ML13331A006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/27/2013
| issue date = 11/27/2013
| title = November 2013 Status Update Letter
| title = November 2013 Status Update Letter
| author name = Harris B G
| author name = Harris B
| author affiliation = NRC/OCM
| author affiliation = NRC/OCM
| addressee name = Froehlich W J, Kastenberg W E, Trikouros N G
| addressee name = Froehlich W, Kastenberg W, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000346
| docket = 05000346
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COMMISSIONWASHINGTON, DC 20555 - 0001 November 27, 2013 In the Matter of FirstEnergy Nuclear Operating Co.
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 November 27, 2013 Administrative Judge                              Administrative Judge William J. Froehlich, Chair                      Nicholas G. Trikouros Atomic Safety and Licensing Board                Atomic Safety and Licensing Board Mail Stop: T-3F23                                Mail Stop: T-3F23 Washington, DC 20555-001                          Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.
(Davis-Besse Nuclear Power Station, Unit 1)
(Davis-Besse Nuclear Power Station, Unit 1)
Docket No. 50
Docket No. 50-346-LR
-346-LR   Dear Administrative Judges
:  Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011
("Order")
and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012
. The Staff published the SER on September 3, 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement ("
DSEIS") in January 2014 and the Final SEIS in June 2014.                  Respectfully submitted,


        /signed (electronically) by/
==Dear Administrative Judges:==
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
-15 D21        Washington, DC 20555
-0001        (301) 415
-1392        brian.harris@nrc.gov Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Mail Stop: T
-3F23 Washington, DC 20555
-001  Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Mail Stop: T
-3F23 Washington, DC 20555
-0001  Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T
-3F23 Washington, DC 20555
-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
    )        )  FIRSTENERGY NUCLEAR OPERATING CO.
  )  Docket No.
50-346-LRA ) (Davis-Besse Nuclear Power Station, Unit 1)
)          )  CERTIFICATE OF SERVICE


Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the November 27
Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement (DSEIS) in January 2014 and the Final SEIS in June 2014.
, 2013 Letter from Brian G. Harris to the Board
Respectfully submitted,
, in the above
                                                    /signed (electronically) by/
-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov
-Filing System, in the above captioned proceeding, this 27th day of November, 2013.
 
Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
-15 D21       Washington, DC 20555
                                                    )
-0001       (301) 415
FIRSTENERGY NUCLEAR OPERATING CO.                    )      Docket No. 50-346-LRA
-1392 brian.harris@nrc.gov}}
                                                    )
(Davis-Besse Nuclear Power Station, Unit 1)          )
                                                    )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the November 27, 2013 Letter from Brian G. Harris to the Board, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 27th day of November, 2013.
Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov}}

Latest revision as of 11:52, 4 November 2019

November 2013 Status Update Letter
ML13331A006
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/27/2013
From: Harris B
NRC/OCM
To: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-346-LR, ASLBP 11-907-01-LR-BD01, RAS 25353
Download: ML13331A006 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 November 27, 2013 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.

(Davis-Besse Nuclear Power Station, Unit 1)

Docket No. 50-346-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff currently anticipates publication of the Draft Supplemental Environmental Impact Statement (DSEIS) in January 2014 and the Final SEIS in June 2014.

Respectfully submitted,

/signed (electronically) by/

Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the November 27, 2013 Letter from Brian G. Harris to the Board, in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 27th day of November, 2013.

Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov