ML13204A116: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:W$POSITION OF THE ORIGINAL DOCUMENT WILL PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIEN OTHERWISE IDENTIFIED BELOW 1) 02546 WC LIBRARY -MG01WC 2) 03044 MCG DOC CNTRL MISC MAN MG05DM 3)4)5)6)03379 D E CALDWELL MG01MM 03447 DON R MILLER MG01RP 03614 MCG OPS PROCEDURE GP MG010P 03744 OPS TRNG MGR. MG03OT BE TO IT IS Duke Energy DOCUMENT TRANSMITTAL FORM REFERENCE MCGUIRE NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL (SLC)QA CONDITION
{{#Wiki_filter:W$POSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY     Normal           THE TRANSMITTAL SIGNATURE UNLESS RECIPIENIT IS                                  Date:      06/26113 OTHERWISE IDENTIFIED BELOW Document Transmittal #:            DUK131770042
[: Yes E No OTHER ACKNOWLEDGEMENT REQUIRED N Yes IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO: Duke Energy McGuire DCRM MGO2DM 13225 Hagers Ferry Road Huntersville, N.C. 28078 Date: 06/26113 Document Transmittal
: 1) 02546 WC LIBRARY - MG01WC
#: DUK131770042
: 2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy                   QA CONDITION                               [:   Yes E No
: 7) 03759 U S NUC REG WASHINGTON, DC 8) 04809 MCG PLANT ENG. LIBR. MG05SE 9) 09460 W C SPENCER MG01RP 10) 09665 JON H THOMPSON, USNRC RECORD RETENTION  
: 3) 03379 D E CALDWELL MG01MM                                                                                    OTHER ACKNOWLEDGEMENT REQUIRED             N   Yes DOCUMENT TRANSMITTAL FORM
# 581188 Rec'd By Page 2 of 2 DOCUMENT NO SLC MEMORANDUM
: 4) 03447 DON R MILLER MG01RP                                                                                      IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
[1 pg.]SLC 16.7.3 [2 pgs.]LIST OF EFFECTIVE SECTIONS [3 pgs.]QACOND NA NA NA REV #/ DATE 136 05/06/13 136 05/06/13 118 05/06/13 DISTR CODE MADM-03A 1 V1 2 X 3 v1 4 V1 5 V1 Date 6-7 -8 9 10 11 V2 V1i Vi Vi ýVi 12 13 14 15 TOTAL 24 REMARKS: PLEASE UPDATE ACCORDINGLY.
: 5) 03614 MCG OPS PROCEDURE GP MG010P                                                                              ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:
REPRO: 3 HOLE PUNCH COPIES RECIPIENT  
REFERENCE
#03044 PREVIOUSLY COMPLETED S D CAPPS VICE PRESIDENT MCGUIRE NUCLEAR STATION BY: BCBEAVER MG01RC BCB/BRG May 6, 2013 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders  
: 6) 03744 OPS TRNG MGR. MG03OT
: 7) 03759 U S NUC REG WASHINGTON, DC                                         MCGUIRE NUCLEAR STATION Duke Energy
: 8) 04809 MCG PLANT ENG. LIBR. MG05SE                                                                                       McGuire
: 9) 09460 W C SPENCER MG01RP                                                                                                 DCRM MGO2DM SELECTED LICENSEE COMMITMENTS
: 10) 09665 JON HTHOMPSON, USNRC                                                                                               13225 Hagers Ferry Road MANUAL (SLC)                                    Huntersville, N.C. 28078 RECORD RETENTION # 581188 Rec'd By Page 2 of 2 Date DOCUMENT NO                                           QACOND      REV #/ DATE    DISTR CODE    1  2 3  4  5  6-7      -  8    9      10 11    12 13  14  15  TOTAL V1 SLC MEMORANDUM [1 pg.]                                 NA      136 05/06/13    MADM-03A          X  v1 V1 V1 V2    V1i Vi      Vi      ýVi                            24 SLC 16.7.3 [2 pgs.]                                     NA      136 05/06/13 LIST OF EFFECTIVE SECTIONS [3 pgs.]                     NA       118 05/06/13 REMARKS: PLEASE UPDATE ACCORDINGLY.                                                                                             S D CAPPS REPRO: 3 HOLE PUNCH COPIES                                                                                       VICE PRESIDENT MCGUIRE NUCLEAR STATION RECIPIENT #03044 PREVIOUSLY COMPLETED                                                               BY:
BCBEAVER           MG01RC     BCB/BRG
 
May 6, 2013 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders


==Subject:==
==Subject:==
McGuire SLC Manual Update Please revise your copy of the manual as follows: REMOVE INSERT List of Effective Sections (Rev 117)SLC 16.7.3 (entire section) (Rev 134)List of Effective Sections (Rev 118)SLC 16.7.3 (entire section) (Rev 136)Revisions may skip numbers due to Regulatory Compliance Filing System.Please call me if you have questions.
McGuire SLC Manual Update Please revise your copy of the manual as follows:
REMOVE                                       INSERT List of Effective Sections (Rev 117)         List of Effective Sections (Rev 118)
SLC 16.7.3 (entire section) (Rev 134)       SLC 16.7.3 (entire section) (Rev 136)
Revisions may skip numbers due to Regulatory Compliance Filing System.
Please call me if you have questions.
Bonnie Beaver Regulatory Compliance 980-875-4180 I
Bonnie Beaver Regulatory Compliance 980-875-4180 I
SELECTED LICENSEE COMMITMENTS (SLC)LOES SLCs ARE REVISED PER SECTION SECTION T REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 134 3/6/13 16.3 REVISION 134 3/6/13 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED -REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 134 3/6/13 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED -REVISION 43 6/11/03 16.6.3 REVISION 134 3/6/13 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 134 3/6/13 16.7.2 REVISION 134 3/6/13 16.7.3 REVISION 136 4/26/13 16.7.4 REVISION 134 3/6/13 16.7.5 REVISION 134 3/6/13 16.7.6 REVISION 134 3/6/13 16.7.7 REVISION 134 3/6/13 16.7.8 REVISION 134 3/6/13 16.7.9 REVISION 134 3/6/13 16.7.10 REVISION 134 3/6/13 16.7.11 REVISION 134 3/6/13 16.8.1 REVISION 135 3/18/13 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 134 3/6/13 16.9.2 REVISION 134 3/6/13 16.9.3 REVISION 134 3/6/13 16.9.4 REVISION 134 3/6/13 16.9.5 REVISION 134 3/6/13 16.9.6 REVISION 134 3/6/13 16.9.7 REVISION 133 12/23/12 16.9.8 REVISION 134 3/6/13 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED -REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I Revision 118 SELECTED LICENSEE COMMITMENTS (SLC)LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED -REVISION 13 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 134 3/6/13 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 134 3/6/13 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 134 3/6/13 16.9.24 DELETED -REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 134 3/6/13 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 134 3/6/13 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 134 3/6/13 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 134 3/6/13 16.11.11 REVISION 134 3/6/13 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 134 3/6/13 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED -REVISION 75 7/20/05 16.13.3 DELETED -REVISION 75 7/20/05 16.13.4 REVISION 134 3/6/13 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 118 Meteorological Instrumentation 16.7.3 16.7 INSTRUMENTATION 16.7.3 Meteorological Instrumentation COMMITMENT APPLICABILITY:
 
