ML080560245
| ML080560245 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 02/14/2008 |
| From: | Beaver B Duke Energy Corp |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| DUK080440026 | |
| Download: ML080560245 (121) | |
Text
PRIORITY Normal DISPOSITION OF THE ORIGINAL DOCUMENT WILL BE TO THE TRANSMITTAL SIGNATURE UNLESS RECIPIENT IS OTHERWISE IDENTIFIED BELOW
- 1) 01623 G L MONTGOMERY MG01WC
- 2) 01749 L C GIBBY - MG01VP
- 4) 02388 DAVID DZIADOSZ LYNCHBG, VA
- 5) 02532 MCG NRC INSP MG-ADMIN MAIL RM
- 6) 02546 WC LIBRARY - MG01WC
- 7) 03044 MCG DOC CNTRL MISC MAN MGO5DM
- 8) 03283 PR TUCKER MG01RP
- 11) 03744 OPS TRNG MGR. MG03OT
- 12) 03759 U S NUC REG WASHINGTON, DC
- 13) 03796 SCIENTECH DUNEDIN, FL
- 14) 04698 D E BORTZ EC08G
- 15) 04809 MCG PLANT ENG. LIBR. MG05SE
-Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION RECORD RETENTION # 005893 TECHNICAL SPECIFICATIONS (TS)
AND TECHNICAL SPECIFICATION BASES (TSB)
Date:
02/14/08 Document Transmittal #:
DUK080440026 QA CONDITION E
Yes
- No OTHER ACKNOWLEDGEMENT REQUIRED
- Yes IF GA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, NC.
28078 Rec'd By Date Page 2 of 3 T
r
~
rrr r-r rr t I DOCUMENT NO TS & TSB MEMORANDUM TSB LIST OF EFFECTIVE SECTIONS TSB 3.5.2 (10 PAGES)
QA COND REV #/ DATE DISTR CODE 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 TOTAL
+
-I 1
1 I-4-4 1-I~
4 4
.l--I--I.-----.--4--I.-------4 NA NA NA
--- 02/12/08 090 02/12/08 09/10/07 MADM-04B V1 VI V1 vi V1 V1 V1 V1 V1 V3 V8 V1 V1 V2 48 REMARKS: PLEASE UPDATE ACCORDINGLY RECIPIENT # 00422 PREVIOUSLY COMPLETED B H HAMILTON VICE PRESIDENT MCGUIRE NUCLEAR STATION BY:
B C BEAVER MGO1RC BCB/CMK (0
0b
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
B~onnie Beaver
.Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section) i Revision 63 4/4/05 ii Revision 63 4/4/05 iii Revision 63 5/25/05 B 2.1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0 9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/1.2/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/18/00 B 3.3.6 Not Used - Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units I and 2 Page I Revision 90
Page NumberAmdmnResinDt Amendment Revision Date B 3.4.6 B 3.4.7 B 3.4.8.
B 3.4.9 B 3.4.10 jB 3.4.11 B 3.4.12 B 3.4.13 B 3.'4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/9 9 8/3/99 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 McGuire Units 1 and 2 Pg eiin9 Page 2 Revision 90
Page Number Amendment Revision Date B 3.6.15:
Revision 0 9/30/98 B 3.6.16 Revision 40 5/8/03 B 3.7.1 Revision 0 9/30/98 B 3.7.2 Revision 79 10/17/06 B 3.7.3 Revision 0 9/30/98 B 3.7.4 Revision 57 4/29/04 B 3.7.5 Revision 60 10/12/04 B 3.7.6 Revision 0 9/30/98 B 3.7.7 Revision 0 9/30/98 B 3.7.8 Revision 0 9/30/98 B 3.7.9 Revision 43 5/28/03 B 3.7.10 Revision 75 6/12/06 B 3.7.11 Revision 65 6/2/05 B 3.7.12 Revision 28 5/17/02 B 3.7.13 Revision 85 2/26/07 B 3.7.14 Revision 66 6/30/05 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 0 9/30/98 B 3.8.1 Revision 92 1/28/08 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 53 2/17/04 B 3.8.4 Revision 36 12/17/02 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 0 9/30/98 B 3.8.7 Revision 20 1/10/02 B 3.8.8 Revision 41 7/29/03 B 3.8.9 Revision 24 2/4/02 B 3.8.10 Revision 41 7/29/03 B 3.9.1 Revision 68 9/1/05 B 3.9.2 Revision 41 7/29/03 B 3.9.3 Revision 91 11/7/07 B 3.9.4 Revision 84 2/20/07 B 3.9.5 Revision 59 7/29/04 McGuire Units 1 and 2 Page 3 Revision 90
Page Number B 3.9.6 B 3.9.7 Amendment Revision 41 Revision 88 Revision Date 7/29/03 9/5/07 McGuire Units 1 and 2 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST).and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part of an ECCS flow path as described by this LCO.
McGuire Units 1 and 2 B 3.5.2-1 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize components from opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the SI pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the SI pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3-5.2-2 Revision No. 89
ECCS-Operating:
B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probabilitythat the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is _ 2200°F;
- b.
Maximum cladding. oxidation is *< 0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from a zirconium water reaction is
< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89
ECOCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design.point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and SI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS--ý-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of. a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECCS-Operating B 3.5.2 BASES N
APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the Sl signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A.1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems* are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 EGCS piping is verified to be water-filled by venting to remove gas from accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an SI signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section XI of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of the ASME Code. Section Xl of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section)
SRevision 63 4/4/05 ii Revision 63.
