{{#Wiki_filter:JPM a OPERATOR: ________________________________
{{#Wiki_filter:JPM a OPERATOR: ________________________________
RO         SRO           DATE:
RO           SRO                   DATE:
JPM NUMBER: a- ALTERNATE PATH TASK NUMBER: U-085-AB-03 TASK TITLE:
JPM NUMBER:         a- ALTERNATE PATH TASK NUMBER:         U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K/A NUMBER: 201001 A2.01                   K/A RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
CRD Pump Trip at <900 psig Reactor Pressure
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-85 and 2-AOI-85-3 VALIDATION TIME: 15 minutes PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
K/A NUMBER:
201001 A2.01   K/A RATING: RO 3.2 SRO 3.3 TASK STANDARD:
Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRMs to prevent a full scram signal , and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-85 and 2-AOI-85-3 VALIDATION TIME:   15 minutes
 
PERFORMANCE TIME:
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____            UNSATISFACTORY ____
SIGNATURE: __________________________              DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS:
___  NO ___
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
RESULTS: SATISFACTORY
INITIATING CUE:
____ UNSATISFACTORY
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER 


INITIAL CONDITIONS:  You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38
JPM a
-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.   
*******************************************************************************
 
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIATING CUE:  The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30
*******************************************************************************
-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
INITIAL CONDITIONS:
 
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
JPM a *******************************************************************************
INITIATING CUE:
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
NRC Examiner: Steps 1 through 5 are for single notch withdrawal, steps 6 through 15 are for continuous withdrawal.
3


JPM a START TIME
*******************************************************************************
*******************************************************************************
 
Performance Step 1:                                             Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal
INITIAL CONDITIONS:  You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38
[1]   SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.   
Standard:
 
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
INITIATING CUE:  The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30
SAT     UNSAT      N/A     COMMENTS:
-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
 
NRC Examiner: Steps 1 through 5 are for single notch withdraw al, steps 6 through 15 are for continuous withdrawal
.
JPM a  4  START TIME           
*******************************************************************************
Performance Step 1:       Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40. Standard:   Selects Control Rod 30-35 by depressing 30-35 pus hbutton. SAT     UNSAT      N/A       COMMENTS:                      
 
*****************************************************************************
*****************************************************************************
Performance Step 2:                                              Critical Not Critical X
[2]    OBSERVE the following for selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
* White light on the Full Core Display ILLUMINATED.
* Rod Out Permit light ILLUMINATED.
Standard:
Observes the above indications.
SAT    UNSAT      N/A      COMMENTS:
4


Performance Step 2:       Critical    Not Critical [2] OBSERVE the following for selected control rod:  
JPM a
****************************************************************************
Performance Step 3:                                               Critical Not Critical X
[3]   VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:
Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.
SAT    UNSAT        N/A    COMMENTS:
*******************************************************************************
Performance Step 4:                                              Critical X Not Critical
[4]    PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[5]   OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Withdraws control rod 30-35.
SAT    UNSAT        N/A    COMMENTS:
5


CRD ROD SELECT pushbutton is brightly ILLUMINATED.
JPM a
White light on the Full Core Display ILLUMINATED. Rod Out Permit light ILLUMINATED.
*******************************************************************************
Performance Step 5:                                                Critical X Not Critical
[6]    IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
[6.1]  PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[6.2]  CHECK control rod coupled by observing the following:
* Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.
* CONTROL ROD OVERTRAVEL annunciator( 2-XA-55-5A, Window 14), does NOT alarm.
[6.3]  CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
Standard:
Standard:
Observes the above indications. SAT      UNSAT      N/A      COMMENTS:                       
If Control Rod is withdrawn to position 48, performs a coupling check.
 
SAT     UNSAT       N/A     COMMENTS:
JPM a  5  ****************************************************************************
6
Performance Step 3:      Critical    Not Critical X  [3]  VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:  Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.
SAT     UNSAT       N/A       COMMENTS:                      


JPM a
*******************************************************************************
*******************************************************************************
 
Performance Step 6:                                                   Critical X Not Critical 6.6.4 Continuous Rod Withdrawal NOTES
Performance Step 4:       Critical X Not Critical
: 1)    Continuous control rod withdrawal may be used when a control rod is to be withdrawn greater than three notches.
[4]  PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and  RELEASE.
: 2)    When in areas of high notch worth, single notch withdrawal should be used instead of continuous rod withdrawal. Information concerning high notch worth is identified by Reactor Engineering in Control Rod Coupling Integrity Check, 2-SR-3.1.3.5A.
[5]  OBSERVE the control rod settles into the desired position and the ROD SETTLE light  extinguishes.
: 3)    When continuously withdrawing a control rod to a position other than position 48 the CRD Notch Override Switch is held in the Override position and then the CRD Control.
Switch is held in the Rod Out Notch position
* Both switches should be released when the control rod reaches two notches prior to its intended position.
(Example: If a control rod is to be withdrawn from position 00 to position 12, the CRD Notch Override Switch and the CRD Control Switch would be used to move the control rod until reaching position 08, then both switches would be released.)
* If the rod settles in a notch prior to the intended position, the CRD Control Switch should be used to withdraw the rod to the intended position.
(using the above example; If the control rod settles at a notch prior to the intended position of 12, the CRD Control Switch would be used to withdraw the control rod to position 12.
[1]    SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.
Standard:
Standard:
Withdraws control rod 30-35. SAT     UNSAT       N/A       COMMENTS:                      
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
SAT     UNSAT         N/A     COMMENTS:
7


JPM a 6  *******************************************************************************
JPM a
Performance Step 5:       Critical Not Critical
*****************************************************************************
[6] IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
Performance Step 7:                                               Critical Not Critical X
[6.1]  PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[2]   OBSERVE the following for selected control rod:
[6.2]  CHECK control rod coupled by observing the following:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
Four rod display digital readout AND the full core s display digital readout AND background light remain illuminated.
* White light on the Full Core Display ILLUMINATED.
CONTROL ROD OVERTRAVEL annunciator( 2-XA-55-5A, Window    14), does NOT alarm.  [6.3]  CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
* Rod Out Permit light ILLUMINATED.
Standard:
Standard:
If Control Rod is withdrawn to position 48 , performs a coupling check. SAT     UNSAT      N/A       COMMENTS:
Observes the above indications.
JPM a  7  *******************************************************************************
SAT     UNSAT      N/A     COMMENTS:
Performance Step 6:       Critical Not Critical 6.6.4 Continuous Rod Withdrawal NOTES 1)  Continuous control rod withdrawal may be used when a control rod is to be withdrawn greater than three notches.
****************************************************************************
: 2)  When in areas of high notch worth, single notch withdrawal should be used instead of continuous rod withdrawal. Information concerning high notch worth is identified by Reactor Engineering in Control Rod Coupling Integrity Check, 2-SR-3.1.3.5A. 3)  When continuously withdrawing a control rod to a position other than position 48 the CRD Notch Override Switch is held in the Override position and then the CRD Control.
Performance Step 8:                                               Critical Not Critical X
Switch is held in the Rod Out Notch position Both switches should be released when the control rod reaches two notches prior to its intended position.
[3]    VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
(Example: If a control rod is to be withdrawn from position 00 to position 12, the CRD Notch Override Switch and the CRD Control Switch would be used to move the control rod until reaching position 08, then both switches would be released.)  If the rod settles in a notch prior to the intended position, the CRD Control Switch should be used to withdraw the rod to the intended position. (using the above example; If the control rod settles at a notch prior to the intended position of 12, the CRD Control Switch would be used to withdraw the control rod to position 12.
[1]  SELECT the desired control rod by depressing the appropriate CRD ROD SELECT  pushbutton, 2-XS-85-40. Standard:  Selects Control Rod 30
-35 by depressing 30
-35 pushbutton
. SAT      UNSAT      N/A      COMMENTS:                       
 
JPM a  8  *****************************************************************************
Performance Step 7:      Critical    Not Critical X  [2]  OBSERVE the following for selected control rod:
 
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
White light on the Full Core Display ILLUMINATED.
Rod Out Permit light ILLUMINATED.
Standard:
Standard:
Observes the above indications. SAT     UNSAT      N/A       COMMENTS:                      
Verifies Rod Worth Minimizer responded correctly.
SAT     UNSAT      N/A     COMMENTS:
****************************************************************************
****************************************************************************
Performance Step 9:                                                Critical Not Critical X
[4]    VERIFY Control Rod is being withdrawn to a position greater than three notches.
Standard:
Verifies Control Rod 30-35 is going from position 16 to 48.
SAT    UNSAT      N/A      COMMENTS:
8


Performance Step 8:      Critical    Not Critical X  [3]  VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
JPM a
Standard:  Verifies Rod Worth Minimizer responded correctly.
SAT      UNSAT      N/A      COMMENTS:                       
****************************************************************************
****************************************************************************
Performance Step 10:                                              Critical Not Critical X
[5]    IF withdrawing the control rod to a position other than 48, THEN PERFORM the following: (Otherwise N/A)
Standard:
Step is NA.
SAT    UNSAT      N/A    COMMENTS:
9


Performance Step 9:      Critical    Not Critical X  [4]  VERIFY Control Rod is being withdrawn to a position greater than three notches.
JPM a
Standard:  Verifies Control Rod 30
*******************************************************************************
-35 is going from position 16 to 48.
Performance Step 11:                                                 Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
SAT      UNSAT      N/A      COMMENTS:
: 1)     Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
JPM a 9  ****************************************************************************
: 2)     Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].
Performance Step 10:      Critical    Not Critical X  [5]  IF withdrawing the control rod to a position other than "48", THEN PERFORM the following: (Otherwise N/A)
[6]     IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
Standard:  Step is NA. SAT      UNSAT      N/A      COMMENTS:
JPM a  10  *******************************************************************************
Performance Step 11:       Critical X Not Critical
 
NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
: 1) Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7]. 2) Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].
[6] IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
[6.1]  PLACE and HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
[6.1]  PLACE and HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
[6.2]  PLACE and HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH. Standard: Continuously withdraws Control Rod 30
[6.2]  PLACE and HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.
-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
Standard:
SAT      UNSAT      N/A       COMMENTS:
Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
CUE: If required, have operator take the actions of 2
SAT      UNSAT      N/A     COMMENTS:
-AOI-85-3 CRD System Failure.
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
Driver: At direction of Evaluator, after or during withdraw of control rod 30
CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.
-35, trip operating CRD Pump.
10


JPM a 11  *******************************************************************************
JPM a
Performance Step 12:       Critical X Not Critical
*******************************************************************************
[6.3] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
Performance Step 12:                                               Critical X Not Critical
[6.4] CHECK control rod coupled by observing the following:
[6.3]   MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
Four rod display digital readout AND full core display digital readout AND background light remain illuminated.
[6.4]   CHECK control rod coupled by observing the following:
CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window 14) does NOT alarm.   [6.5]  RELEASE both CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.   [6.6] CHECK control rod settles into position 48 and ROD SETTLE light e xtinguishes. Standard: If control rod is withdrawn to position 48, performs a coupling check.
* Four rod display digital readout AND full core display digital readout AND background light remain illuminated.
SAT     UNSAT       N/A       COMMENTS:                      
* CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window
: 14) does NOT alarm.
[6.5]  RELEASE both CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.
[6.6]   CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A     COMMENTS:
11


JPM a 12  *******************************************************************************
JPM a
Performance Step 13:       Critical X Not Critical
*******************************************************************************
 
Performance Step 13:                                               Critical X Not Critical
[7] IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48 are to be released.
[7]   IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
[7.1]   PLACE AND HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
[7.1] PLACE AND HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.
[7.2]   PLACE AND HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.
[7.2] PLACE AND HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH. Standard: Continuously withdraws Control Rod 30
Standard:
-35 by holding switch, 2-HS-85-47, in Notch Override and , 2-HS-85-48, in Rod Out Notch.
Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.
SAT     UNSAT       N/A       COMMENTS:
SAT     UNSAT       N/A     COMMENTS:
CUE:  If required, have operator take the actions of 2
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
-AOI-85-3 CRD System Failure.
CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.
Driver: At direction of Evaluator, after or during withdraw of control rod 30
12
-35, trip operating               CRD Pump.  
 
JPM a  13  *******************************************************************************
Performance Step 14:       Critical    Not Critical X  [7.3]  WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.    [7.4]  VERIFY control rod settles into position 48.
Standard:  Stops withdraw of Control Rod 30
-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
 
SAT      UNSAT      N/A      COMMENTS:                       


JPM a
*******************************************************************************
Performance Step 14:                                                Critical Not Critical X
[7.3]    WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.
[7.4]    VERIFY control rod settles into position 48.
Standard:
Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
SAT      UNSAT        N/A    COMMENTS:
*******************************************************************************
*******************************************************************************
Performance Step 15:                                                Critical X Not Critical
[7.5]    PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[7.6]    CHECK control rod coupled by observing the following:
* Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
* CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window
: 14) does NOT alarm.
[7.7]    CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
SAT      UNSAT        N/A    COMMENTS:
13


Performance Step 15:      Critical X  Not Critical
JPM a
[7.5]  PLACE CRD CONTROL SWITCH, 2
****************************************************************************
-HS-85-48, in ROD OUT NOTCH, and RELEASE.  [7.6]  CHECK control rod coupled by observing the following:
Performance Step 16:                                               Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 90/125.
Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
Note: the High-High of 116.4/125 will produce a scram signal.
CONTROL ROD OVERTRAVEL annunciator (2-XA-55-5A, Window 14) does NOT alarm.  [7.7]  CHECK control rod settles into position 48 and ROD SETTLE light extinguishes. Standard:  If control rod is withdrawn to position 48, performs a coupling check.
Standard:
SAT      UNSAT      N/A      COMMENTS:                       
Ranges IRMs to clear or prevent a Rod Block signal.
 
Note: A Full Scram signal from IRMs while withdrawing control rods will be a failure.
JPM a  14  ****************************************************************************
SAT     UNSAT       N/A     COMMENTS:
 
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
Performance Step 16:       Critical X Not Critical
 
Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 90/125.
Note: the High
-High of 116.4/125 will produce a scram signal. Standard:
Ranges IRMs to clear or prevent a Rod Block signal. Note: A Full Scram signal from IRMs while withdrawing control rods will be a failure.
SAT     UNSAT       N/A       COMMENTS:                      
 
Driver: At direction of Evaluator, after or during withdraw of control rod 30
-35, trip operating CRD Pump.
CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.
CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.
14


JPM a 15  ******************************************************************************
JPM a
Performance Step 17:       Critical   Not Critical X 4.1 Immediate Actions
******************************************************************************
[1] IF operating CRD PUMP has failed AND standby CRD Pump is available, THEN PERFORM the following at Panel 2-9-5:   [1.1] PLACE CRD SYSTEM FLOW CONTROL, 2-FIC-85-11, in MAN at minimum setting.
Performance Step 17:                                             Critical Not Critical X 4.1 Immediate Actions
Standard:   Places CRD System Flow Control in Manual and at Minimum setting. SAT     UNSAT      N/A      COMMENTS:                      
[1]   IF operating CRD PUMP has failed AND standby CRD Pump is available, THEN PERFORM the following at Panel 2-9-5:
[1.1]   PLACE CRD SYSTEM FLOW CONTROL, 2-FIC-85-11, in MAN at minimum setting.
Standard:
Places CRD System Flow Control in Manual and at Minimum setting.
SAT     UNSAT      N/A      COMMENTS:
******************************************************************************
Performance Step 18:                                            Critical Not Critical X
[1.2]  START associated standby CRD Pump using one of the following:
* CRD Pump 1B, using 2-HS-85-2A
* CRD Pump 2A, using 2-HS-85-1A Standard:
Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.
SAT    UNSAT      N/A      COMMENTS:
15


JPM a
******************************************************************************
******************************************************************************
Performance Step 9:                                                Critical X Not Critical
[2]      IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:
* In-service CRD Pump tripped and neither CRD Pump can be started, OR
* Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
[2.1]  MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
Standard:
Insert a Manual Scram and places Mode Switch in Shutdown.
SAT    UNSAT        N/A      COMMENTS:
CUE: After Scram report another operator will continue in 2-AOI-100-1.
END OF TASK STOP TIME 16


Performance Step 18:      Critical    Not Critical X  [1.2]  START associated standby CRD Pump using one of the following:
JPM a OPERATOR: ________________________________
1B, using 2-HS-85-2A 2A, using 2-HS-85-1A  Standard:
RO           SRO                   DATE:
Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump. SAT      UNSAT      N/A      COMMENTS:                       
JPM NUMBER:         a- ALTERNATE PATH TASK NUMBER:         U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K/A NUMBER: 201001 A2.01                   K/A RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
 
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-85 and 3-AOI-85-3 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
JPM a 16  ******************************************************************************
Performance Step 9:      Critical X  Not Critical
[2]  IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:  In-service CRD Pump tripped and neither CRD Pump can be started, OR  Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
[2.1]  MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
Standard:  Insert a Manual Scram and places Mode Switch in Shutdown. SAT      UNSAT      N/A      COMMENTS:                       
 
END OF TASK STOP TIME CUE: After Scram report another operator will continue in 2
-AOI-100-1.
JPM a  1  OPERATOR: ________________________________
RO         SRO           DATE:
JPM NUMBER: a- ALTERNATE PATH TASK NUMBER: U-085-AB-03 TASK TITLE:
CRD Pump Trip at <900 psig Reactor Pressure
 
K/A NUMBER:
201001 A2.01 K/A RATING: RO 3.2 SRO 3.3 TASK STANDARD:
Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-85 and 3-AOI-85-3 VALIDATION TIME:
15 minutes
 
MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
 
PERFORMANCE TIME:
PERFORMANCE TIME:
COMMENTS:
COMMENTS: __________________________________________________________
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____            UNSATISFACTORY ____
SIGNATURE: __________________________              DATE: __________
EXAMINER 1


Additional comment sheets attached?
INITIAL CONDITIONS:
YES ___  NO ___
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
RESULTS: SATISFACTORY
INITIATING CUE:
____ UNSATISFACTORY
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER INITIAL CONDITIONS:   You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38
-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.  


INITIATING CUE:  The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdraw al of group 12 and then continue with group 13.
JPM a
 
*******************************************************************************
JPM a *******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
INITIAL CONDITIONS:
You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.
INITIATING CUE:
The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.
NRC Examiner: Steps 1 through 5 are for single notch withdrawal, steps 6 through 15 are for continuous withdrawal.
3


JPM a START TIME
*******************************************************************************
*******************************************************************************
 
Performance Step 1:                                             Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal
INITIAL CONDITIONS:  You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38
[1]   SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.   
Standard:
 
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
INITIATING CUE:  The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30
SAT     UNSAT      N/A     COMMENTS:
-35. Rod Out Notch Override is authorized, complete the withdraw al of group 12 and then continue with group 13.
 
NRC Examiner: Steps 1 through 5 are for single notch withdraw al, steps 6 through 15 are for continuous withdrawal.
JPM  a  4  START TIME           
*******************************************************************************
Performance Step 1:       Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal
[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40. Standard:   Selects Control Rod 30-35 by depressing 30-35 pus hbutton. SAT     UNSAT      N/A       COMMENTS:                      
 
*****************************************************************************
*****************************************************************************
Performance Step 2:                                              Critical Not Critical X
[2]    OBSERVE the following for selected control rod:
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
* White light on the Full Core Display ILLUMINATED.
* Rod Out Permit light ILLUMINATED.
Standard:
Observes the above indications.
SAT    UNSAT      N/A      COMMENTS:
4


Performance Step 2:       Critical   Not Critical X [2] OBSERVE the following for selected control rod:
JPM a
 
****************************************************************************
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
Performance Step 3:                                                 Critical Not Critical X
White light on the Full Core Display ILLUMINATED.
[3]   VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Rod Out Permit light ILLUMINATED.
Standard:
Standard:
Observes the above indications. SAT      UNSAT      N/A      COMMENTS:                       
Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.
 
SAT     UNSAT         N/A     COMMENTS:
JPM  a  5  ****************************************************************************
*******************************************************************************
Performance Step 3:      Critical    Not Critical X  [3]  VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Performance Step 4:                                                 Critical X Not Critical
Standard:  Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.
[4]   PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
SAT     UNSAT       N/A       COMMENTS:                      
[5]   OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
*******************************************************************************
 
Performance Step 4:       Critical X Not Critical
[4] PLACE CRD CONTROL SWITCH, 3
-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.
Standard:
Standard:
Withdraws control rod 30-3 5. SAT     UNSAT       N/A       COMMENTS:
Withdraws control rod 30-35.
Driver: At direction of Evaluator, after or during withdraw of control rod 30
SAT     UNSAT         N/A     COMMENTS:
-35, trip operating CRD Pump.
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
CUE: If required, have operator take the actions of 3
CUE: If required, have operator take the actions of 3-AOI-85-3 CRD System Failure.
-AOI-85-3 CRD System Failure.
5


JPM a *******************************************************************************
JPM a
Performance Step 5:       Critical X Not Critical
*******************************************************************************
[6] IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
Performance Step 5:                                                 Critical X Not Critical
[6.1] PLACE CRD CONTROL SWITCH, 3
[6]   IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:
-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[6.1]   PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[6.2] CHECK control rod coupled by observing the following:
[6.2]   CHECK control rod coupled by observing the following:
Four rod display digital readout AND the full core s display digital readout AND background light remain illuminated.
* Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.
CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window     14, does NOT alarm.   [6.3] CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
* CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.
[6.3]   CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.
Standard:
Standard:
If Control Rod is withdrawn to position 48, performs a coupling check.
If Control Rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A       COMMENTS:                      
SAT     UNSAT       N/A     COMMENTS:
6


JPM a *******************************************************************************
JPM a
Performance Step 6:       Critical X Not Critical 6.6.4 Continuous Rod Withdrawal NOTES 1) Continuous control rod withdrawal may be used when a control rod is to be withdrawn greater than three notches.
*******************************************************************************
: 2) When in areas of high notch worth, single notch withdrawal should be used instead of continuous rod withdrawal. Information concerning high notch worth is identified by Reactor Engineering in Control Rod Coupling Integrity Check, 3-SR-3.1.3.5A. 3) When continuously withdrawing a control rod, the CRD Notch Override Switch is held in the Override position and the CRD Control Switch is held in the Rod Out Notch position. When the control rod reaches two notches below its intended position, both switches should be released.
Performance Step 6:                                                   Critical X Not Critical 6.6.4 Continuous Rod Withdrawal NOTES
If the rod settles in a notch below the intended position, the CRD Control Switch should be used to withdraw the rod to the intended position. EXAMPLE: If a control rod is to be withdrawn from position 00 to position 12, the CRD Notch Override Switch and the CRD Control Switch would be used to move the control rod until reaching position 08, then both switches would be released. If the control rod settles at a notch below the intended position of 12, the  
: 1)     Continuous control rod withdrawal may be used when a control rod is to be withdrawn greater than three notches.
: 2)     When in areas of high notch worth, single notch withdrawal should be used instead of continuous rod withdrawal. Information concerning high notch worth is identified by Reactor Engineering in Control Rod Coupling Integrity Check, 3-SR-3.1.3.5A.
: 3)     When continuously withdrawing a control rod, the CRD Notch Override Switch is held in the Override position and the CRD Control Switch is held in the Rod Out Notch position.
* When the control rod reaches two notches below its intended position, both switches should be released.
* If the rod settles in a notch below the intended position, the CRD Control Switch should be used to withdraw the rod to the intended position.
* EXAMPLE: If a control rod is to be withdrawn from position 00 to position 12, the CRD Notch Override Switch and the CRD Control Switch would be used to move the control rod until reaching position 08, then both switches would be released. If the control rod settles at a notch below the intended position of 12, the CRD Control Switch would be used to withdraw the control rod to position 12.
[1]    SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.
Standard:
Selects Control Rod 30-35 by depressing 30-35 pushbutton.
SAT    UNSAT        N/A      COMMENTS:
7


CRD Control Switch would be used to withdraw the control rod to position 12.
JPM a
[1]  SELECT the desired control rod by depressing the appropriate CRD ROD SELECT  pushbutton, 3-XS-85-40. Standard:  Selects Control Rod 30
*****************************************************************************
-35 by depressing 30
Performance Step 7:                                               Critical Not Critical X
-35 pushbutton
[2]   OBSERVE the following for selected control rod:
. SAT      UNSAT      N/A      COMMENTS:                       
* CRD ROD SELECT pushbutton is brightly ILLUMINATED.
 
* White light on the Full Core Display ILLUMINATED.
JPM a *****************************************************************************
* Rod Out Permit light ILLUMINATED.
Performance Step 7:       Critical   Not Critical X [2] OBSERVE the following for selected control rod:  
Standard:
 
Observes the above indications.
CRD ROD SELECT pushbutton is brightly ILLUMINATED.
SAT    UNSAT      N/A      COMMENTS:
White light on the Full Core Display ILLUMINATED.
****************************************************************************
Rod Out Permit light ILLUMINATED.
Performance Step 8:                                                Critical Not Critical X
[3]    VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
Standard:
Standard:
Observes the above indications. SAT     UNSAT      N/A       COMMENTS:                      
Verifies Rod Worth Minimizer responded correctly.
SAT     UNSAT      N/A     COMMENTS:
****************************************************************************
****************************************************************************
Performance Step 9:                                                Critical Not Critical X
[4]    VERIFY Control Rod is being withdrawn to a position greater than three notches.
Standard:
Verifies Control Rod 30-35 is going from position 16 to 48.
SAT    UNSAT      N/A      COMMENTS:
8


Performance Step 8:      Critical    Not Critical X  [3]  VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.
JPM a
Standard:  Verifies Rod Worth Minimizer responded correctly.
SAT      UNSAT      N/A      COMMENTS:                       
****************************************************************************
****************************************************************************
Performance Step 10:                                              Critical Not Critical X
[5]    IF withdrawing the control rod to a position other than 48, THEN PERFORM the following: (Otherwise N/A)
Standard:
Step is NA.
SAT    UNSAT      N/A    COMMENTS:
9


Performance Step 9:      Critical    Not Critical X  [4]  VERIFY Control Rod is being withdrawn to a position greater than three notches.
JPM a
Standard:  Verifies Control Rod 30
*******************************************************************************
-35 is going from position 16 to 48.
Performance Step 11:                                                 Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
SAT      UNSAT      N/A      COMMENTS:
: 1)     Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
JPM a  9  ****************************************************************************
: 2)     Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].
Performance Step 10:      Critical    Not Critical X  [5]  IF withdrawing the control rod to a position other than "48", THEN PERFORM the following: (Otherwise N/A)
[6]     IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
Standard:  Step is NA. SAT      UNSAT      N/A      COMMENTS:
JPM  a  10  *******************************************************************************
Performance Step 11:       Critical X Not Critical
 
NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:
: 1) Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7]. 2) Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].
[6] IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)
[6.1]  PLACE and HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
[6.1]  PLACE and HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
[6.2]  PLACE and HOL D CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH. Standard: Continuously withdraws Control Rod 30
[6.2]  PLACE and HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.
-35 by holding switch, 3-HS-85-47, in Notch Override and, 3-HS-85-48, in Rod Out Notch.
Standard:
SAT      UNSAT      N/A       COMMENTS:
Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and, 3-HS-85-48, in Rod Out Notch.
CUE: If required
SAT      UNSAT      N/A     COMMENTS:
, have operator take the actions of 3
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
-AOI-85-3 CRD System Failure.
CUE: If required, have operator take the actions of 3-AOI-85-3 CRD System Failure.
Driver: At direction of Evaluator, after or during withdraw of control rod 30
10
-35, trip operating CRD Pump.


JPM a 11  *******************************************************************************
JPM a
Performance Step 12:       Critical X Not Critical
*******************************************************************************
[6.3] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
Performance Step 12:                                               Critical X Not Critical
[6.4] CHECK control rod coupled by observing the following:
[6.3]   MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.
Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.
[6.4]   CHECK control rod coupled by observing the following:
CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.   [6.5]  RELEASE both CRD NOTCH OVERRIDE, 3
* Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.
-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.   [6.6] CHECK control rod settles into position 48 and ROD SETTLE light e xtinguishes. Standard: If control rod is withdrawn to position 48, performs a coupling check. SAT     UNSAT       N/A       COMMENTS:                      
* CONTROL ROD OVERTRAVEL annunciator, 3-XA-55-5A, Window 14, does NOT alarm.
[6.5]  RELEASE both CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.
[6.6]   CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
SAT     UNSAT       N/A     COMMENTS:
11


JPM a 12  *******************************************************************************
JPM a
Performance Step 13:       Critical X Not Critical
*******************************************************************************
 
Performance Step 13:                                               Critical X Not Critical
[7] IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 3
[7]   IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
-HS-85-47, and CRD CONTROL SWITCH , 3-HS-85-48 are to be released.
[7.1]   PLACE AND HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):
[7.2]   PLACE AND HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.
[7.1] PLACE AND HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.
Standard:
[7.2] PLACE AND HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH. Standard: Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and 3-HS-85-48, in Rod Out Notch.
Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and 3-HS-85-48, in Rod Out Notch.
SAT     UNSAT       N/A       COMMENTS:
SAT     UNSAT       N/A     COMMENTS:
CUE:  If required ,  have operator take the actions of 3
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
-AOI-85-3 CRD System Failure.
CUE: If required, have operator take the actions of 3-AOI-85-3 CRD System Failure.
Driver: At direction of Evaluator, after or during withdraw of control rod 30
12
-35, trip operating               CRD Pump.  
 
JPM  a  13  *******************************************************************************
Performance Step 14:       Critical    Not Critical X  [7.3]  WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3
-HS-85-48.    [7.4]  VERIFY control rod settles into position 48.
Standard:  Stops withdraw of Control Rod 30
-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
 
SAT      UNSAT      N/A      COMMENTS:                       


JPM a
*******************************************************************************
Performance Step 14:                                                Critical Not Critical X
[7.3]    WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.
[7.4]    VERIFY control rod settles into position 48.
Standard:
Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.
SAT      UNSAT        N/A    COMMENTS:
*******************************************************************************
*******************************************************************************
Performance Step 15:                                                Critical X Not Critical
[7.5]    PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.
[7.6]    CHECK control rod coupled by observing the following:
* Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
* CONTROL ROD OVERTRAVEL annunciator (3-XA-55-5A, Window
: 14) does NOT alarm.
[7.7]    CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.
Standard:
If control rod is withdrawn to position 48, performs a coupling check.
SAT      UNSAT        N/A    COMMENTS:
13


Performance Step 15:       Critical X Not Critical [7.5]  PLACE CRD CONTROL SWITCH, 3
JPM a
-HS-85-48, in ROD OUT NOTCH, and RELEASE.  [7.6]  CHECK control rod coupled by observing the following:
****************************************************************************
Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
Performance Step 16:                                               Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 104.6/125.
CONTROL ROD OVERTRAVEL annunciator (3-XA-55-5A, Window 14) does NOT alarm. [7.7]  CHECK control rod settles into position 48 and ROD SETTLE light extinguishes. Standard: If control rod is withdrawn to position 48, performs a coupling check.
Note: the High-High of 116.4/125 will produce a scram signal.
SAT      UNSAT       N/A       COMMENTS:                      
Standard:
Ranges IRMs to clear or prevent a Rod Block signal.
Note: A Full Scram signal from IRMs while withdrawing control rods will be a failure.
SAT      UNSAT       N/A     COMMENTS:
Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.
CUE: If required , have operator take the actions of 3-AOI-85-3 CRD System Failure.
14


JPM a 14  ****************************************************************************
JPM a
Performance Step 16:       Critical Not Critical
******************************************************************************
 
Performance Step 17:                                             Critical Not Critical X 4.1 Immediate Actions
Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 104.6/1 25.
[1]    IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 3-9-5:
Note: the High
[1.1]  PLACE CRD SYSTEM FLOW CONTROL, 3-FIC-85-11, in MAN at minimum setting.
-High of 116.4/125 will produce a scram signal. Standard:
Standard:
Ranges IRMs to clear or prevent a Rod Block signal. Note: A Full Scram signal from IRMs while withdrawing control rods will be a failure.
Places CRD System Flow Control in Manual and at Minimum setting.
SAT     UNSAT      N/A      COMMENTS:                      
SAT     UNSAT      N/A      COMMENTS:
 
******************************************************************************
Driver: At direction of Evaluator, after or during withdraw of control rod 30
Performance Step 18:                                             Critical Not Critical X
-35, trip operating CRD Pump.
[1.2]   START associated standby CRD Pump using one of the following:
CUE: If required , have operator take the actions of 3
* CRD Pump 3B, using 3-HS-85-2A
-AOI-85-3 CRD System Failure.
* CRD Pump 3A, using 3-HS-85-1A Standard:
 
Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.
JPM  a  15  ******************************************************************************
SAT     UNSAT      N/A      COMMENTS:
Performance Step 17:       Critical   Not Critical X 4.1 Immediate Actions
15
[1] IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 3-9-5:  [1.1]  PLACE CRD SYSTEM FLOW CONTROL, 3-FIC-85-11, in MAN at minimum setting.
Standard:   Places CRD System Flow Control in Manual and at Minimum setting. SAT     UNSAT      N/A      COMMENTS:                      


JPM a
******************************************************************************
******************************************************************************
Performance Step 19:                                                Critical X Not Critical
[2]      IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:
* In-service CRD Pump tripped and neither CRD Pump can be started, OR
* Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
[2.1]  MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
Standard:
Insert a Manual Scram and places Mode Switch in Shutdown.
SAT    UNSAT        N/A      COMMENTS:
CUE: After Scram report another operator will continue in 3-AOI-100-1.
END OF TASK STOP TIME 16


Performance Step 18:      Critical    Not Critical X  [1.2]  START associated standby CRD Pump using one of the following:
JPM b OPERATOR: ________________________________
CRD Pump 3B, using 3-HS-85-2A -HS-85-1A    Standard:
RO           SRO                   DATE:
Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump. SAT      UNSAT      N/A      COMMENTS:                       
JPM NUMBER:         b- ALTERNATE PATH TASK NUMBER:         U-003-AL-01 TASK TITLE:         Remove RFPT A from Service K/A NUMBER:         259001 A4.04         K/A RATING: RO 3.1 SRO 2.9 PRA:
 
TASK STANDARD: Removes RFPT A from service, trips RFPT A and closes discharge valve LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-3 VALIDATION TIME: 20 minutes PERFORMANCE TIME:
JPM a  16  ******************************************************************************
COMMENTS: __________________________________________________________
Performance Step 19:      Critical X  Not Critical
[2]  IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:  In-service CRD Pump tripped and neither CRD Pump can be started, OR  Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:
[2.1]  MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.
Standard:  Insert a Manual Scram and places Mode Switch in Shutdown. SAT      UNSAT      N/A      COMMENTS:                       
 
END OF TASK STOP TIME CUE: After Scram report another operator will continue in 3
-AOI-100-1.
JPM  b 1
OPERATOR: ________________________________
RO         SRO           DATE:
JPM NUMBER: b- ALTERNATE PATH TASK NUMBER: U-003-AL-01 TASK TITLE: Remove RFPT 'A' from Service K/A NUMBER:
259001 A4.04   K/A RATING: RO 3.1   SRO 2.9 PRA:
TASK STANDARD:
Removes RFPT A from service, trips RFPT A and closes discharge valve
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-3 VALIDATION TIME:
20 minutes PERFORMANCE TIME:
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________          DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 2A.
___  NO ___
RFPT 2A needs to removed from service.
RESULTS: SATISFACTORY
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 2A from service in accordance with 2-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.
____ UNSATISFACTORY
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER 


INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 2A. RFPT 2A needs to removed from service.
JPM b
 
*******************************************************************************
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 2A from service in accordance with 2-OI-3, Reactor Feedwater System section 7
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
.1. Precautions and Limitations have been reviewed.
*******************************************************************************
 
INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 2A.
JPM b *******************************************************************************
RFPT 2A needs to removed from service.
IN-SIMULATOR:
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 2A from service in accordance with 2-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.
I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
3


JPM b START TIME
*******************************************************************************
*******************************************************************************
 
Performance Step 1:                                                   Critical Not Critical X 7.1 RFP/RFPT Shutdown CAUTIONS
INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 2A. RFPT 2A needs to removed from service.
: 1) FAILURE to monitor SJAE/OG CNDR CNDS FLOW, 2-FI-2-42, on Panel 2-9-6 for proper flow (between 2 x 106 and 3 x 106 lbm/hr) may result in SJAE isolation.
 
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 2A from service in accordance with 2-OI-3, Reactor Feedwater System section 7
.1. Precautions and Limitations have been reviewed.
 
JPM  b 4  START TIME           
*******************************************************************************
Performance Step 1:       Critical Not Critical X 7.1 RFP/RFPT Shutdown   CAUTIONS 1) FAILURE to monitor SJAE/OG CNDR CNDS FLOW, 2
-FI-2-42, on Panel 2-9-6 for proper flow (between 2 x 10 6 and 3 x 10 6 lbm/hr) may result in SJAE isolation.
: 2) Changes in Condensate System flow may require adjustment to SPE CNDS BYPASS, 2-FCV-002-0190.
: 2) Changes in Condensate System flow may require adjustment to SPE CNDS BYPASS, 2-FCV-002-0190.
: 3) When isolating the Reactor Feedwater Pump(s) for maintenance, the associated injection water should also be isolated to prevent high seal differential pressure and allow the RFW Pump shafts to rotate freely. (BFNPER123395)
: 3) When isolating the Reactor Feedwater Pump(s) for maintenance, the associated injection water should also be isolated to prevent high seal differential pressure and allow the RFW Pump shafts to rotate freely. (BFNPER123395)
: 4) When a Reactor Feed Pump is isolated (suction, discharge, and minimum flow valve closed) with injection water aligned to the pump, there is a potential of rising pump casing pressure and seal water leakoff flows reaching the point where seal water drains are overcome and seal water is forced into the oil system through the bearing housings. Therefore, the time that a RFP is isolated with injection water aligned to the pump should be minimized.       [1] REFER TO Section 3.0 and REVIEW Precautions and Limitations.
: 4) When a Reactor Feed Pump is isolated (suction, discharge, and minimum flow valve closed) with injection water aligned to the pump, there is a potential of rising pump casing pressure and seal water leakoff flows reaching the point where seal water drains are overcome and seal water is forced into the oil system through the bearing housings. Therefore, the time that a RFP is isolated with injection water aligned to the pump should be minimized.
[2]     [3] IF any Condensate or Condensate Booster Pump is NOT in service, THEN    (Otherwise N/A).
[1]   REFER TO Section 3.0 and REVIEW Precautions and Limitations.
[2]   Verify Reactor Power is 95%. (Ref. P&L 3.0 VV)
[3]   IF any Condensate or Condensate Booster Pump is NOT in service, THEN (Otherwise N/A).
[4]   IF RFP being removed from service is last operating RFP, THEN (Otherwise N/A)
Standard:
Given in initial conditions that step 1 is complete Operator verifies Reactor Power is <95%
Given in initial conditions that step 3 and 4 are N/A.
SAT      UNSAT        N/A      COMMENTS:
4


[4]  IF RFP being removed from service is last operating RFP, THEN (Otherwise N/A)  Standard:  Given in initial conditions that step 1 is complete    Given in initial conditions that step 3 and 4 are N/A. SAT      UNSAT      N/A      COMMENTS:
JPM b
JPM b *******************************************************************************
*******************************************************************************
Performance Step 2:       Critical   Not Critical X   [5] VERIFY in AUTO, RFPT 2A TURNING GEAR MOTOR,   2-HS-3-101A. Standard:   Verifies 2-HS-3-101A in AUTO SAT     UNSAT      N/A       COMMENTS:                      
Performance Step 2:                                   Critical Not Critical X
[5]     VERIFY in AUTO, RFPT 2A TURNING GEAR MOTOR, 2-HS-3-101A.
Standard:
Verifies 2-HS-3-101A in AUTO SAT     UNSAT      N/A   COMMENTS:
5


JPM b ****************************************************************************
JPM b
Performance Step 3:       Critical     Not Critical X NOTES 1) When selected, Column 1 on individual RFPT Speed Control Panel Display Stations (PDS) displays actual pump speed and is not controlled in any mode.
****************************************************************************
Performance Step 3:                                                   Critical Not Critical X NOTES
: 1) When selected, Column 1 on individual RFPT Speed Control Panel Display Stations (PDS) displays actual pump speed and is not controlled in any mode.
: 2) When selected, Column 2 on individual RFPT Speed Control PDS displays pump flow bias and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in AUTO.
: 2) When selected, Column 2 on individual RFPT Speed Control PDS displays pump flow bias and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in AUTO.
: 3) When selected, Column 3 on individual RFPT Speed Control PDS displays RFPT speed demand and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in MANUAL.
: 3) When selected, Column 3 on individual RFPT Speed Control PDS displays RFPT speed demand and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in MANUAL.
: 4) Illustration 2 can be referred to for additional information on the RFPT Speed Control PDSs.   [6] LOWER speed of RFPT/RFP being removed from service by either of the following methods:
: 4) Illustration 2 can be referred to for additional information on the RFPT Speed Control PDSs.
IF Using individual RFPT Manual Governor switch, THEN   GO TO Step 7.1[7].
[6]     LOWER speed of RFPT/RFP being removed from service by either of the following methods:
IF Using individual RFPT Speed Control PDS in MANUAL, THEN       GO TO Step 7.1[8
* IF Using individual RFPT Manual Governor switch, THEN GO TO Step 7.1[7].
]. Standard: Operator proceeds to step 7 or step 8. NOTE most operators will go to step 7 (performance step 4). SAT     UNSAT       N/A       COMMENTS:
* IF Using individual RFPT Speed Control PDS in MANUAL, THEN GO TO Step 7.1[8].
JPM  b 7  *******************************************************************************
Standard:
Performance Step 4:      Critical X  Not Critical
Operator proceeds to step 7 or step 8. NOTE most operators will go to step 7 (performance step 4).
[7]  SLOWLY LOWER speed of RFPT, using individual RFPT 2A SPEED CONT RAISE/LOWER switch, 2-HS-46-8A on Panel 2-9-5, by performing the  following:
SAT       UNSAT         N/A     COMMENTS:
[7.1]  DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL    GOVERNOR.
6


CHECK amber light at switch illuminated.
JPM b
Standard:   Depresses 2
*******************************************************************************
-HS-46-8A to Manual   SAT     UNSAT      N/A       COMMENTS:                      
Performance Step 4:                                              Critical X Not Critical
*****************************************************************************
[7]    SLOWLY LOWER speed of RFPT, using individual RFPT 2A SPEED CONT RAISE/LOWER switch, 2-HS-46-8A on Panel 2-9-5, by performing the following:
[7.1]  DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR.
* CHECK amber light at switch illuminated.
Standard:
Depresses 2-HS-46-8A to Manual SAT     UNSAT      N/A     COMMENTS:
*****************************************************************************
Performance Step 5:                                              *Critical X Not Critical
              *[7.2] SLOWLY LOWER RFPT speed, by placing RFPT Speed Control switch in RAISE and LOWER positions, as necessary.
[7.3]  IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO.
Standard:
Lowers speed of RFPT 2A and verifies RFPT 2B and 2C respond SAT    UNSAT      N/A    COMMENTS:
7


Performance Step 5:      *Critical X  Not Critical    *[7.2]  SLOWLY LOWER RFPT speed, by placing RFPT Speed Control switch    in RAISE and LOWER positions, as necessary.
JPM b
[7.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO.
*******************************************************************************
Standard:  Lowers speed of RFPT 2A and verifies RFPT 2B and 2C respond SAT      UNSAT      N/A      COMMENTS:
Performance Step 6:                                               Critical X Not Critical
JPM b *******************************************************************************
[8]     SLOWLY LOWER speed of RFPT, using individual RFPT 2A SPEED CONTROL PDS, 2-SIC-46-8 by performing the following (Panel 2-9-5):
Performance Step 6:       Critical X Not Critical
[8.1] PLACE PDS in MANUAL AND VERIFY Column 3 is selected.
[8] SLOWLY LOWER speed of RFPT, using individual RFPT 2A SPEED     CONTROL PDS, 2
Standard:
-SIC-46-8 by performing the following (Panel 2-9-5):
Places 2-SIC-46-8 in Manual SAT     UNSAT        N/A    COMMENTS:
[8.1] PLACE PDS in MANUAL AND VERIFY Column 3 is selected. Standard:   Places 2-SIC-46-8 in Manual SAT     UNSAT       N/A       COMMENTS:                      
*****************************************************************************
Performance Step 7:                                                *Critical X Not Critical
              *[8.2] SLOWLY LOWER RFPT speed, using Ramp Up/Ramp Down pushbuttons as necessary.
[8.3]  IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO.
Standard:
Lowers speed of RFPT 2A and verifies RFPT 2B and 2C respond SAT    UNSAT       N/A     COMMENTS:
ALTERNATE PATH STARTS ON THE NEXT STEP 8


JPM b
*****************************************************************************
*****************************************************************************
 
Performance Step 8:                                               Critical X Not Critical CAUTION RFP Discharge Check Valve may fail to close when removing a RFP from service.
Performance Step 7:       *Critical X Not Critical
[9]    IF at any time RFP Discharge Check Valve failure is experienced while removing RFP from service, THEN REFER TO Step 7.1[15].
 