The meteorological monitoring instrumentation channels shown in Table 16.7.3-1 shall be FUNCTIONAL.
SELECTED LICENSEE COMMITMENTS (SLC)
At all times.REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A. 1 Restore non-functional 7 days Meteorological channel(s) to monitoring channels FUNCTIONAL status.non-functional.
LOES SLCs ARE REVISED PER SECTION SECTION       T       REVISION NUMBER                 DATE 16.1                   REVISION 32                 12/2/02 16.2                   REVISION 134               3/6/13 16.3                   REVISION 134               3/6/13 16.4                   Not Issued 16.5.1                 REVISION 115               0308/10 16.5.2                 REVISION 0                 12/14/99 16.5.3                 REVISION 0                 12/14/99 16.5.4                 REVISION 55                 3/23/04 16.5.5                 REVISION 0                 12/14/99 16.5.6                 DELETED - REVISION 120     12/30/10 16.5.7                 REVISION 53                 1/13/04 16.5.8                 REVISION 0                 12/14/99 16.5.9                 REVISION 108               06/10/09 16.5.10                 REVISION 134               3/6/13 16.6.1                 REVISION 0                 12/14/99 16.6.2                 DELETED - REVISION 43       6/11/03 16.6.3                 REVISION 134               3/6/13 16.6.4                 REVISION 27                 06/12/02 16.7.1                 REVISION 134               3/6/13 16.7.2                 REVISION 134               3/6/13 16.7.3                 REVISION 136               4/26/13 16.7.4                 REVISION 134               3/6/13 16.7.5                 REVISION 134               3/6/13 16.7.6                 REVISION 134               3/6/13 16.7.7                 REVISION 134               3/6/13 16.7.8                 REVISION 134               3/6/13 16.7.9                 REVISION 134               3/6/13 16.7.10                 REVISION 134               3/6/13 16.7.11                 REVISION 134               3/6/13 16.8.1                 REVISION 135               3/18/13 16.8.2                   REVISION 0                 12/14/99 16.8.3                   REVISION 121               12/30/10 16.9.1                   REVISION 134               3/6/13 16.9.2                   REVISION 134               3/6/13 16.9.3                   REVISION 134               3/6/13 16.9.4                   REVISION 134               3/6/13 16.9.5                   REVISION 134               3/6/13 16.9.6                   REVISION 134               3/6/13 16.9.7                   REVISION 133               12/23/12 16.9.8                   REVISION 134               3/6/13 16.9.9                   REVISION 101               4/02/08 16.9.10                 DELETED - REVISION 13     2/26/01 16.9.11                 REVISION 22               2/25/02 16.9.12                 REVISION 101               4/02/08 McGuire Units 1 and 2                   I                         Revision 118
OR A.2 Prepare and submit a 17 days Special Report outlining the cause of the malfunction and plans for restoring the channel(s) to FUNCTIONAL status.TESTING REQUIREMENTS
 
--------------------------
SELECTED LICENSEE COMMITMENTS (SLC)
NOTE--------------------------------
LOES SLCs ARE REVISED PER SECTION SECTION               REVISION NUMBER               DATE 16.9.13               DELETED - REVISION 13       2/26/01 16.9.14               REVISION 22                 2/25/02 16.9.15               REVISION 134               3/6/13 16.9.16               REVISION 111               09/09/09 16.9.17               REVISION 86                 1/17/07 16.9.18               REVISION 0                 12/14/99 16.9.19               REVISION 134               3/6/13 16.9.20               REVISION 8                 11/30/00 16.9.21               REVISION 0                 12/14/99 16.9.22               REVISION 109               8/13/09 16.9.23               REVISION 134               3/6/13 16.9.24               DELETED - REVISION 74       6/27/05 16.9.25               REVISION 87                 1/17/07 16.10.1               REVISION 56                 4/6/04 16.11.1               REVISION 112               2/4/10 16.11.2               REVISION 134               3/6/13 16.11.3               REVISION 0                 12/14/99 16.11.4               REVISION 134               3/6/13 16.11.5               REVISION 0                 12/14/99 16.11.6               REVISION 112               2/4/10 16.11.7               REVISION 134               3/6/13 16.11.8               REVISION 0                 12/14/99 16.11.9               REVISION 0                 12/14/99 16.11.10               REVISION 134               3/6/13 16.11.11               REVISION 134               3/6/13 16.11.12               REVISION 67                 2/28/05 16.11.13               REVISION 91                 3/22/07 16.11.14               REVISION 21                 1/17/02 16.11.15               REVISION 21                 1/17/02 16.11.16               REVISION 134               3/6/13 16.11.17               REVISION 118               10/19/10 16.11.18               REVISION 0                 12/14/99 16.11.19               REVISION 0                 12/14/99 16.11.20               REVISION 0                 12/14/99 16.12.1               REVISION 0                 12/14/99 16.12.2                 REVISION 0                 12/14/99 16.13.1                 REVISION 51                 10/1/03 16.13.2                 DELETED - REVISION 75     7/20/05 16.13.3                 DELETED - REVISION 75     7/20/05 16.13.4               REVISION 134               3/6/13 16.14.1               REVISION 0                 12/14/99 16.14.2               REVISION 104               3/18/09 McGuire Units 1 and 2               2                         Revision 118
 