4/4/05 iii Revision 63 5/25/05 B 2. 1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0
'9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B'3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/12/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/18/00 B 3.3.6 Not Used -'Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units 1 and 2 Pg eiin9 Page I Revision 90
Page Number B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10
/B 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Amendment Revision Date Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/9 9 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 McGuire Units 1 and 2 Pg eiin9 Page 2 Revision 90
Page Number Amendment Revision Date B 3.6.15 Revision 0 9/30/98 B 3.6.16 Revision 40 5/8/03 B 3.7.1 Revision 0 9/30/98 B 3.7.2 Revision 79 10/17/06 B 3.7.3 Revision 0 9/30/98 B 3.7.4 Revision 57 4/29/04 B 3.7.5 Revision 60 10/12/04 B 3.7.6 Revision 0 9/30/98 B 3.7.7 Revision 0 9/30/98 B 3.7.8 Revision 0 9/30/98 B 3.7.9 Revision 43 5/28/03 B 3.7.10 Revision 75 6/12/06 B 3.7.11 Revision 65 6/2/05 B 3.7.12 Revision 28 5/17/02 B 3.7.13
-Revision 85 2/26/07 B 3.7.14 Revision 66 6/30/05 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 0 9/30/98 B 3.8.1 Revision 92 1/28/08 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 53 2/17/04 B 3.8.4 Revision 36 12/17/02 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 0 9/30/98 B 3.8.7 Revision 20 1/10/02 B 3.8.8 Revision 41 7/29/03 B 3.8.9 Revision 24 2/4/02 B 3.8.10 Revision 41
.7/29/03 B 3.9.1 Revision 68 9/1/05 B 3.9.2 Revision 41 7/29/03 B 3.9.3 Revision 91 11/7/07 B 3.9.4 Revision 84 2/20/07 B 3.9.5 Revision 59 7/29/04 McGuire Units 1 and 2 Page 3 Revision 90
Page Number B 3.9.6 B 3.9.7 Amendment Revision 41 Revision 88 Revision Date 7/29/03 9/5/07 McGuire Units 1 and 2 Page 4
ý Revision 90,
ECCS--Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part of an ECCS flow path as described by this LCO.
McGuire Units 1 and 2 B 3.5.2-1 Revis-ion No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize components from opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the Sl pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the Sl pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3.5.2-2 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an Sl signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is < 22000F;
- b.
Maximum cladding oxidation is
- 0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from a zirconium water reaction is
< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs..3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not
- the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and SI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and Sl pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO C
In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89 B 3.5.2-5 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the SI signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown.ý'
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A.1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the EccS. The intent of this Condition is to maintain a combination of equipment such that 1.00% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A r'eliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable. such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from-accessible locations susceptible togas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an Sl signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section Xl of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is -
greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of the ASME Code.Section XI of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89 McGuire Units 1 and 2 B 3.5-2-8 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated S! signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold-leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section)
SRevision 63 4/4/05 ii Revision 63 4/4/05 iii Revision 63 5/25/05 B 2. 1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0 9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/12/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/18/00 B 3.3.6 Not Used - Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units 1 and 2 Pg eiin9 Page I Revision 90
Page Number B 3.4.6 B 3.4.7 B 3.4.8 B'3.4.9 B 3.4.10
ýB 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B3 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Amendment Revision Date Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87
- Revision 0 Revision 0
- Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/99 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 McGuire Units 1 and 2 Pg eiin9 Page 2 Revision 90
Page Number Amendment Revision Date B 3.6.15 Revision 0 9/30/98 B 3.6.16 Revision 40 5/8/03 B 3.7.1 Revision 0 9/30/98 B 3.7.12 Revision 79 10/17/06 B 3.7.3 Revision 0 9/30/98 B 3.7.4 Revision 57 4/29/04 B 3.7.5 Revision 60 10/12/04 B 3.7.6 Revision 0 9/30/98 B 3.7.7 Revision 0 9/30/98 B 3.7.8 Revision 0 9/30/98 B 3.7.9 Revision 43 5/28/03 B 3.7.10 Revision 75 6/12/06 B 3.7.11 Revision 65 6/2/05 B 3.7.12 Revision 28 5/17/02 B 3.7.13 Revision 85 2/26/07 B 3.7.14 Revision 66 6/30/05 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 0 9/30/98 B 3.8.1 Revision 92 1/28/08 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 53 2/17/04 B 3.8.4 Revision 36 12/17/02 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 0 9/30/98 B 3.8.7 Revision 20 1/10/02 B 3.8.8 Revision 41 7/29/03 B 3.8.9 Revision 24 2/4/02
- B 3.8.10 Revision 41 7/29/03 B 3.9.1 Revision 68 9/1/05 B 3.9.2 Revision 41 7/29/03 B 3.9.3 Revision 91 11/7/07 B 3.9.4 Revision 84 2/20/07 B 3.9.5 Revision 59 7/29/04 McGuire Units 1 and 2 Pg eiin9 Page 3 Revision 90
Page Number B 3.9.6 B 3.9.7 Amendment Revision 41 Revision 88 Revision Date 7/29/03 9/5/07 McGuire Units 1 and 2 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps.
have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron.concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part of an ECCS flow path as described by this LCO.
0 McGuire Units 1 and 2 B 3.5.2-1 Revision No. 89
ECOS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize components from opposite trains to achieve the required 100% flow to the core, During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared.
between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the SI pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the SI pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3.5.2-2 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removalevents, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is _< 2200°F;
- b.
Maximum cladding oxidation is _< 0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from a zirconium water reaction is
< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and Si trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
a..