Standard:
  *[8.2] SLOWLY LOWER RFPT speed, using Ramp Up/Ramp Down     pushbuttons as necessary.
When Operator lowers speed far enough they will notice the failure of RFP Discharge Check Valve due to check valve failing to close and Reactor Water level lowering. Operator will transition to step 7.1[15].
[8.3] IF this is the NOT the last operating feed pump, THEN  OBSERVE rise in speed of any remaining RFPT operating in AUTO.
SAT    UNSAT        N/A     COMMENTS:
*******************************************************************************
Performance Step 9:                                                Critical Not Critical X
[10]   CONTINUE to slowly lower RFPT speed to minimum speed setting (approximately 600 rpm).
Standard:
Standard:
Lowers speed of RFPT 2A and verifies RFPT 2B and 2C respond SAT      UNSAT      N/A      COMMENTS:                       
Operator will continue to lower speed, once speed has lowered far enough that RFPT 2A discharge pressure is below the discharge pressure of RFPT 2B and 2C, the operator will respond to a failure of RFPT 2A Discharge Check Valve Failure SAT     UNSAT         N/A     COMMENTS:
 
9
ALTERNATE PATH STARTS ON THE NEXT STEP
 
JPM  b 9  *****************************************************************************
Performance Step 8:      Critical X  Not Critical  CAUTION RFP Discharge Check Valve may fail to close when removing a RFP from service.
[9]  IF at any time RFP Discharge Check Valve failure is experienced while removing  RFP from service, THEN  REFER TO Step 7.1[15
]. Standard:
When Operator lowers speed far enough they will notice the failure of RFP Discharge Check Valve due to check valve failing to close and Reactor Water level lowering. Operator will transition to step 7.1[15
]. SAT     UNSAT       N/A       COMMENTS:                      


JPM b
*******************************************************************************
*******************************************************************************
 
Performance Step 10:                                             Critical Not Critical X
Performance Step 9:         Critical   Not Critical X  [10] CONTINUE to slowly lower RFPT speed to minimum speed setting    (approximately 600 rpm).
[15]   IF RFP Discharge Check Valve failure is experienced, THEN
[15.1] DEPRESS RFP 2A(2B)(2C) DISCHARGE TESTABLE CK VLV pushbutton, 2-HS-3-94A.
* VERIFY Discharge Check Valve closed.
Standard:
Standard:
Operator will continue to lower speed, once speed has lowered far enough that RFPT 2 A discharge pressure is below the discharge pressure of RFPT 2B and 2C, the operator will respond to a failure of RFPT 2A Discharge Check Valve Failure SAT      UNSAT      N/A      COMMENTS:                       
Operator depresses 2-HS-3-94A, Check Valve fails to close SAT     UNSAT      N/A     COMMENTS:
 
JPM  b 10  *******************************************************************************
Performance Step 10:        Critical  Not Critical X  [15]  IF RFP Discharge Check Valve failure is experienced, THEN
[15.1]  DEPRESS RFP 2A(2B)(2C) DISCHARGE TESTABLE CK VLV    pushbutton, 2-HS-3-94A.
VERIFY Discharge Check Valve closed.
Standard:  Operator depresses 2
-HS-3-94A, Check Valve fails to close SAT     UNSAT      N/A       COMMENTS:                      
 
*******************************************************************************
*******************************************************************************
 
Performance Step 11:                                             Critical Not Critical X
Performance Step 11:           Critical   Not Critical X   [15.2]   IF RFP Discharge Check Valve failure is still being experienced, THEN   PERFORM either of the following:  
[15.2] IF RFP Discharge Check Valve failure is still being experienced, THEN PERFORM either of the following:
 
[15.2.1] IMMEDIATELY RETURN RFP to service.
[15.2.1] IMMEDIATELY RETURN RFP to service.
Standard:   Operator may raise speed of RFPT 2A and attempt to return to service.
Standard:
SAT     UNSAT      N/A       COMMENTS:
Operator may raise speed of RFPT 2A and attempt to return to service.
CUE: Remove RFPT 2A from service
SAT     UNSAT      N/A     COMMENTS:
.
CUE: Remove RFPT 2A from service.
JPM  b 11  NOTE: Operator may lower pump speed to 600 RPM prior to tripping pump.
10
  *******************************************************************************


Performance Step 12:         *Critical X Not Critical   [15.2.2] PERFORM the following:
JPM b NOTE: Operator may lower pump speed to 600 RPM prior to tripping pump.
A. VERIFY OPEN RFP 2A MIN FLOW VALVE, 2-FCV-3-20
*******************************************************************************
  *B. CLOSE RFP 2A DISCHARGE VALVE using 2-HS-3-19A
Performance Step 12:                                           *Critical X Not Critical
  *C. VERIFY RFP tripped. Standard:
[15.2.2] PERFORM the following:
Verifies RFP 2A min flow valve Open, Closes RFP 2A Discharge Valve 2
A. VERIFY OPEN RFP 2A MIN FLOW VALVE, 2-FCV-3-20
-HS-3-19A AND Trips RFPT 2A.
              *B. CLOSE RFP 2A DISCHARGE VALVE using 2-HS-3-19A
SAT     UNSAT      N/A       COMMENTS:                       CUE: This completes the task. END OF TASK STOP TIME  
              *C. VERIFY RFP tripped.
 
Standard:
JPM  b 1  OPERATOR:  ________________________________
Verifies RFP 2A min flow valve Open, Closes RFP 2A Discharge Valve 2-HS-3-19A AND Trips RFPT 2A.
RO          SRO          DATE:
SAT     UNSAT      N/A     COMMENTS:
JPM NUMBER: b- ALTERNATE PATH TASK NUMBER: U-003-AL-01 TASK TITLE:  Place RFPT 'A' in Service
CUE: This completes the task.
 
END OF TASK STOP TIME 11
K/A NUMBER:
259001 A4.04    K/A RATING: RO 3.1    SRO 2.9 PRA:
TASK STANDARD:
Removes RFPT A from service, trips RFPT A and closes discharge valve
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-3 VALIDATION TIME:  20 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)


JPM b OPERATOR: ________________________________
RO            SRO                  DATE:
JPM NUMBER:          b- ALTERNATE PATH TASK NUMBER:        U-003-AL-01 TASK TITLE:          Place RFPT A in Service K/A NUMBER:          259001 A4.04          K/A RATING: RO 3.1 SRO 2.9 PRA:
TASK STANDARD: Removes RFPT A from service, trips RFPT A and closes discharge valve LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-3 VALIDATION TIME: 20 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)
PERFORMANCE TIME:
PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________            DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 3A.
___  NO ___
RFPT 3A needs to removed from service.
RESULTS: SATISFACTORY
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 3A from service in accordance with 3-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.
____ UNSATISFACTORY
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER 


INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 3A. RFPT 3A needs to removed from service.
JPM b
 
*******************************************************************************
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 3A from service in accordance with 3-OI-3, Reactor Feedwater System section 7
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
.1. Precautions and Limitations have been reviewed.
*******************************************************************************
 
INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 3A.
JPM b *******************************************************************************
RFPT 3A needs to removed from service.
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 3A from service in accordance with 3-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.
3


JPM b START TIME
*******************************************************************************
*******************************************************************************
 
Performance Step 1:                                                     Critical Not Critical X 7.1 RFP/RFPT Shutdown CAUTIONS
INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 3A. RFPT 3A needs to removed from service.
: 1)       FAILURE to monitor SJAE/OG CNDR CNDS FLOW, 3-FI-2-42, on Panel 3-9-6 for proper flow (between 2 x 106 and 3 x 106 lbm/hr) may result in SJAE isolation.
 
: 2)       Changes in Condensate System flow may require adjustment to SPE CNDS BYPASS, 3-FCV-002-0190.
INITIATING CUES: The Unit Supervisor directs you to remove RFPT 3A from service in accordance with 3-OI-3, Reactor Feedwater System section 7
: 3)       When isolating the Reactor Feedwater Pump(s) for maintenance, the associated injection water should also be isolated to prevent high seal differential pressure and allow the RFW Pump shafts to rotate freely. (BFNPER123395)
.1. Precautions and Limitations have been reviewed.
[1]   REFER TO Section 3.0 and REVIEW Precautions and Limitations.
 
[2]   VERIFY Reactor power is less than 80% prior to removing RFP from service.
JPM  b 4  START TIME           
  *******************************************************************************
Performance Step 1:       Critical Not Critical X 7.1 RFP/RFPT Shutdown       CAUTIONS 1) FAILURE to monitor SJAE/OG CNDR CNDS FLOW, 3-FI-2-42, on Panel 3-9-6 for proper flow (between 2 x 10 6 and 3 x 10 6 lbm/hr) may result in SJAE isolation.
: 2) Changes in Condensate System flow may require adjustment to SPE CNDS BYPASS, 3-FCV-002-0190. 3) When isolating the Reactor Feedwater Pump(s) for maintenance, the associated injection water should also be isolated to prevent high seal differential pressure and allow the RFW Pump shafts to rotate freely. (BFNPER123395)       [1] REFER TO Section 3.0 and REVIEW Precautions and Limitations.  
 
[2] VERIFY Reactor power is less than 80% prior to removing RFP from service.
NOTE It may be necessary to switch to SINGLE ELEMENT mode from THREE ELEMENT mode earlier than recommended if Feedwater control becomes unstable.
NOTE It may be necessary to switch to SINGLE ELEMENT mode from THREE ELEMENT mode earlier than recommended if Feedwater control becomes unstable.
[3]    IF RFP being removed from service is last operating RFP OR IF at any time Feedwater control becomes unstable, THEN (Otherwise N/A).
Standard:
Given in initial conditions that step 1 is complete and step 2 is NA.
Operator verifies Reactor Power is <80%
Given in initial conditions that step 3 is NA SAT      UNSAT        N/A      COMMENTS:
4


[3]  IF RFP being removed from service is last operating RFP OR IF at any time Feedwater control becomes unstable, THEN (Otherwise N/A).
JPM b
Standard:  Given in initial conditions that step 1 is complete and step 2 is NA. Operator verifies Reactor Power is <
*******************************************************************************
80%  Given in initial conditions that step 3 is NA SAT      UNSAT      N/A      COMMENTS:
Performance Step 2:                                   Critical Not Critical X
JPM b *******************************************************************************
[4]     VERIFY in AUTO, RFPT 3A TURNING GEAR MOTOR, 3-HS-3-101A.
Performance Step 2:       Critical   Not Critical X   [4] VERIFY in AUTO, RFPT 3A TURNING GEAR MOTOR,   3-HS-3-101A. Standard:   Verifies 3-HS-3-101A in AUTO SAT     UNSAT      N/A       COMMENTS:
Standard:
JPM  b 6  ****************************************************************************
Verifies 3-HS-3-101A in AUTO SAT     UNSAT      N/A   COMMENTS:
Performance Step 3:      Critical    Not Critical X      NOTES 1)  When selected, Column 1 on individual RFPT Speed Control Panel Display Stations  (PDS) displays actual pump speed and is not controlled in any mode. 2)  When selected, Column 2 on individual RFPT Speed Control PDS displays pump flow  bias and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in AUTO. 3)  When selected, Column 3 on individual RFPT Speed Control PDS displays RFPT speed  demand and is changed with the Ramp Up/Ramp Down pushbuttons with the controller
5


in MANUAL.
JPM b
: 4) Illustration 2 can be referred to for additional information on the RFPT Speed Control  
****************************************************************************
Performance Step 3:                                                  Critical Not Critical X NOTES
: 1)    When selected, Column 1 on individual RFPT Speed Control Panel Display Stations (PDS) displays actual pump speed and is not controlled in any mode.
: 2)    When selected, Column 2 on individual RFPT Speed Control PDS displays pump flow bias and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in AUTO.
: 3)    When selected, Column 3 on individual RFPT Speed Control PDS displays RFPT speed demand and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in MANUAL.
: 4)     Illustration 2 can be referred to for additional information on the RFPT Speed Control PDSs.
[5]      LOWER speed of RFPT/RFP being removed from service by either of the following:
* IF Using individual RFPT Manual Governor switch, THEN GO TO Step 7.1[6].
* IF Using individual RFPT Speed Control PDS in MANUAL, THEN GO TO Step 7.1[7].
Standard:
Operator proceeds to step 6 or step 7. NOTE most operators will go to step 6 (performance step 4).
SAT    UNSAT        N/A    COMMENTS:
6


PDSs.    [5]  LOWER speed of RFPT/RFP being removed from service by either of the following:
JPM b
 
*******************************************************************************
IF Using individual RFPT Manual Governor switch, THEN      GO TO Step 7.1[6].
Performance Step 4:                                               Critical X Not Critical
IF Using individual RFPT Speed Control PDS in MANUAL, THEN      GO TO Step 7.1[7
[6]   LOWER speed of RFPT, using individual RFPT 3A SPEED CONT RAISE/LOWER switch, 3-HS-46-8A as follows (Panel 3-9-5):
]. Standard:  Operator proceeds to step 6 or step 7. NOTE most operators will go to step 6 (performance step 4). SAT      UNSAT      N/A      COMMENTS:
[6.1]  DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR.
JPM b *******************************************************************************
* VERIFY illuminated amber light at switch.
Performance Step 4:       Critical X Not Critical
Standard:
[6] LOWER speed of RFPT, using individual RFPT 3A SPEED CONT     RAISE/LOWER switch, 3-HS-46-8A as follows (Panel 3-9-5):
Depresses 3-HS-46-8A to Manual SAT     UNSAT      N/A     COMMENTS:
[6.1]  DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL     GOVERNOR.  
 
VERIFY illuminated amber light at switch.
Standard:   Depresses 3
-HS-46-8A to Manual SAT     UNSAT      N/A       COMMENTS:                      
*****************************************************************************
*****************************************************************************
Performance Step 5:       *Critical X Not Critical     *[6.2] SLOWLY LOWER RFPT speed, by placing RFPT Speed Control switch   in RAISE or LOWER positions, as necessary.
Performance Step 5:                                               *Critical X Not Critical
[6.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise     in speed of any remaining RFPT operating in AUTO as RFW Control     System maintains Reactor water level. Standard:
              *[6.2] SLOWLY LOWER RFPT speed, by placing RFPT Speed Control switch in RAISE or LOWER positions, as necessary.
[6.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO as RFW Control System maintains Reactor water level.
Standard:
Lowers speed of RFPT 3A and verifies RFPT 3B and 3C respond.
Lowers speed of RFPT 3A and verifies RFPT 3B and 3C respond.
SAT     UNSAT      N/A       COMMENTS:
SAT     UNSAT      N/A     COMMENTS:
JPM  b 8  *******************************************************************************
7
Performance Step 6:      Critical X  Not Critical
[7]  SLOWLY LOWER speed of RFPT, using individual RFPT 3A SPEED    CONTROL PDS, 3
-SIC-46-8 as follows (Panel 3-9-5):
[7.1]  PLACE PDS in MANUAL AND VERIFY Column 3 is selected. Standard:  Places 3-SIC-46-8 in Manual. SAT      UNSAT      N/A      COMMENTS:                       


JPM b
*******************************************************************************
Performance Step 6:                                                Critical X Not Critical
[7]    SLOWLY LOWER speed of RFPT, using individual RFPT 3A SPEED CONTROL PDS, 3-SIC-46-8 as follows (Panel 3-9-5):
[7.1] PLACE PDS in MANUAL AND VERIFY Column 3 is selected.
Standard:
Places 3-SIC-46-8 in Manual.
SAT    UNSAT        N/A    COMMENTS:
*****************************************************************************
*****************************************************************************
 
Performance Step 7:                                               *Critical X Not Critical
Performance Step 7:       *Critical X Not Critical
              *[7.2] SLOWLY LOWER RFPT speed, using Ramp Up/Ramp Down pushbuttons as necessary.
    *[7.2] SLOWLY LOWER RFPT speed, using Ramp Up/Ramp Down     pushbuttons as necessary.
[7.3]  IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO as RFW Control System maintains Reactor water level..
[7.3]  IF this is the NOT the last operating feed pump, THEN OBSERVE rise     in speed of any remaining RFPT operating in AUTO as RFW Control     System maintains Reactor water level
Standard:
.. Standard:
Lowers speed of RFPT 3A and verifies RFPT 3B and 3C respond.
Lowers speed of RFPT 3A and verifies RFPT 3B and 3C respond.
SAT     UNSAT       N/A       COMMENTS:
SAT     UNSAT       N/A     COMMENTS:
JPM  b 9  ALTERNATE PATH STARTS ON THE NEXT STEP
8
  *****************************************************************************


Performance Step 8:       *Critical X Not Critical CAUTION RFP Discharge Check Valve failure may be experienced while removing RFP from service.
JPM b ALTERNATE PATH STARTS ON THE NEXT STEP
[8] IF at any time RFP Discharge Check Valve failure is experienced while removing   RFP from service, THEN PERFORM the following: (Otherwise N/A)
*****************************************************************************
Performance Step 8:                                               *Critical X Not Critical CAUTION RFP Discharge Check Valve failure may be experienced while removing RFP from service.
[8]   IF at any time RFP Discharge Check Valve failure is experienced while removing RFP from service, THEN PERFORM the following: (Otherwise N/A)
[8.1]  DEPRESS RFP Discharge Testable Check valve push-button for approximately ten seconds (Panel 3-9-6).
Standard:
      *When Operator lowers speed far enough they will notice the failure of RFP Discharge Check Valve due to check valve failing to close and Reactor Water level lowering. Operator will complete step 7.1[8].
Operator depresses 3-HS-3-94A, Check Valve fails to close.
SAT    UNSAT      N/A      COMMENTS:
9


[8.1]  DEPRESS RFP Discharge Testable Check valve push-button for      approximately ten seconds (Panel 3-9-6). Standard: 
JPM b
*When Operator lowers speed far enough they will notice the failure of RFP Discharge Check Valve due to check valve failing to close and Reactor Water level lowering. Operator  will complete step 7.1[
*****************************************************************************
8]. Operator depresses 3
Performance Step 9:                                               Critical Not Critical X
-HS-3-94A, Check Valve fails to close. SAT      UNSAT      N/A      COMMENTS:
[8.2]  CHECK reverse flow through check valve has stopped.
JPM b 10  *****************************************************************************
[8.3]  IF RFP Discharge Testable Check Valve failure is still being experienced, THEN PERFORM one of the following:
Performance Step 9:       Critical   Not Critical X   [8.2]  CHECK reverse flow through check valve has stopped.  
[8.3.1] IMMEDIATELY RETURN RFP to service.
Standard:
Operator may raise speed of RFPT 3A and attempt to return to service.
SAT    UNSAT      N/A    COMMENTS:
______
CUE: Remove RFPT 3A from service.
10


[8.3]  IF RFP Discharge Testable Check Valve failure is still being experienced,    THEN PERFORM one of the following:  
JPM b NOTE: Operator may lower pump speed to 600 RPM prior to tripping pump.
 
*******************************************************************************
[8.3.1]  IMMEDIATELY RETURN RFP to service. Standard:  Operator may raise speed of RFPT 3A and attempt to return to service.
Performance Step 10:                                           *Critical X Not Critical
 
SAT      UNSAT      N/A      COMMENTS:
______  CUE:  Remove RFPT 3A from servic
: e.
JPM  b 11  *******************************************************************************
 
Performance Step 10:         *Critical X Not Critical
[8.3.2] PERFORM the following:
[8.3.2] PERFORM the following:
A. VERIFY open RFP Minimum Flow Valve.     *B. CLOSE RFP Discharge Valve.
A. VERIFY open RFP Minimum Flow Valve.
    *C. TRIP RFPT. Standard:   Verifies RFP 3A min flow valve Open, Closes RFP 3A Discharge Valve 3
                              *B. CLOSE RFP Discharge Valve.
-HS-3-19A AND Trips RFPT 3A.
                              *C. TRIP RFPT.
SAT     UNSAT      N/A       COMMENTS:
Standard:
Verifies RFP 3A min flow valve Open, Closes RFP 3A Discharge Valve 3-HS-3-19A AND Trips RFPT 3A.
SAT     UNSAT      N/A     COMMENTS:
CUE: This completes the task.
CUE: This completes the task.
END OF TASK STOP TIME
END OF TASK STOP TIME ________
________ NOTE: Operator may lower pump speed to 600 RPM prior to tripping pump.
11


JPM c OPERATOR: ________________________________
JPM c OPERATOR: ________________________________
RO         SRO           DATE: _______                    
RO           SRO                   DATE: _______
 
JPM NUMBER:         c- ALTERNATE PATH TASK NUMBER:         U-001-AB-01 TASK TITLE:         RESPOND TO STUCK OPEN SRV K/A NUMBER: 239002A2.03                   K/A RATING:   RO 4.1   SRO 4.2 TASK STANDARD: Perform control room operations necessary to respond to a stuck open SRV as directed by 2-AOI-1-1 LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI-1-1 VALIDATION TIME: 6 minutes PERFORMANCE TIME:
JPM NUMBER: c- ALTERNATE PATH
 
TASK NUMBER: U-001-AB-01 TASK TITLE: RESPOND TO STUCK OPEN SRV
 
K/A NUMBER: 239002A2.03 K/A RATING:   RO 4.1 SRO 4.2   TASK STANDARD: Perform control room operations necessary to respond to a stuck open SRV as directed by 2
-AOI-1-1 LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI-1-1 VALIDATION TIME: 6 minutes  
 
PERFORMANCE TIME:
COMMENTS: __________________________________________________________
COMMENTS: __________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________          DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
JPM c INITIAL CONDITIONS: You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 2-XA-55-3C, Window 25 is in alarm.
___  NO ___
INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 2-AOI-1-1.
RESULTS: SATISFACTORY ____ UNSATISFACTORY
2
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER JPM c 2  


INITIAL CONDITIONS:
JPM c
You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 2
******************************************************************************
-XA-55-3C, Window 25 is in alarm.  
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
******************************************************************************
INITIAL CONDITIONS: You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 2-XA-55-3C, Window 25 is in alarm.
INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 2-AOI-1-1.
3


INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 
JPM c START TIME Simulator Driver: This JPM requires SRV 1-31 stuck open (imf ad01e 100).
****************************************************************************************************
Performance Step 1:                                                  Critical Not Critical X NOTE Once a MSRV is operated, a time delay of 15 to 30 seconds can be expected before a response can be detected on 2-TR-1-1, MSRV DISCHARGE TAILPIPE TEMPERATURE.
ICS can be used to monitor the discharge tailpipe temperature, but the appropriate indications on 2-TR-1-1 must be confirmed.
4.1    Immediate Action
[1]    IDENTIFY stuck open relief valve by OBSERVING the following:
* SRV TAILPIPE FLOW MONITOR, 2-FMT-1-4, on Panel 2-9-3, OR
* MSRV DISCHARGE TAILPIPE TEMPERATURE recorder, 2-TR-1-1 on Panel 2-9-47.
Standard:
Identified MSRV 1-31 OPEN as indicated on 2-FMT-1-4 SRV Tailpipe Flow Monitor on Panel 2-9-3 or elevated tailpipe temperature as indicated on 2-TR-1-1, Panel 2-9-47.
SAT      UNSAT      N/A      COMMENTS:
4


2-AOI-1-1.
JPM c
JPM c 3   
******************************************************************************
******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Performance Step 2:                                                 Critical X Not Critical
[2]    IF relief valve transient occurred while operating above 90%
power, THEN REDUCE reactor power to 90% RTP with recirc flow.
(Otherwise N/A)
Standard:
Operator Reduces reactor power to 90% RTP with recirc flow.
SAT    UNSAT        N/A      COMMENTS:
******************************************************************************
******************************************************************************
INITIAL CONDITIONS:
Performance Step 3:                                                 Critical X Not Critical
You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 2
[3]    WHILE OBSERVING the indications for the affected Relief valve on the Acoustic Monitor; CYCLE the affected relief valve control switch as required up to three times:
-XA-55-3C, Window 25 is in alarm.  
* CLOSE to OPEN to CLOSE positions Standard:
Placed 2-HS-1-31 in the CLOSE-OPEN-CLOSE position up to three times. Determines valve DID NOT close as indicated by MSRV TAILPIPE FLOW MONITOR or NO indicated increase in generator Mwe.
SAT    UNSAT        N/A      COMMENTS:
5


INITIATING CUE:  The Unit Supervisor directs you to respond to the alarm as directed by 2-AOI-1-1. 
JPM c
 
******************************************************************************
JPM c 4  START TIME    Simulator Driver:  This JPM requires SRV 1
Performance Step 4:                                                 Critical Not Critical X
-31 stuck open (imf ad01e 100
[4]      IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)
).  ****************************************************************************************************
Standard:
Performance Step 1:       Critical   Not Critical X NOTE Once a MSRV is operated, a time delay of 15 to 30 seconds can be expected before a response can be detected on 2
Verified that the SRV did not close and continues in the procedure at step 4.2.1 SAT     UNSAT         N/A     COMMENTS:
-TR-1-1, MSRV DISCHARGE TAILPIPE TEMPERATURE.
******************************************************************************
ICS can be used to monitor the discharge tailpipe temperature, but the appropriate indications on 2-TR-1-1 must be confirmed.
Performance Step 5:                                                 Critical Not Critical X NOTES
4.1  Immediate Action
: 1) Once initial transient of SRV opening has stabilized (pressure regulator compensation) the Heat balance will indicate bad data.
[1]  IDENTIFY stuck open relief valve by OBSERVING the following:
SRV TAILPIPE FLOW MONITOR, 2
-FMT-1-4, on Panel 2-9-3,  OR  MSRV DISCHARGE TAILPIPE TEMPERATURE recorder,  2-TR-1-1 on Panel 2-9-47.
Standard:  Identified MSRV 1-31 OPEN as indicated on 2-FMT-1-4 SRV Tailpipe Flow Monitor on Panel 2-9-3 or elevated tailpipe temperature as indicated on 2
-TR-1-1, Panel 2-9-47. SAT      UNSAT      N/A      COMMENTS:
JPM c 5  ****************************************************************************** Performance Step 2:      Critical X  Not Critical
[2] IF relief valve transient occurred while operating above 90%
power, THEN  REDUCE  (Otherwise N/A)
Standard:  Operator Reduces
. SAT     UNSAT      N/A      COMMENTS:                       
******************************************************************************
 
Performance Step 3:      Critical X  Not Critical
[3]  WHILE OBSERVING the indications for the affected Relief valve on the Acoustic Monitor; CYCLE the affected relief valve control switch as required up to three times:  CLOSE to OPEN to CLOSE positions Standard:  Placed 2-HS-1-31 in the CLOSE-OPEN-CLOSE position up to three times. Determines valve DID NOT close as indicated by MSRV TAILPIPE FLOW MONITOR or NO indicated increase in generator Mwe.
SAT      UNSAT      N/A      COMMENTS:
JPM c 6  ****************************************************************************** Performance Step 4:      Critical    Not Critical X  [4]  IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)
Standard:   Verified that the SRV did not close and continues in the procedure at step 4.2.1 SAT     UNSAT       N/A       COMMENTS:                      
****************************************************************************** Performance Step 5:       Critical   Not Critical X NOTES 1) Once initial transient of SRV opening has stabilized (pressure regulator compensation) the   Heat balance will indicate bad data.
: 2) The SRV TAILPIPE FLOW MONITOR may seal-in an OPEN position indication.
: 2) The SRV TAILPIPE FLOW MONITOR may seal-in an OPEN position indication.
4.2 Subsequent Action 4.2.1  Action if a fire exists with SRV stuck open
4.2   Subsequent Action 4.2.1  Action if a fire exists with SRV stuck open
[1] IF an SRV is open and a fire exists in ANY Appendix R fire area, THEN (Otherwise N/A):
[1] IF an SRV is open and a fire exists in ANY Appendix R fire area, THEN (Otherwise N/A):
INITIATE a manual scram before the Suppression Pool temperature exceeds 95&deg;F.
INITIATE a manual scram before the Suppression Pool temperature exceeds 95&deg;F.
Standard:
Standard:
No fire is indicated. This step is not applicable.  
No fire is indicated. This step is not applicable.
SAT    UNSAT        N/A    COMMENTS:
6


SAT      UNSAT      N/A      COMMENTS:
JPM c
JPM c ****************************************************************************** Performance Step 6:       Critical X Not Critical 4.2 Subsequent Action
******************************************************************************
Performance Step 6:                                                   Critical X Not Critical 4.2     Subsequent Action 4.2.2  Attempt to close valve from Panel 9-3:
[1]    PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the OFF position.
[2]    PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON position.
[3]    IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)
Standard:
Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the off position (Critical) and verifies the power is off (Not Critical). Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON Position (Critical) and verifies SRV 1-31 did not close (Not Critical) and continues at step [4].
SAT      UNSAT        N/A    COMMENTS:
7


4.2.2  Attempt to close valve from Panel 9-3:
JPM c Driver: When the MSRV AUTO ACTUATION LOGIC SWITCH is in INHIBIT, dmf ad01e
 
****************************************************************************************************
[1]  PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the OFF position.
Performance Step 7:                                                 Critical X Not Critical
 
[4]   PLACE MSRV AUTO ACTUATION LOGIC INHIBIT, 2-XS-1-202 in INHIBIT:
[2]  PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON position.
[5]   IF relief valve closes, THEN OPEN breaker or PULL fuses as necessary using Attachment 1 (Unit 2 SRV Solenoid Power Breaker/Fuse Table).
 
Standard:
[3]  IF all SRVs are CLOSED, THEN  CONTINUE at Step 4.2.4. (Otherwise N/A)
Placed MSRV AUTO ACTUATION LOGIC INHIBIT, 2-XS-1-202 in INHIBIT.
Standard:  Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the off position (Critical) and verif ies the power is off (Not Critical). Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON Position (Critical) and verifies SRV 1-31 did not close (Not Critical) and continues at step [4].
Verifies SRV 1-31 closes. Directs AUO/US to open the breaker 8B2 on 250V RMOV Board 2B, or pull fuses FU2-1-31 (Fuse holder 1FU) and FU2-1-31 (Fuse Holder 2FU).
SAT      UNSAT      N/A      COMMENTS:                       
SAT      UNSAT      N/A     COMMENTS:
 
******************************************************************************
JPM c Driver: When the MSRV AUTO ACTUATION LOGIC SWITCH is in INHIBIT , dmf ad01e ****************************************************************************************************
Performance Step 8:                                                 Critical Not Critical X
Performance Step 7:       Critical X Not Critical
[6]   PLACE MSRV AUTO ACTUATION LOGIC INHIBIT 2-XS-1-202, in AUTO.
[4] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT, 2
Standard:
-XS-1-202 in INHIBIT: [5] IF relief valve closes, THEN OPEN breaker or PULL fuses as necessary using Attachment 1 (Unit 2 SRV Solenoid Power Breaker/Fuse Table).
Places MSRV AUTO ACTUATION LOGIC INHIBIT 2-XS-1-202, in AUTO. If switched is placed in Auto prior to power being removed this would be a failure.
Standard: Placed MSRV AUTO ACTUATION LOGIC INHIBIT, 2
SAT      UNSAT      N/A     COMMENTS:
-XS-1-202 in INHIBIT. Verifies SRV 1-31 closes. Directs AUO/US to open the breaker 8B2 on 250V RMOV Board 2B, or pull fuses FU2-1-31 (Fuse holder 1FU) and FU2-1-31 (Fuse Holder 2FU).
Driver: If 2-XS-1-202 is placed in auto imf ad01e to open SRV CUE: That completes this task.
SAT      UNSAT      N/A       COMMENTS:                      
END OF TASK STOP TIME:
****************************************************************************** Performance Step 8:       Critical   Not Critical X [6] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT 2-XS-1-202, in AUTO.
8
Standard: Places MSRV AUTO ACTUATION LOGIC INHIBIT 2-XS-1-202, in AUTO. If switched is placed in Auto prior to power being removed this would be a failure.
SAT      UNSAT      N/A       COMMENTS:                      
 
END OF TASK STOP TIME:    Driver: If 2
-XS-1-202 is placed in auto imf ad01e to open SRV CUE: That completes this task.
 
JPM c  1  OPERATOR: ________________________________
RO          SRO          DATE:  _______                     


JPM NUMBER: c- ALTERNATE PATH
JPM c OPERATOR: ________________________________
 
RO            SRO                  DATE: _______
TASK NUMBER: U-001-AB-01 TASK TITLE: RESPOND TO STUCK OPEN SRV
JPM NUMBER:         c- ALTERNATE PATH TASK NUMBER:         U-001-AB-01 TASK TITLE:         RESPOND TO STUCK OPEN SRV K/A NUMBER: 239002A2.03                   K/A RATING:   RO 4.1   SRO 4.2 TASK STANDARD: Perform control room operations necessary to respond to a stuck open SRV as directed by 3-AOI-1-1 LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI-1-1 VALIDATION TIME: 6 minutes PERFORMANCE TIME:
 
K/A NUMBER: 239002A2.03 K/A RATING:   RO 4.1 SRO 4.2   TASK STANDARD: Perform control room operations necessary to respond to a stuck open SRV as directed by 3-AOI-1-1 LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI-1-1 VALIDATION TIME: 6 minutes  
 
PERFORMANCE TIME:
COMMENTS: __________________________________________________________
COMMENTS: __________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________          DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
JPM c INITIAL CONDITIONS: You are an Operator. Unit 3 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 3-XA-55-3C, Window 25 is in alarm.
___  NO ___
INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 3-AOI-1-1.
RESULTS: SATISFACTORY ____ UNSATISFACTORY
2
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER JPM c  2  


INITIAL CONDITIONS:
JPM c
You are an Operator. Unit 3 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 3-XA-55-3C, Window 25 is in alarm.  
******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
******************************************************************************
INITIAL CONDITIONS: You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 3-XA-55-3C, Window 25 is in alarm.
INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 3-AOI-1-1.
3


INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by
JPM c START TIME Simulator Driver: This JPM requires SRV 1-31 stuck open (imf ad01e 100).
****************************************************************************************************
Performance Step 1:                                                  Critical Not Critical X NOTE Once a MSRV is operated, a time delay of 15 to 30 seconds can be expected before a response can be detected on 3-TR-1-1, MSRV DISCHARGE TAILPIPE TEMPERATURE.
ICS can be used to monitor the discharge tailpipe temperature, but the appropriate indications on 3-TR-1-1 must be confirmed.
4.1    Immediate Action
[1]    IDENTIFY stuck open relief valve by OBSERVING the following:
* SRV TAILPIPE FLOW MONITOR, 3-FMT-1-4, on Panel 3-9-3, OR
* MSRV DISCHARGE TAILPIPE TEMPERATURE recorder, 3-TR-1-1 on Panel 3-9-47.
Standard:
Identified MSRV 1-31 OPEN as indicated on 3-FMT-1-4 SRV Tailpipe Flow Monitor on Panel 3-9-3 or elevated tailpipe temperature as indicated on 3-TR-1-1, Panel 3-9-47.
SAT      UNSAT      N/A      COMMENTS:
4


3-AOI-1-1.
JPM c
JPM c 3   
******************************************************************************
******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
Performance Step 2:                                                 Critical X Not Critical
[2]    IF relief valve transient occurred while operating above 90%
power, THEN REDUCE reactor power to 90% RTP with recirc flow.
(Otherwise N/A)
Standard:
Operator Reduces reactor power to 90% RTP with recirc flow.
SAT    UNSAT        N/A      COMMENTS:
******************************************************************************
******************************************************************************
INITIAL CONDITIONS:
Performance Step 3:                                                Critical X Not Critical
You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 3-XA-55-3C, Window 25 is in alarm.  
[3]    WHILE OBSERVING the indications for the affected Relief valve on the Acoustic Monitor; CYCLE the affected relief valve control switch as required up to three times:
* CLOSE to OPEN to CLOSE positions Standard:
Placed 3-HS-1-31 in the CLOSE-OPEN-CLOSE position up to three times. Determines valve DID NOT close as indicated by MSRV TAILPIPE FLOW MONITOR or NO indicated increase in generator Mwe.
SAT    UNSAT        N/A      COMMENTS:
5


INITIATING CUE:  The Unit Supervisor directs you to respond to the alarm as directed by 3-AOI-1-1. 
JPM c
 
******************************************************************************
JPM c 4  START TIME    Simulator Driver:  This JPM requires SRV 1
Performance Step 4:                                                 Critical Not Critical X
-31 stuck open (imf ad01e 100
[4]      IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)
).  ****************************************************************************************************
Standard:
Performance Step 1:       Critical   Not Critical X NOTE Once a MSRV is operated, a time delay of 15 to 30 seconds can be expected before a response can be detected on 3-TR-1-1, MSRV DISCHARGE TAILPIPE TEMPERATURE.
Verified that the SRV did not close and continues in the procedure at step 4.2.1 SAT     UNSAT         N/A     COMMENTS:
ICS can be used to monitor the discharge tailpipe temperature, but the appropriate indications on 3-TR-1-1 must be confirmed.
******************************************************************************
4.1  Immediate Action
Performance Step 5:                                                 Critical Not Critical X NOTES
[1]  IDENTIFY stuck open relief valve by OBSERVING the following:
: 1) Once initial transient of SRV opening has stabilized (pressure regulator compensation) the Heat balance will indicate bad data.
SRV TAILPIPE FLOW MONITOR, 3-FMT-1-4, on Panel 3-9-3,  OR  MSRV DISCHARGE TAILPIPE TEMPERATURE recorder,  3-TR-1-1 on Panel 3-9-47.
Standard:  Identified MSRV 1-31 OPEN as indicated on 3-FMT-1-4 SRV Tailpipe Flow Monitor on Panel 3-9-3 or elevated tailpipe temperature as indicated on 3-TR-1-1, Panel 3-9-47. SAT      UNSAT      N/A      COMMENTS:
JPM c  5  ****************************************************************************** Performance Step 2:      Critical X  Not Critical
[2] IF relief valve transient occurred while operating above 90%
power, THEN  REDUCE  (Otherwise N/A)
Standard:  Operator Reduces reactor power to . SAT     UNSAT      N/A      COMMENTS:                       
****************************************************************************** Performance Step 3:      Critical X  Not Critical
[3]  WHILE OBSERVING the indications for the affected Relief valve on the Acoustic Monitor; CYCLE the affected relief valve control switch as required up to three times:  CLOSE to OPEN to CLOSE positions Standard:  Placed 3-HS-1-31 in the CLOSE-OPEN-CLOSE position up to three times. Determines valve DID NOT close as indicated by MSRV TAILPIPE FLOW MONITOR or NO indicated increase in generator Mwe.
SAT      UNSAT      N/A      COMMENTS:
JPM c  6  ****************************************************************************** Performance Step 4:      Critical    Not Critical X  [4]  IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)
Standard:   Verified that the SRV did not close and continues in the procedure at step 4.2.1 SAT     UNSAT       N/A       COMMENTS:                      
****************************************************************************** Performance Step 5:       Critical   Not Critical X NOTES 1) Once initial transient of SRV opening has stabilized (pressure regulator compensation) the   Heat balance will indicate bad data.
: 2) The SRV TAILPIPE FLOW MONITOR may seal-in an OPEN position indication.
: 2) The SRV TAILPIPE FLOW MONITOR may seal-in an OPEN position indication.
4.2 Subsequent Action 4.2.1  Action if a fire exists with SRV stuck open
4.2   Subsequent Action 4.2.1  Action if a fire exists with SRV stuck open
[1] IF an SRV is open and a fire exists in ANY Appendix R fire area, THEN (Otherwise N/A):
[1] IF an SRV is open and a fire exists in ANY Appendix R fire area, THEN (Otherwise N/A):
INITIATE a manual scram before the Suppression Pool temperature exceeds 95&deg;F.
INITIATE a manual scram before the Suppression Pool temperature exceeds 95&deg;F.
Standard:
Standard:
No fire is indicated. This step is not applicable.  
No fire is indicated. This step is not applicable.
SAT    UNSAT        N/A    COMMENTS:
6


SAT      UNSAT      N/A      COMMENTS:
JPM c
JPM c ****************************************************************************** Performance Step 6:       Critical X Not Critical 4.2 Subsequent Action
******************************************************************************
Performance Step 6:                                                   Critical X Not Critical 4.2     Subsequent Action 4.2.2  Attempt to close valve from Panel 9-3:
[1]    PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the OFF position.
[2]    PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON position.
[3]    IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)
Standard:
Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the off position (Critical) and verifies the power is off (Not Critical). Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON Position (Critical) and verifies SRV 1-31 did not close (Not Critical) and continues at step [4].
SAT      UNSAT        N/A    COMMENTS:
7


4.2.2  Attempt to close valve from Panel 9-3:
JPM c Driver: When the MSRV AUTO ACTUATION LOGIC SWITCH is in INHIBIT, dmf ad01e
 
****************************************************************************************************
[1]  PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the OFF position.
Performance Step 7:                                                 Critical X Not Critical
 
[4]     PLACE MSRV AUTO ACTUATION LOGIC INHIBIT, 3-XS-1-202 in INHIBIT:
[2]  PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON position.
[5]     IF relief valve closes, THEN OPEN breaker or PULL fuses as necessary using Attachment 1 (Unit 3 SRV Solenoid Power Breaker/Fuse Table).
 