Meteorological Instrumentation 16.7.3 16.7 INSTRUMENTATION 16.7.3 Meteorological Instrumentation COMMITMENT                 The meteorological monitoring instrumentation channels shown in Table 16.7.3-1 shall be FUNCTIONAL.
APPLICABILITY:              At all times.
REMEDIAL ACTIONS CONDITION                           REQUIRED ACTION                 COMPLETION TIME A.       One or more required           A. 1   Restore non-functional         7 days Meteorological                         channel(s) to monitoring channels                     FUNCTIONAL status.
non-functional.
OR A.2     Prepare and submit a           17 days Special Report outlining the cause of the malfunction and plans for restoring the channel(s) to FUNCTIONAL status.
TESTING REQUIREMENTS
--------------------------                     NOTE--------------------------------
Refer to Table 16.7.3-1 to determine which TRs apply for each meteorological monitoring instrumentation.
Refer to Table 16.7.3-1 to determine which TRs apply for each meteorological monitoring instrumentation.
TEST FREQUENCY TR 16.7.3.1 Perform CHANNEL CHECK. 24 hours TR 16.7.3.2 Perform a CHANNEL CALIBRATION.
TEST                                         FREQUENCY TR 16.7.3.1         Perform CHANNEL CHECK.                                         24 hours TR 16.7.3.2         Perform a CHANNEL CALIBRATION.                                 6 months.
6 months.TR 16.7.3.3 Perform a CHANNEL VERIFICATION.
TR 16.7.3.3         Perform a CHANNEL VERIFICATION.                               Weekly McGuire Units 1 and 2                           16.7.3-1                             Revision 136
Weekly McGuire Units 1 and 2 16.7.3-1 Revision 136 Meteorological Instrumentation 16.7.3 TABLE 16.7.3-1 METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT AND LOCATION REQUIRED TESTING CHANNELS REQUIREMENTS
 
: 1. Wind Speed 1.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 1.b Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3 2. Wind Direction 2.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 2.b Meteorological Tower Nominal I TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3 3. Air Temperature  
Meteorological Instrumentation 16.7.3 TABLE 16.7.3-1 METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT AND LOCATION                   REQUIRED TESTING CHANNELS REQUIREMENTS
-Delta T 3.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 798.46' -962.22' TR 16.7.3.2 TR 16.7.3.3 McGuire Units 1 and 2 16.7.3-2 Revision 136 Meteorological Instrumentation 16.7.3 BASES The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere.
: 1. Wind Speed 1.a Meteorological Tower Nominal             1   TR 16.7.3.1 Elev. 801.88'                               TR 16.7.3.2 TR 16.7.3.3 1.b Meteorological Tower Nominal             1   TR 16.7.3.1 Elev. 964.88'                               TR 16.7.3.2 TR 16.7.3.3
This capability is required to evaluate the need for protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23,"Onsite Meteorological Programs," February 1972.TESTING REQUIREMENTS CHANNEL CHECK The daily channel check consists of a qualitative assessment, by observation, of each instrument channel's behavior based upon knowledge of current and previous weather conditions.
: 2. Wind Direction 2.a Meteorological Tower Nominal             1   TR 16.7.3.1 Elev. 801.88'                               TR 16.7.3.2 TR 16.7.3.3 2.b Meteorological Tower Nominal             I   TR 16.7.3.1 Elev. 964.88'                               TR 16.7.3.2 TR 16.7.3.3
Each channel is verified to have power, indicating on scale, and updating normally.CHANNEL VERIFICATION The weekly channel verification combines a more extensive channel check with limited calibration checks and parameter adjustments as necessary.
: 3. Air Temperature - Delta T 3.a Meteorological Tower Nominal             1   TR 16.7.3.1 Elev. 798.46' - 962.22'                     TR 16.7.3.2 TR 16.7.3.3 McGuire Units 1 and 2                 16.7.3-2                   Revision 136
Visual inspections, from the ground, of the wind speed cups and directional vanes are also performed.
 