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
0__
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water.from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot. and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECGS-Operating B 3.5.2 BASES APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the Sl signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A.1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those
- valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an SI signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section XI of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of the ASME Code. Section Xl of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECPS-,-Operating, B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCG valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated Sl signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position. under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an Sl signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a Visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure toallow access for inspection of the strainers, and to.verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-*Operating B 3.5.2, BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section)
SRevision 63 4/4/05 ii Revision 63 4/4/05 iii Revision 63 5/25/05 B 2.1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0 9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/12/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/18/00 B 3.3.6 Not Used - Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units 1 and 2 Pg eiin9 Page I Revision 90
Page Number B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10
ýB 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Amendment AmenmentRevision Date Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/9 9 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 2/17/04 12/04/06 4/23/05 McGuire Units 1 and 2 Pg eiin9 Page 2 Revision 90
Page Number B 3.6.15 B 3.6.16 B 3.7.1 B 3.7.2 B 3.7.3 B 3.7.4 B 3.7.5 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B 3.7.11 B 3.7.12 B 3.7.13 B 3.7.14 B 3.7.15 B 3.7.16 B 3.8.1 B 3.8.2 B 3.8.3 B 3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 B 3.8.8 B 3.8.9 B 3.8.10 B 3.9.1 B 3.9.2 B 3.9.3 B 3.9.4 B 3.9.5 Amendment Revision 0 Revision 40 Revision 0 Revision 79 Revision 0 Revision 57 Revision 60 Revision 0 Revision 0 Revision 0 Revision 43 Revision 75 Revision 65 Revision 28 Revision 85 Revision 66 Revision 66 Revision 0 Revision 92 Revision 92 Revision 53 Revision 36 Revision 41 Revision 0 Revision 20 Revision 41 Revision 24 Revision 41 Revision 68 Revision 41 Revision 91 Revision 84 Revision 59 Revision Date 9/30/98 5/8/03 9/30/98 10/17/06 9/30/98 4/29/04 10/12/04 9/30/98 9/30/98 9/30/98 5/28/03 6/12/06 6/2/05 5/17/02 2/26/07 6/30/05 6/30/05 9/30/98 1/28/08 1/28/08 2/17/04 12/17/02 7/29/03 9/30/98 1/10/02 7/29/03 2/4/02 7/29/03 9/1/05 7/29/03 11/7/07 2/20/07 7/29/04 McGuire Units 1 and 2 Page 3 Revision 90
Page Number B 3.9.6 B 3.9.7 Amendment Revision 41 Revision 88 Revision Date 7/29/03 9/5/07 McGuire Units 1 and 2 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration' The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part of an ECCS flow path as described by this LCO.
0 McGuire Units 1 and 2 B 3.5.2-1 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize components from opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow.to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the SI pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the SI pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3.5.2-2 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat.
removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard, loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is
- 220 0 °F;
- b.
Maximum cladding oxidation is < 0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from azirconium.water reaction is
< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89.
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and Sl pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the, centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not
- the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging andSI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of.offsite power and a single.
failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3).. The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flowpath capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the SI signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A. 1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
"EGCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an Sl signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4' Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section Xl of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of the ASME Code. Section Xl of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-0perat ing B3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section) i Revision 63 4/4/05 ii Revision 63 4/4/05 iii Revision 63 5/25/05 B 2.1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0 9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/12/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/1.8/00 B 3.3.6 Not Used - Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units. 1 and 2 Page I Revision 90
Page Number B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 3, 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 31.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14
- Amendment Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 Revision Date 6/25/07 6/25/07 7/29/03 9/30/98 9/30/9 8 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/99 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/0 5 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 McGuire Units 1 and 2 Pg eiin9 Page 2 Revision 90
Page Number Amendment Revision Date B 3.6.15 Revision 0 9/30/98 B 3.6.16 Revision 40 5/8/03 B 3.7.1 Revision 0 9/30/98 B 3.7.2 Revision 79 10/17/06 B 3.7.3 Revision 0 9/30/98 B 3.7.4 Revision 57 4/29/04 B 3.7.5 Revision 60 10/12/04 B 3.7.6 Revision 0 9/30/98 B 3.7.7 Revision 0 9/30/98 B 3.7.8 Revision 0 9/30/98 B 3.7.9 Revision 43 5/28/03 B 3.7.10 Revision 75 6/12/06 B 3.7.11 Revision 65 6/2/05 B 3.7.12 Revision 28 5/17/02 B 3.7.13 Revision 85 2/26/07 B 3.7.14 Revision 66 6/30/05 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 0 9/30/98 B 3.8.1 Revision 92 1/28/08 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 53 2/17/04 B 3.8.4 Revision 36 12/17/02 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 0 9/30/98 B 3.8.7 Revision 20 1/10/02 B 3.8.8 Revision 41 7/29/03 B 3.8.9 Revision 24 2/4/02 B 3.8.10 Revision 41
.7/29/03 B 3.9.1 Revision 68 9/1/05 B 3.9.2 Revision 41 7/29/03 B 3.9.3 Revision 91 11/7/07 B 3.9.4 Revision 84 2/20/07 B 3.9.5 Revision 59 7/29/04 McGuire Units 1 and 2 Page 3 Revision 90
Page Number B 3.9.6 B 3.9.7 Amendment Revision Date Revision 41 7/29/03 Revision 88 9/5/07 McGuire Units I and 2 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part ofan ECCS flow path as described by this LCO.
McGuire Units 1 and 2 B 3.5.2-1 Revision No. 89
j ECCS--Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize components from opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must.supply sufficient flow to the RCS to be considered 100% capacity, credit is taken inthe safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the SI pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the SI pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3.5.2-2 Revision No-89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and'pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is _< 2200°F;
- b.
Maximum cladding oxidation is *0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from a zirconium water reaction is
_< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps a're also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and SI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment -mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that. an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an Sl subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
I During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the SI signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14A1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled;" and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A.1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the.redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such, that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
. McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
BA and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from.
accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an SI signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section XI of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of theASME Code.Section XI of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
'February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE IN9ERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision BASES Revision Date iiii B 2.1.1 B 2.1.2 B 3.0 B 3.1.1 B 3.1.2 B 3.1.3 B 3.1.4 B 3.1.5 B 3.1.6 B 3.1.7 B 3.1.8 B 3.2.1 B 3.2.2 B 3.2.3 B 3.2.4 B 3.3.1 B 3.3.2 B 3.3.3 B 3.3.4 B 3.3.5 B 3.3.6 B 3.4.1 B 3.4.2 B 3.4.3 B 3.4.4 B 3.4.5 (Revised per section)
Revision 63 Revision 63 Revision 63 Revision 51 Revision 0 Revision 81 Revision 73 Revision 10 Revision 10 Revision 0 Revision 19 Revision 0 Revision 58 Revision 0 Revision 74 Revision 10 Revision 34 Revision 10 Revision 90 Revision 62 Revision 71 Revision 57 Revision 11 Not Used - Revision 87 Revision 51 Revision 0 Revision 44 Revision 86 Revision 86 4/4/05 4/4/05 5/25/05 1/14/04 9/30/98 3/29/07 3/6/06 9/22/00 9/22/00 9/30/98 1/10/02 9/30/98 06/23/04 9/30/98 5/3/06 9/22/00 10/1/02 9/22/00 10/30/07 1/27/05 10/12/05 4/29/04 9/18/00 6/29/06 1/14/04 9/30/98 7/3/03 6/25/07 6/25/07 McGuire Units 1 and 2 Page I Revision 90
Page Number B 3.4.6 pB 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 1B 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.18 B 3.5.2 B 3.5.3 S
B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B.3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Amendment Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 Revision Date 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/99 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 I
McGuire Units 1 and 2 Page 2 Revision 90
Page Number Amendment Revision Date B 3.6.15 Revision 0 9/30/98 B 3.6.16 Revision 40 5/8/03 B 3.7.1 Revision 0 9/30/98 B 3.7.2 Revision 79 10/17/06 B 3.7.3 Revision 0 9/30/98 B 3.7.4 Revision 57 4/29/04 B 3.7.5 Revision 60 10/12/04 B 3.7.6 Revision 0 9/30/98 B 3.7.7 Revision 0 9/30/98 B 3.7.8 Revision 0 9/30/98 B 3.7.9 Revision 43 5/28/03 B 3.7.10 Revision 75 6/12/06 B 3.7.11 Revision 65 6/2/05 B 3.7.12 Revision 28 5/17/02 B 3.7.13 Revision 85 2/26/07 B 3.7.14 Revision 66 6/30/05 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 0 9/30/98 B 3.8.1 Revision 92 1/28/08 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 53 2/17/04 B 3.8.4 Revision 36 12/17/02 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 0 9/30/98 B 3.8.7 Revision 20 1/10/02 B 3.8.8 Revision 41 7/29/03 B 3.8.9 Revision 24 2/4/02 B 3.8.10 Revision 41 7/29/03 B 3.9.1 Revision 68 9/1/05 B 3.9.2 Revision 41 7/29/03 B 3.9.3 Revision 91 11/7/07 B 3.9.4 Revision 84 2/20/07 B 3.9.5 Revision 59 7/29/04 McGuire Units 1 and 2 Page 3 Revision 90
Page Number !.,'"i;ý",
Amendment B 3.9.6 Revision 41 B 3.9.7 Revision 88 Revision Date 7/29/03 9/5/07 McGuire Units I and 2 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of.
secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but.are not considered part of an ECCS flow path as described by this LCO.
McGuire Units 1 and 2 B 3.5.2-I Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the Sl pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize components from opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the Sl pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the Sl pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 I B 3.5.2-2 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is <_ 2200°F;
- b.
Maximum cladding oxidation is _< 0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from a zirconium water reaction is
<0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react;
.McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89
ECCS--Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and SI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to tak6 its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the SI signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A.1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation). Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an SI signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section Xl of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of the ASME Code. Section Xl of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECCS--Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-Operating B 3.5.2 BASES S
SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire.Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section) i Revision 63 4/4/05 ii Revision 63 4/4/05 iii Revision 63 5/25/05 B 2.1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision.73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0 9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/12/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/18/00 B 3.3.6 Not Used - Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units 1 and 2 Page I Revision 90
Page Number B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 B 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Amendment Revision Date Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/99 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 I
McGuire Units 1 and 2 Page 2 Revision 90
Page Number Amendment Revision Date B 3.6.15 Revision 0 9/30/98 B 3.6.16 Revision 40 5/8/03 B 3.7.1 Revision 0 9/30/98 B 3.7.2 Revision 79 10/17/06 B 3.7.3 Revision 0 9/30/98 B 3.7.4 Revision 57 4/29/04.
B 3.7.5 Revision 60 10/12/04 B 3.7.6 Revision 0 9/30/98 B 3.7.7 Revision 0 9/30/98 B 3.7.8 Revision 0 9/30/98 B 3.7.9 Revision 43 5/28/03 B 3.7.10 Revision 75 6/12/06 B 3.7.11 Revision 65 6/2/05 B 3.7.12 Revision 28 5/17/02 B 3.7.13 Revision 85 2/26/07 B 3.7.14 Revision 66 6/30/05 B 3.7.15 Revision 66 6/30/05 B 3.7.16 Revision 0 9/30/98 B 3.8.1 Revision 92 1/28/08 B 3.8.2 Revision 92 1/28/08 B 3.8.3 Revision 53 2/17/04 B 3.8.4 Revision 36 12/17/02 B 3.8.5 Revision 41 7/29/03 B 3.8.6 Revision 0 9/30/98 B 3.8.7 Revision 20 1/10/02 B 3.8.8 Revision 41 7/29/03 B 3.8.9 Revision 24 2/4/02 B 3.8.10 Revision 41 7/29/03 B 3.9.1 Revision 68 9/1/05 B 3.9.2 Revision 41 7/29/03 B 3.9.3 Revision 91 11/7/07 B 3.9.4 Revision 84 2/20/07 B 3.9.5 Revision 59 7/29/04 McGuire Units 1 and 2 Pg eiin9 Page 3 Revision 90
Page Number B 3.9.6 B 3.9.7 Amendment Revision 41 Revision 88 Revision Date 7/29/03 9/5/07 McGuire Units I and 2 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part of an ECCS flow path as described by this LCO.
McGuire Units 1 and 2 B 3.52-1 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of theflow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to, utilize components from opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the SI pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the SI pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3.5.2-2 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1, "Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is *< 2200°F;
- b.
Maximum cladding oxidation is
- 0.17 times the total cladding thickness before oxidation;
- c.
Maximum hydrogen generation from a zirconium water reaction is
< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3.
Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to mitigate a SGTR event, a single failure disabling one ECCS train is not the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and SI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-_Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking suction from the RWST upon an SI signal and automatically transferring suction to the containment sump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECOS-Operating.
B 3.5.2 BASES
.APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the SI signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A. 1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued operation for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an SI signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detectgross degradation caused by impeller structural damage or other hydraulic component problems is required by Section XI of the ASME Code. This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompassesSection XI of the ASME Code. Section Xl of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6, These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS-Operating B 3.5.2.
BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89
February 12, 2008 MEMORANDUM To: All McGuire Nuclear Station Technical Specification, and Technical Specification Bases (TSB)
Manual Holders
Subject:
McGuire Technical Specifications Bases REMOVE INSERT Technical Specification Bases Manual:
TS Bases List of Effected Sections Rev 89 Tech Spec Bases: 3.5.2 Rev 45 (Entire Bases)
TS Bases List of Effected Sections Rev 90 Tech Spec Bases 3.5.2 Rev 89 (Entire Bases)
Revision numbers may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 875-4180
McGuire Nuclear Station Technical Specification Bases LOES TS Bases are revised by section Page Number Revision Revision Date BASES (Revised per section) i Revision 63 4/4/05 ii Revision 63 4/4/05 iii Revision 63 5/25/05 B 2.1.1 Revision 51 1/14/04 B 2.1.2 Revision 0 9/30/98 B 3.0 Revision 81 3/29/07 B 3.1.1 Revision 73 3/6/06 B 3.1.2 Revision 10 9/22/00 B 3.1.3 Revision 10 9/22/00 B 3.1.4 Revision 0 9/30/98 B 3.1.5 Revision 19 1/10/02 B 3.1.6 Revision 0 9/30/98 B 3.1.7 Revision 58 06/23/04 B 3.1.8 Revision 0 9/30/98 B 3.2.1 Revision 74 5/3/06 B 3.2.2 Revision 10 9/22/00 B 3.2.3 Revision 34 10/1/02 B 3.2.4 Revision 10 9/22/00 B 3.3.1 Revision 90 10/30/07 B 3.3.2 Revision 62 1/27/05 B 3.3.3 Revision 71 10/12/05 B 3.3.4 Revision 57 4/29/04 B 3.3.5 Revision 11 9/18/00 B 3.3.6 Not Used - Revision 87 6/29/06 B 3.4.1 Revision 51 1/14/04 B 3.4.2 Revision 0 9/30/98 B 3.4.3 Revision 44 7/3/03 B 3.4.4 Revision 86 6/25/07 B 3.4.5 Revision 86 6/25/07 McGuire Units 1 and 2 Page I Revision 90
Page Number B 3.4.6 B 3.4.7 B 3.4.8 B 3.4.9 B 3.4.10 jB 3.4.11 B 3.4.12 B 3.4.13 B 3.4.14 B 3.4.14-2 B 3.4.14-6 B 3.4.15 B 3.4.16 B 3.4.17 B 3.4.18 B 3.5.1 B 3.5.2 B 3.5.3 B 3.5.4 B 3.5.5 B 3.6.1 B 3.6.2 B 3.6.3 B 3.6.4 B 3.6.5 B 3.6.5-2 B 3.6.6 B 3.6.7 B 3.6.8 B 3.6.9 B 3.6.10 B 3.6.11 B 3.6.12 B 3.6.13 B 3.6.14 Amendment Revision 86 Revision 86 Revision 41 Revision 0 Revision 0 Revision 57 Revision 57 Revision 86 Revision 0 Revision 5 Revision 5 Revision 82 Revision 57 Revision 0 Revision 86 Revision 70 Revision 89 Revision 57 Revision 70 Revision 0 Revision 53 Revision 32 Revision 87 Revision 0 Revision 0 Revision 6 Revision 93 Not Used - Revision 63 Revision 63 Revision 63 Revision 43 Revision 78 Revision 53 Revision 83 Revision 64 Revision Date 6/25/07 6/25/07 7/29/03 9/30/98 9/30/98 4/29/04 4/29/04 6/25/07 9/30/98 8/3/99 8/3/99 9/30/06 4/29/04 9/30/98 6/25/07 10/5/05 9/10/07 4/29/04 10/5/04 9/30/98 2/17/04 10/4/02 6/29/06 9/30/98 9/30/98 10/6/99 04/30/07 4/4/05 4/4/05 4/4/05 5/28/03 9/25/06 2/17/04 12/04/06 4/23/05 McGuire Units 1 and 2 Pg eiin9 Page 2 Revision 90
Page Number B 3.6.15 B 3.6.16 B 3.7.1 B 3.7.2 B 3.7.3 B 3.7.4 B 3.7.5 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B 3.7.11 B 3.7.12 B 3.7.13 B 3.7.14 B 3.7.15 B 3.7.16 B 3.8.1 B,3.8.2 B 3..8.3 B 3.8.4 B 3.8.5 B 3.8.6 B 3.8.7 B 3.8.8 B 3.8.9 B 3.8.10 B 3.9.1 B 3.9.2 B 3.9.3 B 3.9.4 B 3.9.5 Amendment Revision 0 Revision 40 Revision 0 Revision 79 Revision 0 Revision 57 Revision 60 Revision 0 Revision 0 Revision 0 Revision 43 Revision 75 Revision 65 Revision 28 Revision 85 Revision 66 Revision 66 Revision 0 Revision 92 Revision 92 Revision 53 Revision 36 Revision 41 Revision 0 Revision 20 Revision 41 Revision 24 Revision 41 Revision 68 Revision 41 Revision 91 Revision 84 Revision 59 Revision Date 9/30/98 5/8/03 9/30/98 10/17/06 9/30/98 4/29/04 10/12/04 9/30/98 9/30/98 9/30/98 5/28/03 6/12/06 6/2/05 5/17/02 2/26/07 6/30/05 6/30/05, 9/30/98 1/28/08 1/28/08 2/17/04 12/17/02 7/29/03
-9/30/98 1/10/02 7/29/03 2/4/02
.7/29/03 9/1/05 7/29/03 11/7/07 2/20/07 7/29/04 McGuire Units 1 and 2 Pg eiin9 Page 3 Revision 90
Page NumberAmnmnResinDt Amendment Revision Date B 3.9.6 Revision 41 7/29/03 B 3.9.7 Revision 88 9/5/07 McGuire Units 1 and 2 Pg eiin9 Page 4 Revision 90
ECCS-Operating B 3.5.2 B 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS)
B 3.5.2 ECCS-Operating BASES BACKGROUND The function of the ECCS is to provide core cooling and negative reactivity to ensure that the reactor core is protected after any of the following accidents:
- a.
Loss of coolant accident (LOCA), coolant leakage greater than the capability of the normal charging system;
- b.
Rod ejection accident;
- c.
Loss of secondary coolant accident, including uncontrolled steam or feedwater release; and
- d.