Standard:
[3]  IF all SRVs are CLOSED, THEN  CONTINUE at Step 4.2.4. (Otherwise N/A)
Placed MSRV AUTO ACTUATION LOGIC INHIBIT, 3-XS-1-202 in INHIBIT.
Standard:  Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the off position (Critical) and verifies the power is off (Not Critical). Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON Position (Critical) and verifies SRV 1-31 did not close (Not Critical) and continues at step [4].
Verifies SRV 1-31 closes. Directs AUO/US to open the breaker 8C1 on 250V RMOV Board 3B, or pull fuses 3-FU1-001-0031A and 3-FU1-001-0031B.
SAT      UNSAT      N/A      COMMENTS:
SAT      UNSAT       N/A     COMMENTS:
JPM c Driver: When the MSRV AUTO ACTUATION LOGIC SWITCH is in INHIBIT , dmf ad01e ****************************************************************************************************
8
Performance Step 7:       Critical X Not Critical
[4] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT, 3-XS-1-202 in INHIBIT: [5] IF relief valve closes, THEN OPEN breaker or PULL fuses as necessary using Attachment 1 (Unit 3 SRV Solenoid Power Breaker/Fuse Table).
Standard: Placed MSRV AUTO ACTUATION LOGIC INHIBIT, 3-XS-1-202 in INHIBIT. Verifies SRV 1-31 closes. Directs AUO/US to open the breaker 8C1 on 250V RMOV Board 3B, or pull fuses 3-FU1-001-0031A and 3-FU1-001-0031B.
SAT      UNSAT       N/A       COMMENTS:                      
 
JPM c  9  ****************************************************************************** Performance Step 8:      Critical    Not Critical X  [6]  PLACE MSRV AUTO ACTUATION LOGIC INHIBIT 3-XS-1-202, in AUTO.
Standard:  Places MSRV AUTO ACTUATION LOGIC INHIBIT 3-XS-1-202, in AUTO. If switched is placed in Auto prior to power being removed this would be a failure.
SAT      UNSAT      N/A      COMMENTS:                       


JPM c
******************************************************************************
Performance Step 8:                                              Critical Not Critical X
[6]    PLACE MSRV AUTO ACTUATION LOGIC INHIBIT 3-XS-1-202, in AUTO.
Standard:
Places MSRV AUTO ACTUATION LOGIC INHIBIT 3-XS-1-202, in AUTO. If switched is placed in Auto prior to power being removed this would be a failure.
SAT    UNSAT        N/A    COMMENTS:
Driver: If 3-XS-1-202 is placed in auto imf ad01e to open SRV CUE: That completes this task.
END OF TASK STOP TIME:
END OF TASK STOP TIME:
Driver: If 3
9
-XS-1-202 is placed in auto imf ad01e to open SR V  CUE:  That completes this task.


JPM d 1
JPM d OPERATOR: ________________________________
OPERATOR: ________________________________
RO ____       SRO                   DATE: ___________
RO ____         SRO           DATE: ___________
JPM NUMBER:         d- ALTERNATE PATH TASK NUMBER:         U-047-NO-20 TASK TITLE:         Control Valve Tightness Test K/A NUMBER: 245000 A3.08             K/A RATING: RO 3.0 SRO: 3.1 TASK STANDARD: Control Valve Tightness Test IAW 2-OI-47 section 6.9, responds to high turbine vibrations and trips the Main Turbine LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-47 VALIDATION TIME: 20 minutes PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
JPM NUMBER: d- ALTERNATE PATH TASK NUMBER: U-047-NO-20 TASK TITLE: Control Valve Tightness Test
 
K/A NUMBER:
245000 A 3.08   K/A RATING: RO 3.0 SRO: 3.1 TASK STANDARD: Control Valve Tightness Test IAW 2-OI-47 section 6.9, responds to high turbine vibrations and trips the Main Turbine  
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-47 VALIDATION TIME: 20 minutes PERFORMANCE TIME:
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____            UNSATISFACTORY ____
SIGNATURE: __________________________              DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are an Operator on Unit 2. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 2-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 2-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 2-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
___  NO ___
INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 2-OI-47 section 6.9 starting at step 9.
RESULTS: SATISFACTORY
____ UNSATISFACTORY
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER 
 
INITIAL CONDITIONS: You are an Operator on Unit 2. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 2-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 2-HS-47-26, is in Trip Bypass. Th e Turbine Turning Gear Motor control switch, 2-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
 
INITIATING CUE
: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 2-OI-47 section 6.9 starting at step 9.
 
JPM d 3    **************************************************************************
IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


JPM d
**************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
**************************************************************************
**************************************************************************
INITIAL CONDITIONS: You are an Operator on Unit 2. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 2-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 2-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 2-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
INITIAL CONDITIONS: You are an Operator on Unit 2. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 2-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 2-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 2-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 2-OI-47 section 6.9 starting at step 9.
3


INITIATING CUE
JPM d START TIME ________
: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 2-OI-47 section 6.9 starting at step 9.  
**************************************************************************
Performance Step 1:                                         Critical X Not Critical 6.9 Control Valve Tightness Test
[9]    DEPRESS Turbine TRIP pushbutton 2-HS-47-67D.
Standard:
Trips the Turbine.
SAT    UNSAT        N/A      COMMENTS:
**************************************************************************
Performance Step 2:                                          Critical X Not Critical
[10]  DEPRESS Turbine RESET pushbutton 2-HS-47-67E.
Standard:
Resets the Turbine.
SAT    UNSAT        N/A      COMMENTS:
**************************************************************************
Performance Step 3:                                          Critical Not Critical X
[11]  VERIFY ISVs are full open prior to continuing with the next step.
Standard:
Verifies ISVs FULL Open prior to step 12 SAT    UNSAT        N/A      COMMENTS:
CUE:          If a question is raised whether the ISVs are Full Open, inform the Operator that the ISVs are Full Open 4


JPM d 4 ST ART TIME ________           
JPM d
**************************************************************************
**************************************************************************
Performance Step 1:     Critical Not Critical  6.9 Control Valve Tightness Test
Performance Step 4:                                  Critical X Not Critical
[9] DEPRESS Turbine TRIP pushbutton 2-HS-47-67D. Standard:   Trips the Turbine. SAT     UNSAT      N/A       COMMENTS:                    
[12]  DEPRESS the Start Up Rate FAST pushbutton, 2-HS-47-77C.
Standard:
Depresses the Start Up Rate Fast pushbutton.
SAT    UNSAT      N/A    COMMENTS:
**************************************************************************
Performance Step 5:                                 Critical Not Critical X
[13]   VERIFY CV POSITION LIMIT, 2-XI-47-157, is set to approximately 66%.
Standard:
Verifies CV Position Limit set to about 66%
SAT    UNSAT      N/A    COMMENTS:
**************************************************************************
Performance Step 6:                                  Critical X Not Critical
[14]   DEPRESS SYNC SPEED pushbutton, 2-HS-47-77H.
Standard:
Depresses Synch Speed pushbutton.
SAT     UNSAT      N/A     COMMENTS:
5


JPM d
**************************************************************************
**************************************************************************
Performance Step 7:                                        Critical Not Critical X
[15]  WHEN turbine speed is greater than 900 RPM, THEN PLACE Bearing Lift Pumps in Auto by placing the TURBINE TURNING GEAR MOTOR control switch, 2-HS-47-10A, in AUTO.
Standard:
When turbine speed > 900 RPM places bearing lift pumps in Auto.
SAT    UNSAT      N/A    COMMENTS:
Driver:      When Turbine Speed is greater than 900 RPM insert bat NRC/turbvibe
**************************************************************************
Performance Step 8:                                        Critical Not Critical X
[16]  OBSERVE turbine speed is rising and the TURBINE ACCEL light, 2-ZI-47-77A, illuminates.
Standard:
Observe turbine speed is rising and Turbine Acceleration light On SAT    UNSAT      N/A    COMMENTS:
6


Performance Step 2:     Critical X Not Critical
JPM d
[10]  DEPRESS Turbine RESET pushbutton 2-HS-47-67E. Standard:   Resets the Turbine. SAT     UNSAT      N/A       COMMENTS:                    
**************************************************************************
Performance Step 9:                                         Critical X Not Critical Monitors and Recognizes a High Vibration Condition exists.
Standard:
Determines that a Turbine Trip is required with Turbine Vibration greater than 12 Mils.
SAT     UNSAT      N/A     COMMENTS:
7


JPM d
**************************************************************************
**************************************************************************
Performance Step 10:                                          Critical X Not Critical NOTE Step 6.9[4] and 6.9[5] contain conditions for tripping the turbine.
[4]    IF any of the following conditions are met, THEN DEPRESS turbine TRIP pushbutton, 2-HS-47-67D:
* THRUST/JOURNAL BRG TEMPERATURE, 2-TR-47-23, indicates thrust bearing metal temperature exceeding 180&deg;F.
* TURB DIFF EXPANSION, 2-XR-47-20, Point 14, located on Panel 2-9-8, indicates less than 100 Mi (Mils) or greater than 400 Mi.
* THRUST/JOURNAL BRG TEMPERATURE, 2-TR-47-23, indicates bearing metal temperatures exceeding 225&deg;F.
[5]    MONITOR Turbine Vibrations AND IF any of the vibration limits listed in the following Table 1 or Table 2 (as applicable) are exceeded, THEN ,
DEPRESS turbine TRIP pushbutton, 2-HS-47-67D. (otherwise N/A)
Standard:
Depresses Turbine Trip Pushbutton SAT      UNSAT        N/A      COMMENTS:
8


Performance Step 3:      Critical    Not Criti cal X  [11]  VERIFY ISVs are full open prior to continuing with the next step.
JPM d
Standard:  Verifies ISVs FULL Open prior to step 12 SAT      UNSAT      N/A      COMMENTS:                     
 
CUE:  If a question is raised whether the ISVs are Full Open, inform the Operator that the ISVs are Full Open
 
JPM d 5  **************************************************************************
Performance Step 4:      Critical X  Not Critical
[12]  DEPRESS the Start Up Rate FAST pushbutton, 2-HS-47-77C. Standard:  Depresses the Start Up Rate Fast pushbutton.
SAT      UNSAT      N/A      COMMENTS:                     
 
**************************************************************************
**************************************************************************
 
Performance Step 11:                                       Critical Not Critical X
Performance Step 5:     Critical     Not Critical X [13] VERIFY CV POSITION LIMIT, 2
[17]   WHEN turbine speed reaches 1800 RPM, THEN OBSERVE AT SET SPEED light, 2-IL-47-77B, illuminates and the TURBINE ACCEL light, 2-IL-47-77A extinguishes.
-XI-47-157, is set to approximately 66%.
Standard:
Standard:  Verifies CV Position Limit set to about 6 6%  SAT      UNSAT      N/A      COMMENTS:                     
At 1800 RPM observes at Set speed light On and Turbine Acceleration light Off SAT     UNSAT       N/A     COMMENTS:
**************************************************************************
 
Performance Step 6:      Critical X  Not Critical
[14]  DEPRESS SYNC SPEED pushbutton, 2-HS-47-77H. Standard:  Depresses Synch Speed pushbutton. SAT      UNSAT      N/A      COMMENTS:                     
 
JPM d 6  **************************************************************************
Performance Step 7:      Critical    Not Critical X  [15]  WHEN turbine speed is greater than 900 RPM, THEN  PLACE Bearing Lift Pumps in Auto by placing the TURBINE TURNING GEAR MOTOR control switch, 2-HS-47-10A, in AUTO. Standard:
When turbine speed >
900 RPM places bearing lift pumps in Auto. SAT     UNSAT       N/A       COMMENTS:                    
 
**************************************************************************
**************************************************************************
Performance Step 8:     Critical     Not Critical X [16] OBSERVE turbine speed is rising and the TURBINE ACCEL light, 2
Performance Step 12:                                       Critical Not Critical X
-ZI-47-77A, illuminates.
[18RECORD test results in the Narrative Log.
Standard:   Observe turbine speed is rising and Turbine Acceleration light On SAT      UNSAT      N/A      COMMENTS:
[19]   NOTIFY Unit Supervisor of test results.
Driver:  When Turbine Speed is greater than 900 RPM insert bat NRC/turbvibe
 
JPM d 7  **************************************************************************
Performance Step 9:      Critical X  Not Critical Monitors and Recognizes a High Vibration Condition exists. Standard:  Determines that a Turbine Trip is required with Turbine Vibration greater than 12 Mils. SAT      UNSAT      N/A      COMMENTS:                     
 
JPM d 8  **************************************************************************
Performance Step 10:      Critical X  Not Critical  NOTE  Step 6.9[4] and 6.9[5] contain conditions for tripping the turbine.
[4] IF any of the following conditions are met, THEN  DEPRESS turbine TRIP pushbutton, 2-HS-47-67D:  2-TR-47-23, indicates thrust bearing metal temperature exceeding 180&deg;F. 2-XR-47-20, Point 14, located on Panel 2-9-8, indicates less than 100 Mi (Mils) or greater than 400 Mi. 2-TR-47-23, indicates bearing metal temperatures exceeding 225&deg;F.
 
[5]  MONITOR Turbine Vibrations AND IF any of the vibration limits listed in the following Table 1 or Table 2 (as applicable) are exceeded, THEN , DEPRESS turbine TRIP pushbutton, 2-HS-47-67D. (otherwise N/A)
Standard:
Standard:
Depresses Turbine Trip Pushbutton SAT      UNSAT      N/A      COMMENTS:
Narrative Logs are not modeled on the simulator. Step [18] is not applicable.
JPM d 9  **************************************************************************
Notifies the Unit Supervisor of Turbine Trip.
Performance Step 11:      Critical    Not Critical X  [17] WHEN turbine speed reaches 1800 RPM, THEN OBSERVE AT SET SPEED light, 2-IL-47-77B, illuminates and the TURBINE ACCEL light, 2
SAT     UNSAT       N/A     COMMENTS:
-IL-47-77A extinguishes.
STOP TIME ________
Standard:  At 1800 RPM observes at Set speed light On and Turbine Acceleration light Off  SAT     UNSAT       N/A       COMMENTS:                    
END OF TASK 9
**************************************************************************
Performance Step 12:      Critical    Not Critical X  [18]  RECORD test results in the Narrative Log. 


[19]  NOTIFY Unit Supervisor of test results.
JPM d OPERATOR: ________________________________
Standard:  Narrative Logs are not modeled on the simulator. Step [18] is not applicable.
RO ____       SRO                   DATE: ___________
Notifies the Unit Supervisor of Turbine Trip. SAT      UNSAT      N/A      COMMENTS:                         
JPM NUMBER:         d- ALTERNATE PATH TASK NUMBER:         U-047-NO-20 TASK TITLE:         Control Valve Tightness Test K/A NUMBER: 245000 A3.08             K/A RATING: RO 3.0 SRO: 3.1 TASK STANDARD: Control Valve Tightness Test IAW 3-OI-47 section 6.9, responds to high turbine vibrations and trips the Main Turbine LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-47 VALIDATION TIME: 20 minutes PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
STOP TIME ________      END OF TASK
 
JPM d 1
OPERATOR: ________________________________
RO ____         SRO           DATE: ___________
 
JPM NUMBER: d- ALTERNATE PATH TASK NUMBER: U-047-NO-20 TASK TITLE: Control Valve Tightness Test
 
K/A NUMBER:
245000 A 3.08   K/A RATING: RO 3.0 SRO: 3.1 TASK STANDARD: Control Valve Tightness Test IAW 3-OI-47 section 6.9, responds to high turbine vibrations and trips the Main Turbine  
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-47 VALIDATION TIME: 20 minutes
 
PERFORMANCE TIME:
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
 
Additional comment sheets attached? YES ___ NO ___
Additional comment sheets attached? YES
RESULTS:     SATISFACTORY ____             UNSATISFACTORY ____
___   NO ___
SIGNATURE: __________________________               DATE: __________
RESULTS: SATISFACTORY
EXAMINER 1
____ UNSATISFACTORY
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER


INITIAL CONDITIONS: You are an Operator on Unit 3. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 3-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 3-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 3-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
INITIAL CONDITIONS: You are an Operator on Unit 3. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 3-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 3-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 3-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 3-OI-47 section 6.9 starting at step 9.


INITIATING CUE
JPM d
:  The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 3-OI-47 section 6.9 starting at step 9.
**************************************************************************
 
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
JPM d 3    **************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
 
**************************************************************************
**************************************************************************
INITIAL CONDITIONS: You are an Operator on Unit 3. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 3-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 3-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 3-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
INITIAL CONDITIONS: You are an Operator on Unit 3. The Turbine-Generator has been operating at 200 MWe for the past 3 hours, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 3-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 3-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 3-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.
INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 3-OI-47 section 6.9 starting at step 9.
3


INITIATING CUE
JPM d START TIME ________
: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 3-OI-47 section 6.9 starting at step 9.  
**************************************************************************
Performance Step 1:                                 Critical X Not Critical 6.9 Control Valve Tightness Test
[9]    DEPRESS Turbine TRIP pushbutton 3-HS-47-67D.
Standard:
Trips the Turbine.
SAT    UNSAT      N/A    COMMENTS:
**************************************************************************
Performance Step 2:                                Critical X Not Critical
[10]  DEPRESS Turbine RESET pushbutton 3-HS-47-67E.
Standard:
Resets the Turbine.
SAT    UNSAT      N/A    COMMENTS:
4


JPM d 4 ST ART TIME ________           
JPM d
**************************************************************************
**************************************************************************
Performance Step 1:     Critical Not Critical 6.9 Control Valve Tightness Test
Performance Step 3:                                          Critical Not Critical X
[11]  VERIFY ISVs are full open prior to continuing with the next step.
Standard:
Verifies ISVs FULL Open prior to step 12 SAT    UNSAT        N/A    COMMENTS:
CUE:          If a question is raised whether the ISVs are Full Open, inform the Operator that the ISVs are Full Open
**************************************************************************
Performance Step 4:                                          Critical X Not Critical
[12]  DEPRESS the Start Up Rate FAST pushbutton, 3-HS-47-77C.
Standard:
Depresses the Start Up Rate Fast pushbutton.
SAT    UNSAT        N/A    COMMENTS:
**************************************************************************
Performance Step 5:                                         Critical Not Critical X
[13]  VERIFY CV POSITION LIMIT, 3-XI-47-157, is set to approximately 66%.
Standard:
Verifies CV Position Limit set to about 66%
SAT    UNSAT        N/A    COMMENTS:
5


[9] DEPRESS Turbine TRIP pushbutton 3-HS-47-67D. Standard:  Trips the Turbine. SAT     UNSAT      N/A       COMMENTS:                    
JPM d
**************************************************************************
Performance Step 6:                                      Critical X Not Critical
[14]   DEPRESS SYNC SPEED pushbutton, 3-HS-47-77H.
Standard:
Depresses Synch Speed pushbutton.
SAT    UNSAT      N/A    COMMENTS:
**************************************************************************
Performance Step 7:                                      Critical Not Critical X
[15]   WHEN turbine speed is greater than 900 RPM, THEN PLACE Bearing Lift Pumps in Auto by placing the TURBINE TURNING GEAR MOTOR control switch, 3-HS-47-10A, in AUTO.
Standard:
When turbine speed > 900 RPM places bearing lift pumps in Auto.
SAT     UNSAT      N/A   COMMENTS:
Driver:      When Turbine Speed is greater than 900 RPM insert bat NRC/turbvibe 6


JPM d
**************************************************************************
**************************************************************************
 
Performance Step 8:                                         Critical Not Critical X
Performance Step 2:     Critical Not Critical
[16]   OBSERVE turbine speed is rising and the TURBINE ACCEL light, 3-ZI-47-77A, illuminates.
[10] DEPRESS Turbine RESET pushbutton 3-HS-47-67E. Standard:   Resets the Turbine. SAT     UNSAT      N/A       COMMENTS:                     
Standard:
 
Observe turbine speed is rising and Turbine Acceleration light On SAT     UNSAT      N/A    COMMENTS:
JPM d 5  **************************************************************************
Performance Step 3:      Critical     Not Critical X  [11]  VERIFY ISVs are full open prior to continuing with the next step.
Standard:  Verifies ISVs FULL Open prior to step 12 SAT      UNSAT      N/A      COMMENTS:                    
 
**************************************************************************
**************************************************************************
Performance Step 9:                                        Critical X Not Critical Monitors and Recognizes a High Vibration Condition exists.
Standard:
Determines that a Turbine Trip is required with Turbine Vibration greater than 12 Mils.
SAT    UNSAT      N/A    COMMENTS:
7


Performance Step 4:      Critical X  Not Critical
JPM d
[12]  DEPRESS the Start Up Rate FAST pushbutton, 3-HS-47-77C. Standard:  Depresses the Start Up Rate Fast pushbutton.
SAT      UNSAT      N/A      COMMENTS:                     
 
**************************************************************************
**************************************************************************
Performance Step 10:                                          Critical X Not Critical NOTE Step 6.9[4] and 6.9[5] contain conditions for tripping the turbine.
[4]    IF any of the following conditions are met, THEN DEPRESS turbine TRIP pushbutton, 3-HS-47-67D:
* THRUST/JOURNAL BRG TEMPERATURE, 3-TR-47-23, indicates thrust bearing metal temperature exceeding 180&deg;F.
* TURB DIFF EXPANSION, 3-XR-47-20, Point 14, located on Panel 3-9-8, indicates less than 100 Mi (Mils) or greater than 400 Mi.
* THRUST/JOURNAL BRG TEMPERATURE, 3-TR-47-23, indicates bearing metal temperatures exceeding 225&deg;F.
[5]    MONITOR Turbine Vibrations and DEPRESS the turbine TRIP pushbutton, 3-HS-47-67D, if any vibration limits listed in the above Table 1 or Table 2 (as applicable) are exceeded.
Standard:
Depresses Turbine Trip Pushbutton SAT      UNSAT        N/A      COMMENTS:
8


Performance Step 5:      Critical    Not Critical X  [13]  VERIFY CV POSITION LIMIT, 3-XI-47-157, is set to approximately 66%.
JPM d
Standard:  Verifies CV Position Limit set to about 66%
SAT      UNSAT      N/A      COMMENTS:
CUE:  If a question is raised whether the ISVs are Full Open, inform the Operator that the ISVs are Full Open
 
JPM d 6  **************************************************************************
Performance Step 6:      Critical X  Not Critical  [14]  DEPRESS SYNC SPEED pushbutton, 3-HS-47-77H. Standard:  Depresses Synch Speed pushbutton. SAT      UNSAT      N/A      COMMENTS:                     
**************************************************************************
Performance Step 7:      Critical    Not Critical X  [15]  WHEN turbine speed is greater than 900 RPM, THEN  PLACE Bearing Lift Pumps in Auto by placing the TURBINE TURNING GEAR MOTOR control switch, 3-HS-47-10A, in AUTO. Standard:
When turbine speed >
900 RPM places bearing lift pumps in Auto. SAT      UNSAT      N/A      COMMENTS:
Driver:  When Turbine Speed is greater than 900 RPM insert bat NRC/turbvibe
 
JPM d 7  **************************************************************************Performance Step 8:      Critical    Not Critical X  [16]  OBSERVE turbine speed is rising and the TURBINE ACCEL light, 3-ZI-47-77A, illuminates.
Standard:  Observe turbine speed is rising and Turbine Acceleration light On SAT      UNSAT      N/A      COMMENTS:                     
 
**************************************************************************
**************************************************************************
 
Performance Step 11:                                       Critical Not Critical X
Performance Step 9:     Critical Not Critical
[17]  WHEN turbine speed reaches 1800 RPM, THEN OBSERVE AT SET SPEED light, 3-IL-47-77B, illuminates and the TURBINE ACCEL light, 3-IL-47-77A extinguishes.
 
Standard:
Monitors and Recognizes a High Vibration Condition exists. Standard:  Determines that a Turbine Trip is required with Turbine Vibration greater than 12 Mils. SAT      UNSAT      N/A      COMMENTS:                     
At 1800 RPM observes at Set speed light On and Turbine Acceleration light Off SAT     UNSAT       N/A     COMMENTS:
 
JPM d 8  **************************************************************************
Performance Step 10:      Critical X Not Critical NOTE  Step 6.9[4] and 6.9[5] contain conditions for tripping the turbine.
[4]  IF any of the following conditions are met, THEN  DEPRESS turbine TRIP pushbutton, 3-HS-47-67D:  3-TR-47-23, indicates thrust bearing metal temperature exceeding 180&deg;F. 3-XR-47-20, Point 14, located on Panel 3-9-8, indicates less than 100 Mi (Mils) or greater than 400 Mi. 3-TR-47-23, indicates bearing metal temperatures exceeding 225&deg;F.
 
[5] MONITOR Turbine Vibrations and DEPRESS the turbine TRIP pushbutton, 3-HS-47-67D, if any vibration limits listed in the above Table 1 or Table 2 (as applicable) are exceeded. Standard:   Depresses Turbine Trip Pushbutton SAT      UNSAT      N/A      COMMENTS:
JPM d 9  **************************************************************************
Performance Step 11:      Critical    Not Critical X  [17]  WHEN turbine speed reaches 1800 RPM, THEN OBSERVE AT SET SPEED light, 3-IL-47-77B, illuminates and the TURBINE ACCEL light, 3-IL-47-77A extinguishes.
Standard:   At 1800 RPM observes at Set speed light On and Turbine Acceleration light Off   SAT     UNSAT       N/A       COMMENTS:                    
 
**************************************************************************
**************************************************************************
Performance Step 12:                                        Critical Not Critical X
[18]  RECORD test results in the Narrative Log.
[19]  NOTIFY Unit Supervisor of test results.
Standard:
Narrative Logs are not modeled on the simulator. Step [18] is not applicable.
Notifies the Unit Supervisor of Turbine Trip.
SAT    UNSAT        N/A    COMMENTS:
STOP TIME ________
END OF TASK 9


Performance Step 12:      Critical    Not Critical X  [18]  RECORD test results in the Narrative Log.
JPM e OPERATOR: ___________________________
 
RO ____       SRO           DATE:
[19]  NOTIFY Unit Supervisor of test results.
JPM NUMBER:         e TASK NUMBER:         U-064-NO-03 TASK TITLE:         Vent Drywell IAW 2-AOI-64-1 K/A NUMBER: 223001 EA1.14           K/A RATING: RO 4.2 SRO: 4.1 TASK STANDARD: Vent the Drywell with Standby Gas Treatment Fan.
Standard:  Narrative Logs are not modeled on the simulator. Step [18] is not applicable.
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI-64-1 VALIDATION TIME:
Notifies the Unit Supervisor of Turbine Trip. SAT      UNSAT      N/A      COMMENTS:                   
PERFORMANCE TIME:
 
COMMENTS: _________________________________________________________
STOP TIME ________      END OF TASK
 
JPM e OPERATOR: ___________________________
RO ____ SRO         DATE:
JPM NUMBER: e TASK NUMBER: U-064-NO-03 TASK TITLE: Vent Drywell IAW 2-AOI-64-1 K/A NUMBER: 223001 EA1.14 K/A RATING: RO 4.2 SRO: 4.1 TASK STANDARD:
Vent the Drywell with Standby Gas Treatment Fan.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI-64-1 VALIDATION TIME:
PERFORMANCE TIME:  
 
COMMENTS:
_________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ___            UNSATISFACTORY ___
SIGNATURE: _________________________          DATE: __________
EXAMINER


Additional comment sheets attached?  YES
___  NO ___
RESULTS: SATISFACTORY
___  UNSATISFACTORY
___
SIGNATURE:
_________________________
DATE: __________
EXAMINER 2
INITIAL CONDITIONS: You are a Reactor Operator. The Unit 2 reactor is at 100%. 2-EOI-2 has been entered on suppression pool water level high. All available drywell cooling is in service.
INITIAL CONDITIONS: You are a Reactor Operator. The Unit 2 reactor is at 100%. 2-EOI-2 has been entered on suppression pool water level high. All available drywell cooling is in service.
Drywell pressure is 1.8 PSIG and rising slowly.
Drywell pressure is 1.8 PSIG and rising slowly.
INITIATING CUE: The Unit Supervisor has directed you to vent the drywell in accordance with 2-AOI-64-1.
2


INITIATING CUE
JPM e
:  The Unit Supervisor has directed you to vent the drywell in accordance with 2-AOI-64-1. 
****************************************************************************
 
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
JPM e   ****************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*****************************************************************************
*****************************************************************************
INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor is at 60%. 2-EOI-2 has been entered on suppression pool water level high. All available drywell cooling is in service.
Drywell pressure is 1.8 PSIG and rising slowly.
INITIATING CUE: The Unit Supervisor has directed you to vent the drywell in accordance with 2-AOI-64-1.


INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor is at 60%. 2-EOI-2 has been entered on suppression pool water level high. All available drywell cooling is in service. Drywell pressure is 1.8 PSIG and rising slowly. 
JPM e START TIME
 
*******************************************************************************
INITIATING CUE
Performance Step 1:                                               Critical Not Critical X 4.2 Subsequent Actions
:  The Unit Supervisor has directed you to vent the drywell in accordance with 2-AOI-64-1.   
[1]   IF any EOI entry condition is met, THEN ENTER appropriate EOI(s). (Otherwise N/A)
 
JPM e START TIME          
  *******************************************************************************
 
Performance Step 1:       Critical     Not Critical X 4.2 Subsequent Actions
[1] IF any EOI entry condition is met, THEN ENTER appropriate EOI(s). (Otherwise N/A)
Standard:
Standard:
N/A. SAT     UNSAT       N/A       COMMENTS:                      
N/A.
*******************************************************************************
SAT     UNSAT       N/A     COMMENTS:
Performance Step 2:       Critical     Not Critical X [2] IF Drywell Pressure is High, THEN PERFORM the following: (Otherwise N/A)
*******************************************************************************
Performance Step 2:                                               Critical Not Critical X
[2]   IF Drywell Pressure is High, THEN PERFORM the following: (Otherwise N/A)
[2.1]  CHECK Drywell pressure using multiple indications.
[2.1]  CHECK Drywell pressure using multiple indications.
[2.2]  IF Drywell pressure rising rate indicates Reactor Scram at 2.45 psi is imminent, THEN REDUCE Reactor power via Recirc flow to minimize the impact of a scram from high power.
[2.3]  CHECK Drywell pressure using multiple indications.
[2.4]  ALIGN and START additional Drywell coolers and fans as necessary. REFER TO 2-OI-64.
Standard:
Given in initial conditions.
SAT    UNSAT        N/A    COMMENTS:


[2.2]  IF Drywell pressure rising rate indicates Reactor Scram at 2.45 psi is imminent, THEN REDUCE Reactor power via Recirc flow to minimize the impact of a scram from high power.
JPM e
 
*******************************************************************************
[2.3]  CHECK Drywell pressure using multiple indications.
Performance Step 3:                                                 Critical X Not Critical CAUTION Stack release rates exceeding 1.4 X 107 ci/sec, or a SI-4.8.B.1.a.1 release fraction above one will result in ODCM release limits being exceeded.
 
[2.4]  ALIGN and START additional Drywell coolers and fans as necessary. REFER TO 2-OI-64. Standard:  Given in initial conditions. SAT      UNSAT      N/A      COMMENTS:                       
 
JPM e *******************************************************************************
Performance Step 3:       Critical X Not Critical   CAUTION Stack release rates exceeding 1.4 X 10 7 -4.8.B.1.a.1 release fraction above one will result in ODCM release limits being exceeded.
[2.5]  VENT Drywell as follows:
[2.5]  VENT Drywell as follows:
[2.5.1] CLOSE SUPPR CHBR INBD ISOLATION VLV 2-FCV-64-34 (Panel 2-9-3). Standard:   Closes 2-FCV-63-34. SAT     UNSAT       N/A       COMMENTS:                      
[2.5.1] CLOSE SUPPR CHBR INBD ISOLATION VLV 2-FCV-64-34 (Panel 2-9-3).
 
Standard:
Closes 2-FCV-63-34.
SAT     UNSAT       N/A     COMMENTS:
****************************************************************************
****************************************************************************
 
Performance Step 4:                                                 Critical Not Critical X
Performance Step 4:       Critical     Not Critical X [2.5.2] VERIFY OPEN, DRYWELL INBD ISOLATION VLV, 2-FCV-64-31 (Panel 2-9-3). Standard:
[2.5.2] VERIFY OPEN, DRYWELL INBD ISOLATION VLV, 2-FCV-64-31 (Panel 2-9-3).
Standard:
Verifies 2-FCV-64-31 is open.
Verifies 2-FCV-64-31 is open.
SAT     UNSAT       N/A       COMMENTS:                      
SAT     UNSAT       N/A     COMMENTS:


JPM e *******************************************************************************
JPM e
Performance Step 5:       Critical     Not Critical X [2.5.3] VERIFY 2-FIC-84-20 is in AUTO and SET at 100 scfm (Panel 2-9-55).
*******************************************************************************
Standard: Verifies 2-FIC-84-20 is in AUTO and SET at 100 scfm.
Performance Step 5:                                               Critical Not Critical X
SAT      UNSAT      N/A      COMMENTS:                      
[2.5.3] VERIFY 2-FIC-84-20 is in AUTO and SET at 100 scfm (Panel 2-9-55).
Standard:
Verifies 2-FIC-84-20 is in AUTO and SET at 100 scfm.
SAT      UNSAT      N/A      COMMENTS:
****************************************************************************
Performance Step 6:                                                Critical X Not Critical
[2.5.4] VERIFY RUNNING a Standby Gas Treatment Fan STGTS TRAIN C(A)(B)
(Panel 2-9-25).
Standard:
Starts SGTS TRAIN C FAN (Panel 2-9-25).
SAT      UNSAT      N/A      COMMENTS:
Driver: If requested as Unit 1 Operator to start SGTS Fan A or B, report: Unit 1 Control Room Staff are unavailable to start the SGTS fans.


JPM e
*******************************************************************************
Performance Step 7:                                              Critical Not Critical X
[2.5.5] IF required, THEN REQUEST Unit 1 Operator to START Standby Gas Treatment Fans A or B. (Otherwise N/A)
CAUTION If 2-FCV-84-20 closes after 2-HS-64-35 is opened, the reason for valve closure must be cleared and 2-HS-64-35 must be returned to OPEN in order for 2-FCV-84-20 to re-open.
[2.5.6] IF required, THEN RECORD venting data in 2-SI-4.7.A.2.a (Otherwise N/A)
Standard:
N/A SAT    UNSAT        N/A    COMMENTS:
CUE: IF asked as Unit Supervisor, then report: 2-SI-4.7.A.2.a is NOT required.
****************************************************************************
****************************************************************************
Performance Step 8:                                              Critical X Not Critical
[2.5.7] PLACE 2-FCV-84-20 CONTROL DW/SUPPR CHBR VENT, 2-HS-64-35, in OPEN (Panel 2-9-3).
Standard:
Places 2-HS-64-35, in OPEN.
SAT    UNSAT        N/A    COMMENTS:


Performance Step 6:       Critical Not Critical   [2.5.4] VERIFY RUNNING a Standby Gas Treatment Fan STGTS TRAIN C(A)(B)
JPM e
(Panel 2-9-25). Standard:  Starts SGTS TRAIN C FAN (Panel 2-9-25). SAT     UNSAT       N/A       COMMENTS:
*******************************************************************************
Driver: If requested as Unit 1 Operator to start SGTS Fan A or B, report: Unit 1 Control Room Staff are unavailable to start the SGTS fans
Performance Step 9:                                                 Critical Not Critical X
.
[2.5.8] MONITOR stack release rates to prevent exceeding ODCM limits.
JPM  e  *******************************************************************************
Standard:
 
Calls for rounds operator to perform 0-SI-4.8.B.1.a.1, Airborne Effluent Release rate (Gas Log).
Performance Step 7:       Critical     Not Critical [2.5.5] IF required, THEN REQUEST Unit 1 Operator to START Standby Gas Treatment Fans A or B. (Otherwise N/A)   CAUTION If 2-FCV-84-20 closes after 2
SAT     UNSAT       N/A     COMMENTS:
-HS-64-35 is opened, the reason for valve closure must be cleared and 2
CUE: As rounds operator when requested to perform the Gas Log, report: The rounds operator is performing 0-SI-4.8.B.1.a.1, Airborne Effluent Release rate (Gas Log).
-HS-64-35 must be returned to OPEN in order for 2-FCV-84-20 to re-open.
****************************************************************************
[2.5.6]
Performance Step 10:                                                 Critical X Not Critical
IF required, THEN RECORD venting data in 2-SI-4.7.A.2.a (Otherwise N/A)  Standard:
[2.5.9] WHEN Drywell pressure has been reduced as required, THEN STOP SGT Train(s).
N/A  SAT     UNSAT       N/A       COMMENTS:
Standard:
CUE: IF asked as Unit Supervisor, then report: 2
Stops the running SBGT Train.
-SI-4.7.A.2.a is NOT required.
SAT     UNSAT       N/A     COMMENTS:
CUE: When Performance Step 9 is complete, and at the discretion of the evaluator: Report to the candidate that time compression will be used and Drywell Pressure has lowered to 1.5 PSIG .
Drywell venting is no longer required.