CHANNEL CALIBRATION The semi-annual channel calibration encompasses the entire channel from the sensors to the data recorders.
Meteorological Instrumentation 16.7.3 BASES The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
Each sensor is lowered from the tower, inspected, and replaced if necessary.
TESTING REQUIREMENTS CHANNEL CHECK The daily channel check consists of a qualitative assessment, by observation, of each instrument channel's behavior based upon knowledge of current and previous weather conditions. Each channel is verified to have power, indicating on scale, and updating normally.
A full calibration on each processor and data recorder is performed and replaced if necessary.
CHANNEL VERIFICATION The weekly channel verification combines a more extensive channel check with limited calibration checks and parameter adjustments as necessary. Visual inspections, from the ground, of the wind speed cups and directional vanes are also performed.
CHANNEL CALIBRATION The semi-annual channel calibration encompasses the entire channel from the sensors to the data recorders. Each sensor is lowered from the tower, inspected, and replaced if necessary. A full calibration on each processor and data recorder is performed and replaced if necessary.
REFERENCES
REFERENCES
: 1. Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.2. UFSAR Section 2.3.3.McGuire Units 1 and 2 16.7.3-3 Revision 136}}
: 1.       Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
: 2.       UFSAR Section 2.3.3.
McGuire Units 1 and 2                     16.7.3-3                           Revision 136}}

Latest revision as of 16:43, 4 November 2019

SLC Manual Update
ML13204A116
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 06/26/2013
From: Beaver B
Duke Energy Corp
To:
Office of Nuclear Reactor Regulation
References
DUK131770042
Download: ML13204A116 (7)


Text

W$POSITION OF THE ORIGINAL DOCUMENT WILL BE TO PRIORITY Normal THE TRANSMITTAL SIGNATURE UNLESS RECIPIENIT IS Date: 06/26113 OTHERWISE IDENTIFIED BELOW Document Transmittal #: DUK131770042

1) 02546 WC LIBRARY - MG01WC
2) 03044 MCG DOC CNTRL MISC MAN MG05DM Duke Energy QA CONDITION [: Yes E No
3) 03379 D E CALDWELL MG01MM OTHER ACKNOWLEDGEMENT REQUIRED N Yes DOCUMENT TRANSMITTAL FORM
4) 03447 DON R MILLER MG01RP IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED, PLEASE
5) 03614 MCG OPS PROCEDURE GP MG010P ACKNOWLEDGE RECEIPT BY RETURNING THIS FORM TO:

REFERENCE

6) 03744 OPS TRNG MGR. MG03OT
7) 03759 U S NUC REG WASHINGTON, DC MCGUIRE NUCLEAR STATION Duke Energy
8) 04809 MCG PLANT ENG. LIBR. MG05SE McGuire
9) 09460 W C SPENCER MG01RP DCRM MGO2DM SELECTED LICENSEE COMMITMENTS
10) 09665 JON HTHOMPSON, USNRC 13225 Hagers Ferry Road MANUAL (SLC) Huntersville, N.C. 28078 RECORD RETENTION # 581188 Rec'd By Page 2 of 2 Date DOCUMENT NO QACOND REV #/ DATE DISTR CODE 1 2 3 4 5 6-7 - 8 9 10 11 12 13 14 15 TOTAL V1 SLC MEMORANDUM [1 pg.] NA 136 05/06/13 MADM-03A X v1 V1 V1 V2 V1i Vi Vi ýVi 24 SLC 16.7.3 [2 pgs.] NA 136 05/06/13 LIST OF EFFECTIVE SECTIONS [3 pgs.] NA 118 05/06/13 REMARKS: PLEASE UPDATE ACCORDINGLY. S D CAPPS REPRO: 3 HOLE PUNCH COPIES VICE PRESIDENT MCGUIRE NUCLEAR STATION RECIPIENT #03044 PREVIOUSLY COMPLETED BY:

