspections, from the ground, of the wind speed cups and directional vanes are also performed.
CHANNEL CALIBRATION The semi-annual channel calibration encompasses the entire channel from the sensors to the data recorders. Each sensor is lowered from the tower, inspected, and replaced if necessary. A full calibration on each processor and data recorder is performed and replaced if necessary.
REFERENCES
: 1.      Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
: 2.      UFSAR Section 2.3.3.
McGuire Units 1 and 2                    16.7.3-3                            Revision 136}}

Latest revision as of 16:43, 4 November 2019

SLC Manual Update
ML13204A116
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 06/26/2013
From: Beaver B
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
References
DUK131770042
Download: ML13204A116 (7)


Text

W$POSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIENIT IS Date: 06/26113 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK131770042

1) 02546 WC LIBRARY - MG01WC
2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy QA CONDITION [: Yes E No
3) 03379 D E CALDWELL MG01MM OTHER ACKNOWLEDGEMENT REQUIRED N Yes DOCUMENT TRANSMITTAL FORM
4) 03447 DON R MILLER MG01RP IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 03614 MCG OPS PROCEDURE GP MG010P ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE

6) 03744 OPS TRNG MGR. MG03OT
7) 03759 U S NUC REG WASHINGTON, DC MCGUIRE NUCLEAR STATION Duke Energy
8) 04809 MCG PLANT ENG. LIBR. MG05SE McGuire
9) 09460 W C SPENCER MG01RP DCRM MGO2DM SELECTED LICENSEE COMMITMENTS
10) 09665 JON HTHOMPSON, USNRC 13225 Hagers Ferry Road MANUAL (SLC) Huntersville, N.C. 28078 RECORD RETENTION # 581188 Rec'd By Page 2 of 2 Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 1 2 3 4 5 6-7 - 8 9 10 11 12 13 14 15 TOTAL V1 SLC MEMORANDUM [1 pg.] NA 136 05/06/13 MADM-03A X v1 V1 V1 V2 V1i Vi Vi ýVi 24 SLC 16.7.3 [2 pgs.] NA 136 05/06/13 LIST OF EFFECTIVE SECTIONS [3 pgs.] NA 118 05/06/13 REMARKS: PLEASE UPDATE ACCORDINGLY. S D CAPPS REPRO: 3 HOLE PUNCH COPIES VICE PRESIDENT MCGUIRE NUCLEAR STATION RECIPIENT #03044 PREVIOUSLY COMPLETED BY:

BCBEAVER MG01RC BCB/BRG

May 6, 2013 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 117) List of Effective Sections (Rev 118)

SLC 16.7.3 (entire section) (Rev 134) SLC 16.7.3 (entire section) (Rev 136)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance 980-875-4180 I

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION T REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 134 3/6/13 16.3 REVISION 134 3/6/13 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED - REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 134 3/6/13 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED - REVISION 43 6/11/03 16.6.3 REVISION 134 3/6/13 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 134 3/6/13 16.7.2 REVISION 134 3/6/13 16.7.3 REVISION 136 4/26/13 16.7.4 REVISION 134 3/6/13 16.7.5 REVISION 134 3/6/13 16.7.6 REVISION 134 3/6/13 16.7.7 REVISION 134 3/6/13 16.7.8 REVISION 134 3/6/13 16.7.9 REVISION 134 3/6/13 16.7.10 REVISION 134 3/6/13 16.7.11 REVISION 134 3/6/13 16.8.1 REVISION 135 3/18/13 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 134 3/6/13 16.9.2 REVISION 134 3/6/13 16.9.3 REVISION 134 3/6/13 16.9.4 REVISION 134 3/6/13 16.9.5 REVISION 134 3/6/13 16.9.6 REVISION 134 3/6/13 16.9.7 REVISION 133 12/23/12 16.9.8 REVISION 134 3/6/13 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED - REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I Revision 118

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED - REVISION 13 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 134 3/6/13 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 134 3/6/13 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 134 3/6/13 16.9.24 DELETED - REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 134 3/6/13 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 134 3/6/13 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 134 3/6/13 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 134 3/6/13 16.11.11 REVISION 134 3/6/13 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 134 3/6/13 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED - REVISION 75 7/20/05 16.13.3 DELETED - REVISION 75 7/20/05 16.13.4 REVISION 134 3/6/13 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 118

Meteorological Instrumentation 16.7.3 16.7 INSTRUMENTATION 16.7.3 Meteorological Instrumentation COMMITMENT The meteorological monitoring instrumentation channels shown in Table 16.7.3-1 shall be FUNCTIONAL.

APPLICABILITY: At all times.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A. 1 Restore non-functional 7 days Meteorological channel(s) to monitoring channels FUNCTIONAL status.

non-functional.

OR A.2 Prepare and submit a 17 days Special Report outlining the cause of the malfunction and plans for restoring the channel(s) to FUNCTIONAL status.

TESTING REQUIREMENTS


NOTE--------------------------------

Refer to Table 16.7.3-1 to determine which TRs apply for each meteorological monitoring instrumentation.

TEST FREQUENCY TR 16.7.3.1 Perform CHANNEL CHECK. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TR 16.7.3.2 Perform a CHANNEL CALIBRATION. 6 months.

TR 16.7.3.3 Perform a CHANNEL VERIFICATION. Weekly McGuire Units 1 and 2 16.7.3-1 Revision 136

Meteorological Instrumentation 16.7.3 TABLE 16.7.3-1 METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT AND LOCATION REQUIRED TESTING CHANNELS REQUIREMENTS

1. Wind Speed 1.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 1.b Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3
2. Wind Direction 2.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 2.b Meteorological Tower Nominal I TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3
3. Air Temperature - Delta T 3.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 798.46' - 962.22' TR 16.7.3.2 TR 16.7.3.3 McGuire Units 1 and 2 16.7.3-2 Revision 136

Meteorological Instrumentation 16.7.3 BASES The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.

TESTING REQUIREMENTS CHANNEL CHECK The daily channel check consists of a qualitative assessment, by observation, of each instrument channel's behavior based upon knowledge of current and previous weather conditions. Each channel is verified to have power, indicating on scale, and updating normally.

CHANNEL VERIFICATION The weekly channel verification combines a more extensive channel check with limited calibration checks and parameter adjustments as necessary. Visual inspections, from the ground, of the wind speed cups and directional vanes are also performed.

CHANNEL CALIBRATION The semi-annual channel calibration encompasses the entire channel from the sensors to the data recorders. Each sensor is lowered from the tower, inspected, and replaced if necessary. A full calibration on each processor and data recorder is performed and replaced if necessary.

REFERENCES

1. Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
2. UFSAR Section 2.3.3.

McGuire Units 1 and 2 16.7.3-3 Revision 136