JPM e
****************************************************************************
Performance Step 11:                                          Critical X Not Critical
[2.5.10] VERIFY 2-HS-64-35, in AUTO and 2-FCV-84-20 CLOSED (Panel 2-9-3).
Standard:
Verifies 2-HS-64-35 in AUTO Verifies 2-FCV-84-20 CLOSED (Green Light ON and Red Light OFF on 2-ZI-84-20)
SAT    UNSAT      N/A      COMMENTS:
****************************************************************************
Performance Step 12:                                          Critical X Not Critical
[2.5.11] OPEN SUPPR CHBR INBD ISOLATION VLV 2-FCV-64-34 (Panel 2-9-3).
Standard:
Opens 2-FCV-64-34.
SAT    UNSAT      N/A      COMMENTS:
****************************************************************************
****************************************************************************
Performance Step 8:       Critical X Not Critical    [2.5.7]  PLACE 2-FCV-84-20 CONTROL DW/SUPPR CHBR VENT, 2
Performance Step 13:                                         Critical Not Critical X
-HS-64-35, in OPEN (Panel 2-9-3). Standard:  Places 2-HS-64-35, in OPEN. SAT      UNSAT      N/A      COMMENTS:                       
[2.5.12] VERIFY Drywell DP compressor operates correctly to maintain required Drywell to Suppression Chamber DP.
 
Standard:
JPM  e  *******************************************************************************
Monitors Drywell to Suppression Chamber DP.
Performance Step 9:      Critical     Not Critical X [2.5.8]  MONITOR stack release rates to prevent exceeding ODCM limits.
SAT     UNSAT      N/A      COMMENTS:
Standard:  Calls for rounds operator to perform 0
-SI-4.8.B.1.a.1, Airborne Effluent Release rate (Gas Log). SAT      UNSAT      N/A      COMMENTS:
CUE: As rounds operator when requested to perform the Gas Log, report: The rounds operator is performing 0
-SI-4.8.B.1.a.1, Airborne Effluent Release rate (Gas Log).
  ****************************************************************************
Performance Step 10:      Critical X Not Critical  [2.5.9] WHEN Drywell pressure has been reduced as required, THEN STOP SGT Train(s).
Standard: Stops the running SBGT Train.
SAT      UNSAT      N/A      COMMENTS:
CUE: When Performance Step 9 is complete, and at the discretion of the evaluator: Report to the candidate that time compression will be used and Drywell Pressure has lowered to 1.5 PSIG . Drywell venting is no longer required.
 
JPM  e  ****************************************************************************
Performance Step 11:      Critical X Not Critical  [2.5.10] VERIFY 2-HS-64-35, in AUTO and 2-FCV-84-20 CLOSED (Panel 2-9-3). Standard:  Verifies 2-HS-64-35 in AUTO Verifies 2-FCV-84-20 CLOSED (Green Light ON and Red Light OFF on 2-ZI-84-20)  SAT     UNSAT      N/A       COMMENTS:                       
****************************************************************************
Performance Step 12:      Critical X Not Critical  [2.5.11] OPEN SUPPR CHBR INBD ISOLATION VLV 2-FCV-64-34 (Panel 2-9-3). Standard:  Opens 2-FCV-64-34. SAT     UNSAT      N/A      COMMENTS:                      


JPM e
****************************************************************************
****************************************************************************
Performance Step 13:       Critical     Not Critical X [2.5.12] VERIFY Drywell DP compressor operates correctly to maintain required Drywell to Suppression Chamber DP
Performance Step 14:                                             Critical   Not Critical X
. Standard:  Monitors Drywell to Suppression Chamber DP.
[2.5.13] RECORD SGTS Train(s) run time in appropriate Control Room Reactor narrative log for transfer to 1-SR-2.
SAT      UNSAT      N/A      COMMENTS:                       
Standard:
 
Narrative Logs are not modeled on the simulator. Step [2.5.13] is not applicable.
JPM  e  ****************************************************************************
Records SGTS Train C run time in narrative log.
Performance Step 14:      Critical    Not Critical X  [2.5.13] RECORD SGTS Train(s) run time in appropriate Control Room Reactor narrative log for transfer to 1
SAT     UNSAT       N/A     COMMENTS:
-SR-2. Standard: Narrative Logs are not modeled on the simulator. Step [2.5.13] is not applicable. Records SGTS Train C run time in narrative log. SAT     UNSAT       N/A       COMMENTS:                      
 
STOP TIME END OF TASK
STOP TIME END OF TASK


JPM f OPERATOR: ________________________________
JPM f OPERATOR: ________________________________
RO         SRO           DATE:                      
RO           SRO                   DATE:
 
JPM NUMBER:         f TASK NUMBER:         S-57A-NO-01 TASK TITLE: Perform Control Room Transfer of 4kV Unit Board 2B Power Supplies K/A NUMBER: 262001A4.03                   K/A RATING: RO 3.2 SRO 3.4 TASK STANDARD: Perform control room operation required to successfully transfer 4kV unit board 2B power supply from normal to alternate power supply.
JPM NUMBER: f TASK NUMBER: S-57A-NO-01 TASK TITLE: Perform Control Room Transfer of 4kV Unit Board 2B Power Supplies  
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 0-OI-57A VALIDATION TIME: 8 minutes PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
K/A NUMBER: 262001A4.03 K/A RATING: RO 3.2 SRO 3.4 TASK STANDARD: Perform control room operation required to successfully transfer 4kV unit board 2B power supply from normal to alternate power supply.  
 
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 0-OI-57A VALIDATION TIME:   8 minutes PERFORMANCE TIME:
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________            DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS:
___  NO ___
You are the Reactor Operator. Preventative maintenance is required on 4kV Unit Board 2B Normal Feeder Breaker, 1214.
RESULTS: SATISFACTORY
INITIATING CUE:
____ UNSATISFACTORY
The Shift Manager has directed you to transfer 4kV Unit Board 2B from the USST to the Start Bus per 0-OI-57A, section 8.13.1.
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER 
 
INITIAL CONDITIONS:   You are the Reactor Operator. Preventative maintenance is required on 4kV Unit Board 2B Normal Feeder Breaker, 1214.  
 
INITIATING CUE:   The Shift Manager has directed you to transfer 4kV Unit Board 2B from the USST to the Start Bus per 0-OI-57A, section 8.13.1.
 
JPM f  3  *******************************************************************************
IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


JPM f
*******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
*******************************************************************************
INITIAL CONDITIONS:
You are the Reactor Operator. Preventative maintenance is required on 4KV Unit Board 2B Normal Feeder Breaker, 1214.The Precautions and limitations of 0-OI-57A, Switchyard and 4160V AC Electrical System, have been reviewed.
.
INITIATING CUE:
The Shift Manager has directed you to transfer 4kV Unit Board 2B from the USST to the Start Bus per 0-OI-57A, section 8.13.1.
3


INITIAL CONDITIONS:  You are the Reactor Operator. Preventative maintenance is required on 4KV Unit Board 2B Normal Feeder Breaker, 1214.The Precautions and limitations of 0-OI-57A, Switchyard and 4160V AC Electrical System, have been reviewed.
JPM f START TIME
.
*****************************************************************************
 
Performance Step 1:                                               Critical Not Critical X 8.13   Control Room Transfer of 4kV Unit Board 2B Power Supplies 8.13.1 Transfer 4kv Unit Board 2B from USST to Start Bus
INITIATING CUE:  The Shift Manager has directed you to transfer 4kV Unit Board 2B from the USST to the Start Bus per 0-OI-57A, section 8.13.1.
[1]   REVIEW all Precautions and Limitations.
 
[2]   NOTIFY NSS of possible loss of power to Security Systems prior to transferring 4kV UNIT BD 2B.
JPM f START TIME          
Standard:
  *****************************************************************************
Review of precautions and limitations given in initial conditions.
 
Performance Step 1:       Critical     Not Critical X 8.13 Control Room Transfer of 4kV Unit Board 2B Power Supplies  
 
8.13.1 Transfer 4kv Unit Board 2B from USST to Start Bus
[1] REVIEW all Precautions and Limitations.
 
[2] NOTIFY NSS of possible loss of power to Security Systems prior to transferring 4kV UNIT BD 2B.
Standard: Review of precautions and limitations given in initial conditions.
Notifies NSS of possible loss of power to security systems.
Notifies NSS of possible loss of power to security systems.
SAT     UNSAT       N/A       COMMENTS:                      
SAT     UNSAT       N/A   COMMENTS:
CAUTIONS
: 1)    Capacitor bank fuses are subject to clearing when the unit boards are being supplied from the 161 source and large pumps are started. Unit Supervisors should evaluate placing the Capacitor Banks in Manual prior to starting Condensate, CBP, RHR, CS or CCW pumps.
: 2)    If 4kV Unit Board 2B is fed from the Alternate Power Supply, then Auto Transfer must be blocked for 4kV Unit Boards: 1A, 1B, 2A, 3A and 3B. (Ref. 2-45E721 OPL3
          & 1-45E721 OPL5)
: 3)    If 4kV Unit Board 2B is fed from the Alternate Power Supply (Start Bus), then Shutdown Bus 1 Auto transfer must be blocked.(Ref. 2-45E721 OPL3)\
: 4)    If either 4kV UNIT BD 1A, 1B, 2A, 3A or 3B is aligned to a Start Bus, prior to aligning UNIT BD 2B to Start Bus, check Technical Specifications 3.8.1.a and 3.8.2.a to determine operability of qualified AC circuits between the offsite transmission network and the onsite Class 1E Electrical Power Distribution System.
4


CAUTIONS 1) Capacitor bank fuses are subject to clearing when the unit boards are being supplied from the 161 source and large pumps are started. Unit Supervisors should evaluate placing the Capacitor Banks in Manual prior to starting Condensate, CBP, RHR, CS or CCW pumps. 2) If 4kV Unit Board 2B is fed from the Alternate Power Supply, then Auto Transfer must be blocked for 4kV Unit Boards: 1A, 1B, 2A, 3A and 3B. (Ref. 2-45E721 OPL3
JPM f NOTES
 
: 1)     All procedural steps are performed from Control Room Panel 2-9-8.
& 1-45E721 OPL5)
: 2)     This procedure section contains actions to ensure electrical load restrictions are not exceeded when 4kV UNIT BD 2B is placed on the Alternate Supply (Start Bus).
: 3) If 4kV Unit Board 2B is fed from the Alternate Power Supply (Start Bus), then Shutdown Bus 1 Auto transfer must be blocked.(Ref. 2-45E721 OPL3)\
****************************************************************************
: 4)  If either 4kV UNIT BD 1A, 1B, 2A, 3A or 3B is aligned to a Start Bus, prior to aligning UNIT BD 2B to Start Bus, check Technical Specifications 3.8.1.a and 3.8.2.a to determine operability of qualified AC circuits between the offsite transmission network and the onsite Class 1E Electrical Power Distribution System.
Performance Step 2:                                                 Critical Not Critical X
 
[3]     ENSURE 4kV Start Busses are aligned Normal:
JPM f NOTES 1) All procedural steps are performed from Control Room Panel 2-9-8.
: 2) This procedure section contains actions to ensure electrical load restrictions are not exceeded when 4kV UNIT BD 2B is placed on the Alternate Supply (Start Bus). ****************************************************************************
 
Performance Step 2:       Critical     Not Critical X
[3]   ENSURE 4kV Start Busses are aligned Normal:
[3.1]  On Panel 9-23-2, VERIFY 4kV Start Bus 1A ALT FDR BKR 1518 OPEN.
[3.1]  On Panel 9-23-2, VERIFY 4kV Start Bus 1A ALT FDR BKR 1518 OPEN.
[3.2]  On Panel 9-23-2, VERIFY 4kV Start Bus 1B ALT FDR BKR 1414 OPEN.
[3.2]  On Panel 9-23-2, VERIFY 4kV Start Bus 1B ALT FDR BKR 1414 OPEN.
Standard: Verifies Start Busses are aligned normal by Verifying the alt bkrs 1518 and 1414 are open. SAT     UNSAT       N/A       COMMENTS:
Standard:
JPM f  6  ******************************************************************************
Verifies Start Busses are aligned normal by Verifying the alt bkrs 1518 and 1414 are open.
Performance Step 3:      Critical    Not Critical X  [4]  On panel 0-9-23-7, VERIFY Shutdown Bus 1 is fed from Normal Supply (4kV Unit Board 1A).
SAT     UNSAT       N/A     COMMENTS:
Standard:  Verifies Shutdown Bus 1 is fed from Normal Supply. SAT      UNSAT      N/A      COMMENTS:                       
5


JPM f
******************************************************************************
Performance Step 3:                                          Critical  Not Critical X
[4]    On panel 0-9-23-7, VERIFY Shutdown Bus 1 is fed from Normal Supply (4kV Unit Board 1A).
Standard:
Verifies Shutdown Bus 1 is fed from Normal Supply.
SAT    UNSAT        N/A      COMMENTS:
*******************************************************************************
*******************************************************************************
 
Performance Step 4:                                           *Critical X Not Critical
Performance Step 4:       *Critical X   Not Critical   *[5] On panel 0-9-23-7, MOMENTARILY DEPRESS 0-HS-211-AB1, 4kV SD BUS 1 AUTO TO MANUAL TRIP push-button, and CHECK the following:
*[5]   On panel 0-9-23-7, MOMENTARILY DEPRESS 0-HS-211-AB1, 4kV SD BUS 1 AUTO TO MANUAL TRIP push-button, and CHECK the following:
A. 0-HS-211-AB1, 4kV SD BUS 1 AUTO TO MANUAL TRIP push-button, light extinguished.
A. 0-HS-211-AB1, 4kV SD BUS 1 AUTO TO MANUAL TRIP push-button, light extinguished.
B. 0-43-211-AB1, 4kV SD BUS 1 AUTO/LOCKOUT RESET, trips. Standard: *Depresse s 0-HS-211-AB1 Verifies the light extinguished and 0-43-211-AB1 trips SAT     UNSAT       N/A       COMMENTS:                      
B. 0-43-211-AB1, 4kV SD BUS 1 AUTO/LOCKOUT RESET, trips.
Standard:
      *Depresses 0-HS-211-AB1 Verifies the light extinguished and 0-43-211-AB1 trips SAT     UNSAT       N/A     COMMENTS:
6


JPM f *******************************************************************************
JPM f
Performance Step 5:       Critical     Not Critical X [6] RE-ALIGN 4kV Auto Transfers to meet Load Restrictions.
*******************************************************************************
Performance Step 5:                                             Critical Not Critical X
[6]   RE-ALIGN 4kV Auto Transfers to meet Load Restrictions.
[6.1]  On Panel 1-9-8, VERIFY 1-XS-57-4, 4kV UNIT BD 1A MAN/AUTO SELECT switch to MAN.
[6.1]  On Panel 1-9-8, VERIFY 1-XS-57-4, 4kV UNIT BD 1A MAN/AUTO SELECT switch to MAN.
[6.2]  On Panel 1-9-8, VERIFY 1-XS-57-7, 4kV UNIT BD 1B MAN/AUTO SELECT switch to MAN.
[6.2]  On Panel 1-9-8, VERIFY 1-XS-57-7, 4kV UNIT BD 1B MAN/AUTO SELECT switch to MAN.
Standard:   Contacts Unit 1 Operator to place 1-XS-57-4 and 1-XS-57-7 to Manual on panel 1-9-8.
Standard:
SAT     UNSAT      N/A       COMMENTS:                      
Contacts Unit 1 Operator to place 1-XS-57-4 and 1-XS-57-7 to Manual on panel 1-9-8.
 
SAT     UNSAT      N/A   COMMENTS:
CUE: [As Unit 1 Operator, Report] 1-XS-57-4 and 1-XS-57-7 are in Manual.
*****************************************************************************
*****************************************************************************
 
Performance Step 6:                                             Critical X Not Critical
Performance Step 6:       Critical X   Not Critical
[6.3]  VERIFY 2-XS-57-4, 4kV UNIT BD 2A MAN/AUTO SELECT switch to MAN.
[6.3]  VERIFY 2-XS-57-4, 4kV UNIT BD 2A MAN/AUTO SELECT switch to MAN.
[6.4]  VERIFY 2-XS-57-7, 4kV UNIT BD 2B MAN/AUTO SELECT switch to MAN.
[6.4]  VERIFY 2-XS-57-7, 4kV UNIT BD 2B MAN/AUTO SELECT switch to MAN.
Standard:
Standard:
Places 2-XS-57-4 and 2-XS-57-7 switch to manual.
Places 2-XS-57-4 and 2-XS-57-7 switch to manual.
SAT     UNSAT      N/A       COMMENTS:
SAT     UNSAT      N/A   COMMENTS:
CUE: [As Unit 1 Operator, Report]
7
1-XS-57-4 and 1-XS-57-7 are in Manual.


JPM f ****************************************************************************
JPM f
Performance Step 7:       Critical     Not Critical X [6.5]  On Panel 3-9-8, VERIFY 3-XS-57-4, 4kV UNIT BD 3A MAN/AUTO SELECT switch to MAN.
****************************************************************************
Performance Step 7:                                             Critical Not Critical X
[6.5]  On Panel 3-9-8, VERIFY 3-XS-57-4, 4kV UNIT BD 3A MAN/AUTO SELECT switch to MAN.
[6.6]  On Panel 3-9-8, VERIFY 3-XS-57-7, 4kV UNIT BD 3B MAN/AUTO SELECT switch to MAN.
[6.6]  On Panel 3-9-8, VERIFY 3-XS-57-7, 4kV UNIT BD 3B MAN/AUTO SELECT switch to MAN.
Standard:   Contacts Unit 3 Operator to place 3-XS-57-4 and 3-XS-57-7 to Manual on panel 3-9-8.
Standard:
SAT     UNSAT      N/A       COMMENTS:                      
Contacts Unit 3 Operator to place 3-XS-57-4 and 3-XS-57-7 to Manual on panel 3-9-8.
SAT     UNSAT      N/A   COMMENTS:
CUE: [As Unit 3 Operator, Report] 3-XS-57-4 and 3-XS-57-7 are in Manual.
8


CUE: [As Unit 3 Operator, Report]
JPM f
3-XS-57-4 and 3-XS-57-7 are in Manual.
****************************************************************************
 
Performance Step 8:                                       Critical Not Critical X
JPM f ****************************************************************************
[7]   TRANSFER 4kv UNIT BD 2B to the ALT FDR, BKR 1526
Performance Step 8:       Critical     Not Critical X [7] TRANSFER 4kv UNIT BD 2B to the ALT FDR, BKR 1526
[7.1]  PLACE 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT switch to START BUS 1B.
[7.1]  PLACE 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT switch to START BUS 1B.  
[7.2]  CHECK START BUS 1B Voltage on 2-EI-57-28 is between 3950 and 4400 Volts.
 
Standard:
[7.2]  CHECK START BUS 1B Voltage on 2
Placed 2-XS-202-1 switch to START BUS 1B.
-EI-57-28 is between 3950 and 4400 Volts.
Checked START BUS 1B Voltage on 2-EI-57-28 is between 3950 and 4400 Volts.
Standard: Placed 2-XS-202-1 switch to START BUS 1B. Checked START BUS 1B Voltage on 2-EI-57-28 is between 3950 and 4400 Volts.
SAT     UNSAT      N/A   COMMENTS:
SAT     UNSAT      N/A       COMMENTS:                      
****************************************************************************
****************************************************************************
Performance Step 9:                                       Critical X Not Critical
 
[7.3]  PLACE and HOLD 2-HS-57-8, 4kV UNIT BD 2B ALT FDR BKR 1526 switch to CLOSE.
Performance Step 9:       Critical X   Not Critical
Standard:
[7.3]  PLACE and HOLD 2-HS-57-8, 4kV UNIT BD 2B ALT FDR BKR 1526 switch to CLOSE. Standard:
Places and Holds 2-HS-57-8, 4kV UNIT BD 2B ALT FDR BKR 1526 switch to CLOSE.
Places and Holds 2-HS-57-8, 4kV UNIT BD 2B ALT FDR BKR 1526 switch to CLOSE.
SAT     UNSAT      N/A       COMMENTS:                      
SAT     UNSAT      N/A   COMMENTS:
9


JPM f 10  *******************************************************************************
JPM f
Performance Step 10:       Critical X   Not Critical
*******************************************************************************
[7.4] PLACE 2-HS-57-6, 4kV UNIT BD 2B NORM FDR BKR 1214 switch to TRIP.
Performance Step 10:                                       Critical X Not Critical
[7.4]   PLACE 2-HS-57-6, 4kV UNIT BD 2B NORM FDR BKR 1214 switch to TRIP.
Standard:
Places 2-HS-57-6, 4kV UNIT BD 2B NORM FDR BKR 1214 switch to TRIP.
SAT    UNSAT      N/A    COMMENTS:
*******************************************************************************
Performance Step 11:                                        Critical Not Critical X
[7.5]  CHECK CLOSED the 4kV UNIT BD 2B, ALT FDR BREAKER 1526.
[7.6]  CHECK OPEN the 4kV UNIT BD 2B, NORM FDR BREAKER 1214.
[7.7]  RELEASE BKRs 1526 and 1214 control switches.
Standard:
Standard:
Place s 2-HS-57-6, 4kV UNIT BD 2B NORM FDR BKR 1214 switch to TRIP.
Checked CLOSED the 4kV UNIT BD 2B, ALT FDR BKR 1526.
SAT      UNSAT      N/A       COMMENTS:                      
Checked OPEN the 4kV UNIT BD 2B, NORM FDR BREAKER 1214 RELEASED BKRs 1526 and 1214 control switches SAT     UNSAT     N/A     COMMENTS:
10


JPM f
*******************************************************************************
*******************************************************************************
 
Performance Step 12:                                           Critical Not Critical X
Performance Step 11:       Critical     Not Critical X [7.5]  CHECK CLOSED the 4kV UNIT BD 2B, ALT FDR BREAKER 1526.
[7.8]   PLACE 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT SWITCH TO UNIT BD 2B.
[7.6]  CHECK OPEN the 4kV UNIT BD 2B, NORM FDR BREAKER 1214.
[7.9]   CHECK 4kV UNIT BD 2B voltage is between 3950 and 4400 Volts.
[7.7]  RELEASE BKRs 1526 and 1214 control switches. Standard:  Checked CLOSED the 4kV UNIT BD 2B, ALT FDR BKR 1526.
Standard:
Checked OPEN the 4kV UNIT BD 2B, NORM FDR BREAKER 1214 RELEASED BKRs 1526 and 1214 control switches
Places 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT SWITCH to UNIT BD 2B Checked 4kV UNIT BD 2B voltage is between 3950 and 4400 Volts.
 
SAT     UNSAT       N/A     COMMENTS:
SAT      UNSAT      N/A      COMMENTS:                       
 
JPM f  11  *******************************************************************************
Performance Step 12:      Critical    Not Critical X  [7.8] PLACE 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT SWITCH TO UNIT BD 2B.
[7.9] CHECK 4kV UNIT BD 2B voltage is between 3950 and 4400 Volts.
Standard:   Places 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT SWITCH to UNIT BD 2B Checked 4kV UNIT BD 2B voltage is between 3950 and 4400 Volts.
SAT     UNSAT       N/A       COMMENTS:                      
 
*******************************************************************************
*******************************************************************************
 
Performance Step 13:                                           Critical Not Critical X
Performance Step 13:       Critical     Not Critical X [7.10] VERIFY LOCALLY 4kV BKR 1526 closing spring target indicates charged and the amber breaker spring charged light is on.
[7.10] VERIFY LOCALLY 4kV BKR 1526 closing spring target indicates charged and the amber breaker spring charged light is on.
Standard:
Standard:
Dispatched AUO to verify breaker 1526 closing spring recharged.  
Dispatched AUO to verify breaker 1526 closing spring recharged.
 
SAT     UNSAT       N/A     COMMENTS:
SAT     UNSAT       N/A       COMMENTS:                      
CUE:         [After Dispatched, the AUO Reports] Breaker 1526 closing spring target indicates charged and the amber breaker spring charged lamp is illuminated.
 
CUE:         That completes this task.
END OF TASK STOP TIME CUE: [After Dispatched, the AUO Reports] Breaker 1526 closing spring target indicates charged and the amber breaker spring charged lamp is illuminated.
END OF TASK STOP TIME 11
CUE: That completes this task.
 
JPM  g 1  OPERATOR: ___________________________
RO ____ SRO          DATE:
JPM NUMBER: g TASK NUMBER: U-000-EM-74 TASK TITLE:  Crosstie CAD to Drywell Control Air
 
K/A NUMBER:
218000 A2.03  K/A RATING: RO 3.4  SRO:  3.6 TASK STANDAR D: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
LOCATION OF PERFORMANCE:
Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix
-8G VALIDATION TIME:  10 minutes
 
PERFORMANCE TIME:


COMMENTS:
JPM g OPERATOR: ___________________________
_________________________________________________________
RO ____      SRO            DATE:
JPM NUMBER:          g TASK NUMBER:        U-000-EM-74 TASK TITLE:          Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03            K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-8G VALIDATION TIME: 10 minutes PERFORMANCE TIME:
COMMENTS: _________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ___            UNSATISFACTORY ___
SIGNATURE: _________________________            DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.
___  NO ___
INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
RESULTS: SATISFACTORY
___  UNSATISFACTORY
___
SIGNATURE:
_________________________
DATE: __________
EXAMINER 
 
INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.  
 
INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air
 
JPM g 3    ****************************************************************************
IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


JPM      g
****************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*****************************************************************************
*****************************************************************************
INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.
INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
3


INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.
JPM     g START TIME
 
*******************************************************************************
INITIATING CUE
Performance Step 1:                                               Critical X Not Critical
:  The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air. 
: 1.     OPEN the following valves:
 
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54)
JPM g START TIME          
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)
  *******************************************************************************
Standard:
 
Opens 0-FCV-84-5 and 16.
Performance Step 1:       Critical X Not Critical
SAT      UNSAT      N/A     COMMENTS:
: 1. OPEN the following valves:
*******************************************************************************
0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54) 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55) Standard:   Opens 0-FCV-84-5 and 16. SAT      UNSAT      N/A       COMMENTS:                      
Performance Step 2:                                               Critical Not Critical X
*******************************************************************************
: 2.     VERIFY 0-PI-84-6, N2 VAPORIZER A OUTLET PRESSURE, and 0-PI-84-17, N2 VAPORIZER B OUTLET PRESSURE, indicate approximately 100 psig (Unit 1, Panel 9-54 and 9-55)
Performance Step 2:       Critical     Not Critical X 2. VERIFY 0-PI-84-6, N2 VAPORIZER A OUTLET PRESSURE, and 0
-PI-84-17, N2 VAPORIZER B OUTLET PRESSURE, indicate approximately 100 psig (Unit 1, Panel 9-54 and 9-55)
Standard:
Standard:
Verifies 0-PI-84-6 and 0-PI-84-17 (Located on back of Unit 2 Panel 9-54 in simulator) indicating approximately 100 psig.
Verifies 0-PI-84-6 and 0-PI-84-17 (Located on back of Unit 2 Panel 9-54 in simulator) indicating approximately 100 psig.
SAT      UNSAT      N/A       COMMENTS:                      
SAT      UNSAT      N/A     COMMENTS:
 
4
JPM g 5  *******************************************************************************
Performance Step 3:      *Critical X  Not Critical
  *3. PLACE keylock switch 2-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-54)
: 4. CHECK OPEN 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 2, Panel 9-54)  Standard:  Places keylock switch 2-HS-84-48 in Open and verifies 2-FSV-84-48 is open. SAT      UNSAT      N/A      COMMENTS:                       


JPM  g
*******************************************************************************
Performance Step 3:                                              *Critical X Not Critical
*3. PLACE keylock switch 2-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-54)
: 4. CHECK OPEN 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 2, Panel 9-54)
Standard:
Places keylock switch 2-HS-84-48 in Open and verifies 2-FSV-84-48 is open.
SAT    UNSAT      N/A    COMMENTS:
****************************************************************************
****************************************************************************
 
Performance Step 4:                                             *Critical X Not Critical
Performance Step 4:       *Critical X Not Critical
*5. PLACE keylock switch 2-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-55)
  *5. PLACE keylock switch 2-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-55)
: 6. CHECK OPEN 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
: 6. CHECK OPEN 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
Standard:   Places keylock switch 2-HS-84-49 in Open and verifies 2-FSV-84-49 open. SAT     UNSAT      N/A       COMMENTS:                      
Standard:
Places keylock switch 2-HS-84-49 in Open and verifies 2-FSV-84-49 open.
SAT     UNSAT      N/A     COMMENTS:
5


JPM g *******************************************************************************
JPM   g
Performance Step 5:       Critical X Not Critical
*******************************************************************************
: 7. CHEC K MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2
Performance Step 5:                                               Critical X Not Critical
-PA-32-31, alarm cleared (2
: 7.     CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, alarm cleared (2-XA-55-3D, Window 18)
-XA-55-3D, Window 18)
Standard:
Standard: Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (2
Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (2-XA-55-3D, Window 18) still in Alarm (would Not clear) and continues with procedure.
-XA-55-3D, Window 18) still in Alarm (would Not clear) and continues with procedure.
SAT      UNSAT       N/A     COMMENTS:
SAT      UNSAT       N/A       COMMENTS:                      
****************************************************************************
****************************************************************************
Performance Step 6:                                              Critical Not Critical X
: 8.      IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, annunciator is or remains in alarm (2-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
: a.      DISPATCH personnel to Unit 2, RB, El 565 ft, to MONITOR the following indications for low pressure:
* 2-PI-84-51, CAD N2 PRESSURE TO DWCA indicator, for CAD A (R-10 S-line, by Drywell Access Door)
* 2-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-12 U-line, behind 480V RB Vent Board 2B)
Standard:
Dispatches personnel to Reactor Building to monitor 2-PI-84-51 and 2-PI-84-50 for low pressure.
SAT      UNSAT        N/A    COMMENTS:
CUE: Do NOT report unless directed by NRC. When dispatched, as AUO, report] 2-PI 51, CAD N 2 Pressure to DWCA indicator, for CAD A is reading 110 psig. 2-PI-84-50 for CAD B is reading 5 psig.
6


Performance Step 6:      Critical    Not Critical X
JPM   g
: 8. IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2
*******************************************************************************
-PA-32-31, annunciator is or remains in alarm (2
Performance Step 7:                                             Critical X Not Critical
-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
: b. MONITOR 0-FI-84-7(18), CAD LINE A(B) N2 FLOW, on Unit 1, Panel 1-9-54(55) for high flow.
: a. DISPATCH personnel to Unit 2, RB, El 565 ft, to MONITOR the following indications for low pressure:
2-PI-84-51, CAD N2 PRESSURE TO DWCA indicator, for CAD A (R-10 S-line, by Drywell Access Door) 2-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-12 U-line, behind 480V RB Vent Board 2B)
Standard:  Dispatches personnel to Reactor Building to monitor 2-PI-84-51 and 2-PI-84-50 for low pressure. SAT      UNSAT      N/A      COMMENTS:
CUE:  Do NOT report unless directed by NRC.
When dispatched, as AUO, report]  2
-PI-84-51, CAD N 2 Pressure to DWCA indicator, for CAD A is reading 110 psig. 2-PI-84-50 for CAD B is reading 5 psig.
JPM g *******************************************************************************
Performance Step 7:       Critical X Not Critical
: b. MONITOR 0-FI-84-7(18), CAD LINE A(B) N2 FLOW, on Unit 1, Panel 1-9-54(55) for high flow.
Standard:
Standard:
Recognizes 0
Recognizes 0-FI-84-7 flow 0 scfm and 0-FI-84-18 flow 90 scfm.
-FI-84-7 flow 0 scfm and 0-FI-84-18 flow 90 scfm.
SAT     UNSAT      N/A     COMMENTS:
SAT     UNSAT      N/A       COMMENTS:
NOTE CAD System A to Drywell Control Air supplies the following MSIVs:
NOTE CAD System A to Drywell Control Air supplies the following MSIVs:
 
* 2-FCV-1-14, MSIV LINE A INBOARD
2-FCV-1-14, MSIV LINE A INBOA RD  2-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
* 2-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
 
* 2-FCV-1-37, MSIV LINE C INBOARD
2-FCV-1-37, MSIV LINE C INBOARD 2-FCV-1-51, MSIV LINE D INBOARD
* 2-FCV-1-51, MSIV LINE D INBOARD
 
****************************************************************************
****************************************************************************
Performance Step 8:                                            Critical Not Critical X
: c. MONITOR inboard MSIV indication status for valves drifting closed.
Standard:
Recognizes 2-FCV-1-37 and 51 closed.
SAT    UNSAT      N/A    COMMENTS:
7


Performance Step 8:       Critical     Not Critical X c. MONITOR inboard MSIV indication status for valves drifting closed.
JPM    g
*******************************************************************************
Performance Step 9:                                           Critical Not Critical X
: 9. IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54)
* 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-54)
Standard:
Standard:
Recognizes 2-FCV-1-37 and 51 closed. SAT      UNSAT      N/A      COMMENTS:
JPM g 8  *******************************************************************************
Performance Step 9:      Critical    Not Critical X
: 9. IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
0-F CV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 1, Panel 9-54)  2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-54)  Standard:
N/A - No indications of being depressurized.
N/A - No indications of being depressurized.
SAT     UNSAT      N/A       COMMENTS:                      
SAT     UNSAT      N/A   COMMENTS:
 
****************************************************************************
****************************************************************************
 
Performance Step 10:                                         Critical X Not Critical
Performance Step 10:       Critical X Not Critical
: 10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
: 10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)   2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55) Standard:
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 1, Panel 9-55)
Closes 0-FCV-84-16 and 2-FSV-84-49. SAT     UNSAT      N/A       COMMENTS:
* 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)
STOP TIME END OF TASK
Standard:
 
Closes 0-FCV-84-16 and 2-FSV-84-49.
JPM  g 1  OPERATOR: ___________________________
SAT     UNSAT      N/A   COMMENTS:
RO ____ SRO          DATE:
STOP TIME END OF TASK 8
JPM NUMBER: g TASK NUMBER: U-000-EM-74 TASK TITLE:  Crosstie CAD to Drywell Control Air


K/A NUMBER:
JPM g OPERATOR: ___________________________
218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
RO ____      SRO            DATE:
LOCATION OF PERFORMANCE:
JPM NUMBER:          g TASK NUMBER:        U-000-EM-74 TASK TITLE:          Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03             K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.
Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix
LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-8G VALIDATION TIME: 10 minutes PERFORMANCE TIME:
-8G VALIDATION TIME: 10 minutes
COMMENTS: _________________________________________________________
 
PERFORMANCE TIME:  
 
COMMENTS:
_________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ___            UNSATISFACTORY ___
SIGNATURE: _________________________            DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.
___  NO ___
INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
RESULTS: SATISFACTORY
___  UNSATISFACTORY
___
SIGNATURE:
_________________________
DATE: __________
EXAMINER 


INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.  
JPM      g
******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.
INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.
3


INITIATING C UE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.  
JPM    g START TIME
*******************************************************************************
Performance Step 1:                                               Critical X Not Critical
: 1. OPEN the following valves:
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Panel 3-9-54)
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Panel 3-9-55)
Standard:
Opens 0-FCV-84-5 and 16.
SAT    UNSAT      N/A    COMMENTS:
*******************************************************************************
Performance Step 2:                                              Critical Not Critical X
: 2. VERIFY 0-PI-84-6/3, VAPOR A OUTLET PRESS, and 0-PI-84-17/3, VAPOR B OUTLET PRESS, indicate approximately 100 psig (Unit 3, Panel 3-9-54 and 3-9-55)
Standard:
Verified 0-PI-84-6/3 and 0-PI-84-17/3 (Located on Unit 3, Panel 3-9-54 and 3-9-55) indicating approximately 100 psig.
SAT    UNSAT      N/A    COMMENTS:
4


JPM g 3    ******************************************************************************
JPM   g
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
Performance Step 3:                                              *Critical X Not Critical
*3. PLACE keylock switch 3-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-54)
: 4. CHECK OPEN 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 3, Panel 3-9-54)
Standard:
Places keylock switch 3-HS-84-48 in Open and verifies 3-FSV-84-48 open.
SAT    UNSAT      N/A    COMMENTS:
****************************************************************************
Performance Step 4:                                              *Critical X Not Critical
*5. PLACE keylock switch 3-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-55)
: 6. CHECK OPEN 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-55)
Standard:
Places keylock switch 3-HS-84-49 in Open and verifies 3-FSV-84-49.
SAT    UNSAT      N/A    COMMENTS:
5


JPM    g
*******************************************************************************
*******************************************************************************
 
Performance Step 5:                                             Critical X Not Critical
INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.
: 7. CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, alarm cleared (3-XA-55-3D, Window 18)
 
Standard:
INITIATING CUE
Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (3-XA-55-3D, Window 18) still in Alarm (would NOT clear) and continues with procedure.
:  The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air. 
SAT     UNSAT       N/A     COMMENTS:
 
JPM g  4  START TIME           
  *******************************************************************************
 
Performance Step 1:       Critical X Not Critical   1. OPEN the following valves:
0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Panel 3-9-54)  0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Panel 3-9-55)  Standard:  Opens 0-FCV-84-5 and 16. SAT      UNSAT      N/A      COMMENTS:                       
*******************************************************************************
Performance Step 2:      Critical    Not Critical X  2. VERIFY 0-PI-84-6/3, VAPOR A OUTLET PRESS, and 0
-PI-84-17/3, VAPOR B OUTLET PRESS, indicate approximately 100 psig (Unit 3, Panel 3-9-54 and 3-9-55)
Standard: Verified 0
-PI-84-6/3 and 0-PI-84-17/3 (Located on Unit 3, Panel 3-9-54 and 3-9-55) indicating approximately 100 psig. SAT      UNSAT      N/A      COMMENTS:                       
 
JPM g  5  *******************************************************************************
Performance Step 3:      *Critical X  Not Critical
    *3. PLACE keylock switch 3-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-54)
: 4. CHECK OPEN 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 3, Panel 3-9-54)  Standard:  Places keylock switch 3
-HS-84-48 in Open and verifies 3
-FSV-84-48 open. SAT     UNSAT       N/A       COMMENTS:                      
 
****************************************************************************
****************************************************************************
 
Performance Step 6:                                             Critical Not Critical X
Performance Step 4:      *Critical X  Not Critical  *5. PLACE keylock switch 3-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-55)
: 6. CHECK OPEN 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-55)  Standard:  Places keylock switch 3-HS-84-49 in Open and verifies 3-FSV-84-49. SAT      UNSAT      N/A      COMMENTS:                       
 
JPM g  6  *******************************************************************************
Performance Step 5:      Critical X  Not Critical  7. CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3
-PA-32-31, alarm cleared (3
-XA-55-3D, Window 18)
Standard:  Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (3-XA-55-3D, Window 18) still in Alarm (would NOT clear) and continues with procedure.
SAT      UNSAT      N/A      COMMENTS:                       
****************************************************************************
 
Performance Step 6:       Critical     Not Critical X
: 8. IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, annunciator is or remains in alarm (3-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
: 8. IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, annunciator is or remains in alarm (3-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
: a. DISPATCH personnel to Unit 3, RB, El 565 ft, to MONITOR the following indications for low pressure:
: a.     DISPATCH personnel to Unit 3, RB, El 565 ft, to MONITOR the following indications for low pressure:
3-PI-84-51, CAD A CROSSTIE TO DWCA PRESS INDR, for CAD A (R-17 S-line, by Drywell Access Door) 3-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-19 U-line, behind 480V RB Vent Board 3B)
* 3-PI-84-51, CAD A CROSSTIE TO DWCA PRESS INDR, for CAD A (R-17 S-line, by Drywell Access Door)
Standard: Dispatches personnel to Reactor Building to monitor 3-PI-84-51 and 3-PI-84-50 for low pressure. SAT     UNSAT       N/A       COMMENTS:
* 3-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-19 U-line, behind 480V RB Vent Board 3B)
CUE: Do NOT report unless directed by NRC.
Standard:
When dispatched, as AUO, report 3-PI-84-51, CAD N 2 Pressure to DWCA indicator, for CAD A is reading 110 psig and 3-PI-84-50 reading 5 psig.  
Dispatches personnel to Reactor Building to monitor 3-PI-84-51 and 3-PI-84-50 for low pressure.
SAT     UNSAT       N/A     COMMENTS:
CUE: Do NOT report unless directed by NRC. When dispatched, as AUO, report 3-PI-84-51, CAD N 2 Pressure to DWCA indicator, for CAD A is reading 110 psig and 3-PI-84-50 reading 5 psig.
6


JPM g *******************************************************************************
JPM   g
Performance Step 7:       Critical X Not Critical
*******************************************************************************
: b. MONITOR 0-FI-84-7/3(18/3), CAD A(B) N2 SYSTEM FLOW, on Panel 3-9-54(55) for high flow.
Performance Step 7:                                               Critical X Not Critical
: b. MONITOR 0-FI-84-7/3(18/3), CAD A(B) N2 SYSTEM FLOW, on Panel 3-9-54(55) for high flow.
Standard:
Standard:
Recognizes 0
Recognizes 0-FI-84-7/3 flow is 0 scfm and that 0-FI-84-18 flow is 50 scfm.
-FI-84-7/3 flow is 0 scfm and that 0-FI-84-18 flow is 50 scfm.
SAT     UNSAT      N/A     COMMENTS:
SAT     UNSAT      N/A       COMMENTS:                      
 
NOTE: CAD System A to Drywell Control Air supplies the following MSIVs:
NOTE: CAD System A to Drywell Control Air supplies the following MSIVs:
3-FCV-1-14, MSIV LINE A INBOARD 3-FCV-1-26, MSIV LINE B INBOARD NOTE: CAD System B to Drywell Control Air supplies the following MSIVs:
* 3-FCV-1-14, MSIV LINE A INBOARD
3-FCV-1-37, MSIV LINE C INBOARD 3-FCV-1-51, MSIV LINE D INBOARD
* 3-FCV-1-26, MSIV LINE B INBOARD NOTE: CAD System B to Drywell Control Air supplies the following MSIVs:
 
* 3-FCV-1-37, MSIV LINE C INBOARD
* 3-FCV-1-51, MSIV LINE D INBOARD
****************************************************************************
****************************************************************************
 
Performance Step 8:                                               Critical Not Critical X
Performance Step 8:       Critical     Not Critical X c. MONITOR inboard MSIV indication status for valves drifting closed.
: c. MONITOR inboard MSIV indication status for valves drifting closed.
Standard:
Standard:
Recognizes 3-FCV-1-37 and 51 closed. SAT     UNSAT      N/A       COMMENTS:                        
Recognizes 3-FCV-1-37 and 51 closed.
SAT     UNSAT      N/A     COMMENTS:
7


JPM g *******************************************************************************
JPM     g
Performance Step 9:       Critical     Not Critical X
*******************************************************************************
Performance Step 9:                                           Critical Not Critical X
: 9. IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
: 9. IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 3, Panel 3-9-54)   3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-54) Standard:
* 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 3, Panel 3-9-54)
* 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-54)
Standard:
N/A - No indications of being depressurized.
N/A - No indications of being depressurized.
SAT     UNSAT      N/A       COMMENTS:                      
SAT     UNSAT      N/A     COMMENTS:
 
****************************************************************************
****************************************************************************
 
Performance Step 10:                                         Critical X Not Critical
Performance Step 10:       Critical X Not Critical
: 10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
: 10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 3, Panel 3-9-55)   3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-55) Standard:
* 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 3, Panel 3-9-55)
Closes 0-FCV-84-16 and 3-FSV-84-49. SAT     UNSAT      N/A       COMMENTS:
* 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-55)
STOP TIME END OF TASK
Standard:
 
Closes 0-FCV-84-16 and 3-FSV-84-49.
JPM h 1  OPERATOR:
SAT     UNSAT      N/A     COMMENTS:
RO          SRO          DATE:
STOP TIME END OF TASK 8
JPM NUMBER: h TASK NUMBER:  U-090-NO-01 TASK TITLE: Returning DW Radiation Monitor CAM, 2-RM-90-256 to service K/A NUMBER:
2 72000 A2.10  K/A RATING: RO 3.9  SRO:  4.1 TASK STANDARD: DW Radiation Monitor CAM, 2-RM-90-256 is in service
 
LOCATION OF PERFORMANCE:
SIMULATOR
 
REFERENCES/PROCEDURES NEEDED: 2-AOI-100-1 VALIDATION TIME:  15 minutes
 
PERFORMANCE TIME:


JPM h OPERATOR:
RO            SRO                  DATE:
JPM NUMBER:          h TASK NUMBER:        U-090-NO-01 TASK TITLE: Returning DW Radiation Monitor CAM, 2-RM-90-256 to service K/A NUMBER: 272000 A2.10            K/A RATING: RO 3.9 SRO: 4.1 TASK STANDARD: DW Radiation Monitor CAM, 2-RM-90-256 is in service LOCATION OF PERFORMANCE: SIMULATOR REFERENCES/PROCEDURES NEEDED: 2-AOI-100-1 VALIDATION TIME: 15 minutes PERFORMANCE TIME:
COMMENTS:
COMMENTS:
Additional comment sheets attached? YES NO RESULTS: SATISFACTORY
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY _____         UNSATISFACTORY_____
_____ UNSATISFACTORY___
SIGNATURE: ____________________               DATE: _____
__
EXAMINER 1
SIGNATURE:
____________________
 
DATE: _____                 EXAMINER
 
JPM h 2  *****************************************************************
IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


JPM h
*****************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
******************************************************************
******************************************************************
INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 2-AOI-100-1, Reactor Scram.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 2-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.
2


INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 2
INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 2-AOI-100-1, Reactor Scram.
-AOI-100-1, Reactor Scram.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 2-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 2-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service
.
 
INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 2
-AOI-100-1, Reactor Scram.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 2-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains , and the Drywell Continuous Air Monitor to service.
JPM h 4  START TIME           
  *******************************************************************************
Performance Step 1:      Critical X  Not Critical
[33]  VERIFY the following systems/equipment in service or RETURN them to service at standby readiness, as necessary, in accordance with the following or the appropriate OI:
 
[33.1]  PLACE Drywell DP Air Compressor in service at Panel 2-9-3 as follows:
PLACE DRYWELL INBD ISOLATION VLV switch, 2-HS-64-31, in AUTO after OPEN.
PLACE SUPPR CHBR INBD ISOLATION VLV switch, 2-HS-64-34, in AUTO after OPEN.
Standard:  Places 2-HS-64-31 and 34 in Auto after Open. SAT      UNSAT      N/A      COMMENTS:                       


JPM h START TIME
*******************************************************************************
Performance Step 1:                                                Critical X Not Critical
[33]  VERIFY the following systems/equipment in service or RETURN them to service at standby readiness, as necessary, in accordance with the following or the appropriate OI:
[33.1] PLACE Drywell DP Air Compressor in service at Panel 2-9-3 as follows:
* PLACE DRYWELL INBD ISOLATION VLV switch, 2-HS-64-31, in AUTO after OPEN.
* PLACE SUPPR CHBR INBD ISOLATION VLV switch, 2-HS-64-34, in AUTO after OPEN.
Standard:
Places 2-HS-64-31 and 34 in Auto after Open.
SAT    UNSAT        N/A    COMMENTS:
*******************************************************************************
*******************************************************************************
Performance Step 2:                                                Critical X Not Critical
* DEPRESS DRYWELL DP COMP SUCTION VLV RESET switch, 2-HS-64-139A.
* DEPRESS DRYWELL DP COMP DISCH VLV RESET switch, 2-HS-64-140A.
Standard:
Depresses 2-HS-64-139A and 2-HS-64-140A to reset.
SAT    UNSAT        N/A    COMMENTS:
4


Performance Step 2:       Critical X Not Critical DEPRESS DRYWELL DP COMP SUCTION VLV RESET switch, 2-HS-64-139A.
JPM h
DEPRESS DRYWELL DP COMP DISCH VLV RESET switch, 2-HS-64-140A.
****************************************************************************
Performance Step 3:                                     Critical X Not Critical
[33.2] PLACE Drywell Floor and Equipment Drains in service at Panel 2-9-4 as follows:
* PLACE DW EQPT DRAIN INBD ISOL VALVE switch, 2-HS-77-15A, in AUTO after OPEN.
* PLACE DW EQPT DRAIN OUTBD ISOL VALVE switch, 2-HS-77-15B, in AUTO after OPEN.
Standard:
Standard:
Depresses 2-HS-64-139A and 2-HS-64-140A to reset.
Places 2-HS-77-15A and 2-HS-77-15B in Auto after Open.
SAT     UNSAT       N/A       COMMENTS:
SAT     UNSAT         N/A   COMMENTS:
JPM h 5  ****************************************************************************
*******************************************************************************
Performance Step 3:     Critical X   Not Critical
Performance Step 4:                                             Critical X Not Critical
[33.2]  PLACE Drywell Floor and Equipment Drains in service at Panel 2-9-4 as    follows:    PLACE DW EQPT DRAIN INBD ISOL VALVE switch, 2-HS-77-15A, in AUTO after OPEN.
* PLACE DW FLOOR DRAIN INBD ISOL VALVE switch, 2-HS-77-2A, in AUTO after OPEN.
PLACE DW EQPT DRAIN OUTBD ISOL VALVE switch, 2-HS-77-15B, in AUTO after OPEN.
* PLACE DW FLOOR DRAIN OUTBD ISOL VALVE switch, 2-HS-77-2B, in AUTO after OPEN.
Standard:
Standard:
Places 2-HS-77-15A and 2-HS-77-15B in Auto after Open. SAT     UNSAT       N/A       COMMENTS:                      
Places 2-HS-77-2A and 2B in Auto after Open.
SAT     UNSAT         N/A   COMMENTS:
5


*******************************************************************************
JPM h
*****************************************************************************
Performance Step 5:                                                  Critical X Not Critical
[33.3] PLACE DRYWELL RAD MONITOR in service at Panel 2-9-2 by DEPRESSING the following RESET pushbuttons:
* UPPER INBD SUPPLY ISOL VALVE RESET, 2-HS-90-254A-A
* LOWER INBD SUPPLY ISOL VALVE RESET, 2-HS-90-254B-A
* INBD RETURN ISOL VALVE RESET, 2-HS-90-257B-A
* OUTBD SUPPLY ISOL VALVE RESET, 2-HS-90-255A
* OUTBD RETURN ISOL VALVE RESET, 2-HS-90-257A-A Standard:
Depresses the five listed reset pushbuttons to return the Drywell Rad Monitor to service SAT    UNSAT      N/A      COMMENTS:
6


Performance Step 4:       Critical X   Not Critical PLACE DW FLOOR DRAIN INBD ISOL VALVE switch, 2-HS-77-2A, in AUTO after OPEN.
JPM h
PLACE DW FLOOR DRAIN OUTBD ISOL VALVE switch, 2-HS-77-2B, in AUTO after OPEN.
*****************************************************************************
Performance Step 6:                                               Critical X Not Critical
[33.4] PERFORM the following to place the Drywell Atmosphere Monitor (H202) in service:
[33.4.1]      DEPRESS H2/O2 ANALYZER ISOLATION RESET pushbutton, 2-HS-76-91 on Panel 2-9-54.
Standard:
Standard:
Places 2-HS-77-2A and 2B in Auto after Open. SAT      UNSAT      N/A      COMMENTS:
Depresses 2-HS-76-91to reset H2/O2 Analyzer SAT     UNSAT      N/A     COMMENTS:
JPM h 6  *****************************************************************************
Performance Step 5:      Critical X  Not Critical
[33.3]  PLACE DRYWELL RAD MONITOR in service at Panel 2-9-2 by    DEPRESSING the following RESET pushbuttons:
UPPER INBD SUPPLY ISOL VALVE RESET, 2-HS-90-254A-A  LOWER INBD SUPPLY ISOL VALVE RESET, 2-HS-90-254B-A  INBD RETURN ISOL VALVE RESET, 2-HS-90-257B-A  OUTBD SUPPLY ISOL VALVE RESET, 2-HS-90-255A  OUTBD RETURN ISOL VALVE RESET, 2-HS-90-257A-A  Standard:  Depresses the five listed reset pushbuttons to return the Drywell Rad Monitor to service SAT      UNSAT      N/A      COMMENTS:
JPM h 7  *****************************************************************************
Performance Step 6:      Critical X  Not Critical
[33.4]  PERFORM the following to place the Drywell Atmosphere Monitor (H 2 0 2) in service:  [33.4.1]  DEPRESS H2/O2 ANALYZER ISOLATION RESET pushbutton, 2-HS-76-91 on Panel 2-9-54. Standard:  Depresses 2-HS-76-91to reset H2/O2 Analyzer SAT     UNSAT      N/A       COMMENTS:
CUE: Another operator is going to place the H2/O2 Analyzer in service. This completes your task.
CUE: Another operator is going to place the H2/O2 Analyzer in service. This completes your task.
END OF TASK STOP TIME ______
7


END OF TASK
JPM h OPERATOR:
 
RO           SRO                   DATE:
STOP TIME
JPM NUMBER:         h TASK NUMBER:         U-090-NO-01 TASK TITLE: Returning DW Radiation Monitor CAM, 3-RM-90-256 to service K/A NUMBER: 272000 A2.10             K/A RATING: RO 3.9 SRO: 4.1 TASK STANDARD: DW Radiation Monitor CAM, 3-RM-90-256 is in service LOCATION OF PERFORMANCE: SIMULATOR REFERENCES/PROCEDURES NEEDED: 3-AOI-100-1 VALIDATION TIME: 15 minutes PERFORMANCE TIME:
______
JPM h OPERATOR:
RO         SRO           DATE:
JPM NUMBER: h TASK NUMBER: U-090-NO-01 TASK TITLE: Returning DW Radiation Monitor CAM, 3-RM-90-256 to service K/A NUMBER:
2 72000 A2.10   K/A RATING: RO 3.9 SRO: 4.1 TASK STANDARD: DW Radiation Monitor CAM, 3-RM-90-256 is in service
 
LOCATION OF PERFORMANCE:
SIMULATOR  
 
REFERENCES/PROCEDURES NEEDED: 3-AOI-100-1 VALIDATION TIME: 15 minutes
 
PERFORMANCE TIME:  
 
COMMENTS:
COMMENTS:
Additional comment sheets attached? YES NO RESULTS: SATISFACTORY
Additional comment sheets attached? YES     NO RESULTS:     SATISFACTORY _____         UNSATISFACTORY_____
_____ UNSATISFACTORY___
SIGNATURE: ____________________               DATE: _____
__
EXAMINER 1
SIGNATURE:
____________________
 
DATE: _____                 EXAMINER
 
JPM h 2  *****************************************************************
IN-SIMULATOR:  I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct".  (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.


JPM h
*****************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
******************************************************************
******************************************************************
INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 3-AOI-100-1, Reactor Scram.
INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 3-AOI-100-1, Reactor Scram.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 3-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 3-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.
.
2


INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 3-AOI-100-1, Reactor Scram.
INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 3-AOI-100-1, Reactor Scram.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 3-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains , and the Drywell Continuous Air Monitor to service.
INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 3-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.
JPM h  4  START TIME           
  *******************************************************************************
Performance Step 1:      Critical X  Not Critical
[33]  VERIFY the following systems/equipment in service or RETURN them to service at standby readiness, as necessary, in accordance with the following or the appropriate OI:
 
[33.1]  PLACE Drywell DP Air Compressor in service at Panel 3-9-3 as follows:
PLACE DRYWELL INBD ISOLATION VLV switch, 3-HS-64-31, in AUTO after OPEN.
PLACE SUPPR CHBR INBD ISOLATION VLV switch, 3-HS-64-34, in AUTO after OPEN.
Standard:  Places 3-HS-64-31 and 34 in Auto after Open. SAT      UNSAT      N/A      COMMENTS:                       


JPM h START TIME
*******************************************************************************
Performance Step 1:                                                Critical X Not Critical
[33]  VERIFY the following systems/equipment in service or RETURN them to service at standby readiness, as necessary, in accordance with the following or the appropriate OI:
[33.1] PLACE Drywell DP Air Compressor in service at Panel 3-9-3 as follows:
* PLACE DRYWELL INBD ISOLATION VLV switch, 3-HS-64-31, in AUTO after OPEN.
* PLACE SUPPR CHBR INBD ISOLATION VLV switch, 3-HS-64-34, in AUTO after OPEN.
Standard:
Places 3-HS-64-31 and 34 in Auto after Open.
SAT    UNSAT        N/A    COMMENTS:
*******************************************************************************
*******************************************************************************
Performance Step 2:                                                Critical X Not Critical
* DEPRESS DRYWELL DP COMP SUCTION VLV RESET switch, 3-HS-64-139A.
* DEPRESS DRYWELL DP COMP DISCH VLV RESET switch, 3-HS-64-140A.
Standard:
Depresses 3-HS-64-139A and 3-HS-64-140A to reset.
SAT    UNSAT        N/A    COMMENTS:
4


Performance Step 2:       Critical X Not Critical DEPRESS DRYWELL DP COMP SUCTION VLV RESET switch, 3-HS-64-139A.
JPM h
DEPRESS DRYWELL DP COMP DISCH VLV RESET switch, 3-HS-64-140A.
****************************************************************************
Performance Step 3:                                     Critical X Not Critical
[33.2] PLACE Drywell Floor and Equipment Drains in service at Panel 3-9-4 as follows:
* PLACE DW EQPT DRAIN INBD ISOL VALVE switch, 3-HS-77-15A, in AUTO after OPEN.
* PLACE DW EQPT DRAIN OUTBD ISOL VALVE switch, 3-HS-77-15B, in AUTO after OPEN.
Standard:
Standard:
Depresses 3-HS-64-139A and 3-HS-64-140A to reset.
Places 3-HS-77-15A and 3-HS-77-15B in Auto after Open.
SAT     UNSAT       N/A       COMMENTS:
SAT     UNSAT         N/A   COMMENTS:
JPM h  5  ****************************************************************************
*******************************************************************************
Performance Step 3:     Critical X Not Critical
Performance Step 4:                                             Critical X Not Critical
[33.2]  PLACE Drywell Floor and Equipment Drains in service at Panel 3-9-4 as    follows:    PLACE DW EQPT DRAIN INBD ISOL VALVE switch, 3-HS-77-15A, in AUTO after OPEN.
* PLACE DW FLOOR DRAIN INBD ISOL VALVE switch, 3-HS-77-2A, in AUTO after OPEN.
PLACE DW EQPT DRAIN OUTBD ISOL VALVE switch, 3-HS-77-15B, in AUTO after OPEN.
* PLACE DW FLOOR DRAIN OUTBD ISOL VALVE switch, 3-HS-77-2B, in AUTO after OPEN.
Standard:
Standard:
Places 3-HS-77-15A and 3-HS-77-15B in Auto after Open. SAT     UNSAT       N/A       COMMENTS:                      
Places 3-HS-77-2A and 2B in Auto after Open.
SAT     UNSAT         N/A   COMMENTS:
5


*******************************************************************************
JPM h
*****************************************************************************
Performance Step 5:                                                  Critical X Not Critical
[33.3] PLACE DRYWELL RAD MONITOR in service at Panel 3-9-2 by DEPRESSING the following RESET pushbuttons:
* UPPER INBD SUPPLY ISOL VALVE RESET, 3-HS-90-254A-A
* LOWER INBD SUPPLY ISOL VALVE RESET, 3-HS-90-254B-A
* INBD RETURN ISOL VALVE RESET, 3-HS-90-257B-A
* OUTBD SUPPLY ISOL VALVE RESET, 3-HS-90-255A
* OUTBD RETURN ISOL VALVE RESET, 3-HS-90-257A-A Standard:
Depresses the five listed reset pushbuttons to return the Drywell Rad Monitor to service SAT    UNSAT      N/A      COMMENTS:
6


Performance Step 4:       Critical X Not Critical PLACE DW FLOOR DRAIN INBD ISOL VALVE switch, 3-HS-77-2A, in AUTO after OPEN.
JPM h
PLACE DW FLOOR DRAIN OUTBD ISOL VALVE switch, 3-HS-77-2B, in AUTO after OPEN.
*****************************************************************************
Performance Step 6:                                               Critical X Not Critical
[33.4] PERFORM the following to place the Drywell Atmosphere Monitor (H202) in service:
[33.4.1]      DEPRESS H2/O2 ANALYZER ISOLATION RESET pushbutton, 3-HS-76-91 on Panel 3-9-54.
Standard:
Standard:
Places 3-HS-77-2A and 2B in Auto after Open. SAT      UNSAT      N/A      COMMENTS:
Depresses 3-HS-76-91to reset H2/O2 Analyzer SAT     UNSAT      N/A     COMMENTS:
JPM h  6  *****************************************************************************
Performance Step 5:      Critical X  Not Critical
[33.3]  PLACE DRYWELL RAD MONITOR in service at Panel 3-9-2 by    DEPRESSING the following RESET pushbuttons:
UPPER INBD SUPPLY ISOL VALVE RESET, 3-HS-90-254A-A  LOWER INBD SUPPLY ISOL VALVE RESET, 3-HS-90-254B-A  INBD RETURN ISOL VALVE RESET, 3-HS-90-257B-A  OUTBD SUPPLY ISOL VALVE RESET, 3-HS-90-255A  OUTBD RETURN ISOL VALVE RESET, 3-HS-90-257A-A  Standard:  Depresses the five listed reset pushbuttons to return the Drywell Rad Monitor to service SAT      UNSAT      N/A      COMMENTS:
JPM h  7  *****************************************************************************
Performance Step 6:      Critical X  Not Critical
[33.4]  PERFORM the following to place the Drywell Atmosphere Monitor (H 2 0 2) in service:  [33.4.1]  DEPRESS H2/O2 ANALYZER ISOLATION RESET pushbutton, 3-HS-76-91 on Panel 3-9-54. Standard:  Depresses 3-HS-76-91to reset H2/O2 Analyzer SAT     UNSAT      N/A       COMMENTS:
CUE: Another operator is going to place the H2/O2 Analyzer in service. This completes your task.
CUE: Another operator is going to place the H2/O2 Analyzer in service. This completes your task.
END OF TASK STOP TIME ______
7


END OF TASK
JPM i OPERATOR: ____________________________________
 
RO           SRO                   DATE:
STOP TIME
JPM NUMBER:         i TASK NUMBER:         U-000-SS-32 TASK TITLE:         Reactor Pressure Control at Panel 2-25-32 K/A NUMBER:         295016 AA1.08       K/A RATING: RO 4.0 SRO: 4.0 TASK STANDARD: Reactor Pressure control established at panel 2-25-32 and MSIVs closed.
______
JPM i OPERATOR: ____________________________________
RO         SRO           DATE:
JPM NUMBER: i TASK NUMBER: U-000-SS-32 TASK TITLE: Reactor Pressure Control at Panel 2-25-32 K/A NUMBER:
295016 AA1.08 K/A RATING: RO 4.0 SRO: 4.0 TASK STANDARD:
Reactor Pressure control established at panel 2 32 and MSIVs closed.
 
PRA:
PRA:
LOCATION OF PERFORMANCE:
LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 2-AOI-100-2 VALIDATION TIME: 15 minutes PERFORMANCE TIME:
Plant REFERENCES/PROCEDURES NEEDED: 2-AOI-100-2 VALIDATION TIME: 15 minutes
COMMENTS: __________________________________________________________
 
PERFORMANCE TIME:
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________            DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are a Unit Operator Unit 2 Control had to be abandoned. The Unit Supervisor is operating in 2-AOI-100-2 Control Room Abandonment. All control rods inserted when RPS was actuated. Another operator has Attachment 9 at Panel 2-25-32.
___  NO ___
INITIATING CUE: The Unit Supervisor directs you establish pressure control at Panel 2-25-32 and to close the MSIVs. The directed Reactor Pressure band is 800 to 1000 psig.
RESULTS: SATISFACTORY
____ UNSATISFACTORY
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER INITIAL CONDITIONS: You are a Unit Operator Unit 2 Control had to be abandoned. The Unit Supervisor is operating in 2
-AOI-100-2 Control Room Abandonment. All control rods inserted when RPS was actuated. Another operator has Attachment 9 at Panel 2 32. INITIATING CUE
: The Unit Supervisor directs you establish pressure control at Panel 2 32 and to close the MSIVs. The directed Reactor Pressure band is 800 to 1000 psig.
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT


JPM i 3    *******************************************************************************
JPM i
 
*******************************************************************************
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. SELF CHECKING may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. SELF CHECKING may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. Observe ALL plant radiological and safety precautions. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.
-conductive pointing device. Observe ALL plant radiological and safety precautions. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.
When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
INITIAL CONDITIONS: You are a Unit Operator Unit 2 Control had to be abandoned. The Unit Supervisor is operating in 2-AOI-100-2 Control Room Abandonment. All control rods inserted when RPS was actuated. Another operator has Attachment 9 at Panel 2-25-32.
INITIATING CUE: The Unit Supervisor directs you establish pressure control at Panel 2-25-32 and to close the MSIVs. The directed Reactor Pressure band is 800 to 1000 psig.
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT 3


JPM i START TIME
*******************************************************************************
*******************************************************************************
Performance Step 1:                                          Critical Not Critical X 4.2    Unit 2 Subsequent Actions
[1]    IF ALL control rods were NOT fully inserted AND RPS failed to deenergize, THEN:
(Otherwise N/A)
Standard:
N/A SAT    UNSAT      N/A    COMMENTS:
4


INITIAL CONDITIONS: You are a Unit Operator Unit 2 Control had to be abandoned. The Unit Supervisor is operating in 2
JPM i
-AOI-100-2 Control Room Abandonment. All control rods inserted when RPS was actuated.
*******************************************************************************
Another operator has Attachment 9 at Panel 2 32. INITIATING CUE: The Unit Supervisor directs you establish pressure control at Panel 2 32 and to close the MSIVs. The directed Reactor Pressure band is 800 to 1000 psig.
Performance Step 2:                                                  Critical Not Critical X NOTES
: 1)    The following transfers Reactor Pressure Control to Panel 2-25-32 to allow for pressure control while completing the Panel Checklist.
: 2)    Attachment 9, Alarm Response Procedure Panel 2-25-32, provides for any alarms associated with this instruction.
CAUTION
: 1)    Failure to place control switch in desired position prior to transferring to emergency position may result in inadvertent actuation of the component.
: 2)    Operation from Panel 2-25-32 bypasses logic and interlocks normally associated with the components.
[2]    PLACE the following MSRV control switches in CLOSE/AUTO at Panel 2-25-32:
Switch No.                    Description 2-HS-1-22C                    MAIN STM LINE B RELIEF VALVE 2-HS-1-5C                      MAIN STM LINE A RELIEF VALVE 2-HS-1-30C                    MAIN STM LINE C RELIEF VALVE 2-HS-1-34C                    MAIN STM LINE C RELIEF VALVE Standard:
Simulates placing 2-HS-1-22C, 5C, 30C, and 34C in Close /Auto SAT    UNSAT        N/A      COMMENTS:
Cue: Switch is in Close/Auto, or as found. If Asked Reactor Pressure is stable at 960 psig 5


CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT
JPM i
*******************************************************************************
Performance Step 3:                                                 Critical X Not Critical
[3]    PLACE the following MSRV disconnect switches in DISCT at Panel 2-25-32:
Switch No.            Description 2-XS-1-18            MAIN STM LINE B RELIEF VALVE DISCT 2-XS-1-4              MAIN STM LINE A RELIEF VALVE DISCT 2-XS-1-42            MAIN STM LINE D RELIEF VALVE DISCT 2-XS-1-23            MAIN STM LINE B RELIEF VALVE DISCT 2-XS-1-41            MAIN STM LINE D RELIEF VALVE DISCT 2-XS-1-180            MAIN STM LINE D RELIEF VALVE DISCT Standard:
Simulates placing 2-XS-1-18, 4, 42, 23, 41, and 180 in Disct SAT    UNSAT      N/A    COMMENTS:
Cue: Switches are in DISCONNECT.
6


JPM i 4  START TIME           
JPM i
  *******************************************************************************
*******************************************************************************
Performance Step 1:       Critical     Not Critical 4.2 Unit 2 Subsequent Actions
Performance Step 4:                                           Critical X Not Critical
[4]    PLACE the following MSRV transfer switches in EMERG at Panel 2-25-32:
Switch No.           Description 2-XS-1-22            MAIN STM LINE B RELIEF VALVE XFR 2-XS-1-5              MAIN STM LINE A RELIEF VALVE XFR 2-XS-1-30            MAIN STM LINE C RELIEF VALVE XFR 2-XS-1-34            MAIN STM LINE C RELIEF VALVE XFR Standard:
Simulates placing 2-XS-1-22, 5, 30 and 34 in Emergency SAT    UNSAT      N/A    COMMENTS:
CUE: Switches are in Emergency.
7


[1]  IF ALL control rods were NOT fully inserted AND RPS failed to deenergize, THEN:  (Otherwise N/A)
JPM i
Standard:   N/A  SAT      UNSAT      N/A       COMMENTS:                        
*******************************************************************************
Performance Step 5:                                                Critical X Not Critical NOTE Use of the following sequence when opening MSRVs should distribute heat evenly in the Suppression Pool.
[5]    MAINTAIN Reactor Pressure between 800 and 1000 psig using the following sequence at Panel 2-25-32:
A.      2-HS-1-22C, MAIN STM LINE B RELIEF VALVE B.      2-HS-1-5C, MAIN STM LINE A RELIEF VALVE C.      2-HS-1-30C, MAIN STM LINE C RELIEF VALVE D.      2-HS-1-34C, MAIN STM LINE C RELIEF VALVE Standard:
Simulates cycling SRVs as necessary to maintain reactor pressure 800 to 1000 psig SAT      UNSAT      N/A     COMMENTS:
CUE: Initial Reactor Pressure is 960 psig, when the Inboard MSIVs are closed in the next step begin to raise and lower pressure depending upon actions of the applicant. Until JPM complete cycle reactor pressure between 800 to 1000 psig every two minutes. If candidate fails to check or ask give a high or low pressure as warranted.
8


JPM i *******************************************************************************
JPM i
Performance Step 2:       Critical     Not Critical X      NOTES 1)  The following transfers Reactor Pressure Control to Panel 2-25-32 to allow for pressure  control while completing the Panel Checklist.
    *******************************************************************************
: 2)  Attachment 9, Alarm Response Procedure Panel 2-25-32, provides for any alarms associated with this instruction.
Performance Step 6:                                                   Critical X Not Critical CAUTION Failure to place control switch in desired position prior to transferring to emergency position may result in inadvertent actuation of the component.
CAUTION 1)  Failure to place control switch in desired position prior to transferring to emergency position may result in inadvertent actuation of the component. 2)  Operation from Panel 2-25-32 bypasses logic and interlocks normally associated with the components.
[6]      CLOSE MSIVs using the following switch sequence at Panel 2-25-32:
[2]  PLACE the following MSRV control switches in CLOSE/AUTO at Panel 2-25-32:  Switch No. Description 2-HS-1-22C    MAIN STM LINE B RELIEF VALVE 2-HS-1-5C    MAIN STM LINE A RELIEF VALVE 2-HS-1-30C    MAIN STM LINE C RELIEF VALVE 2-HS-1-34C    MAIN STM LINE C RELIEF VALVE Standard:
[6.1] PLACE control switch in CLOSE.
Simulates placing 2
[6.2]  PLACE transfer switch in EMERG.
-HS-1-22C, 5C, 30C, and 34C in Close /Auto SAT     UNSAT      N/A       COMMENTS:
Standard:
Cue: Switch is in Close/Auto, or as found. If Asked Reactor Pressure is stable at 960 psig 
Simulates placing control switch in close and then the transfer switch for each MSIV SAT       UNSAT      N/A     COMMENTS:
CUE: Control switch is in Close, Transfer switch is in Emergency, MSIV green light On and Red light Off.
When the D Inboard MSIV is closed Reactor Pressure begins to rise.
When applicant demonstrates pressure control terminate JPM, once all MSIV are closed.
END OF TASK STOP TIME 9


JPM i 6  *******************************************************************************
JPM j OPERATOR: ________________________________
Performance Step 3:      Critical X  Not Critical
RO           SRO                   DATE:
[3]  PLACE the following MSRV disconnect switches in DISCT at Panel 2-25-32:  Switch No. Description 2-XS-1-18  MAIN STM LINE B RELIEF VALVE DISCT 2-XS-1-4  MAIN STM LINE A RELIEF VALVE DISCT 2-XS-1-42  MAIN STM LINE D RELIEF VALVE DISCT 2-XS-1-23  MAIN STM LINE B RELIEF VALVE DISCT 2-XS-1-41  MAIN STM LINE D RELIEF VALVE DISCT 2-XS-1-180  MAIN STM LINE D RELIEF VALVE DISCT Standard:
JPM NUMBER:         j TASK NUMBER:         U-000-SS-10 TASK TITLE: Reset Battery Charger 1, 2B and 3 K/A NUMBER: 295004 A1.01                   K/A RATING: RO 3.3 SRO 3.4 TASK STANDARD: Resets battery chargers 1, 2b, and 3 during a fire in the unit 1 reactor building EL 621 and 639 North of column line R.
Simulates placing 2
LOCATION OF PERFORMANCE: Control Bay REFERENCES/PROCEDURES NEEDED: 0-SSI-1-5 VALIDATION TIME: 20 minutes PERFORMANCE TIME: 60 minutes maximum COMMENTS: __________________________________________________________
-XS-1-18, 4, 42, 23, 41, and 180 in Disct  SAT      UNSAT      N/A      COMMENTS:                        Cue:  Switch es are in DISCONNECT.
 
JPM i 7  *******************************************************************************
Performance Step 4:      Critical X  Not Critical
[4]  PLACE the following MSRV transfer switches in EMERG at Panel 2-25-32:  Switch No. Description 2-XS-1-22  MAIN STM LINE B RELIEF VALVE XFR 2-XS-1-5  MAIN STM LINE A RELIEF VALVE XFR 2-XS-1-30  MAIN STM LINE C RELIEF VALVE XFR 2-XS-1-34  MAIN STM LINE C RELIEF VALVE XFR Standard:
Simulates placing 2
-XS-1-22, 5, 30 and 34 in Emergency SAT      UNSAT      N/A      COMMENTS:
CUE:  Switches are in Emergency.
 
JPM i 8  *******************************************************************************
Performance Step 5:      Critical X  Not Critical NOTE Use of the following sequence when opening MSRVs should distribute heat evenly in the Suppression Pool.
[5]  MAINTAIN Reactor Pressure between 800 and 1000 psig using the following sequence at Panel 2-25-32:  A. 2-HS-1-22C, MAIN STM LINE B RELIEF VALVE B. 2-HS-1-5C, MAIN STM LINE A RELIEF VALVE C. 2-HS-1-30C, MAIN STM LINE C RELIEF VALVE D. 2-HS-1-34C, MAIN STM LINE C RELIEF VALVE Standard:
Simulates cycling SRVs as necessary to maintain reactor pressure 800 to 1000 psig SAT      UNSAT      N/A      COMMENTS:                       
 
CUE:  Initial Reactor Pressure is 960 psig, when the Inboard MSIVs are closed in the next step begin to raise and lower pressure depending upon actions of the applicant. Until JPM complete cycle reactor pressure between 800 to 1000 psig every two minutes. If candidate fails to check or ask give a high or low pressure as warranted. 
 
JPM i 9  *******************************************************************************
Performance Step 6:      Critical X  Not Critical        CAUTION Failure to place control switch in desired position prior to transferring to emergency position may result in inadvertent actuation of the component.
[6]  CLOSE MSIVs using the following switch sequence at Panel 2-25-32:
[6.1]  PLACE control switch in CLOSE.  [6.2]  PLACE transfer switch in EMERG.
Standard:    Simulates placing control switch in close and then the transfer switch for each MSIV SAT      UNSAT      N/A      COMMENTS:                       
 
END OF TASK STOP TIME CUE:  Control switch is in Close, Transfer switch is in Emergency, MSIV green light On and Red light Off. When the D Inboard MSIV is closed Reactor Pressure begins to rise. When applicant demonstrates pressure control terminate JPM, once all MSIV are closed.
 
J PM  j OPERATOR: ________________________________
RO         SRO           DATE:                      
 
JPM NUMBER: j TASK NUMBER: U-000-SS-10 TASK TITLE:
Reset Battery Charger 1, 2B and 3 K/A NUMBER:
295004 A1.01   K/A RATING: RO 3.3 SRO 3.4 TASK STANDARD:
Resets battery chargers 1, 2b, and 3 during a fire in the unit 1 reactor building EL 621 and 639 North of column line R.
 
LOCATION OF PERFORMANCE:
Control Bay
 
REFERENCES/PROCEDURES NEEDED: 0-SSI-1-5 VALIDATION TIME:   20 minutes PERFORMANCE TIME:
60 minutes maximum
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________            DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS:
___  NO ___
A fire has occurred in Unit 1 Reactor Building. The Shift Manager has directed entry into the SSIs.
RESULTS: SATISFACTORY
INITIATING CUE:
____ UNSATISFACTORY
The Unit Supervisor directs you to perform Operator 2 Manual Actions, Section 2.0, of 0-SSI-1-5, Unit 1 Reactor Building Fire EL 621 and 639 North of Column Line R.
____
SIGNATURE:
__________________________
DATE: __________
EXAMINER 
 
INITIAL CONDITIONS:   A fire has occurred in Unit 1 Reactor Building. The Shift Manager has directed entry into the SSI's.
 
INITIATING CUE:   The Unit Supervisor directs you to perform Operator 2 Manual Actions, Section 2.0, of 0
-SSI-1-5, Unit 1 Reactor Building Fire EL 621 and 639 North of Column Line R.
 
This JPM is Time Critical.
This JPM is Time Critical.


JPM j *******************************************************************************
JPM j
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
*******************************************************************************
INITIAL CONDITIONS:
INITIAL CONDITIONS:
A fire has occurred in Unit 1 Reactor Building. The Shift Manager has directed entry into the SSI's.
A fire has occurred in Unit 1 Reactor Building. The Shift Manager has directed entry into the SSIs.
 
INITIATING CUE:
INITIATING CUE:  
 
The Unit 2 Unit Supervisor directs you to perform Operator 2 Manual Actions, Section 2.0, of 0-SSI-1-5, Unit 1 Reactor Building Fire EL 621 and 639 North of Column Line R.
The Unit 2 Unit Supervisor directs you to perform Operator 2 Manual Actions, Section 2.0, of 0-SSI-1-5, Unit 1 Reactor Building Fire EL 621 and 639 North of Column Line R.
This JPM is Time Critical.
This JPM is Time Critical.
3


JPM j START TIME          
JPM j START TIME
  *******************************************************************************
*******************************************************************************
Performance Step 1:       Critical   Not Critical X
Performance Step 1:                                               Critical Not Critical X 0-SSI-1-5 2.0   RESET BATTERY CHARGERS 1, 2B AND 3
0-SSI-1-5 2.0 RESET BATTERY CHARGERS 1, 2B AND 3
[1]   Notification has been received from the Unit 2 Unit Supervisor to perform this section.
[1] Notification has been received from the Unit 2 Unit Supervisor to perform this section.
Standard:
Standard:   Given in initial conditions
Given in initial conditions.
. SAT     UNSAT       N/A       COMMENTS:                      
SAT     UNSAT       N/A     COMMENTS:
 
*****************************************************************************
*****************************************************************************
Performance Step 2:                                              Critical X Not Critical (60 Min)
[2]    PROCEED TO 250V BATTERY CHARGER 1, 1-CHGA-248-0001, AND PLACE POWER ON, 1-HS-248-0001, in EMERG.
Standard:
Simulates placing 1-HS-248-0001 POWER ON in EMERG at Battery Charger 1.
SAT    UNSAT        N/A      COMMENTS:
CUE: The POWER ON handswitch is in EMERGENCY.
4


Performance Step 2:      Critical X  Not Critical  (60 Min)  [2]  PROCEED TO 250V BATTERY CHARGER 1, 1-CHGA-248-0001, AND PLACE POWER ON, 1-HS-248-0001, in EMERG.
JPM j
Standard:  Simulates placing 1-HS-248-0001 POWER ON in EMERG at Battery Charger 1.
****************************************************************************
SAT      UNSAT      N/A      COMMENTS:
Performance Step 3:                                         Critical X Not Critical
CUE: The POWER ON handswitch is in EMERGENCY.                                                           
[3]   PROCEED TO 250V BATTERY CHARGER 3, CHGA-248-0003, AND PLACE POWER ON, 3-HS-248-0003, in EMERG.
 