Steam generator tube rupture (SGTR).
The addition of negative reactivity is designed primarily for the loss of secondary coolant accident where primary cooldown could add enough positive reactivity to achieve criticality and return to significant power.
There are three phases of ECCS operation: injection, cold leg recirculation, and hot leg recirculation. In the injection phase, water is taken from the refueling water storage tank (RWST) and injected into the Reactor Coolant System (RCS) through the cold legs. When sufficient water is removed from the RWST to ensure that enough boron has been added to maintain the reactor subcritical and the containment sumps have enough water to supply the required net positive suction head to the ECCS pumps, suction is switched to the containment sump for cold leg recirculation. When the core decay heat has decreased to a level low enough to be successfully removed without direct RHR pump injection flow, the RHR cold leg injection path is realigned to discharge to the auxiliary containment spray header. After approximately 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, part of the ECCS flow is shifted to the hot leg recirculation phase to provide a backflush which, for a cold leg break, would reduce the boiling in the top of the core and prevent excessive boron concentration.
The ECCS consists of three separate subsystems: centrifugal charging (high head), safety injection (SI) (intermediate head), and residual heat removal (RHR) (low head). Each subsystem consists of two redundant, 100% capacity trains. The ECCS accumulators and the RWST are also part of the ECCS, but are not considered part of an ECCS flow path as described by this LCO.
McGuire Units 1 and 2 B 3.5.2-1 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The ECCS flow paths consist of piping, valves, heat exchangers, and pumps such that water from the RWST can be injected into the RCS following the accidents described in this LCO. The major components of each subsystem are the centrifugal charging pumps, the RHR pumps, heat exchangers, and the SI pumps. Each of the three subsystems consists of two 100% capacity trains that are interconnected and redundant such that either train is capable of supplying 100% of the flow required to mitigate the accident consequences. This interconnecting and redundant subsystem design provides the operators with the ability to utilize componentsfrom opposite trains to achieve the required 100% flow to the core.
During the injection phase of LOCA recovery, a suction header supplies water from the RWST to the ECCS pumps. Mostly separate piping supplies each subsystem and each train within the subsystem. The discharge from the centrifugal charging pumps combines, then divides again into four supply lines, each of which feeds the injection line to one RCS cold leg. The discharge from the SI and RHR pumps divides and feeds an injection line to each of the RCS cold legs. Throttle valves in the SI lines are set to balance the flow to the RCS. This balance ensures sufficient flow to the core to meet the analysis assumptions following a LOCA in one of the RCS cold legs. The flow split from the RHR lines cannot be adjusted. Although much of the two ECCS trains are composed of completely separate piping, certain areas are shared between trains. The most important of these are 1) where both trains flow through a single physical pipe, and 2) at the injection connections to the RCS cold legs. Since each train must supply sufficient flow to the RCS to be considered 100% capacity, credit is taken in the safety analyses for flow to three intact cold legs. Any configuration which, when combined with a single active failure, prevents the flow from either ECCS pump in a given train from reaching all four cold legs injection points on that train is unanalyzed and might render both trains of that ECCS subsystem inoperable.
For LOCAs that are too small to depressurize the RCS below the shutoff head of the SI pumps, the centrifugal charging pumps supply water until the RCS pressure decreases below the SI pump shutoff head. During this period, the steam generators are used to provide part of the core cooling function.
During the recirculation phase of LOCA recovery, RHR pump suction is transferred to the containment sump. The RHR pumps then supply the other ECCS pumps. Initially, recirculation is through the same paths as the injection phase. Subsequently, for large LOCAs, the recirculation phase includes injection into both the hot and cold legs.
McGuire Units 1 and 2 B 3.5.2-2 Revision No. 89
ECCS-Operating B 3.5.2 BASES BACKGROUND (continued)
The high and intermediate head subsystems of the ECCS also functions to supply borated water to the reactor core following increased heat removal events, such as a main steam line break (MSLB). The limiting design conditions occur when the moderator temperature coefficient is highly negative, such as at the end of each cycle.
During low temperature conditions in the RCS, limitations are placed on the maximum number of ECCS pumps that may be OPERABLE. Refer to the Bases for LCO 3.4.12, "Low Temperature Overpressure Protection (LTOP) System," for the basis of these requirements.
The ECCS subsystems are actuated upon receipt of an SI signal. The actuation of safeguard loads is accomplished in a programmed time sequence. If offsite power is available, the safeguard loads start immediately in the programmed sequence. If offsite power is not available, the Engineered Safety Feature (ESF) buses shed normal operating loads and are connected to the emergency diesel generators (EDGs). Safeguard loads are then actuated in the programmed time sequence. The time delay associated with diesel starting, sequenced loading, and pump starting determines the time required before pumped flow is available to the core following a safety injection actuation.
The active ECCS components, along with the passive accumulators and the RWST covered in LCO 3.5.1,."Accumulators," and LCO 3.5.4, "Refueling Water Storage Tank (RWST)," provide the cooling water necessary to meet GDC 35 (Ref. 1).
APPLICABLE The LCO helps to ensure that the following acceptance criteria for the SAFETY ANALYSES ECCS, established by 10 CFR 50.46 (Ref. 2), will be met following a small break LOCA and there is a high level of probability that the criteria are met following a large break LOCA:
- a.
Maximum fuel element cladding temperature is _ 22000F;
- b.
Maximum cladding oxidation is _ 0.17 times the total cladding thickness before oxidation;
.c.
Maximum hydrogen generation from a zirconium water reaction is
< 0.01 times the hypothetical amount generated if all of the metal in the cladding cylinders surrounding the fuel, excluding the cladding surrounding the plenum volume, were to react; McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-3 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
- d.
Core is maintained in a coolable geometry; and
- e.
Adequate long term core cooling capability is maintained.
The LCO also limits the potential for a post trip return to power following an MSLB event and ensures that containment pressure and temperature limits are met.