BCBEAVER MG01RC BCB/BRG

May 6, 2013 MEMORANDUM To: All McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual Holders

Subject:

McGuire SLC Manual Update Please revise your copy of the manual as follows:

REMOVE INSERT List of Effective Sections (Rev 117) List of Effective Sections (Rev 118)

SLC 16.7.3 (entire section) (Rev 134) SLC 16.7.3 (entire section) (Rev 136)

Revisions may skip numbers due to Regulatory Compliance Filing System.

Please call me if you have questions.

Bonnie Beaver Regulatory Compliance 980-875-4180 I

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION T REVISION NUMBER DATE 16.1 REVISION 32 12/2/02 16.2 REVISION 134 3/6/13 16.3 REVISION 134 3/6/13 16.4 Not Issued 16.5.1 REVISION 115 0308/10 16.5.2 REVISION 0 12/14/99 16.5.3 REVISION 0 12/14/99 16.5.4 REVISION 55 3/23/04 16.5.5 REVISION 0 12/14/99 16.5.6 DELETED - REVISION 120 12/30/10 16.5.7 REVISION 53 1/13/04 16.5.8 REVISION 0 12/14/99 16.5.9 REVISION 108 06/10/09 16.5.10 REVISION 134 3/6/13 16.6.1 REVISION 0 12/14/99 16.6.2 DELETED - REVISION 43 6/11/03 16.6.3 REVISION 134 3/6/13 16.6.4 REVISION 27 06/12/02 16.7.1 REVISION 134 3/6/13 16.7.2 REVISION 134 3/6/13 16.7.3 REVISION 136 4/26/13 16.7.4 REVISION 134 3/6/13 16.7.5 REVISION 134 3/6/13 16.7.6 REVISION 134 3/6/13 16.7.7 REVISION 134 3/6/13 16.7.8 REVISION 134 3/6/13 16.7.9 REVISION 134 3/6/13 16.7.10 REVISION 134 3/6/13 16.7.11 REVISION 134 3/6/13 16.8.1 REVISION 135 3/18/13 16.8.2 REVISION 0 12/14/99 16.8.3 REVISION 121 12/30/10 16.9.1 REVISION 134 3/6/13 16.9.2 REVISION 134 3/6/13 16.9.3 REVISION 134 3/6/13 16.9.4 REVISION 134 3/6/13 16.9.5 REVISION 134 3/6/13 16.9.6 REVISION 134 3/6/13 16.9.7 REVISION 133 12/23/12 16.9.8 REVISION 134 3/6/13 16.9.9 REVISION 101 4/02/08 16.9.10 DELETED - REVISION 13 2/26/01 16.9.11 REVISION 22 2/25/02 16.9.12 REVISION 101 4/02/08 McGuire Units 1 and 2 I Revision 118

SELECTED LICENSEE COMMITMENTS (SLC)