JPM j ****************************************************************************
Performance Step 3:       Critical X Not Critical
[3] PROCEED TO 250V BATTERY CHARGER 3, CHGA-248-0003, AND PLACE POWER ON, 3-HS-248-0003, in EMERG.
Standard:
Standard:
Simulates placing 1-HS-248-0003 POWER ON in EMERG at Battery Charger 3. SAT     UNSAT      N/A       COMMENTS:
Simulates placing 1-HS-248-0003 POWER ON in EMERG at Battery Charger 3.
SAT     UNSAT      N/A     COMMENTS:
CUE: The POWER ON handswitch is in EMERGENCY.
CUE: The POWER ON handswitch is in EMERGENCY.
*******************************************************************************
*******************************************************************************
 
Performance Step 4:                                         *Critical X Not Critical
Performance Step 4:       *Critical X Not Critical
[4]   PROCEED TO 250V BATTERY CHARGER 2A, 2-CHGA-248-0002A, AND PERFORM the following:
[4] PROCEED TO 250V BATTERY CHARGER 2A, 2-CHGA-248-0002A, AND PERFORM the following:  
              *[4.1] PLACE POWER ON, 2-HS-248-0002A, in OFF.
  *[4.1] PLACE POWER ON, 2
[4.2]   VERIFY ALTERNATE SUPPLY INPUT FROM 480V CMN BD 1/3A, 2-BKR-248-0002AB, in OFF.
-HS-248-0002A, in OFF.  
Standard:
 
Simulates placing POWER ON, 2-HS-248-0002A, in OFF. Verifies ALTERNATE SUPPLY INPUT FROM 480V CMN BD 1/3A in OFF.
[4.2] VERIFY ALTERNATE SUPPLY INPUT FROM 480V CMN BD 1/3A, 2-BKR-248-0002AB, in OFF.
SAT     UNSAT      N/A     COMMENTS:
Standard: Simulates placing POWER ON, 2
-HS-248-0002A, in OFF. Verifies ALTERNATE SUPPLY INPUT FROM 480V CMN BD 1/3A in OFF.
SAT     UNSAT      N/A       COMMENTS:
CUE: The POWER ON handswitch is in OFF and the ALTERNATE SUPPLY INPUT is in OFF.
CUE: The POWER ON handswitch is in OFF and the ALTERNATE SUPPLY INPUT is in OFF.
5


JPM j *******************************************************************************
JPM j
Performance Step 5:       Critical X Not Critical
*******************************************************************************
[4.3] PLACE NORMAL SUPPLY INPUT FROM 480V SD BD 2A/6D,   2-BKR-248-0002AA, in OFF.
Performance Step 5:                                       Critical X Not Critical
[4.4] PLACE DC BREAKER, 2
[4.3]   PLACE NORMAL SUPPLY INPUT FROM 480V SD BD 2A/6D, 2-BKR-248-0002AA, in OFF.
-BKR-248-0002A/DC, in OFF.
[4.4]   PLACE DC BREAKER, 2-BKR-248-0002A/DC, in OFF.
Standard: Simulates placing the NORMAL SUPPLY INPUT in OFF. Places the DC BREAKER 2-BKR-248-0002A/DC, in OFF.
Standard:
SAT     UNSAT      N/A       COMMENTS:
Simulates placing the NORMAL SUPPLY INPUT in OFF. Places the DC BREAKER 2-BKR-248-0002A/DC, in OFF.
SAT     UNSAT      N/A     COMMENTS:
CUE: The NORMAL SUPPLY INPUT is in OFF and the DC BREAKER is in OFF.
CUE: The NORMAL SUPPLY INPUT is in OFF and the DC BREAKER is in OFF.
6


JPM j *******************************************************************************
JPM j
Performance Step 6:       Critical X Not Critical
*******************************************************************************
[5] PROCEED TO BATTERY CHARGER 2A OUTPUT TRANSFER SWITCH, 2-XSW-248-0002A, AND PLACE OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, in OFF. Standard:
Performance Step 6:                                     Critical X Not Critical
Simulates placing OUTPUT XFER SW TO BKR 608, 2
[5]   PROCEED TO BATTERY CHARGER 2A OUTPUT TRANSFER SWITCH, 2-XSW-248-0002A, AND PLACE OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, in OFF.
-BKR-248-0002AE, in OFF. SAT     UNSAT      N/A       COMMENTS:
Standard:
CUE: The OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, is in OFF.  
Simulates placing OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, in OFF.
SAT     UNSAT      N/A   COMMENTS:
CUE: The OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, is in OFF.
*****************************************************************************
*****************************************************************************
 
Performance Step 7:                                     Critical Not Critical X
Performance Step 7:       Critical Not Critical X   [6] PROCEED TO 250V BATTERY BOARD 2 Breaker 607, AND PLACE   0-BKR-280-0002/607 250V BATTERY CHARGER 2B EMER TIE TO DC BD 2, in ON.
[6]   PROCEED TO 250V BATTERY BOARD 2 Breaker 607, AND PLACE 0-BKR-280-0002/607 250V BATTERY CHARGER 2B EMER TIE TO DC BD 2, in ON.
Standard:   Simulates placing BATTERY CHARGER 2B EMER TIE TO DC BD 2 in ON. SAT     UNSAT      N/A       COMMENTS:
Standard:
Simulates placing BATTERY CHARGER 2B EMER TIE TO DC BD 2 in ON.
SAT     UNSAT      N/A   COMMENTS:
CUE: The BATTERY CHARGER 2B EMER TIE TO DC BD 2 is in ON.
CUE: The BATTERY CHARGER 2B EMER TIE TO DC BD 2 is in ON.
JPM  j  8  ****************************************************************************
7


Performance Step 8:       Critical X Not Critical
JPM j
[7] PERFORM the following at BATTERY CHARGER 2B OUTPUT TRANSFER SWITCH 2B, 0-XSW-248-0002B:
****************************************************************************
[7.1] PLACE BATTERY CHARGER 2B OUTPUT TRANSFER SWITCH 2B, 0-XSW-248-0002B, Mechanical interlock, in TO BATTERY BD 2 BKR 607 position.
Performance Step 8:                                               Critical X Not Critical
[7.2] PLACE TO BATTERY BD 2 BKR 607 breaker, in ON.
[7]     PERFORM the following at BATTERY CHARGER 2B OUTPUT TRANSFER SWITCH 2B, 0-XSW-248-0002B:
Standard: Simulates sliding the Mechanical Interlock left to the TO BATTERY BD 2 BKR 607 position, and placing TO BATTERY BD 2 BKR 607 breaker in ON. SAT     UNSAT       N/A       COMMENTS:                       CUE: The Mechanical interlock, is in TO BATTERY BD 2 BKR 607 position, and TO BATTERY BD 2 BKR 607 breaker is in ON.
[7.1]   PLACE BATTERY CHARGER 2B OUTPUT TRANSFER SWITCH 2B, 0-XSW-248-0002B, Mechanical interlock, in TO BATTERY BD 2 BKR 607 position.
[7.2]   PLACE TO BATTERY BD 2 BKR 607 breaker, in ON.
Standard:
Simulates sliding the Mechanical Interlock left to the TO BATTERY BD 2 BKR 607 position, and placing TO BATTERY BD 2 BKR 607 breaker in ON.
SAT     UNSAT       N/A     COMMENTS:
CUE: The Mechanical interlock, is in TO BATTERY BD 2 BKR 607 position, and TO BATTERY BD 2 BKR 607 breaker is in ON.
8


JPM j ****************************************************************************
JPM j
Performance Step 9:       Critical X Not Critical
****************************************************************************
[7.3]  PROCEED TO 250V BATTERY CHARGER 2B, 0-CHGA-248-0002B, AND PERFORM the following:
Performance Step 9:                                         Critical X Not Critical
[7.3.1] PLACE NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D, 0
[7.3]  PROCEED TO 250V BATTERY CHARGER 2B, 0-CHGA-248-0002B, AND PERFORM the following:
-BKR-248-0002BA, in ON.  
[7.3.1] PLACE NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D, 0-BKR-248-0002BA, in ON.
[7.3.2] PLACE DC BREAKER, 0-BKR-248-0002B/DC, in ON.
Standard:
Simulates placing NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D in ON, and placing DC BREAKER in ON.
SAT    UNSAT        N/A    COMMENTS:
CUE: The NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D is in ON, and the DC BREAKER is in ON.
9


[7.3.2] PLACE DC BREAKER, 0
JPM j
-BKR-248-0002B/DC, in   ON. Standard: Simulates placing NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D in ON, and placing DC BREAKER in ON.
****************************************************************************
SAT      UNSAT      N/A       COMMENTS:                       CUE: The NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D is in ON, and the DC BREAKER is in ON.
Performance Step 10:                                              Critical X Not Critical NOTE The following step will place Battery Charger 2B in service with the 480V load shed logic trip bypassed.
[7.3.3] PLACE POWER ON, 0-HS-248-0002B, in EMERG.
Standard:
Simulates placing POWER ON, 0-HS-248-0002B, in EMERG.
SAT      UNSAT      N/A     COMMENTS:
CUE: The POWER ON handswitch is in EMERGENCY.
10


JPM j 10  ****************************************************************************
JPM j
Performance Step 10:      Critical X  Not Critical  NOTE The following step will place Battery Charger 2B in service with the 480V load shed logic trip bypassed.        [7.3.3] PLACE POWER ON, 0
*******************************************************************************
-HS-248-0002B, in EMERG.
Performance Step 11:                                               Critical __ Not Critical X
Standard:  Simulates placing POWER ON, 0
[8]   NOTIFY Unit 2 Unit Supervisor of completion of this section.
-HS-248-0002B, in EMERG.
SAT      UNSAT      N/A      COMMENTS:                        CUE: The POWER ON handswitch is in EMERGENCY.
 
JPM  j  11  *******************************************************************************
Performance Step 11:       Critical __ Not Critical X
[8] NOTIFY Unit 2 Unit Supervisor of completion of this section.
Standard:
Standard:
Notifies the Unit 2 Unit Supervisor of completion of this section.
Notifies the Unit 2 Unit Supervisor of completion of this section.
SAT     UNSAT      N/A       COMMENTS:                      
SAT     UNSAT      N/A     COMMENTS:
CUE: Another Operator will perform Section 3.0. This completes your task.
END OF TASK STOP TIME            60 Minutes is the time-critical allowed maximum 11


END OF TASK STOP TIME 60 Minutes is the time
JPM k OPERATOR: _________________________________
-critical allowed maximum  CUE:  Another Operator will perform Section 3.0. This completes your task.
RO ____       SRO ____             DATE: __________
 
JPM NUMBER:         i TASK NUMBER:         U-000-EM-19 TASK TITLE:         1-EOI Appendix-1A Removal of RPS SCRAM Fuses K/A NUMBER: 212000 A2.20                 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 1-EOI Appendix-1A LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 1-EOI Appendix-1A VALIDATION TIME: 10 minutes PERFORMANCE TIME:
JPM     1  OPERATOR: _________________________________
COMMENTS: __________________________________________________________
RO ____ SRO ____ DATE: __________
 
JPM NUMBER: i TASK NUMBER: U-000-EM-19 TASK TITLE: 1-EOI Appendix-1A Removal of RPS SCRAM Fuses
 
K/A NUMBER: 212 000 A 2.20   K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 1-EOI Appendix-1A  
 
LOCATION OF PERFORMANCE:
Plant REFERENCES/PROCEDURES NEEDED: 1-EOI Appendix-1A  
 
VALIDATION TIME: 10 minutes
 
PERFORMANCE TIME:  
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________          DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are the Extra Operator. The Unit 1 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
___  NO ___
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 1-9-5.
RESULTS: SATISFACTORY
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 1-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
____ UNSATISFACTORY ____
 
SIGNATURE:  __________________________
DATE: __________
EXAMINER INITIAL CONDITIONS: You are the Extra Operator. The Unit 1 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9
-5 are still illuminated. EOI-1 has been entered and followed to RC/Q
-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 1-9-5.
INITIATING CUE
: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 1
-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.    
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM 3    *******************************************************************************
JPM       k
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
 
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
*******************************************************************************
 
INITIAL CONDITIONS: You are the Extra Operator. The Unit 1 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
INITIAL CONDITIONS: You are the Extra Operator. The Unit 1 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 1-9-5.
-5 are still illuminated. EOI-1 has been entered and followed to RC/Q
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 1-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 1-9-5.
INITIATING CUE
: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 1
-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.  
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
3


JPM START TIME          
JPM   k START TIME
  *******************************************************************************
*******************************************************************************
Performance Step 1:                                              Critical Not Critical X
: 1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 1-9-5.
Standard:
Given in initial conditions SAT    UNSAT        N/A      COMMENTS:
*******************************************************************************
Performance Step 2:                                              Critical Not Critical X
: 2. DISPATCH personnel to the Auxiliary Instrument Room to perform the following:
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.
Standard:
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT    UNSAT        N/A      COMMENTS:
CUE:          When location of EOI Storage Box identified, Operator has the fuse pullers 4


Performance Step 1:       Critical     Not Critical 1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 1-9-5. Standard:   Given in initial conditions SAT     UNSAT       N/A      COMMENTS:                      
JPM    k
*******************************************************************************
Performance Step 3:                                                 Critical X Not Critical
: b.      LOCATE Terminal Strip CC inside 1-PNLA-009-0015, Bay 2, Rear.
: c.     REMOVE the following fuses (located at bottom of terminal strip CC, 1-PNLA-009-0015):
RPS BUS A BLOCK                  NUMBER                FUSE ID CC                      FOUR (4)              1-FU1-085-0037AA CC                      FIVE (5)              1-FU1-085-0039A/2 CC                      SIX (6)                1-FU1-085-0039A/3 CC                      SEVEN (7)              1-FU1-085-0039A/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT       N/A      COMMENTS:
CUE:            When location of proper Fuse is indicated the Fuse has been removed 5


JPM    k
*******************************************************************************
*******************************************************************************
Performance Step 4:                                                  Critical X Not Critical
: d.      LOCATE Terminal Strip CC inside 1-PNLA-009-0017, Bay 2, Rear.
: e.      REMOVE the following fuses (located at bottom of terminal strip CC, 1-PNLA-009-0017):
RPS BUS B BLOCK                  NUMBER                FUSE ID CC                      FOUR (4)              1-FU1-085-0037BA CC                      FIVE (5)              1-FU1-085-0039B/2 CC                      SIX (6)                1-FU1-085-0039B/3 CC                      SEVEN (7)              1-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT    UNSAT        N/A      COMMENTS:
CUE:            When location of proper Fuse is indicated the Fuse has been removed 6


Performance Step 2:      Critical      Not Critical X  2. DISPATCH personnel to the Auxiliary Instrument Room to perform the following:
JPM   k
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box. Standard:
  *******************************************************************************
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT      UNSAT      N/A      COMMENTS:                       
Performance Step 5:                                             Critical Not Critical X
 
: f.      WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.
CUE:   When location of EOI Storage Box identified, Operator has the fuse pullers
 
JPM 5 *******************************************************************************
Performance Step 3:       Critical Not Critical  b. LOCATE Terminal Strip CC inside 1
-PNLA-009-0015, Bay 2, Rear.
: c. REMOVE the following fuses (located at bottom of terminal strip CC, 
 
1-PNLA-009-0015): RPS BUS "A" BLOCK  NUMBER  FUSE ID CC    FOUR (4)  1-FU1-085-0037AA CC    FIVE (5)  1-FU1-085-0039A/2 CC    SIX (6)  1-FU1-085-0039A/3 CC    SEVEN (7)  1-FU1-085-0039A/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT      UNSAT      N/A      COMMENTS:                       
 
CUE:    When location of proper Fuse is indicated the Fuse has been removed
 
JPM 6  *******************************************************************************
Performance Step 4:      Critical X Not Critical  d. LOCATE Terminal Strip CC inside 1
-PNLA-009-0017, Bay 2, Rear.
: e. REMOVE the following fuses (located at bottom of terminal strip CC, 
 
1-PNLA-009-0017): RPS BUS "B" BLOCK  NUMBER  FUSE ID CC    FOUR (4)  1-FU1-085-0037BA CC    FIVE (5)  1-FU1-085-0039B/2 CC    SIX (6)  1-FU1-085-0039B/3 CC    SEVEN (7)  1-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT      N/A      COMMENTS:                       
 
CUE:    When location of proper Fuse is indicated the Fuse has been removed
 
JPM 7  *******************************************************************************
Performance Step 5:      Critical    Not Critical X  f. WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.
Standard:
Standard:
Notifies Unit 1 Operator All RPS Fuse removed SAT     UNSAT       N/A       COMMENTS:                      
Notifies Unit 1 Operator All RPS Fuse removed SAT     UNSAT       N/A     COMMENTS:
CUE:          Acknowledge Notification, SRO Does not direct replacement of fuses END OF TASK STOP TIME 7


END OF TASK
JPM k OPERATOR: _________________________________
 
RO ____       SRO ____             DATE: __________
STOP TIME CUE:    Acknowledge Notification, SRO Does not direct replacement of fuses
JPM NUMBER:         i TASK NUMBER:         U-000-EM-19 TASK TITLE:         2-EOI Appendix-1A Removal of RPS SCRAM Fuses K/A NUMBER: 212000 A2.20                 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 2-EOI Appendix-1A LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-1A VALIDATION TIME: 10 minutes PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
JPM OPERATOR: _________________________________
RO ____ SRO ____ DATE: __________
 
JPM NUMBER: i TASK NUMBER: U-000-EM-19 TASK TITLE: 2-EOI Appendix-1A Removal of RPS SCRAM Fuses
 
K/A NUMBER:
212000 A2.20 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 2-EOI Appendix-1A  
 
LOCATION OF PERFORMANCE:
Plant REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-1A  
 
VALIDATION TIME: 10 minutes
 
PERFORMANCE TIME:  
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________          DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
___  NO ___
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.
RESULTS: SATISFACTORY
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
____ UNSATISFACTORY ____
 
SIGNATURE:  __________________________
DATE: __________
EXAMINER INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9
-5 are still illuminated. EOI-1 has been entered and followed to RC/Q
-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.
INITIATING CUE
: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2
-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.    
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM 3    *******************************************************************************
JPM       k
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
 
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
*******************************************************************************
 
INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.
-5 are still illuminated. EOI-1 has been entered and followed to RC/Q
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.
INITIATING CUE
: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2
-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.  
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
3


JPM START TIME          
JPM   k START TIME
  *******************************************************************************
*******************************************************************************
Performance Step 1:                                              Critical Not Critical X
: 1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.
Standard:
Given in initial conditions SAT    UNSAT        N/A      COMMENTS:
*******************************************************************************
Performance Step 2:                                              Critical Not Critical X
: 2. DISPATCH personnel to Unit 2 Auxiliary Instrument Room to perform the following:
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.
Standard:
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT    UNSAT        N/A      COMMENTS:
CUE:          When location of EOI Storage Box identified, Operator has the fuse pullers 4


Performance Step 1:       Critical     Not Critical X  1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5. Standard:   Given in initial conditions SAT     UNSAT       N/A      COMMENTS:                      
JPM    k
*******************************************************************************
Performance Step 3:                                                 Critical X Not Critical
: b.      LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
: c.     REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15):
RPS BUS A BLOCK                  NUMBER                FUSE ID CC                      FOUR (4)              2-FU1-085-0037AA CC                      FIVE (5)              2-FU1-085-0039A/2 CC                      SIX (6)                2-FU1-085-0039A/3 CC                      SEVEN (7)              2-FU1-085-0039A/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT       N/A      COMMENTS:
CUE:            When location of proper Fuse is indicated the Fuse has been removed 5


*****************************************************************
JPM    k
**************
*******************************************************************************
Performance Step 2:       Critical     Not Critical 2. DISPATCH personnel to Unit 2 Auxiliary Instrument Room to perform the following:
Performance Step 4:                                                 Critical X Not Critical
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box. Standard:
: d.      LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT     UNSAT       N/A      COMMENTS:                      
: e.     REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-17):
RPS BUS B BLOCK                  NUMBER                FUSE ID CC                      FOUR (4)              2-FU1-085-0037BA CC                      FIVE (5)              2-FU1-085-0039B/2 CC                      SIX (6)                2-FU1-085-0039B/3 CC                      SEVEN (7)              2-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT       N/A      COMMENTS:
CUE:            When location of proper Fuse is indicated the Fuse has been removed 6


CUE:   When location of EOI Storage Box identified, Operator has the fuse pullers
JPM    k
*******************************************************************************
Performance Step 5:                                            Critical Not Critical X
: f.      WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.
Standard:
Notifies Unit 2 Operator All RPS Fuse removed SAT    UNSAT        N/A    COMMENTS:
CUE:           Acknowledge Notification, SRO Does not direct replacement of fuses END OF TASK STOP TIME 7


JPM 5  *******************************************************************************
JPM k OPERATOR: _________________________________
Performance Step 3:      Critical X  Not Critical  b. LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
RO ____       SRO ____             DATE: __________
: c. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15): RPS BUS "A" BLOCK  NUMBER  FUSE ID  CC    FOUR (4)  2-FU1-085-0037AA CC    FIVE (5)  2-FU1-085-0039A/2 CC    SIX (6)  2-FU1-085-0039A/3 CC    SEVEN (7)  2-FU1-085-0039A/4 Standard:  Identifies terminal strip and simulates removing listed fuses SAT      UNSAT      N/A      COMMENTS:                       
JPM NUMBER:         i TASK NUMBER:         U-000-EM-19 TASK TITLE:         3-EOI Appendix-1A Removal of RPS SCRAM Fuses K/A NUMBER: 212000 A2.20                 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 3-EOI Appendix-1A LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-1A VALIDATION TIME: 10 minutes PERFORMANCE TIME:
 
COMMENTS: __________________________________________________________
CUE:    When location of proper Fuse is indicated the Fuse has been removed
 
JPM 6  *******************************************************************************
Performance Step 4:      Critical X  Not Critical  d. LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
: e. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-17): RPS BUS "B" BLOCK  NUMBER  FUSE ID  CC    FOUR (4)  2-FU1-085-0037BA CC  FIVE (5)  2-FU1-085-0039B/2 CC    SIX (6)  2-FU1-085-0039B/3 CC    SEVEN (7)  2-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT      UNSAT      N/A      COMMENTS:                       
 
CUE:    When location of proper Fuse is indicated the Fuse has been removed
 
JPM 7  *******************************************************************************
Performance Step 5:      Critical    Not Critical X  f. WHEN ALL fuses are removed, THEN NOTIFY Unit Operator. Standard:
Notifies Unit 2 Operator All RPS Fuse removed SAT      UNSAT      N/A      COMMENTS:                       
 
END OF TASK
 
STOP TIME CUE:    Acknowledge Notification, SRO Does not direct replacement of fuses
 
JPM 1  OPERATOR: _________________________________
RO ____ SRO ____ DATE: __________
 
JPM NUMBER: i TASK NUMBER: U-000-EM-19 TASK TITLE: 3-EOI Appendix-1A Removal of RPS SCRAM Fuses
 
K/A NUMBER:
212000 A2.20 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 3-EOI Appendix-1A  
 
LOCATION OF PERFORMANCE:
Plant REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-1A  
 
VALIDATION TIME: 10 minutes
 
PERFORMANCE TIME:  
 
COMMENTS:
__________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Additional comment sheets attached? YES ___ NO ___
RESULTS:      SATISFACTORY ____          UNSATISFACTORY ____
SIGNATURE: __________________________          DATE: __________
EXAMINER 1


Additional comment sheets attached?  YES
INITIAL CONDITIONS: You are the Extra Operator. The Unit 3 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
___  NO ___
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 3-9-5.
RESULTS: SATISFACTORY
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 3-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
____ UNSATISFACTORY ____
 
SIGNATURE:  __________________________
DATE: __________
EXAMINER INITIAL CONDITIONS: You are the Extra Operator. The Unit 3 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9
-5 are still illuminated. EOI-1 has been entered and followed to RC/Q
-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 3-9-5.
INITIATING CUE
: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 3
-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.    
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!


JPM 3    *******************************************************************************
JPM       k
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
 
IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.
When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.
*******************************************************************************
*******************************************************************************
 
INITIAL CONDITIONS: You are the Extra Operator. The Unit 3 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.
INITIAL CONDITIONS: You are the Extra Operator. The Unit 3 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9
EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 3-9-5.
-5 are still illuminated. EOI-1 has been entered and followed to RC/Q
INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 3-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.
-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 3-9-5.
INITIATING CUE
: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 3
-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.  
 
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!
3


JPM START TIME          
JPM   k START TIME
  *******************************************************************************
*******************************************************************************
Performance Step 1:                                              Critical Not Critical X
: 1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.
Standard:
Given in initial conditions SAT    UNSAT        N/A      COMMENTS:
*******************************************************************************
Performance Step 2:                                              Critical Not Critical X
: 2. DISPATCH personnel to Unit 3 Auxiliary Instrument Room to perform the following:
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.
Standard:
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT    UNSAT        N/A      COMMENTS:
CUE:          When location of EOI Storage Box identified, Operator has the fuse pullers 4


Performance Step 1:       Critical     Not Critical X  1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5. Standard:   Given in initial conditions SAT     UNSAT       N/A      COMMENTS:                      
JPM    k
*******************************************************************************
Performance Step 3:                                                 Critical X Not Critical
: b.      LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
: c.     REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15):
RPS BUS A BLOCK                  NUMBER                FUSE ID CC                      FOUR (4)              3-FU1-085-0037AA CC                      FIVE (5)              3-FU1-085-0039A/2 CC                      SIX (6)                3-FU1-085-0039A/3 CC                      SEVEN (7)              3-FU1-085-0039A/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT       N/A      COMMENTS:
CUE:            When location of proper Fuse is indicated the Fuse has been removed 5


*****************************************************************
JPM    k
**************
*******************************************************************************
Performance Step 2:       Critical     Not Critical 2. DISPATCH personnel to Unit 3 Auxiliary Instrument Room to perform the following:
Performance Step 4:                                                 Critical X Not Critical
: a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box. Standard:
: d.      LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT     UNSAT       N/A      COMMENTS:                      
: e.     REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-17):
RPS BUS B BLOCK                  NUMBER                FUSE ID CC                      FOUR (4)              3-FU1-085-0037BA CC                      FIVE (5)              3-FU1-085-0039B/2 CC                      SIX (6)                3-FU1-085-0039B/3 CC                      SEVEN (7)              3-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT       N/A      COMMENTS:
CUE:            When location of proper Fuse is indicated the Fuse has been removed 6


CUE:   When location of EOI Storage Box identified, Operator has the fuse pullers
JPM   k
 
  *******************************************************************************
JPM 5 *******************************************************************************
Performance Step 5:                                             Critical Not Critical X
Performance Step 3:       Critical Not Critical  b. LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
: f.      WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.
: c. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15): RPS BUS "A" BLOCK  NUMBER  FUSE ID  CC    FOUR (4)  3-FU1-085-0037AA CC    FIVE (5)  3-FU1-085-0039A/2 CC    SIX (6)  3-FU1-085-0039A/3 CC    SEVEN (7)  3-FU1-085-0039A/4 Standard:  Identifies terminal strip and simulates removing listed fuses SAT      UNSAT      N/A      COMMENTS:                       
Standard:
 
Notifies Unit 3 Operator All RPS Fuse removed SAT     UNSAT       N/A     COMMENTS:
CUE:    When location of proper Fuse is indicated the Fuse has been removed
CUE:           Acknowledge Notification, SRO Does not direct replacement of fuses END OF TASK STOP TIME 7}}
 
JPM 6  *******************************************************************************
Performance Step 4:      Critical X Not Critical  d. LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
: e. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-17): RPS BUS "B" BLOCK  NUMBER  FUSE ID  CC    FOUR (4)  3-FU1-085-0037BA CC  FIVE (5)  3-FU1-085-0039B/2 CC    SIX (6)  3-FU1-085-0039B/3 CC    SEVEN (7)  3-FU1-085-0039B/4 Standard:
Identifies terminal strip and simulates removing listed fuses SAT     UNSAT      N/A      COMMENTS:                       
 
CUE:    When location of proper Fuse is indicated the Fuse has been removed
 
JPM 7  *******************************************************************************
Performance Step 5:      Critical    Not Critical X  f. WHEN ALL fuses are removed, THEN NOTIFY Unit Operator. Standard:
Notifies Unit 3 Operator All RPS Fuse removed SAT     UNSAT       N/A       COMMENTS:                      
 
END OF TASK
 
STOP TIME CUE:   Acknowledge Notification, SRO Does not direct replacement of fuses}}

Revision as of 09:08, 4 November 2019

302 Draft Simulator & In-plant JPMs
ML14049A015
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/18/2014
From:
NRC/RGN-II
To:
Tennessee Valley Authority
References
U-085-AB-03
Download: ML14049A015 (181)


Text

JPM a OPERATOR: ________________________________

RO SRO DATE:

JPM NUMBER: a- ALTERNATE PATH TASK NUMBER: U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K/A NUMBER: 201001 A2.01 K/A RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-85 and 2-AOI-85-3 VALIDATION TIME: 15 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

JPM a

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

NRC Examiner: Steps 1 through 5 are for single notch withdrawal, steps 6 through 15 are for continuous withdrawal.

3

JPM a START TIME

Performance Step 1: Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

Standard:

Selects Control Rod 30-35 by depressing 30-35 pushbutton.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

[2] OBSERVE the following for selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • White light on the Full Core Display ILLUMINATED.
  • Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

4

JPM a

Performance Step 3: Critical Not Critical X

[3] VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.

SAT UNSAT N/A COMMENTS:

Performance Step 4: Critical X Not Critical

[4] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

Withdraws control rod 30-35.

SAT UNSAT N/A COMMENTS:

5

JPM a

Performance Step 5: Critical X Not Critical

[6] IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:

[6.1] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6.2] CHECK control rod coupled by observing the following:

  • Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.

[6.3] CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.

Standard:

If Control Rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:

6

JPM a

Performance Step 6: Critical X Not Critical 6.6.4 Continuous Rod Withdrawal NOTES

1) Continuous control rod withdrawal may be used when a control rod is to be withdrawn greater than three notches.
2) When in areas of high notch worth, single notch withdrawal should be used instead of continuous rod withdrawal. Information concerning high notch worth is identified by Reactor Engineering in Control Rod Coupling Integrity Check, 2-SR-3.1.3.5A.
3) When continuously withdrawing a control rod to a position other than position 48 the CRD Notch Override Switch is held in the Override position and then the CRD Control.

Switch is held in the Rod Out Notch position

  • Both switches should be released when the control rod reaches two notches prior to its intended position.

(Example: If a control rod is to be withdrawn from position 00 to position 12, the CRD Notch Override Switch and the CRD Control Switch would be used to move the control rod until reaching position 08, then both switches would be released.)

  • If the rod settles in a notch prior to the intended position, the CRD Control Switch should be used to withdraw the rod to the intended position.

(using the above example; If the control rod settles at a notch prior to the intended position of 12, the CRD Control Switch would be used to withdraw the control rod to position 12.

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 2-XS-85-40.

Standard:

Selects Control Rod 30-35 by depressing 30-35 pushbutton.

SAT UNSAT N/A COMMENTS:

7

JPM a

Performance Step 7: Critical Not Critical X

[2] OBSERVE the following for selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • White light on the Full Core Display ILLUMINATED.
  • Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

Performance Step 8: Critical Not Critical X

[3] VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly.

SAT UNSAT N/A COMMENTS:

Performance Step 9: Critical Not Critical X

[4] VERIFY Control Rod is being withdrawn to a position greater than three notches.

Standard:

Verifies Control Rod 30-35 is going from position 16 to 48.

SAT UNSAT N/A COMMENTS:

8

JPM a

Performance Step 10: Critical Not Critical X

[5] IF withdrawing the control rod to a position other than 48, THEN PERFORM the following: (Otherwise N/A)

Standard:

Step is NA.

SAT UNSAT N/A COMMENTS:

9

JPM a

Performance Step 11: Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:

1) Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
2) Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].

[6] IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)

[6.1] PLACE and HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.

[6.2] PLACE and HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.

10

JPM a

Performance Step 12: Critical X Not Critical

[6.3] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.

[6.4] CHECK control rod coupled by observing the following:

  • Four rod display digital readout AND full core display digital readout AND background light remain illuminated.
14) does NOT alarm.

[6.5] RELEASE both CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.

[6.6] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:

11

JPM a

Performance Step 13: Critical X Not Critical

[7] IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):

[7.1] PLACE AND HOLD CRD NOTCH OVERRIDE, 2-HS-85-47, in NOTCH OVERRRIDE.

[7.2] PLACE AND HOLD CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 2-HS-85-47, in Notch Override and, 2-HS-85-48, in Rod Out Notch.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.

12

JPM a

Performance Step 14: Critical Not Critical X

[7.3] WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 2-HS-85-47, and CRD CONTROL SWITCH, 2-HS-85-48.

[7.4] VERIFY control rod settles into position 48.

Standard:

Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.

SAT UNSAT N/A COMMENTS:

Performance Step 15: Critical X Not Critical

[7.5] PLACE CRD CONTROL SWITCH, 2-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[7.6] CHECK control rod coupled by observing the following:

  • Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
14) does NOT alarm.

[7.7] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:

13

JPM a

Performance Step 16: Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 90/125.

Note: the High-High of 116.4/125 will produce a scram signal.

Standard:

Ranges IRMs to clear or prevent a Rod Block signal.

Note: A Full Scram signal from IRMs while withdrawing control rods will be a failure.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required, have operator take the actions of 2-AOI-85-3 CRD System Failure.

14

JPM a

Performance Step 17: Critical Not Critical X 4.1 Immediate Actions

[1] IF operating CRD PUMP has failed AND standby CRD Pump is available, THEN PERFORM the following at Panel 2-9-5:

[1.1] PLACE CRD SYSTEM FLOW CONTROL, 2-FIC-85-11, in MAN at minimum setting.

Standard:

Places CRD System Flow Control in Manual and at Minimum setting.

SAT UNSAT N/A COMMENTS:

Performance Step 18: Critical Not Critical X

[1.2] START associated standby CRD Pump using one of the following:

  • CRD Pump 1B, using 2-HS-85-2A
  • CRD Pump 2A, using 2-HS-85-1A Standard:

Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.

SAT UNSAT N/A COMMENTS:

15

JPM a

Performance Step 9: Critical X Not Critical

[2] IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:

  • In-service CRD Pump tripped and neither CRD Pump can be started, OR
  • Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:

[2.1] MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.

Standard:

Insert a Manual Scram and places Mode Switch in Shutdown.

SAT UNSAT N/A COMMENTS:

CUE: After Scram report another operator will continue in 2-AOI-100-1.

END OF TASK STOP TIME 16

JPM a OPERATOR: ________________________________

RO SRO DATE:

JPM NUMBER: a- ALTERNATE PATH TASK NUMBER: U-085-AB-03 TASK TITLE: CRD Pump Trip at <900 psig Reactor Pressure K/A NUMBER: 201001 A2.01 K/A RATING: RO 3.2 SRO 3.3 TASK STANDARD: Withdraws Control Rod, if withdrawn to position 48; performs a coupling check, ranges IRMs to prevent a full scram signal, and inserts a manual scram; when unable to restore CRD drive water pressure >940 psig.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-85 and 3-AOI-85-3 VALIDATION TIME: 15 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

JPM a

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Reactor Operator. Plant startup is in progress. Last completed Control Rod was 38-43 from 16 to 48, Sequence A2 Group 12. Other Operators are assigned heat up rate monitoring and Reactor Level Control.

INITIATING CUE:

The Unit Supervisor directs you to continue withdrawing controls rods for plant startup, the next control rod is 30-35. Rod Out Notch Override is authorized, complete the withdrawal of group 12 and then continue with group 13.

NRC Examiner: Steps 1 through 5 are for single notch withdrawal, steps 6 through 15 are for continuous withdrawal.

3

JPM a START TIME

Performance Step 1: Critical X Not Critical 6.6.3 Control Rod Notch Withdrawal

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

Standard:

Selects Control Rod 30-35 by depressing 30-35 pushbutton.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

[2] OBSERVE the following for selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • White light on the Full Core Display ILLUMINATED.
  • Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

4

JPM a

Performance Step 3: Critical Not Critical X

[3] VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly and verified Control Rod 30-35 is going from position 16 to 48.

SAT UNSAT N/A COMMENTS:

Performance Step 4: Critical X Not Critical

[4] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[5] OBSERVE the control rod settles into the desired position and the ROD SETTLE light extinguishes.

Standard:

Withdraws control rod 30-35.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required, have operator take the actions of 3-AOI-85-3 CRD System Failure.

5

JPM a

Performance Step 5: Critical X Not Critical

[6] IF control rod is notch withdrawn to rod notch Position 48, THEN PERFORM control rod coupling integrity check as follows:

[6.1] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[6.2] CHECK control rod coupled by observing the following:

  • Four rod display digital readout AND the full cores display digital readout AND background light remain illuminated.

[6.3] CHECK the control rod settles into Position 48 and the ROD SETTLE light extinguishes.

Standard:

If Control Rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:

6

JPM a

Performance Step 6: Critical X Not Critical 6.6.4 Continuous Rod Withdrawal NOTES

1) Continuous control rod withdrawal may be used when a control rod is to be withdrawn greater than three notches.
2) When in areas of high notch worth, single notch withdrawal should be used instead of continuous rod withdrawal. Information concerning high notch worth is identified by Reactor Engineering in Control Rod Coupling Integrity Check, 3-SR-3.1.3.5A.
3) When continuously withdrawing a control rod, the CRD Notch Override Switch is held in the Override position and the CRD Control Switch is held in the Rod Out Notch position.
  • When the control rod reaches two notches below its intended position, both switches should be released.
  • If the rod settles in a notch below the intended position, the CRD Control Switch should be used to withdraw the rod to the intended position.
  • EXAMPLE: If a control rod is to be withdrawn from position 00 to position 12, the CRD Notch Override Switch and the CRD Control Switch would be used to move the control rod until reaching position 08, then both switches would be released. If the control rod settles at a notch below the intended position of 12, the CRD Control Switch would be used to withdraw the control rod to position 12.

[1] SELECT the desired control rod by depressing the appropriate CRD ROD SELECT pushbutton, 3-XS-85-40.

Standard:

Selects Control Rod 30-35 by depressing 30-35 pushbutton.

SAT UNSAT N/A COMMENTS:

7

JPM a

Performance Step 7: Critical Not Critical X

[2] OBSERVE the following for selected control rod:

  • CRD ROD SELECT pushbutton is brightly ILLUMINATED.
  • White light on the Full Core Display ILLUMINATED.
  • Rod Out Permit light ILLUMINATED.

Standard:

Observes the above indications.

SAT UNSAT N/A COMMENTS:

Performance Step 8: Critical Not Critical X

[3] VERIFY ROD WORTH MINIMIZER operable and LATCHED in to correct ROD GROUP, when Rod Worth Minimizer is enforcing.

Standard:

Verifies Rod Worth Minimizer responded correctly.

SAT UNSAT N/A COMMENTS:

Performance Step 9: Critical Not Critical X

[4] VERIFY Control Rod is being withdrawn to a position greater than three notches.

Standard:

Verifies Control Rod 30-35 is going from position 16 to 48.

SAT UNSAT N/A COMMENTS:

8

JPM a

Performance Step 10: Critical Not Critical X

[5] IF withdrawing the control rod to a position other than 48, THEN PERFORM the following: (Otherwise N/A)

Standard:

Step is NA.

SAT UNSAT N/A COMMENTS:

9

JPM a

Performance Step 11: Critical X Not Critical NOTE When continuously withdrawing a control rod to position 48, the control rod coupling integrity check can be performed by one of the two following methods:

1) Coupling integrity check while maintaining the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position. If this method is selected, perform Step 6.6.4[6] and N/A Step 6.6.4[7].
2) Coupling integrity check after releasing the CRD Notch Override Switch and the CRD Control Switch. If this method is selected, perform Step 6.6.4[7] and N/A Step 6.6.4[6].

[6] IF continuously withdrawing the control rod to position 48 and performing the control rod coupling integrity check in conjunction with withdrawal, THEN PERFORM the following: (Otherwise N/A)

[6.1] PLACE and HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.

[6.2] PLACE and HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and, 3-HS-85-48, in Rod Out Notch.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required, have operator take the actions of 3-AOI-85-3 CRD System Failure.

10

JPM a

Performance Step 12: Critical X Not Critical

[6.3] MAINTAIN the CRD Notch Override Switch in the Override position and the CRD Control Switch in the Rod Out Notch position, with the control rod at position 48.

[6.4] CHECK control rod coupled by observing the following:

  • Four rod display digital readout AND the full core display digital readout AND background light remain illuminated.

[6.5] RELEASE both CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.

[6.6] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:

11

JPM a

Performance Step 13: Critical X Not Critical

[7] IF continuously withdrawing the control rod to position 48, the control rod coupling integrity check will be performed after the CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48 are to be released. THEN PERFORM control rod coupling integrity check as follows (otherwise N/A):

[7.1] PLACE AND HOLD CRD NOTCH OVERRIDE, 3-HS-85-47, in NOTCH OVERRRIDE.

[7.2] PLACE AND HOLD CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH.

Standard:

Continuously withdraws Control Rod 30-35 by holding switch, 3-HS-85-47, in Notch Override and 3-HS-85-48, in Rod Out Notch.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required, have operator take the actions of 3-AOI-85-3 CRD System Failure.

12

JPM a

Performance Step 14: Critical Not Critical X

[7.3] WHEN position 48 is reached, THEN RELEASE CRD NOTCH OVERRIDE, 3-HS-85-47, and CRD CONTROL SWITCH, 3-HS-85-48.

[7.4] VERIFY control rod settles into position 48.

Standard:

Stops withdraw of Control Rod 30-35 at position 48 by releasing hand switches and verifies rod settles at position 48.

SAT UNSAT N/A COMMENTS:

Performance Step 15: Critical X Not Critical

[7.5] PLACE CRD CONTROL SWITCH, 3-HS-85-48, in ROD OUT NOTCH, and RELEASE.

[7.6] CHECK control rod coupled by observing the following:

  • Four rod display digital readout AND full core display digital readout AND background light will remain illuminated.
14) does NOT alarm.

[7.7] CHECK control rod settles into position 48 and ROD SETTLE light extinguishes.

Standard:

If control rod is withdrawn to position 48, performs a coupling check.

SAT UNSAT N/A COMMENTS:

13

JPM a

Performance Step 16: Critical X Not Critical Operator Ranges IRMs as necessary; to maintain greater than the downscale reading of 7.5/125 and less than the upscale reading of 104.6/125.

Note: the High-High of 116.4/125 will produce a scram signal.

Standard:

Ranges IRMs to clear or prevent a Rod Block signal.

Note: A Full Scram signal from IRMs while withdrawing control rods will be a failure.

SAT UNSAT N/A COMMENTS:

Driver: At direction of Evaluator, after or during withdraw of control rod 30-35, trip operating CRD Pump.

CUE: If required , have operator take the actions of 3-AOI-85-3 CRD System Failure.

14

JPM a

Performance Step 17: Critical Not Critical X 4.1 Immediate Actions

[1] IF operating CRD PUMP has failed AND the standby CRD Pump is available, THEN PERFORM the following at Panel 3-9-5:

[1.1] PLACE CRD SYSTEM FLOW CONTROL, 3-FIC-85-11, in MAN at minimum setting.

Standard:

Places CRD System Flow Control in Manual and at Minimum setting.