Each ECCS subsystem is taken credit for in a large break LOCA event at full power (Refs. 3 and 4). This event has the greatest potential to challenge the limits on runout flow set by the manufacturer of the ECCS pumps. It also sets the maximum response time for their actuation. Direct flow from the centrifugal charging pumps and SI pumps is credited in a small break LOCA event. The RHR pumps are also credited, for larger small break LOCAs, as the means of supplying suction to these higher head ECCS pumps after the switch to sump recirculation. This event establishes the flow and discharge head at the design point for the centrifugal charging pumps. The MSLB analysis also credits the SI and centrifugal charging pumps. Although some ECCS flow is necessary to 6mitigate a SGTR event, a single failure disabling one ECCS train is not
- the limiting single failure for this transient. The SGTR analysis primary to secondary break flow is increased by the availability of both centrifugal charging and SI trains. Therefore, the SGTR analysis is penalized by assuming both ECCS trains are operable as required by the LCO. The OPERABILITY requirements for the ECCS are based on the following LOCA analysis assumptions:
- a.
A large break LOCA event, with loss of offsite power and a single failure disabling one ECCS train; and
- b.
A small break LOCA event, with a loss of offsite power and a single failure disabling one ECCS train.
During the blowdown stage of a LOCA, the RCS depressurizes as primary coolant is ejected through the break into the containment. The nuclear reaction is terminated either by moderator voiding during large breaks or control rod insertion for small breaks. Following depressurization, emergency cooling water is injected into the cold legs, flows into the downcomer, fills the lower plenum, and refloods the core.
The effects on containment mass and energy releases are accounted for in appropriate analyses (Ref. 3). The LCO ensures that an ECCS train will deliver sufficient water to match boiloff rates soon enough to minimize the consequences of the core being uncovered following a large LOCA.
McGuire Units 1 and 2 B 3.5.2-4 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABLE SAFETY ANALYSES (continued)
It also ensures that the centrifugal charging and SI pumps will deliver sufficient water and boron during a small LOCA to maintain core subcriticality. For smaller LOCAs, the centrifugal charging pump delivers sufficient fluid to maintain RCS inventory. For a small break LOCA, the steam generators continue to serve as the heat sink, providing part of the required core cooling.
The ECCS trains satisfy Criterion 3 of 10 CFR 50.36 (Ref. 5).
LCO In MODES 1, 2, and 3, two independent (and redundant) ECCS trains are required to ensure that sufficient ECCS flow is available, assuming a single failure affecting either train. Additionally, individual components within the ECCS trains may be called upon to mitigate the consequences of other transients and accidents.
In MODES 1, 2, and 3, an ECCS train consists of a centrifugal charging subsystem, an SI subsystem, and an RHR subsystem. Each train includes the piping, instruments, and controls to ensure an OPERABLE flow path capable of taking'suction from the RWST upon an SI signal and automatically transferring suction to the containmentsump.
During an event requiring ECCS actuation, a flow path is required to provide an abundant supply of water from the RWST to the RCS via the ECCS pumps and their respective supply headers to each of the four cold leg injection nozzles. In the long term, this flow path may be switched to take its supply from the containment sump and to supply its flow to the RCS hot and cold legs. The flow path for each train must maintain its designed independence to ensure that no single failure can disable both ECCS trains.
APPLICABILITY In MODES 1, 2, and 3, the ECCS OPERABILITY requirements for the limiting Design Basis Accident, a large break LOCA, are based on full power operation. Although reduced power would not require the same level of performance, the accident analysis does not provide for reduced cooling requirements in the lower MODES. The centrifugal charging pump performance is based on a small break LOCA, which establishes the pump performance curve and has less dependence on power. The SI pump performance requirements are based on a small break LOCA. For both of these types of pumps, the large break LOCA analysis depends only on the flow value at containment pressure, not on the shape of the flow versus pressure curve at higher pressures. MODE 2 and MODE 3 requirements are bounded by the MODE 1 analysis.
McGuire Units 1 and 2 B 3.5.2-5 Revision No. 89
ECCS-Operating B 3.5.2 BASES APPLICABILITY (continued)
This LCO is only applicable in MODE 3 and above. Below MODE 3, the SI signal setpoint is manually bypassed by operator control, and system functional requirements are relaxed as described in LCO 3.5.3, "ECCS-Shutdown."
As indicated in the Note, the flow path may be isolated for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in MODE 3, under controlled conditions, to perform pressure isolation valve testing per SR 3.4.14.1. The flow path is readily restorable from the control room.
In MODES 5 and 6, plant conditions are such that the probability of an event requiring ECCS injection is extremely low. Core cooling requirements in MODE 5 are addressed by LCO 3.4.7, "RCS Loops-MODE 5, Loops Filled," and LCO 3.4.8, "RCS Loops-MODE 5, Loops Not Filled." MODE 6 core cooling requirements are addressed by LCO 3.9.5, "Residual Heat Removal (RHR) and Coolant Circulation-High Water Level," and LCO 3.9.6, "Residual Heat Removal (RHR) and Coolant Circulation-Low Water Level."
ACTIONS A.1 With one or more trains inoperable and at least 100% of the ECCS flow equivalent to a single OPERABLE ECCS train available, the inoperable components must be returned to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Completion Time is based on an NRC reliability evaluation (Ref. 6) and is a reasonable time for repair of many ECCS components.
An ECCS train is inoperable if it is not capable of delivering design flow to the RCS. Individual components are inoperable if they are not capable of performing their design function or supporting systems are not available.
The LCO requires the OPERABILITY of a number of independent subsystems. Due to the redundancy of trains and the diversity of subsystems, the inoperability of one component in a train does not render the ECCS incapable of performing its function. Neither does the inoperability of two different components, each in a different train, necessarily result in a loss of function for the ECCS. The intent of this Condition is to maintain a combination of equipment such that 100% of the ECCS flow equivalent to a single OPERABLE ECCS train remains available. This allows increased flexibility in plant operations under circumstances when components in opposite trains are inoperable.
McGuire Units 1 and 2 B 3.5.2-6 Revision No. 89
ECCS-Operating B 3.5.2 BASES ACTIONS (continued)
An event accompanied by a loss of offsite power.and the failure of an EDG can disable one ECCS train until power is restored. A reliability analysis (Ref. 6) has shown that the impact of having one full ECCS train inoperable is sufficiently small to justify continued. operationfor 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
Reference 7 describes situations in which one component, such as an RHR crossover, valve, can disable both ECCS trains. With one or more component(s) inoperable such that 100% of the flow equivalent to a single OPERABLE ECCS train is not available, the facility is in a condition outside the accident analysis. Therefore, LCO 3.0.3 must be immediately entered.