LOES SLCs ARE REVISED PER SECTION SECTION REVISION NUMBER DATE 16.9.13 DELETED - REVISION 13 2/26/01 16.9.14 REVISION 22 2/25/02 16.9.15 REVISION 134 3/6/13 16.9.16 REVISION 111 09/09/09 16.9.17 REVISION 86 1/17/07 16.9.18 REVISION 0 12/14/99 16.9.19 REVISION 134 3/6/13 16.9.20 REVISION 8 11/30/00 16.9.21 REVISION 0 12/14/99 16.9.22 REVISION 109 8/13/09 16.9.23 REVISION 134 3/6/13 16.9.24 DELETED - REVISION 74 6/27/05 16.9.25 REVISION 87 1/17/07 16.10.1 REVISION 56 4/6/04 16.11.1 REVISION 112 2/4/10 16.11.2 REVISION 134 3/6/13 16.11.3 REVISION 0 12/14/99 16.11.4 REVISION 134 3/6/13 16.11.5 REVISION 0 12/14/99 16.11.6 REVISION 112 2/4/10 16.11.7 REVISION 134 3/6/13 16.11.8 REVISION 0 12/14/99 16.11.9 REVISION 0 12/14/99 16.11.10 REVISION 134 3/6/13 16.11.11 REVISION 134 3/6/13 16.11.12 REVISION 67 2/28/05 16.11.13 REVISION 91 3/22/07 16.11.14 REVISION 21 1/17/02 16.11.15 REVISION 21 1/17/02 16.11.16 REVISION 134 3/6/13 16.11.17 REVISION 118 10/19/10 16.11.18 REVISION 0 12/14/99 16.11.19 REVISION 0 12/14/99 16.11.20 REVISION 0 12/14/99 16.12.1 REVISION 0 12/14/99 16.12.2 REVISION 0 12/14/99 16.13.1 REVISION 51 10/1/03 16.13.2 DELETED - REVISION 75 7/20/05 16.13.3 DELETED - REVISION 75 7/20/05 16.13.4 REVISION 134 3/6/13 16.14.1 REVISION 0 12/14/99 16.14.2 REVISION 104 3/18/09 McGuire Units 1 and 2 2 Revision 118

Meteorological Instrumentation 16.7.3 16.7 INSTRUMENTATION 16.7.3 Meteorological Instrumentation COMMITMENT The meteorological monitoring instrumentation channels shown in Table 16.7.3-1 shall be FUNCTIONAL.

APPLICABILITY: At all times.

REMEDIAL ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more required A. 1 Restore non-functional 7 days Meteorological channel(s) to monitoring channels FUNCTIONAL status.

non-functional.

OR A.2 Prepare and submit a 17 days Special Report outlining the cause of the malfunction and plans for restoring the channel(s) to FUNCTIONAL status.

TESTING REQUIREMENTS


NOTE--------------------------------

Refer to Table 16.7.3-1 to determine which TRs apply for each meteorological monitoring instrumentation.

TEST FREQUENCY TR 16.7.3.1 Perform CHANNEL CHECK. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> TR 16.7.3.2 Perform a CHANNEL CALIBRATION. 6 months.

TR 16.7.3.3 Perform a CHANNEL VERIFICATION. Weekly McGuire Units 1 and 2 16.7.3-1 Revision 136

Meteorological Instrumentation 16.7.3 TABLE 16.7.3-1 METEOROLOGICAL MONITORING INSTRUMENTATION INSTRUMENT AND LOCATION REQUIRED TESTING CHANNELS REQUIREMENTS

1. Wind Speed 1.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 1.b Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3
2. Wind Direction 2.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 801.88' TR 16.7.3.2 TR 16.7.3.3 2.b Meteorological Tower Nominal I TR 16.7.3.1 Elev. 964.88' TR 16.7.3.2 TR 16.7.3.3
3. Air Temperature - Delta T 3.a Meteorological Tower Nominal 1 TR 16.7.3.1 Elev. 798.46' - 962.22' TR 16.7.3.2 TR 16.7.3.3 McGuire Units 1 and 2 16.7.3-2 Revision 136

Meteorological Instrumentation 16.7.3 BASES The FUNCTIONALITY of the meteorological instrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.

TESTING REQUIREMENTS CHANNEL CHECK The daily channel check consists of a qualitative assessment, by observation, of each instrument channel's behavior based upon knowledge of current and previous weather conditions. Each channel is verified to have power, indicating on scale, and updating normally.

CHANNEL VERIFICATION The weekly channel verification combines a more extensive channel check with limited calibration checks and parameter adjustments as necessary. Visual inspections, from the ground, of the wind speed cups and directional vanes are also performed.

CHANNEL CALIBRATION The semi-annual channel calibration encompasses the entire channel from the sensors to the data recorders. Each sensor is lowered from the tower, inspected, and replaced if necessary. A full calibration on each processor and data recorder is performed and replaced if necessary.

REFERENCES

1. Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.
2. UFSAR Section 2.3.3.

McGuire Units 1 and 2 16.7.3-3 Revision 136