SAT UNSAT N/A COMMENTS:

Performance Step 18: Critical Not Critical X

[1.2] START associated standby CRD Pump using one of the following:

  • CRD Pump 3B, using 3-HS-85-2A
  • CRD Pump 3A, using 3-HS-85-1A Standard:

Attempts to start standby CRD Pump and may also attempt to start tripped CRD Pump.

SAT UNSAT N/A COMMENTS:

15

JPM a

Performance Step 19: Critical X Not Critical

[2] IF Reactor Pressure is less than 900 PSIG and either of the following conditions exists:

  • In-service CRD Pump tripped and neither CRD Pump can be started, OR
  • Charging Water Pressure can NOT be restored and maintained above 940 PSIG, THEN PERFORM the following:

[2.1] MANUALLY SCRAM Reactor, IMMEDIATELY PLACE the reactor mode switch in the SHUTDOWN position.

Standard:

Insert a Manual Scram and places Mode Switch in Shutdown.

SAT UNSAT N/A COMMENTS:

CUE: After Scram report another operator will continue in 3-AOI-100-1.

END OF TASK STOP TIME 16

JPM b OPERATOR: ________________________________

RO SRO DATE:

JPM NUMBER: b- ALTERNATE PATH TASK NUMBER: U-003-AL-01 TASK TITLE: Remove RFPT A from Service K/A NUMBER: 259001 A4.04 K/A RATING: RO 3.1 SRO 2.9 PRA:

TASK STANDARD: Removes RFPT A from service, trips RFPT A and closes discharge valve LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-3 VALIDATION TIME: 20 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 2A.

RFPT 2A needs to removed from service.

INITIATING CUES: The Unit Supervisor directs you to remove RFPT 2A from service in accordance with 2-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.

JPM b

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 2A.

RFPT 2A needs to removed from service.

INITIATING CUES: The Unit Supervisor directs you to remove RFPT 2A from service in accordance with 2-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.

3

JPM b START TIME

Performance Step 1: Critical Not Critical X 7.1 RFP/RFPT Shutdown CAUTIONS

1) FAILURE to monitor SJAE/OG CNDR CNDS FLOW, 2-FI-2-42, on Panel 2-9-6 for proper flow (between 2 x 106 and 3 x 106 lbm/hr) may result in SJAE isolation.
2) Changes in Condensate System flow may require adjustment to SPE CNDS BYPASS, 2-FCV-002-0190.
3) When isolating the Reactor Feedwater Pump(s) for maintenance, the associated injection water should also be isolated to prevent high seal differential pressure and allow the RFW Pump shafts to rotate freely. (BFNPER123395)
4) When a Reactor Feed Pump is isolated (suction, discharge, and minimum flow valve closed) with injection water aligned to the pump, there is a potential of rising pump casing pressure and seal water leakoff flows reaching the point where seal water drains are overcome and seal water is forced into the oil system through the bearing housings. Therefore, the time that a RFP is isolated with injection water aligned to the pump should be minimized.

[1] REFER TO Section 3.0 and REVIEW Precautions and Limitations.

[2] Verify Reactor Power is 95%. (Ref. P&L 3.0 VV)

[3] IF any Condensate or Condensate Booster Pump is NOT in service, THEN (Otherwise N/A).

[4] IF RFP being removed from service is last operating RFP, THEN (Otherwise N/A)

Standard:

Given in initial conditions that step 1 is complete Operator verifies Reactor Power is <95%

Given in initial conditions that step 3 and 4 are N/A.

SAT UNSAT N/A COMMENTS:

4

JPM b

Performance Step 2: Critical Not Critical X

[5] VERIFY in AUTO, RFPT 2A TURNING GEAR MOTOR, 2-HS-3-101A.

Standard:

Verifies 2-HS-3-101A in AUTO SAT UNSAT N/A COMMENTS:

5

JPM b

Performance Step 3: Critical Not Critical X NOTES

1) When selected, Column 1 on individual RFPT Speed Control Panel Display Stations (PDS) displays actual pump speed and is not controlled in any mode.
2) When selected, Column 2 on individual RFPT Speed Control PDS displays pump flow bias and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in AUTO.
3) When selected, Column 3 on individual RFPT Speed Control PDS displays RFPT speed demand and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in MANUAL.
4) Illustration 2 can be referred to for additional information on the RFPT Speed Control PDSs.

[6] LOWER speed of RFPT/RFP being removed from service by either of the following methods:

  • IF Using individual RFPT Manual Governor switch, THEN GO TO Step 7.1[7].
  • IF Using individual RFPT Speed Control PDS in MANUAL, THEN GO TO Step 7.1[8].

Standard:

Operator proceeds to step 7 or step 8. NOTE most operators will go to step 7 (performance step 4).

SAT UNSAT N/A COMMENTS:

6

JPM b

Performance Step 4: Critical X Not Critical

[7] SLOWLY LOWER speed of RFPT, using individual RFPT 2A SPEED CONT RAISE/LOWER switch, 2-HS-46-8A on Panel 2-9-5, by performing the following:

[7.1] DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR.

  • CHECK amber light at switch illuminated.

Standard:

Depresses 2-HS-46-8A to Manual SAT UNSAT N/A COMMENTS:

Performance Step 5: *Critical X Not Critical

  • [7.2] SLOWLY LOWER RFPT speed, by placing RFPT Speed Control switch in RAISE and LOWER positions, as necessary.

[7.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO.

Standard:

Lowers speed of RFPT 2A and verifies RFPT 2B and 2C respond SAT UNSAT N/A COMMENTS:

7

JPM b

Performance Step 6: Critical X Not Critical

[8] SLOWLY LOWER speed of RFPT, using individual RFPT 2A SPEED CONTROL PDS, 2-SIC-46-8 by performing the following (Panel 2-9-5):

[8.1] PLACE PDS in MANUAL AND VERIFY Column 3 is selected.

Standard:

Places 2-SIC-46-8 in Manual SAT UNSAT N/A COMMENTS:

Performance Step 7: *Critical X Not Critical

  • [8.2] SLOWLY LOWER RFPT speed, using Ramp Up/Ramp Down pushbuttons as necessary.

[8.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO.

Standard:

Lowers speed of RFPT 2A and verifies RFPT 2B and 2C respond SAT UNSAT N/A COMMENTS:

ALTERNATE PATH STARTS ON THE NEXT STEP 8

JPM b

Performance Step 8: Critical X Not Critical CAUTION RFP Discharge Check Valve may fail to close when removing a RFP from service.

[9] IF at any time RFP Discharge Check Valve failure is experienced while removing RFP from service, THEN REFER TO Step 7.1[15].

Standard:

When Operator lowers speed far enough they will notice the failure of RFP Discharge Check Valve due to check valve failing to close and Reactor Water level lowering. Operator will transition to step 7.1[15].

SAT UNSAT N/A COMMENTS:

Performance Step 9: Critical Not Critical X

[10] CONTINUE to slowly lower RFPT speed to minimum speed setting (approximately 600 rpm).

Standard:

Operator will continue to lower speed, once speed has lowered far enough that RFPT 2A discharge pressure is below the discharge pressure of RFPT 2B and 2C, the operator will respond to a failure of RFPT 2A Discharge Check Valve Failure SAT UNSAT N/A COMMENTS:

9

JPM b

Performance Step 10: Critical Not Critical X

[15] IF RFP Discharge Check Valve failure is experienced, THEN

[15.1] DEPRESS RFP 2A(2B)(2C) DISCHARGE TESTABLE CK VLV pushbutton, 2-HS-3-94A.

Standard:

Operator depresses 2-HS-3-94A, Check Valve fails to close SAT UNSAT N/A COMMENTS:

Performance Step 11: Critical Not Critical X

[15.2] IF RFP Discharge Check Valve failure is still being experienced, THEN PERFORM either of the following:

[15.2.1] IMMEDIATELY RETURN RFP to service.

Standard:

Operator may raise speed of RFPT 2A and attempt to return to service.

SAT UNSAT N/A COMMENTS:

CUE: Remove RFPT 2A from service.

10

JPM b NOTE: Operator may lower pump speed to 600 RPM prior to tripping pump.

Performance Step 12: *Critical X Not Critical

[15.2.2] PERFORM the following:

A. VERIFY OPEN RFP 2A MIN FLOW VALVE, 2-FCV-3-20

  • B. CLOSE RFP 2A DISCHARGE VALVE using 2-HS-3-19A
  • C. VERIFY RFP tripped.

Standard:

Verifies RFP 2A min flow valve Open, Closes RFP 2A Discharge Valve 2-HS-3-19A AND Trips RFPT 2A.

SAT UNSAT N/A COMMENTS:

CUE: This completes the task.

END OF TASK STOP TIME 11

JPM b OPERATOR: ________________________________

RO SRO DATE:

JPM NUMBER: b- ALTERNATE PATH TASK NUMBER: U-003-AL-01 TASK TITLE: Place RFPT A in Service K/A NUMBER: 259001 A4.04 K/A RATING: RO 3.1 SRO 2.9 PRA:

TASK STANDARD: Removes RFPT A from service, trips RFPT A and closes discharge valve LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-3 VALIDATION TIME: 20 minutes MAX. TIME ALLOWED: (Completed for Time Critical JPMs only)

PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 3A.

RFPT 3A needs to removed from service.

INITIATING CUES: The Unit Supervisor directs you to remove RFPT 3A from service in accordance with 3-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.

JPM b

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are the Unit Operator. An oil leak has been identified on RFPT 3A.

RFPT 3A needs to removed from service.

INITIATING CUES: The Unit Supervisor directs you to remove RFPT 3A from service in accordance with 3-OI-3, Reactor Feedwater System section 7.1. Precautions and Limitations have been reviewed.

3

JPM b START TIME

Performance Step 1: Critical Not Critical X 7.1 RFP/RFPT Shutdown CAUTIONS

1) FAILURE to monitor SJAE/OG CNDR CNDS FLOW, 3-FI-2-42, on Panel 3-9-6 for proper flow (between 2 x 106 and 3 x 106 lbm/hr) may result in SJAE isolation.
2) Changes in Condensate System flow may require adjustment to SPE CNDS BYPASS, 3-FCV-002-0190.
3) When isolating the Reactor Feedwater Pump(s) for maintenance, the associated injection water should also be isolated to prevent high seal differential pressure and allow the RFW Pump shafts to rotate freely. (BFNPER123395)

[1] REFER TO Section 3.0 and REVIEW Precautions and Limitations.

[2] VERIFY Reactor power is less than 80% prior to removing RFP from service.

NOTE It may be necessary to switch to SINGLE ELEMENT mode from THREE ELEMENT mode earlier than recommended if Feedwater control becomes unstable.

[3] IF RFP being removed from service is last operating RFP OR IF at any time Feedwater control becomes unstable, THEN (Otherwise N/A).

Standard:

Given in initial conditions that step 1 is complete and step 2 is NA.

Operator verifies Reactor Power is <80%

Given in initial conditions that step 3 is NA SAT UNSAT N/A COMMENTS:

4

JPM b

Performance Step 2: Critical Not Critical X

[4] VERIFY in AUTO, RFPT 3A TURNING GEAR MOTOR, 3-HS-3-101A.

Standard:

Verifies 3-HS-3-101A in AUTO SAT UNSAT N/A COMMENTS:

5

JPM b

Performance Step 3: Critical Not Critical X NOTES

1) When selected, Column 1 on individual RFPT Speed Control Panel Display Stations (PDS) displays actual pump speed and is not controlled in any mode.
2) When selected, Column 2 on individual RFPT Speed Control PDS displays pump flow bias and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in AUTO.
3) When selected, Column 3 on individual RFPT Speed Control PDS displays RFPT speed demand and is changed with the Ramp Up/Ramp Down pushbuttons with the controller in MANUAL.
4) Illustration 2 can be referred to for additional information on the RFPT Speed Control PDSs.

[5] LOWER speed of RFPT/RFP being removed from service by either of the following:

  • IF Using individual RFPT Manual Governor switch, THEN GO TO Step 7.1[6].
  • IF Using individual RFPT Speed Control PDS in MANUAL, THEN GO TO Step 7.1[7].

Standard:

Operator proceeds to step 6 or step 7. NOTE most operators will go to step 6 (performance step 4).

SAT UNSAT N/A COMMENTS:

6

JPM b

Performance Step 4: Critical X Not Critical

[6] LOWER speed of RFPT, using individual RFPT 3A SPEED CONT RAISE/LOWER switch, 3-HS-46-8A as follows (Panel 3-9-5):

[6.1] DEPRESS RFPT Speed Control Raise/Lower switch to MANUAL GOVERNOR.

  • VERIFY illuminated amber light at switch.

Standard:

Depresses 3-HS-46-8A to Manual SAT UNSAT N/A COMMENTS:

Performance Step 5: *Critical X Not Critical

  • [6.2] SLOWLY LOWER RFPT speed, by placing RFPT Speed Control switch in RAISE or LOWER positions, as necessary.

[6.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO as RFW Control System maintains Reactor water level.

Standard:

Lowers speed of RFPT 3A and verifies RFPT 3B and 3C respond.

SAT UNSAT N/A COMMENTS:

7

JPM b

Performance Step 6: Critical X Not Critical

[7] SLOWLY LOWER speed of RFPT, using individual RFPT 3A SPEED CONTROL PDS, 3-SIC-46-8 as follows (Panel 3-9-5):

[7.1] PLACE PDS in MANUAL AND VERIFY Column 3 is selected.

Standard:

Places 3-SIC-46-8 in Manual.

SAT UNSAT N/A COMMENTS:

Performance Step 7: *Critical X Not Critical

  • [7.2] SLOWLY LOWER RFPT speed, using Ramp Up/Ramp Down pushbuttons as necessary.

[7.3] IF this is the NOT the last operating feed pump, THEN OBSERVE rise in speed of any remaining RFPT operating in AUTO as RFW Control System maintains Reactor water level..

Standard:

Lowers speed of RFPT 3A and verifies RFPT 3B and 3C respond.

SAT UNSAT N/A COMMENTS:

8

JPM b ALTERNATE PATH STARTS ON THE NEXT STEP

Performance Step 8: *Critical X Not Critical CAUTION RFP Discharge Check Valve failure may be experienced while removing RFP from service.

[8] IF at any time RFP Discharge Check Valve failure is experienced while removing RFP from service, THEN PERFORM the following: (Otherwise N/A)

[8.1] DEPRESS RFP Discharge Testable Check valve push-button for approximately ten seconds (Panel 3-9-6).

Standard:

  • When Operator lowers speed far enough they will notice the failure of RFP Discharge Check Valve due to check valve failing to close and Reactor Water level lowering. Operator will complete step 7.1[8].

Operator depresses 3-HS-3-94A, Check Valve fails to close.

SAT UNSAT N/A COMMENTS:

9

JPM b

Performance Step 9: Critical Not Critical X

[8.2] CHECK reverse flow through check valve has stopped.

[8.3] IF RFP Discharge Testable Check Valve failure is still being experienced, THEN PERFORM one of the following:

[8.3.1] IMMEDIATELY RETURN RFP to service.

Standard:

Operator may raise speed of RFPT 3A and attempt to return to service.

SAT UNSAT N/A COMMENTS:

______

CUE: Remove RFPT 3A from service.

10

JPM b NOTE: Operator may lower pump speed to 600 RPM prior to tripping pump.

Performance Step 10: *Critical X Not Critical

[8.3.2] PERFORM the following:

A. VERIFY open RFP Minimum Flow Valve.

  • B. CLOSE RFP Discharge Valve.

Standard:

Verifies RFP 3A min flow valve Open, Closes RFP 3A Discharge Valve 3-HS-3-19A AND Trips RFPT 3A.

SAT UNSAT N/A COMMENTS:

CUE: This completes the task.

END OF TASK STOP TIME ________

11

JPM c OPERATOR: ________________________________

RO SRO DATE: _______

JPM NUMBER: c- ALTERNATE PATH TASK NUMBER: U-001-AB-01 TASK TITLE: RESPOND TO STUCK OPEN SRV K/A NUMBER: 239002A2.03 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Perform control room operations necessary to respond to a stuck open SRV as directed by 2-AOI-1-1 LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI-1-1 VALIDATION TIME: 6 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

JPM c INITIAL CONDITIONS: You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 2-XA-55-3C, Window 25 is in alarm.

INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 2-AOI-1-1.

2

JPM c

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 2-XA-55-3C, Window 25 is in alarm.

INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 2-AOI-1-1.

3

JPM c START TIME Simulator Driver: This JPM requires SRV 1-31 stuck open (imf ad01e 100).

Performance Step 1: Critical Not Critical X NOTE Once a MSRV is operated, a time delay of 15 to 30 seconds can be expected before a response can be detected on 2-TR-1-1, MSRV DISCHARGE TAILPIPE TEMPERATURE.

ICS can be used to monitor the discharge tailpipe temperature, but the appropriate indications on 2-TR-1-1 must be confirmed.

4.1 Immediate Action

[1] IDENTIFY stuck open relief valve by OBSERVING the following:

  • SRV TAILPIPE FLOW MONITOR, 2-FMT-1-4, on Panel 2-9-3, OR
  • MSRV DISCHARGE TAILPIPE TEMPERATURE recorder, 2-TR-1-1 on Panel 2-9-47.

Standard:

Identified MSRV 1-31 OPEN as indicated on 2-FMT-1-4 SRV Tailpipe Flow Monitor on Panel 2-9-3 or elevated tailpipe temperature as indicated on 2-TR-1-1, Panel 2-9-47.

SAT UNSAT N/A COMMENTS:

4

JPM c

Performance Step 2: Critical X Not Critical

[2] IF relief valve transient occurred while operating above 90%

power, THEN REDUCE reactor power to 90% RTP with recirc flow.

(Otherwise N/A)

Standard:

Operator Reduces reactor power to 90% RTP with recirc flow.

SAT UNSAT N/A COMMENTS:

Performance Step 3: Critical X Not Critical

[3] WHILE OBSERVING the indications for the affected Relief valve on the Acoustic Monitor; CYCLE the affected relief valve control switch as required up to three times:

  • CLOSE to OPEN to CLOSE positions Standard:

Placed 2-HS-1-31 in the CLOSE-OPEN-CLOSE position up to three times. Determines valve DID NOT close as indicated by MSRV TAILPIPE FLOW MONITOR or NO indicated increase in generator Mwe.

SAT UNSAT N/A COMMENTS:

5

JPM c

Performance Step 4: Critical Not Critical X

[4] IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)

Standard:

Verified that the SRV did not close and continues in the procedure at step 4.2.1 SAT UNSAT N/A COMMENTS:

Performance Step 5: Critical Not Critical X NOTES

1) Once initial transient of SRV opening has stabilized (pressure regulator compensation) the Heat balance will indicate bad data.
2) The SRV TAILPIPE FLOW MONITOR may seal-in an OPEN position indication.

4.2 Subsequent Action 4.2.1 Action if a fire exists with SRV stuck open

[1] IF an SRV is open and a fire exists in ANY Appendix R fire area, THEN (Otherwise N/A):

INITIATE a manual scram before the Suppression Pool temperature exceeds 95°F.

Standard:

No fire is indicated. This step is not applicable.

SAT UNSAT N/A COMMENTS:

6

JPM c

Performance Step 6: Critical X Not Critical 4.2 Subsequent Action 4.2.2 Attempt to close valve from Panel 9-3:

[1] PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the OFF position.

[2] PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON position.

[3] IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)

Standard:

Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the off position (Critical) and verifies the power is off (Not Critical). Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON Position (Critical) and verifies SRV 1-31 did not close (Not Critical) and continues at step [4].

SAT UNSAT N/A COMMENTS:

7

JPM c Driver: When the MSRV AUTO ACTUATION LOGIC SWITCH is in INHIBIT, dmf ad01e

Performance Step 7: Critical X Not Critical

[4] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT, 2-XS-1-202 in INHIBIT:

[5] IF relief valve closes, THEN OPEN breaker or PULL fuses as necessary using Attachment 1 (Unit 2 SRV Solenoid Power Breaker/Fuse Table).

Standard:

Placed MSRV AUTO ACTUATION LOGIC INHIBIT, 2-XS-1-202 in INHIBIT.

Verifies SRV 1-31 closes. Directs AUO/US to open the breaker 8B2 on 250V RMOV Board 2B, or pull fuses FU2-1-31 (Fuse holder 1FU) and FU2-1-31 (Fuse Holder 2FU).

SAT UNSAT N/A COMMENTS:

Performance Step 8: Critical Not Critical X

[6] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT 2-XS-1-202, in AUTO.

Standard:

Places MSRV AUTO ACTUATION LOGIC INHIBIT 2-XS-1-202, in AUTO. If switched is placed in Auto prior to power being removed this would be a failure.

SAT UNSAT N/A COMMENTS:

Driver: If 2-XS-1-202 is placed in auto imf ad01e to open SRV CUE: That completes this task.

END OF TASK STOP TIME:

8

JPM c OPERATOR: ________________________________

RO SRO DATE: _______

JPM NUMBER: c- ALTERNATE PATH TASK NUMBER: U-001-AB-01 TASK TITLE: RESPOND TO STUCK OPEN SRV K/A NUMBER: 239002A2.03 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Perform control room operations necessary to respond to a stuck open SRV as directed by 3-AOI-1-1 LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-AOI-1-1 VALIDATION TIME: 6 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

JPM c INITIAL CONDITIONS: You are an Operator. Unit 3 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 3-XA-55-3C, Window 25 is in alarm.

INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 3-AOI-1-1.

2

JPM c

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. Unit 2 is at 100% power. Annunciator MAIN STEAM RELIEF VALVE OPEN, 3-XA-55-3C, Window 25 is in alarm.

INITIATING CUE: The Unit Supervisor directs you to respond to the alarm as directed by 3-AOI-1-1.

3

JPM c START TIME Simulator Driver: This JPM requires SRV 1-31 stuck open (imf ad01e 100).

Performance Step 1: Critical Not Critical X NOTE Once a MSRV is operated, a time delay of 15 to 30 seconds can be expected before a response can be detected on 3-TR-1-1, MSRV DISCHARGE TAILPIPE TEMPERATURE.

ICS can be used to monitor the discharge tailpipe temperature, but the appropriate indications on 3-TR-1-1 must be confirmed.

4.1 Immediate Action

[1] IDENTIFY stuck open relief valve by OBSERVING the following:

  • SRV TAILPIPE FLOW MONITOR, 3-FMT-1-4, on Panel 3-9-3, OR
  • MSRV DISCHARGE TAILPIPE TEMPERATURE recorder, 3-TR-1-1 on Panel 3-9-47.

Standard:

Identified MSRV 1-31 OPEN as indicated on 3-FMT-1-4 SRV Tailpipe Flow Monitor on Panel 3-9-3 or elevated tailpipe temperature as indicated on 3-TR-1-1, Panel 3-9-47.

SAT UNSAT N/A COMMENTS:

4

JPM c

Performance Step 2: Critical X Not Critical

[2] IF relief valve transient occurred while operating above 90%

power, THEN REDUCE reactor power to 90% RTP with recirc flow.

(Otherwise N/A)

Standard:

Operator Reduces reactor power to 90% RTP with recirc flow.

SAT UNSAT N/A COMMENTS:

Performance Step 3: Critical X Not Critical

[3] WHILE OBSERVING the indications for the affected Relief valve on the Acoustic Monitor; CYCLE the affected relief valve control switch as required up to three times:

  • CLOSE to OPEN to CLOSE positions Standard:

Placed 3-HS-1-31 in the CLOSE-OPEN-CLOSE position up to three times. Determines valve DID NOT close as indicated by MSRV TAILPIPE FLOW MONITOR or NO indicated increase in generator Mwe.

SAT UNSAT N/A COMMENTS:

5

JPM c

Performance Step 4: Critical Not Critical X

[4] IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)

Standard:

Verified that the SRV did not close and continues in the procedure at step 4.2.1 SAT UNSAT N/A COMMENTS:

Performance Step 5: Critical Not Critical X NOTES

1) Once initial transient of SRV opening has stabilized (pressure regulator compensation) the Heat balance will indicate bad data.
2) The SRV TAILPIPE FLOW MONITOR may seal-in an OPEN position indication.

4.2 Subsequent Action 4.2.1 Action if a fire exists with SRV stuck open

[1] IF an SRV is open and a fire exists in ANY Appendix R fire area, THEN (Otherwise N/A):

INITIATE a manual scram before the Suppression Pool temperature exceeds 95°F.

Standard:

No fire is indicated. This step is not applicable.

SAT UNSAT N/A COMMENTS:

6

JPM c

Performance Step 6: Critical X Not Critical 4.2 Subsequent Action 4.2.2 Attempt to close valve from Panel 9-3:

[1] PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the OFF position.

[2] PLACE the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON position.

[3] IF all SRVs are CLOSED, THEN CONTINUE at Step 4.2.4. (Otherwise N/A)

Standard:

Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the off position (Critical) and verifies the power is off (Not Critical). Placed the SRV TAILPIPE FLOW MONITOR POWER SWITCH in the ON Position (Critical) and verifies SRV 1-31 did not close (Not Critical) and continues at step [4].

SAT UNSAT N/A COMMENTS:

7

JPM c Driver: When the MSRV AUTO ACTUATION LOGIC SWITCH is in INHIBIT, dmf ad01e

Performance Step 7: Critical X Not Critical

[4] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT, 3-XS-1-202 in INHIBIT:

[5] IF relief valve closes, THEN OPEN breaker or PULL fuses as necessary using Attachment 1 (Unit 3 SRV Solenoid Power Breaker/Fuse Table).

Standard:

Placed MSRV AUTO ACTUATION LOGIC INHIBIT, 3-XS-1-202 in INHIBIT.

Verifies SRV 1-31 closes. Directs AUO/US to open the breaker 8C1 on 250V RMOV Board 3B, or pull fuses 3-FU1-001-0031A and 3-FU1-001-0031B.

SAT UNSAT N/A COMMENTS:

8

JPM c

Performance Step 8: Critical Not Critical X

[6] PLACE MSRV AUTO ACTUATION LOGIC INHIBIT 3-XS-1-202, in AUTO.

Standard:

Places MSRV AUTO ACTUATION LOGIC INHIBIT 3-XS-1-202, in AUTO. If switched is placed in Auto prior to power being removed this would be a failure.

SAT UNSAT N/A COMMENTS:

Driver: If 3-XS-1-202 is placed in auto imf ad01e to open SRV CUE: That completes this task.

END OF TASK STOP TIME:

9

JPM d OPERATOR: ________________________________

RO ____ SRO DATE: ___________

JPM NUMBER: d- ALTERNATE PATH TASK NUMBER: U-047-NO-20 TASK TITLE: Control Valve Tightness Test K/A NUMBER: 245000 A3.08 K/A RATING: RO 3.0 SRO: 3.1 TASK STANDARD: Control Valve Tightness Test IAW 2-OI-47 section 6.9, responds to high turbine vibrations and trips the Main Turbine LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-OI-47 VALIDATION TIME: 20 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are an Operator on Unit 2. The Turbine-Generator has been operating at 200 MWe for the past 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 2-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 2-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 2-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.

INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 2-OI-47 section 6.9 starting at step 9.

JPM d

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator on Unit 2. The Turbine-Generator has been operating at 200 MWe for the past 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 2-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 2-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 2-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.

INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 2-OI-47 section 6.9 starting at step 9.

3

JPM d START TIME ________

Performance Step 1: Critical X Not Critical 6.9 Control Valve Tightness Test

[9] DEPRESS Turbine TRIP pushbutton 2-HS-47-67D.

Standard:

Trips the Turbine.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical X Not Critical

[10] DEPRESS Turbine RESET pushbutton 2-HS-47-67E.

Standard:

Resets the Turbine.

SAT UNSAT N/A COMMENTS:

Performance Step 3: Critical Not Critical X

[11] VERIFY ISVs are full open prior to continuing with the next step.

Standard:

Verifies ISVs FULL Open prior to step 12 SAT UNSAT N/A COMMENTS:

CUE: If a question is raised whether the ISVs are Full Open, inform the Operator that the ISVs are Full Open 4

JPM d

Performance Step 4: Critical X Not Critical

[12] DEPRESS the Start Up Rate FAST pushbutton, 2-HS-47-77C.

Standard:

Depresses the Start Up Rate Fast pushbutton.

SAT UNSAT N/A COMMENTS:

Performance Step 5: Critical Not Critical X

[13] VERIFY CV POSITION LIMIT, 2-XI-47-157, is set to approximately 66%.

Standard:

Verifies CV Position Limit set to about 66%

SAT UNSAT N/A COMMENTS:

Performance Step 6: Critical X Not Critical

[14] DEPRESS SYNC SPEED pushbutton, 2-HS-47-77H.

Standard:

Depresses Synch Speed pushbutton.

SAT UNSAT N/A COMMENTS:

5

JPM d

Performance Step 7: Critical Not Critical X

[15] WHEN turbine speed is greater than 900 RPM, THEN PLACE Bearing Lift Pumps in Auto by placing the TURBINE TURNING GEAR MOTOR control switch, 2-HS-47-10A, in AUTO.

Standard:

When turbine speed > 900 RPM places bearing lift pumps in Auto.

SAT UNSAT N/A COMMENTS:

Driver: When Turbine Speed is greater than 900 RPM insert bat NRC/turbvibe

Performance Step 8: Critical Not Critical X

[16] OBSERVE turbine speed is rising and the TURBINE ACCEL light, 2-ZI-47-77A, illuminates.

Standard:

Observe turbine speed is rising and Turbine Acceleration light On SAT UNSAT N/A COMMENTS:

6

JPM d

Performance Step 9: Critical X Not Critical Monitors and Recognizes a High Vibration Condition exists.

Standard:

Determines that a Turbine Trip is required with Turbine Vibration greater than 12 Mils.

SAT UNSAT N/A COMMENTS:

7

JPM d

Performance Step 10: Critical X Not Critical NOTE Step 6.9[4] and 6.9[5] contain conditions for tripping the turbine.

[4] IF any of the following conditions are met, THEN DEPRESS turbine TRIP pushbutton, 2-HS-47-67D:

  • THRUST/JOURNAL BRG TEMPERATURE, 2-TR-47-23, indicates thrust bearing metal temperature exceeding 180°F.
  • TURB DIFF EXPANSION, 2-XR-47-20, Point 14, located on Panel 2-9-8, indicates less than 100 Mi (Mils) or greater than 400 Mi.
  • THRUST/JOURNAL BRG TEMPERATURE, 2-TR-47-23, indicates bearing metal temperatures exceeding 225°F.

[5] MONITOR Turbine Vibrations AND IF any of the vibration limits listed in the following Table 1 or Table 2 (as applicable) are exceeded, THEN ,

DEPRESS turbine TRIP pushbutton, 2-HS-47-67D. (otherwise N/A)

Standard:

Depresses Turbine Trip Pushbutton SAT UNSAT N/A COMMENTS:

8

JPM d

Performance Step 11: Critical Not Critical X

[17] WHEN turbine speed reaches 1800 RPM, THEN OBSERVE AT SET SPEED light, 2-IL-47-77B, illuminates and the TURBINE ACCEL light, 2-IL-47-77A extinguishes.

Standard:

At 1800 RPM observes at Set speed light On and Turbine Acceleration light Off SAT UNSAT N/A COMMENTS:

Performance Step 12: Critical Not Critical X

[18] RECORD test results in the Narrative Log.

[19] NOTIFY Unit Supervisor of test results.

Standard:

Narrative Logs are not modeled on the simulator. Step [18] is not applicable.

Notifies the Unit Supervisor of Turbine Trip.

SAT UNSAT N/A COMMENTS:

STOP TIME ________

END OF TASK 9

JPM d OPERATOR: ________________________________

RO ____ SRO DATE: ___________

JPM NUMBER: d- ALTERNATE PATH TASK NUMBER: U-047-NO-20 TASK TITLE: Control Valve Tightness Test K/A NUMBER: 245000 A3.08 K/A RATING: RO 3.0 SRO: 3.1 TASK STANDARD: Control Valve Tightness Test IAW 3-OI-47 section 6.9, responds to high turbine vibrations and trips the Main Turbine LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-OI-47 VALIDATION TIME: 20 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are an Operator on Unit 3. The Turbine-Generator has been operating at 200 MWe for the past 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 3-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 3-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 3-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.

INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 3-OI-47 section 6.9 starting at step 9.

JPM d

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator on Unit 3. The Turbine-Generator has been operating at 200 MWe for the past 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, 45 minutes ago the Generator was taken off line. The Precautions and Limitations in of 3-OI-47 Turbine-Generator System have been reviewed. The Main Turbine Vibration Trip Bypass, 3-HS-47-26, is in Trip Bypass. The Turbine Turning Gear Motor control switch, 3-HS-47-10A, is in On. Steps 1 through 8 of section 6.9 are complete.

INITIATING CUE: The Unit Supervisor directs you to complete the Control Valve Tightness Test IAW 3-OI-47 section 6.9 starting at step 9.

3

JPM d START TIME ________

Performance Step 1: Critical X Not Critical 6.9 Control Valve Tightness Test

[9] DEPRESS Turbine TRIP pushbutton 3-HS-47-67D.

Standard:

Trips the Turbine.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical X Not Critical

[10] DEPRESS Turbine RESET pushbutton 3-HS-47-67E.

Standard:

Resets the Turbine.

SAT UNSAT N/A COMMENTS:

4

JPM d

Performance Step 3: Critical Not Critical X

[11] VERIFY ISVs are full open prior to continuing with the next step.

Standard:

Verifies ISVs FULL Open prior to step 12 SAT UNSAT N/A COMMENTS:

CUE: If a question is raised whether the ISVs are Full Open, inform the Operator that the ISVs are Full Open

Performance Step 4: Critical X Not Critical

[12] DEPRESS the Start Up Rate FAST pushbutton, 3-HS-47-77C.

Standard:

Depresses the Start Up Rate Fast pushbutton.

SAT UNSAT N/A COMMENTS:

Performance Step 5: Critical Not Critical X

[13] VERIFY CV POSITION LIMIT, 3-XI-47-157, is set to approximately 66%.

Standard:

Verifies CV Position Limit set to about 66%

SAT UNSAT N/A COMMENTS:

5

JPM d

Performance Step 6: Critical X Not Critical

[14] DEPRESS SYNC SPEED pushbutton, 3-HS-47-77H.

Standard:

Depresses Synch Speed pushbutton.

SAT UNSAT N/A COMMENTS:

Performance Step 7: Critical Not Critical X

[15] WHEN turbine speed is greater than 900 RPM, THEN PLACE Bearing Lift Pumps in Auto by placing the TURBINE TURNING GEAR MOTOR control switch, 3-HS-47-10A, in AUTO.

Standard:

When turbine speed > 900 RPM places bearing lift pumps in Auto.

SAT UNSAT N/A COMMENTS:

Driver: When Turbine Speed is greater than 900 RPM insert bat NRC/turbvibe 6

JPM d

Performance Step 8: Critical Not Critical X

[16] OBSERVE turbine speed is rising and the TURBINE ACCEL light, 3-ZI-47-77A, illuminates.

Standard:

Observe turbine speed is rising and Turbine Acceleration light On SAT UNSAT N/A COMMENTS:

Performance Step 9: Critical X Not Critical Monitors and Recognizes a High Vibration Condition exists.

Standard:

Determines that a Turbine Trip is required with Turbine Vibration greater than 12 Mils.

SAT UNSAT N/A COMMENTS:

7

JPM d

Performance Step 10: Critical X Not Critical NOTE Step 6.9[4] and 6.9[5] contain conditions for tripping the turbine.

[4] IF any of the following conditions are met, THEN DEPRESS turbine TRIP pushbutton, 3-HS-47-67D:

  • THRUST/JOURNAL BRG TEMPERATURE, 3-TR-47-23, indicates thrust bearing metal temperature exceeding 180°F.
  • TURB DIFF EXPANSION, 3-XR-47-20, Point 14, located on Panel 3-9-8, indicates less than 100 Mi (Mils) or greater than 400 Mi.
  • THRUST/JOURNAL BRG TEMPERATURE, 3-TR-47-23, indicates bearing metal temperatures exceeding 225°F.

[5] MONITOR Turbine Vibrations and DEPRESS the turbine TRIP pushbutton, 3-HS-47-67D, if any vibration limits listed in the above Table 1 or Table 2 (as applicable) are exceeded.

Standard:

Depresses Turbine Trip Pushbutton SAT UNSAT N/A COMMENTS:

8

JPM d

Performance Step 11: Critical Not Critical X

[17] WHEN turbine speed reaches 1800 RPM, THEN OBSERVE AT SET SPEED light, 3-IL-47-77B, illuminates and the TURBINE ACCEL light, 3-IL-47-77A extinguishes.

Standard:

At 1800 RPM observes at Set speed light On and Turbine Acceleration light Off SAT UNSAT N/A COMMENTS:

Performance Step 12: Critical Not Critical X

[18] RECORD test results in the Narrative Log.

[19] NOTIFY Unit Supervisor of test results.

Standard:

Narrative Logs are not modeled on the simulator. Step [18] is not applicable.

Notifies the Unit Supervisor of Turbine Trip.

SAT UNSAT N/A COMMENTS:

STOP TIME ________

END OF TASK 9

JPM e OPERATOR: ___________________________

RO ____ SRO DATE:

JPM NUMBER: e TASK NUMBER: U-064-NO-03 TASK TITLE: Vent Drywell IAW 2-AOI-64-1 K/A NUMBER: 223001 EA1.14 K/A RATING: RO 4.2 SRO: 4.1 TASK STANDARD: Vent the Drywell with Standby Gas Treatment Fan.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-AOI-64-1 VALIDATION TIME:

PERFORMANCE TIME:

COMMENTS: _________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ___ UNSATISFACTORY ___

SIGNATURE: _________________________ DATE: __________

EXAMINER

INITIAL CONDITIONS: You are a Reactor Operator. The Unit 2 reactor is at 100%. 2-EOI-2 has been entered on suppression pool water level high. All available drywell cooling is in service.

Drywell pressure is 1.8 PSIG and rising slowly.

INITIATING CUE: The Unit Supervisor has directed you to vent the drywell in accordance with 2-AOI-64-1.

2

JPM e

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor is at 60%. 2-EOI-2 has been entered on suppression pool water level high. All available drywell cooling is in service.

Drywell pressure is 1.8 PSIG and rising slowly.

INITIATING CUE: The Unit Supervisor has directed you to vent the drywell in accordance with 2-AOI-64-1.

JPM e START TIME

Performance Step 1: Critical Not Critical X 4.2 Subsequent Actions

[1] IF any EOI entry condition is met, THEN ENTER appropriate EOI(s). (Otherwise N/A)

Standard:

N/A.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

[2] IF Drywell Pressure is High, THEN PERFORM the following: (Otherwise N/A)

[2.1] CHECK Drywell pressure using multiple indications.

[2.2] IF Drywell pressure rising rate indicates Reactor Scram at 2.45 psi is imminent, THEN REDUCE Reactor power via Recirc flow to minimize the impact of a scram from high power.

[2.3] CHECK Drywell pressure using multiple indications.

[2.4] ALIGN and START additional Drywell coolers and fans as necessary. REFER TO 2-OI-64.

Standard:

Given in initial conditions.

SAT UNSAT N/A COMMENTS:

JPM e

Performance Step 3: Critical X Not Critical CAUTION Stack release rates exceeding 1.4 X 107 ci/sec, or a SI-4.8.B.1.a.1 release fraction above one will result in ODCM release limits being exceeded.

[2.5] VENT Drywell as follows:

[2.5.1] CLOSE SUPPR CHBR INBD ISOLATION VLV 2-FCV-64-34 (Panel 2-9-3).

Standard:

Closes 2-FCV-63-34.

SAT UNSAT N/A COMMENTS:

Performance Step 4: Critical Not Critical X

[2.5.2] VERIFY OPEN, DRYWELL INBD ISOLATION VLV, 2-FCV-64-31 (Panel 2-9-3).

Standard:

Verifies 2-FCV-64-31 is open.

SAT UNSAT N/A COMMENTS:

JPM e

Performance Step 5: Critical Not Critical X

[2.5.3] VERIFY 2-FIC-84-20 is in AUTO and SET at 100 scfm (Panel 2-9-55).

Standard:

Verifies 2-FIC-84-20 is in AUTO and SET at 100 scfm.

SAT UNSAT N/A COMMENTS:

Performance Step 6: Critical X Not Critical

[2.5.4] VERIFY RUNNING a Standby Gas Treatment Fan STGTS TRAIN C(A)(B)

(Panel 2-9-25).

Standard:

Starts SGTS TRAIN C FAN (Panel 2-9-25).

SAT UNSAT N/A COMMENTS:

Driver: If requested as Unit 1 Operator to start SGTS Fan A or B, report: Unit 1 Control Room Staff are unavailable to start the SGTS fans.

JPM e

Performance Step 7: Critical Not Critical X

[2.5.5] IF required, THEN REQUEST Unit 1 Operator to START Standby Gas Treatment Fans A or B. (Otherwise N/A)

CAUTION If 2-FCV-84-20 closes after 2-HS-64-35 is opened, the reason for valve closure must be cleared and 2-HS-64-35 must be returned to OPEN in order for 2-FCV-84-20 to re-open.

[2.5.6] IF required, THEN RECORD venting data in 2-SI-4.7.A.2.a (Otherwise N/A)

Standard:

N/A SAT UNSAT N/A COMMENTS:

CUE: IF asked as Unit Supervisor, then report: 2-SI-4.7.A.2.a is NOT required.