B.1 and B.2 If the inoperable trains cannot be returned to OPERABLE status within the associated Completion Time, the plant must be brought to a MODE in which the LCO does not apply. To achieve this status, the plant must be brought to MODE 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and MODE 4 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the required plant conditions from full power conditions in an orderly manner and without challenging plant systems.
SURVEILLANCE SR 3.5.2.1 REQUIREMENTS Verification of proper valve position ensures that the flow path from the ECCS pumps to the RCS is maintained. Misalignment of these valves could render both ECCS trains inoperable. Securing these valves using the power disconnect switches in the correct position ensures that they cannot change position as a result of an active failure or be inadvertently misaligned. These valves are of the type, described in Reference 7, that can disable the function of both ECCS trains and invalidate the accident analyses. A 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Frequency is considered reasonable in view of other administrative controls that will ensure a mispositioned valve is unlikely.
SR 3.5.2.2 Verifying the correct alignment for manual, power operated, and automatic valves in the ECCS flow paths provides assurance that the proper flow paths will exist for ECCS operation. This SR does not apply to valves that are locked, sealed, or otherwise secured in position, since these were verified to be in the correct position prior to locking, sealing, McGuire Units 1 and 2 B 3.5.2-7 Revision No. 89 McGuire Units 1 and 2 B 3.5.2-7
.Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) or securing. A valve that receives an actuation signal is allowed to be in a nonaccident position provided the valve will automatically reposition within the proper stroke time. This Surveillance does not require any testing or valve manipulation. Rather, it involves verification that those valves capable of being mispositioned are in the correct position. The 31 day Frequency is appropriate because the valves are operated under administrative control.
This Frequency has been shown to be acceptable through operating experience.
SR 3.5.2.3 ECCS piping is verified to be water-filled by venting to remove gas from accessible locations susceptible to gas accumulation. Alternative means may be used to verify water-filled conditions (e.g., ultrasonic testing or high point sightglass observation).
Maintaining the piping from the ECCS pumps to the RCS full of water ensures that the system will perform properly, injecting its full capacity into the RCS upon demand. This will also prevent water hammer, pump cavitation, and pumping of noncondensible gas (e.g., air, nitrogen, or hydrogen) into the reactor vessel following an SI signal or during shutdown cooling. The 31 day Frequency takes into consideration the gradual nature of gas accumulation in the ECCS piping and the procedural controls governing system operation.
SR 3.5.2.4 Periodic surveillance testing of ECCS pumps to detect gross degradation caused by impeller structural damage or other hydraulic component problems is required by Section XI of the ASME Code.' This type of testing may be accomplished by measuring the pump developed head at only one point of the pump characteristic curve. This verifies both that the measured performance is within an acceptable tolerance of the original pump baseline performance and that the performance at the test flow is greater than or equal to the performance assumed in the plant safety analysis. SRs are specified in the Inservice Testing Program, which encompasses Section Xl of the ASME Code.Section XI of the ASME Code provides the activities and Frequencies necessary to satisfy the requirements.
McGuire Units 1 and 2 B 3.5.2-8 Revision No. 89
ECCS-Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued)
SR 3.5.2.5 and SR 3.5.2.6 These Surveillances demonstrate that each automatic ECCS valve actuates to the required position on an actual or simulated SI signal and that each ECCS pump starts on receipt of an actual or simulated SI signal. This Surveillance is not required for valves that are locked, sealed, or otherwise secured in the required position under administrative controls. The 18 month Frequency is based on the need to perform these Surveillances under the conditions that apply during a plant outage and the potential for unplanned plant transients if the Surveillances were performed with the reactor at power. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment. The actuation logic is tested as part of ESF Actuation System testing, and equipment performance is monitored as part of the Inservice Testing Program.
SR 3.5.2.7 The position of throttle valves in the flow path on an SI signal is necessary for proper ECCS performance. These valves have mechanical locks to ensure proper positioning for restricted flow to a ruptured cold leg, ensuring that the other cold legs receive at least the required minimum flow. The 18 month Frequency is based on the same reasons as those stated in SR 3.5.2.5 and SR 3.5.2.6.
SR 3.5.2.8 Periodic inspections of the ECCS containment sump strainer assembly (consisting of modular tophats, grating, plenums and waterboxes) and the associated enclosure (the stainless steel structure surrounding the strainer assembly located inside the crane wall) ensure they are unrestricted and stay in proper operating condition. Inspections will consist of a visual examination of the exterior surfaces of the strainer assembly and interior and exterior surfaces of the enclosure for any evidence of debris, structural distress, or abnormal corrosion. The intent of the surveillance is to ensure the absence of any condition which could adversely affect strainer functionality. Surveillance performance will not require removal of any tophat modules, but the strainer assembly exterior shall be visually inspected. This inspection will necessarily entail opening the top of the enclosure to allow access for inspection of the strainers, and to verify cleanliness of the enclosure interior space. A detailed inspection of the enclosure and exterior strainer assembly surfaces is required to establish a high confidence that no adverse conditions are present.
The 18 month Frequency is based on the need to perform McGuire Units 1 and 2 B 3.5.2-9 Revision No. 89
ECCS--Operating B 3.5.2 BASES SURVEILLANCE REQUIREMENTS (continued) this Surveillance under the conditions that apply during a plant outage and on the need to have access to the location. This Frequency has been found to be sufficient to detect abnormal degradation and is confirmed by operating experience.
REFERENCES
- 1.
10 CFR 50, Appendix A, GDC 35.
- 2.
- 3.
UFSAR, Section 6.2.1.
- 4.
UFSAR, Chapter 15.
- 5.
10 CFR 50.36, Technical Specifications, (c)(2)(ii).
- 6.
NRC Memorandum to V. Stello, Jr., from R.L. Baer, "Recommended Interim Revisions to LCOs for ECCS Components," December 1, 1975.
- 7.
IE Information Notice No. 87-01.
McGuire Units 1 and 2 B 3.5.2-10 Revision No. 89