Performance Step 8: Critical X Not Critical

[2.5.7] PLACE 2-FCV-84-20 CONTROL DW/SUPPR CHBR VENT, 2-HS-64-35, in OPEN (Panel 2-9-3).

Standard:

Places 2-HS-64-35, in OPEN.

SAT UNSAT N/A COMMENTS:

JPM e

Performance Step 9: Critical Not Critical X

[2.5.8] MONITOR stack release rates to prevent exceeding ODCM limits.

Standard:

Calls for rounds operator to perform 0-SI-4.8.B.1.a.1, Airborne Effluent Release rate (Gas Log).

SAT UNSAT N/A COMMENTS:

CUE: As rounds operator when requested to perform the Gas Log, report: The rounds operator is performing 0-SI-4.8.B.1.a.1, Airborne Effluent Release rate (Gas Log).

Performance Step 10: Critical X Not Critical

[2.5.9] WHEN Drywell pressure has been reduced as required, THEN STOP SGT Train(s).

Standard:

Stops the running SBGT Train.

SAT UNSAT N/A COMMENTS:

CUE: When Performance Step 9 is complete, and at the discretion of the evaluator: Report to the candidate that time compression will be used and Drywell Pressure has lowered to 1.5 PSIG .

Drywell venting is no longer required.

JPM e

Performance Step 11: Critical X Not Critical

[2.5.10] VERIFY 2-HS-64-35, in AUTO and 2-FCV-84-20 CLOSED (Panel 2-9-3).

Standard:

Verifies 2-HS-64-35 in AUTO Verifies 2-FCV-84-20 CLOSED (Green Light ON and Red Light OFF on 2-ZI-84-20)

SAT UNSAT N/A COMMENTS:

Performance Step 12: Critical X Not Critical

[2.5.11] OPEN SUPPR CHBR INBD ISOLATION VLV 2-FCV-64-34 (Panel 2-9-3).

Standard:

Opens 2-FCV-64-34.

SAT UNSAT N/A COMMENTS:

Performance Step 13: Critical Not Critical X

[2.5.12] VERIFY Drywell DP compressor operates correctly to maintain required Drywell to Suppression Chamber DP.

Standard:

Monitors Drywell to Suppression Chamber DP.

SAT UNSAT N/A COMMENTS:

JPM e

Performance Step 14: Critical Not Critical X

[2.5.13] RECORD SGTS Train(s) run time in appropriate Control Room Reactor narrative log for transfer to 1-SR-2.

Standard:

Narrative Logs are not modeled on the simulator. Step [2.5.13] is not applicable.

Records SGTS Train C run time in narrative log.

SAT UNSAT N/A COMMENTS:

STOP TIME END OF TASK

JPM f OPERATOR: ________________________________

RO SRO DATE:

JPM NUMBER: f TASK NUMBER: S-57A-NO-01 TASK TITLE: Perform Control Room Transfer of 4kV Unit Board 2B Power Supplies K/A NUMBER: 262001A4.03 K/A RATING: RO 3.2 SRO 3.4 TASK STANDARD: Perform control room operation required to successfully transfer 4kV unit board 2B power supply from normal to alternate power supply.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 0-OI-57A VALIDATION TIME: 8 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS:

You are the Reactor Operator. Preventative maintenance is required on 4kV Unit Board 2B Normal Feeder Breaker, 1214.

INITIATING CUE:

The Shift Manager has directed you to transfer 4kV Unit Board 2B from the USST to the Start Bus per 0-OI-57A, section 8.13.1.

JPM f

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

You are the Reactor Operator. Preventative maintenance is required on 4KV Unit Board 2B Normal Feeder Breaker, 1214.The Precautions and limitations of 0-OI-57A, Switchyard and 4160V AC Electrical System, have been reviewed.

.

INITIATING CUE:

The Shift Manager has directed you to transfer 4kV Unit Board 2B from the USST to the Start Bus per 0-OI-57A, section 8.13.1.

3

JPM f START TIME

Performance Step 1: Critical Not Critical X 8.13 Control Room Transfer of 4kV Unit Board 2B Power Supplies 8.13.1 Transfer 4kv Unit Board 2B from USST to Start Bus

[1] REVIEW all Precautions and Limitations.

[2] NOTIFY NSS of possible loss of power to Security Systems prior to transferring 4kV UNIT BD 2B.

Standard:

Review of precautions and limitations given in initial conditions.

Notifies NSS of possible loss of power to security systems.

SAT UNSAT N/A COMMENTS:

CAUTIONS

1) Capacitor bank fuses are subject to clearing when the unit boards are being supplied from the 161 source and large pumps are started. Unit Supervisors should evaluate placing the Capacitor Banks in Manual prior to starting Condensate, CBP, RHR, CS or CCW pumps.
2) If 4kV Unit Board 2B is fed from the Alternate Power Supply, then Auto Transfer must be blocked for 4kV Unit Boards: 1A, 1B, 2A, 3A and 3B. (Ref. 2-45E721 OPL3

& 1-45E721 OPL5)

3) If 4kV Unit Board 2B is fed from the Alternate Power Supply (Start Bus), then Shutdown Bus 1 Auto transfer must be blocked.(Ref. 2-45E721 OPL3)\
4) If either 4kV UNIT BD 1A, 1B, 2A, 3A or 3B is aligned to a Start Bus, prior to aligning UNIT BD 2B to Start Bus, check Technical Specifications 3.8.1.a and 3.8.2.a to determine operability of qualified AC circuits between the offsite transmission network and the onsite Class 1E Electrical Power Distribution System.

4

JPM f NOTES

1) All procedural steps are performed from Control Room Panel 2-9-8.
2) This procedure section contains actions to ensure electrical load restrictions are not exceeded when 4kV UNIT BD 2B is placed on the Alternate Supply (Start Bus).

Performance Step 2: Critical Not Critical X

[3] ENSURE 4kV Start Busses are aligned Normal:

[3.1] On Panel 9-23-2, VERIFY 4kV Start Bus 1A ALT FDR BKR 1518 OPEN.

[3.2] On Panel 9-23-2, VERIFY 4kV Start Bus 1B ALT FDR BKR 1414 OPEN.

Standard:

Verifies Start Busses are aligned normal by Verifying the alt bkrs 1518 and 1414 are open.

SAT UNSAT N/A COMMENTS:

5

JPM f

Performance Step 3: Critical Not Critical X

[4] On panel 0-9-23-7, VERIFY Shutdown Bus 1 is fed from Normal Supply (4kV Unit Board 1A).

Standard:

Verifies Shutdown Bus 1 is fed from Normal Supply.

SAT UNSAT N/A COMMENTS:

Performance Step 4: *Critical X Not Critical

  • [5] On panel 0-9-23-7, MOMENTARILY DEPRESS 0-HS-211-AB1, 4kV SD BUS 1 AUTO TO MANUAL TRIP push-button, and CHECK the following:

A. 0-HS-211-AB1, 4kV SD BUS 1 AUTO TO MANUAL TRIP push-button, light extinguished.

B. 0-43-211-AB1, 4kV SD BUS 1 AUTO/LOCKOUT RESET, trips.

Standard:

  • Depresses 0-HS-211-AB1 Verifies the light extinguished and 0-43-211-AB1 trips SAT UNSAT N/A COMMENTS:

6

JPM f

Performance Step 5: Critical Not Critical X

[6] RE-ALIGN 4kV Auto Transfers to meet Load Restrictions.

[6.1] On Panel 1-9-8, VERIFY 1-XS-57-4, 4kV UNIT BD 1A MAN/AUTO SELECT switch to MAN.

[6.2] On Panel 1-9-8, VERIFY 1-XS-57-7, 4kV UNIT BD 1B MAN/AUTO SELECT switch to MAN.

Standard:

Contacts Unit 1 Operator to place 1-XS-57-4 and 1-XS-57-7 to Manual on panel 1-9-8.

SAT UNSAT N/A COMMENTS:

CUE: [As Unit 1 Operator, Report] 1-XS-57-4 and 1-XS-57-7 are in Manual.

Performance Step 6: Critical X Not Critical

[6.3] VERIFY 2-XS-57-4, 4kV UNIT BD 2A MAN/AUTO SELECT switch to MAN.

[6.4] VERIFY 2-XS-57-7, 4kV UNIT BD 2B MAN/AUTO SELECT switch to MAN.

Standard:

Places 2-XS-57-4 and 2-XS-57-7 switch to manual.

SAT UNSAT N/A COMMENTS:

7

JPM f

Performance Step 7: Critical Not Critical X

[6.5] On Panel 3-9-8, VERIFY 3-XS-57-4, 4kV UNIT BD 3A MAN/AUTO SELECT switch to MAN.

[6.6] On Panel 3-9-8, VERIFY 3-XS-57-7, 4kV UNIT BD 3B MAN/AUTO SELECT switch to MAN.

Standard:

Contacts Unit 3 Operator to place 3-XS-57-4 and 3-XS-57-7 to Manual on panel 3-9-8.

SAT UNSAT N/A COMMENTS:

CUE: [As Unit 3 Operator, Report] 3-XS-57-4 and 3-XS-57-7 are in Manual.

8

JPM f

Performance Step 8: Critical Not Critical X

[7] TRANSFER 4kv UNIT BD 2B to the ALT FDR, BKR 1526

[7.1] PLACE 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT switch to START BUS 1B.

[7.2] CHECK START BUS 1B Voltage on 2-EI-57-28 is between 3950 and 4400 Volts.

Standard:

Placed 2-XS-202-1 switch to START BUS 1B.

Checked START BUS 1B Voltage on 2-EI-57-28 is between 3950 and 4400 Volts.

SAT UNSAT N/A COMMENTS:

Performance Step 9: Critical X Not Critical

[7.3] PLACE and HOLD 2-HS-57-8, 4kV UNIT BD 2B ALT FDR BKR 1526 switch to CLOSE.

Standard:

Places and Holds 2-HS-57-8, 4kV UNIT BD 2B ALT FDR BKR 1526 switch to CLOSE.

SAT UNSAT N/A COMMENTS:

9

JPM f

Performance Step 10: Critical X Not Critical

[7.4] PLACE 2-HS-57-6, 4kV UNIT BD 2B NORM FDR BKR 1214 switch to TRIP.

Standard:

Places 2-HS-57-6, 4kV UNIT BD 2B NORM FDR BKR 1214 switch to TRIP.

SAT UNSAT N/A COMMENTS:

Performance Step 11: Critical Not Critical X

[7.5] CHECK CLOSED the 4kV UNIT BD 2B, ALT FDR BREAKER 1526.

[7.6] CHECK OPEN the 4kV UNIT BD 2B, NORM FDR BREAKER 1214.

[7.7] RELEASE BKRs 1526 and 1214 control switches.

Standard:

Checked CLOSED the 4kV UNIT BD 2B, ALT FDR BKR 1526.

Checked OPEN the 4kV UNIT BD 2B, NORM FDR BREAKER 1214 RELEASED BKRs 1526 and 1214 control switches SAT UNSAT N/A COMMENTS:

10

JPM f

Performance Step 12: Critical Not Critical X

[7.8] PLACE 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT SWITCH TO UNIT BD 2B.

[7.9] CHECK 4kV UNIT BD 2B voltage is between 3950 and 4400 Volts.

Standard:

Places 2-XS-202-1, 4kV BD/BUS/XFMR VOLTAGE SELECT SWITCH to UNIT BD 2B Checked 4kV UNIT BD 2B voltage is between 3950 and 4400 Volts.

SAT UNSAT N/A COMMENTS:

Performance Step 13: Critical Not Critical X

[7.10] VERIFY LOCALLY 4kV BKR 1526 closing spring target indicates charged and the amber breaker spring charged light is on.

Standard:

Dispatched AUO to verify breaker 1526 closing spring recharged.

SAT UNSAT N/A COMMENTS:

CUE: [After Dispatched, the AUO Reports] Breaker 1526 closing spring target indicates charged and the amber breaker spring charged lamp is illuminated.

CUE: That completes this task.

END OF TASK STOP TIME 11

JPM g OPERATOR: ___________________________

RO ____ SRO DATE:

JPM NUMBER: g TASK NUMBER: U-000-EM-74 TASK TITLE: Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-8G VALIDATION TIME: 10 minutes PERFORMANCE TIME:

COMMENTS: _________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ___ UNSATISFACTORY ___

SIGNATURE: _________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

JPM g

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. The Unit 2 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 2-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

3

JPM g START TIME

Performance Step 1: Critical X Not Critical

1. OPEN the following valves:

Standard:

Opens 0-FCV-84-5 and 16.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

2. VERIFY 0-PI-84-6, N2 VAPORIZER A OUTLET PRESSURE, and 0-PI-84-17, N2 VAPORIZER B OUTLET PRESSURE, indicate approximately 100 psig (Unit 1, Panel 9-54 and 9-55)

Standard:

Verifies 0-PI-84-6 and 0-PI-84-17 (Located on back of Unit 2 Panel 9-54 in simulator) indicating approximately 100 psig.

SAT UNSAT N/A COMMENTS:

4

JPM g

Performance Step 3: *Critical X Not Critical

  • 3. PLACE keylock switch 2-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-54)
4. CHECK OPEN 2-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 2, Panel 9-54)

Standard:

Places keylock switch 2-HS-84-48 in Open and verifies 2-FSV-84-48 is open.

SAT UNSAT N/A COMMENTS:

Performance Step 4: *Critical X Not Critical

  • 5. PLACE keylock switch 2-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 2, Panel 9-55)
6. CHECK OPEN 2-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 2, Panel 9-55)

Standard:

Places keylock switch 2-HS-84-49 in Open and verifies 2-FSV-84-49 open.

SAT UNSAT N/A COMMENTS:

5

JPM g

Performance Step 5: Critical X Not Critical

7. CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, alarm cleared (2-XA-55-3D, Window 18)

Standard:

Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (2-XA-55-3D, Window 18) still in Alarm (would Not clear) and continues with procedure.

SAT UNSAT N/A COMMENTS:

Performance Step 6: Critical Not Critical X

8. IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 2-PA-32-31, annunciator is or remains in alarm (2-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
a. DISPATCH personnel to Unit 2, RB, El 565 ft, to MONITOR the following indications for low pressure:
  • 2-PI-84-51, CAD N2 PRESSURE TO DWCA indicator, for CAD A (R-10 S-line, by Drywell Access Door)
  • 2-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-12 U-line, behind 480V RB Vent Board 2B)

Standard:

Dispatches personnel to Reactor Building to monitor 2-PI-84-51 and 2-PI-84-50 for low pressure.

SAT UNSAT N/A COMMENTS:

CUE: Do NOT report unless directed by NRC. When dispatched, as AUO, report] 2-PI 51, CAD N 2 Pressure to DWCA indicator, for CAD A is reading 110 psig. 2-PI-84-50 for CAD B is reading 5 psig.

6

JPM g

Performance Step 7: Critical X Not Critical

b. MONITOR 0-FI-84-7(18), CAD LINE A(B) N2 FLOW, on Unit 1, Panel 1-9-54(55) for high flow.

Standard:

Recognizes 0-FI-84-7 flow 0 scfm and 0-FI-84-18 flow 90 scfm.

SAT UNSAT N/A COMMENTS:

NOTE CAD System A to Drywell Control Air supplies the following MSIVs:

  • 2-FCV-1-14, MSIV LINE A INBOARD
  • 2-FCV-1-26, MSIV LINE B INBOARD NOTE CAD System B to Drywell Control Air supplies the following MSIVs:
  • 2-FCV-1-37, MSIV LINE C INBOARD
  • 2-FCV-1-51, MSIV LINE D INBOARD

Performance Step 8: Critical Not Critical X

c. MONITOR inboard MSIV indication status for valves drifting closed.

Standard:

Recognizes 2-FCV-1-37 and 51 closed.

SAT UNSAT N/A COMMENTS:

7

JPM g

Performance Step 9: Critical Not Critical X

9. IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:

Standard:

N/A - No indications of being depressurized.

SAT UNSAT N/A COMMENTS:

Performance Step 10: Critical X Not Critical

10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:

Standard:

Closes 0-FCV-84-16 and 2-FSV-84-49.

SAT UNSAT N/A COMMENTS:

STOP TIME END OF TASK 8

JPM g OPERATOR: ___________________________

RO ____ SRO DATE:

JPM NUMBER: g TASK NUMBER: U-000-EM-74 TASK TITLE: Crosstie CAD to Drywell Control Air K/A NUMBER: 218000 A2.03 K/A RATING: RO 3.4 SRO: 3.6 TASK STANDARD: Align Containment Air Dilution systems A and B to the Drywell Air System and then isolates CAD System B.

LOCATION OF PERFORMANCE: Simulator REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-8G VALIDATION TIME: 10 minutes PERFORMANCE TIME:

COMMENTS: _________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ___ UNSATISFACTORY ___

SIGNATURE: _________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

JPM g

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are an Operator. The Unit 3 reactor has scrammed. EOI-1 has been followed to RC/P-8.

INITIATING CUE: The Unit Supervisor has directed you to perform 3-EOI Appendix-8G, Crosstie CAD to Drywell Control Air.

3

JPM g START TIME

Performance Step 1: Critical X Not Critical

1. OPEN the following valves:
  • 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Panel 3-9-54)
  • 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Panel 3-9-55)

Standard:

Opens 0-FCV-84-5 and 16.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

2. VERIFY 0-PI-84-6/3, VAPOR A OUTLET PRESS, and 0-PI-84-17/3, VAPOR B OUTLET PRESS, indicate approximately 100 psig (Unit 3, Panel 3-9-54 and 3-9-55)

Standard:

Verified 0-PI-84-6/3 and 0-PI-84-17/3 (Located on Unit 3, Panel 3-9-54 and 3-9-55) indicating approximately 100 psig.

SAT UNSAT N/A COMMENTS:

4

JPM g

Performance Step 3: *Critical X Not Critical

  • 3. PLACE keylock switch 3-HS-84-48, CAD A CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-54)
4. CHECK OPEN 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR, (Unit 3, Panel 3-9-54)

Standard:

Places keylock switch 3-HS-84-48 in Open and verifies 3-FSV-84-48 open.

SAT UNSAT N/A COMMENTS:

Performance Step 4: *Critical X Not Critical

  • 5. PLACE keylock switch 3-HS-84-49, CAD B CROSS TIE TO DW CONTROL AIR, in OPEN (Unit 3, Panel 3-9-55)
6. CHECK OPEN 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-55)

Standard:

Places keylock switch 3-HS-84-49 in Open and verifies 3-FSV-84-49.

SAT UNSAT N/A COMMENTS:

5

JPM g

Performance Step 5: Critical X Not Critical

7. CHECK MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, alarm cleared (3-XA-55-3D, Window 18)

Standard:

Recognizes MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW (3-XA-55-3D, Window 18) still in Alarm (would NOT clear) and continues with procedure.

SAT UNSAT N/A COMMENTS:

Performance Step 6: Critical Not Critical X

8. IF MAIN STEAM RELIEF VLV AIR ACCUM PRESS LOW, 3-PA-32-31, annunciator is or remains in alarm (3-XA-55-3D, Window 18), THEN DETERMINE which Drywell Control Air header is depressurized as follows:
a. DISPATCH personnel to Unit 3, RB, El 565 ft, to MONITOR the following indications for low pressure:
  • 3-PI-84-51, CAD A CROSSTIE TO DWCA PRESS INDR, for CAD A (R-17 S-line, by Drywell Access Door)
  • 3-PI-84-50, DW CONT AIR N2 SUPPLY PRESS indicator, for CAD B (R-19 U-line, behind 480V RB Vent Board 3B)

Standard:

Dispatches personnel to Reactor Building to monitor 3-PI-84-51 and 3-PI-84-50 for low pressure.

SAT UNSAT N/A COMMENTS:

CUE: Do NOT report unless directed by NRC. When dispatched, as AUO, report 3-PI-84-51, CAD N 2 Pressure to DWCA indicator, for CAD A is reading 110 psig and 3-PI-84-50 reading 5 psig.

6

JPM g

Performance Step 7: Critical X Not Critical

b. MONITOR 0-FI-84-7/3(18/3), CAD A(B) N2 SYSTEM FLOW, on Panel 3-9-54(55) for high flow.

Standard:

Recognizes 0-FI-84-7/3 flow is 0 scfm and that 0-FI-84-18 flow is 50 scfm.

SAT UNSAT N/A COMMENTS:

NOTE: CAD System A to Drywell Control Air supplies the following MSIVs:

  • 3-FCV-1-14, MSIV LINE A INBOARD
  • 3-FCV-1-26, MSIV LINE B INBOARD NOTE: CAD System B to Drywell Control Air supplies the following MSIVs:
  • 3-FCV-1-37, MSIV LINE C INBOARD
  • 3-FCV-1-51, MSIV LINE D INBOARD

Performance Step 8: Critical Not Critical X

c. MONITOR inboard MSIV indication status for valves drifting closed.

Standard:

Recognizes 3-FCV-1-37 and 51 closed.

SAT UNSAT N/A COMMENTS:

7

JPM g

Performance Step 9: Critical Not Critical X

9. IF Drywell Control Air header supplied from CAD System A shows indications of being depressurized, THEN CLOSE the following valves:
  • 0-FCV-84-5, CAD SYSTEM A N2 SHUTOFF VALVE (Unit 3, Panel 3-9-54)
  • 3-FSV-84-48, CAD A CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-54)

Standard:

N/A - No indications of being depressurized.

SAT UNSAT N/A COMMENTS:

Performance Step 10: Critical X Not Critical

10. IF Drywell Control Air header supplied from CAD B shows indications of being depressurized, THEN CLOSE the following valves:
  • 0-FCV-84-16, CAD SYSTEM B N2 SHUTOFF VALVE (Unit 3, Panel 3-9-55)
  • 3-FSV-84-49, CAD B CROSS TIE TO DW CONTROL AIR (Unit 3, Panel 3-9-55)

Standard:

Closes 0-FCV-84-16 and 3-FSV-84-49.

SAT UNSAT N/A COMMENTS:

STOP TIME END OF TASK 8

JPM h OPERATOR:

RO SRO DATE:

JPM NUMBER: h TASK NUMBER: U-090-NO-01 TASK TITLE: Returning DW Radiation Monitor CAM, 2-RM-90-256 to service K/A NUMBER: 272000 A2.10 K/A RATING: RO 3.9 SRO: 4.1 TASK STANDARD: DW Radiation Monitor CAM, 2-RM-90-256 is in service LOCATION OF PERFORMANCE: SIMULATOR REFERENCES/PROCEDURES NEEDED: 2-AOI-100-1 VALIDATION TIME: 15 minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES NO RESULTS: SATISFACTORY _____ UNSATISFACTORY_____

SIGNATURE: ____________________ DATE: _____

EXAMINER 1

JPM h

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 2-AOI-100-1, Reactor Scram.

INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 2-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.

2

INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 2-AOI-100-1, Reactor Scram.

INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 2-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.

JPM h START TIME

Performance Step 1: Critical X Not Critical

[33] VERIFY the following systems/equipment in service or RETURN them to service at standby readiness, as necessary, in accordance with the following or the appropriate OI:

[33.1] PLACE Drywell DP Air Compressor in service at Panel 2-9-3 as follows:

  • PLACE DRYWELL INBD ISOLATION VLV switch, 2-HS-64-31, in AUTO after OPEN.
  • PLACE SUPPR CHBR INBD ISOLATION VLV switch, 2-HS-64-34, in AUTO after OPEN.

Standard:

Places 2-HS-64-31 and 34 in Auto after Open.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical X Not Critical

  • DEPRESS DRYWELL DP COMP SUCTION VLV RESET switch, 2-HS-64-139A.
  • DEPRESS DRYWELL DP COMP DISCH VLV RESET switch, 2-HS-64-140A.

Standard:

Depresses 2-HS-64-139A and 2-HS-64-140A to reset.

SAT UNSAT N/A COMMENTS:

4

JPM h

Performance Step 3: Critical X Not Critical

[33.2] PLACE Drywell Floor and Equipment Drains in service at Panel 2-9-4 as follows:

  • PLACE DW EQPT DRAIN INBD ISOL VALVE switch, 2-HS-77-15A, in AUTO after OPEN.
  • PLACE DW EQPT DRAIN OUTBD ISOL VALVE switch, 2-HS-77-15B, in AUTO after OPEN.

Standard:

Places 2-HS-77-15A and 2-HS-77-15B in Auto after Open.

SAT UNSAT N/A COMMENTS:

Performance Step 4: Critical X Not Critical

  • PLACE DW FLOOR DRAIN INBD ISOL VALVE switch, 2-HS-77-2A, in AUTO after OPEN.
  • PLACE DW FLOOR DRAIN OUTBD ISOL VALVE switch, 2-HS-77-2B, in AUTO after OPEN.

Standard:

Places 2-HS-77-2A and 2B in Auto after Open.

SAT UNSAT N/A COMMENTS:

5

JPM h

Performance Step 5: Critical X Not Critical

[33.3] PLACE DRYWELL RAD MONITOR in service at Panel 2-9-2 by DEPRESSING the following RESET pushbuttons:

  • UPPER INBD SUPPLY ISOL VALVE RESET, 2-HS-90-254A-A
  • LOWER INBD SUPPLY ISOL VALVE RESET, 2-HS-90-254B-A
  • INBD RETURN ISOL VALVE RESET, 2-HS-90-257B-A
  • OUTBD SUPPLY ISOL VALVE RESET, 2-HS-90-255A
  • OUTBD RETURN ISOL VALVE RESET, 2-HS-90-257A-A Standard:

Depresses the five listed reset pushbuttons to return the Drywell Rad Monitor to service SAT UNSAT N/A COMMENTS:

6

JPM h

Performance Step 6: Critical X Not Critical

[33.4] PERFORM the following to place the Drywell Atmosphere Monitor (H202) in service:

[33.4.1] DEPRESS H2/O2 ANALYZER ISOLATION RESET pushbutton, 2-HS-76-91 on Panel 2-9-54.

Standard:

Depresses 2-HS-76-91to reset H2/O2 Analyzer SAT UNSAT N/A COMMENTS:

CUE: Another operator is going to place the H2/O2 Analyzer in service. This completes your task.

END OF TASK STOP TIME ______

7

JPM h OPERATOR:

RO SRO DATE:

JPM NUMBER: h TASK NUMBER: U-090-NO-01 TASK TITLE: Returning DW Radiation Monitor CAM, 3-RM-90-256 to service K/A NUMBER: 272000 A2.10 K/A RATING: RO 3.9 SRO: 4.1 TASK STANDARD: DW Radiation Monitor CAM, 3-RM-90-256 is in service LOCATION OF PERFORMANCE: SIMULATOR REFERENCES/PROCEDURES NEEDED: 3-AOI-100-1 VALIDATION TIME: 15 minutes PERFORMANCE TIME:

COMMENTS:

Additional comment sheets attached? YES NO RESULTS: SATISFACTORY _____ UNSATISFACTORY_____

SIGNATURE: ____________________ DATE: _____

EXAMINER 1

JPM h

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 3-AOI-100-1, Reactor Scram.

INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 3-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.

2

INITIAL CONDITIONS: You are a Unit Operator. Plant conditions are as found. The Unit Supervisor is operating in 3-AOI-100-1, Reactor Scram.

INITIATING CUES: The Unit Supervisor directs you to perform step 33 of 3-AOI-100-1, Reactor Scram, to return the Drywell DP Air Compressor, the Drywell Floor and Equipment Drains, and the Drywell Continuous Air Monitor to service.

JPM h START TIME

Performance Step 1: Critical X Not Critical

[33] VERIFY the following systems/equipment in service or RETURN them to service at standby readiness, as necessary, in accordance with the following or the appropriate OI:

[33.1] PLACE Drywell DP Air Compressor in service at Panel 3-9-3 as follows:

  • PLACE DRYWELL INBD ISOLATION VLV switch, 3-HS-64-31, in AUTO after OPEN.
  • PLACE SUPPR CHBR INBD ISOLATION VLV switch, 3-HS-64-34, in AUTO after OPEN.

Standard:

Places 3-HS-64-31 and 34 in Auto after Open.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical X Not Critical

  • DEPRESS DRYWELL DP COMP SUCTION VLV RESET switch, 3-HS-64-139A.
  • DEPRESS DRYWELL DP COMP DISCH VLV RESET switch, 3-HS-64-140A.

Standard:

Depresses 3-HS-64-139A and 3-HS-64-140A to reset.

SAT UNSAT N/A COMMENTS:

4

JPM h

Performance Step 3: Critical X Not Critical

[33.2] PLACE Drywell Floor and Equipment Drains in service at Panel 3-9-4 as follows:

  • PLACE DW EQPT DRAIN INBD ISOL VALVE switch, 3-HS-77-15A, in AUTO after OPEN.
  • PLACE DW EQPT DRAIN OUTBD ISOL VALVE switch, 3-HS-77-15B, in AUTO after OPEN.

Standard:

Places 3-HS-77-15A and 3-HS-77-15B in Auto after Open.

SAT UNSAT N/A COMMENTS:

Performance Step 4: Critical X Not Critical

  • PLACE DW FLOOR DRAIN INBD ISOL VALVE switch, 3-HS-77-2A, in AUTO after OPEN.
  • PLACE DW FLOOR DRAIN OUTBD ISOL VALVE switch, 3-HS-77-2B, in AUTO after OPEN.

Standard:

Places 3-HS-77-2A and 2B in Auto after Open.

SAT UNSAT N/A COMMENTS:

5

JPM h

Performance Step 5: Critical X Not Critical

[33.3] PLACE DRYWELL RAD MONITOR in service at Panel 3-9-2 by DEPRESSING the following RESET pushbuttons:

  • UPPER INBD SUPPLY ISOL VALVE RESET, 3-HS-90-254A-A
  • LOWER INBD SUPPLY ISOL VALVE RESET, 3-HS-90-254B-A
  • INBD RETURN ISOL VALVE RESET, 3-HS-90-257B-A
  • OUTBD SUPPLY ISOL VALVE RESET, 3-HS-90-255A
  • OUTBD RETURN ISOL VALVE RESET, 3-HS-90-257A-A Standard:

Depresses the five listed reset pushbuttons to return the Drywell Rad Monitor to service SAT UNSAT N/A COMMENTS:

6

JPM h

Performance Step 6: Critical X Not Critical

[33.4] PERFORM the following to place the Drywell Atmosphere Monitor (H202) in service:

[33.4.1] DEPRESS H2/O2 ANALYZER ISOLATION RESET pushbutton, 3-HS-76-91 on Panel 3-9-54.

Standard:

Depresses 3-HS-76-91to reset H2/O2 Analyzer SAT UNSAT N/A COMMENTS:

CUE: Another operator is going to place the H2/O2 Analyzer in service. This completes your task.

END OF TASK STOP TIME ______

7

JPM i OPERATOR: ____________________________________

RO SRO DATE:

JPM NUMBER: i TASK NUMBER: U-000-SS-32 TASK TITLE: Reactor Pressure Control at Panel 2-25-32 K/A NUMBER: 295016 AA1.08 K/A RATING: RO 4.0 SRO: 4.0 TASK STANDARD: Reactor Pressure control established at panel 2-25-32 and MSIVs closed.

PRA:

LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 2-AOI-100-2 VALIDATION TIME: 15 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are a Unit Operator Unit 2 Control had to be abandoned. The Unit Supervisor is operating in 2-AOI-100-2 Control Room Abandonment. All control rods inserted when RPS was actuated. Another operator has Attachment 9 at Panel 2-25-32.

INITIATING CUE: The Unit Supervisor directs you establish pressure control at Panel 2-25-32 and to close the MSIVs. The directed Reactor Pressure band is 800 to 1000 psig.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT

JPM i

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. SELF CHECKING may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. Observe ALL plant radiological and safety precautions. I will provide initiating cues and indicate any steps to be discussed. When you complete the task successfully, the objective for this job performance measure will be satisfied.

When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are a Unit Operator Unit 2 Control had to be abandoned. The Unit Supervisor is operating in 2-AOI-100-2 Control Room Abandonment. All control rods inserted when RPS was actuated. Another operator has Attachment 9 at Panel 2-25-32.

INITIATING CUE: The Unit Supervisor directs you establish pressure control at Panel 2-25-32 and to close the MSIVs. The directed Reactor Pressure band is 800 to 1000 psig.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT 3

JPM i START TIME

Performance Step 1: Critical Not Critical X 4.2 Unit 2 Subsequent Actions

[1] IF ALL control rods were NOT fully inserted AND RPS failed to deenergize, THEN:

(Otherwise N/A)

Standard:

N/A SAT UNSAT N/A COMMENTS:

4

JPM i

Performance Step 2: Critical Not Critical X NOTES

1) The following transfers Reactor Pressure Control to Panel 2-25-32 to allow for pressure control while completing the Panel Checklist.
2) Attachment 9, Alarm Response Procedure Panel 2-25-32, provides for any alarms associated with this instruction.

CAUTION

1) Failure to place control switch in desired position prior to transferring to emergency position may result in inadvertent actuation of the component.
2) Operation from Panel 2-25-32 bypasses logic and interlocks normally associated with the components.

[2] PLACE the following MSRV control switches in CLOSE/AUTO at Panel 2-25-32:

Switch No. Description 2-HS-1-22C MAIN STM LINE B RELIEF VALVE 2-HS-1-5C MAIN STM LINE A RELIEF VALVE 2-HS-1-30C MAIN STM LINE C RELIEF VALVE 2-HS-1-34C MAIN STM LINE C RELIEF VALVE Standard:

Simulates placing 2-HS-1-22C, 5C, 30C, and 34C in Close /Auto SAT UNSAT N/A COMMENTS:

Cue: Switch is in Close/Auto, or as found. If Asked Reactor Pressure is stable at 960 psig 5

JPM i

Performance Step 3: Critical X Not Critical

[3] PLACE the following MSRV disconnect switches in DISCT at Panel 2-25-32:

Switch No. Description 2-XS-1-18 MAIN STM LINE B RELIEF VALVE DISCT 2-XS-1-4 MAIN STM LINE A RELIEF VALVE DISCT 2-XS-1-42 MAIN STM LINE D RELIEF VALVE DISCT 2-XS-1-23 MAIN STM LINE B RELIEF VALVE DISCT 2-XS-1-41 MAIN STM LINE D RELIEF VALVE DISCT 2-XS-1-180 MAIN STM LINE D RELIEF VALVE DISCT Standard:

Simulates placing 2-XS-1-18, 4, 42, 23, 41, and 180 in Disct SAT UNSAT N/A COMMENTS:

Cue: Switches are in DISCONNECT.

6

JPM i

Performance Step 4: Critical X Not Critical

[4] PLACE the following MSRV transfer switches in EMERG at Panel 2-25-32:

Switch No. Description 2-XS-1-22 MAIN STM LINE B RELIEF VALVE XFR 2-XS-1-5 MAIN STM LINE A RELIEF VALVE XFR 2-XS-1-30 MAIN STM LINE C RELIEF VALVE XFR 2-XS-1-34 MAIN STM LINE C RELIEF VALVE XFR Standard:

Simulates placing 2-XS-1-22, 5, 30 and 34 in Emergency SAT UNSAT N/A COMMENTS:

CUE: Switches are in Emergency.

7

JPM i

Performance Step 5: Critical X Not Critical NOTE Use of the following sequence when opening MSRVs should distribute heat evenly in the Suppression Pool.

[5] MAINTAIN Reactor Pressure between 800 and 1000 psig using the following sequence at Panel 2-25-32:

A. 2-HS-1-22C, MAIN STM LINE B RELIEF VALVE B. 2-HS-1-5C, MAIN STM LINE A RELIEF VALVE C. 2-HS-1-30C, MAIN STM LINE C RELIEF VALVE D. 2-HS-1-34C, MAIN STM LINE C RELIEF VALVE Standard:

Simulates cycling SRVs as necessary to maintain reactor pressure 800 to 1000 psig SAT UNSAT N/A COMMENTS:

CUE: Initial Reactor Pressure is 960 psig, when the Inboard MSIVs are closed in the next step begin to raise and lower pressure depending upon actions of the applicant. Until JPM complete cycle reactor pressure between 800 to 1000 psig every two minutes. If candidate fails to check or ask give a high or low pressure as warranted.

8

JPM i

Performance Step 6: Critical X Not Critical CAUTION Failure to place control switch in desired position prior to transferring to emergency position may result in inadvertent actuation of the component.

[6] CLOSE MSIVs using the following switch sequence at Panel 2-25-32:

[6.1] PLACE control switch in CLOSE.

[6.2] PLACE transfer switch in EMERG.

Standard:

Simulates placing control switch in close and then the transfer switch for each MSIV SAT UNSAT N/A COMMENTS:

CUE: Control switch is in Close, Transfer switch is in Emergency, MSIV green light On and Red light Off.

When the D Inboard MSIV is closed Reactor Pressure begins to rise.

When applicant demonstrates pressure control terminate JPM, once all MSIV are closed.

END OF TASK STOP TIME 9

JPM j OPERATOR: ________________________________

RO SRO DATE:

JPM NUMBER: j TASK NUMBER: U-000-SS-10 TASK TITLE: Reset Battery Charger 1, 2B and 3 K/A NUMBER: 295004 A1.01 K/A RATING: RO 3.3 SRO 3.4 TASK STANDARD: Resets battery chargers 1, 2b, and 3 during a fire in the unit 1 reactor building EL 621 and 639 North of column line R.

LOCATION OF PERFORMANCE: Control Bay REFERENCES/PROCEDURES NEEDED: 0-SSI-1-5 VALIDATION TIME: 20 minutes PERFORMANCE TIME: 60 minutes maximum COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS:

A fire has occurred in Unit 1 Reactor Building. The Shift Manager has directed entry into the SSIs.

INITIATING CUE:

The Unit Supervisor directs you to perform Operator 2 Manual Actions, Section 2.0, of 0-SSI-1-5, Unit 1 Reactor Building Fire EL 621 and 639 North of Column Line R.

This JPM is Time Critical.

JPM j

IN-SIMULATOR: I will explain the initial conditions and state the task to be performed. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's Correct". (OR "That's Incorrect", if applicable). When you have completed your assigned task, you will say, "my task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS:

A fire has occurred in Unit 1 Reactor Building. The Shift Manager has directed entry into the SSIs.

INITIATING CUE:

The Unit 2 Unit Supervisor directs you to perform Operator 2 Manual Actions, Section 2.0, of 0-SSI-1-5, Unit 1 Reactor Building Fire EL 621 and 639 North of Column Line R.

This JPM is Time Critical.

3

JPM j START TIME

Performance Step 1: Critical Not Critical X 0-SSI-1-5 2.0 RESET BATTERY CHARGERS 1, 2B AND 3

[1] Notification has been received from the Unit 2 Unit Supervisor to perform this section.

Standard:

Given in initial conditions.

SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical X Not Critical (60 Min)

[2] PROCEED TO 250V BATTERY CHARGER 1, 1-CHGA-248-0001, AND PLACE POWER ON, 1-HS-248-0001, in EMERG.

Standard:

Simulates placing 1-HS-248-0001 POWER ON in EMERG at Battery Charger 1.

SAT UNSAT N/A COMMENTS:

CUE: The POWER ON handswitch is in EMERGENCY.

4

JPM j

Performance Step 3: Critical X Not Critical

[3] PROCEED TO 250V BATTERY CHARGER 3, CHGA-248-0003, AND PLACE POWER ON, 3-HS-248-0003, in EMERG.

Standard:

Simulates placing 1-HS-248-0003 POWER ON in EMERG at Battery Charger 3.

SAT UNSAT N/A COMMENTS:

CUE: The POWER ON handswitch is in EMERGENCY.

Performance Step 4: *Critical X Not Critical

[4] PROCEED TO 250V BATTERY CHARGER 2A, 2-CHGA-248-0002A, AND PERFORM the following:

  • [4.1] PLACE POWER ON, 2-HS-248-0002A, in OFF.

[4.2] VERIFY ALTERNATE SUPPLY INPUT FROM 480V CMN BD 1/3A, 2-BKR-248-0002AB, in OFF.

Standard:

Simulates placing POWER ON, 2-HS-248-0002A, in OFF. Verifies ALTERNATE SUPPLY INPUT FROM 480V CMN BD 1/3A in OFF.

SAT UNSAT N/A COMMENTS:

CUE: The POWER ON handswitch is in OFF and the ALTERNATE SUPPLY INPUT is in OFF.

5

JPM j

Performance Step 5: Critical X Not Critical

[4.3] PLACE NORMAL SUPPLY INPUT FROM 480V SD BD 2A/6D, 2-BKR-248-0002AA, in OFF.

[4.4] PLACE DC BREAKER, 2-BKR-248-0002A/DC, in OFF.

Standard:

Simulates placing the NORMAL SUPPLY INPUT in OFF. Places the DC BREAKER 2-BKR-248-0002A/DC, in OFF.

SAT UNSAT N/A COMMENTS:

CUE: The NORMAL SUPPLY INPUT is in OFF and the DC BREAKER is in OFF.

6

JPM j

Performance Step 6: Critical X Not Critical

[5] PROCEED TO BATTERY CHARGER 2A OUTPUT TRANSFER SWITCH, 2-XSW-248-0002A, AND PLACE OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, in OFF.

Standard:

Simulates placing OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, in OFF.

SAT UNSAT N/A COMMENTS:

CUE: The OUTPUT XFER SW TO BKR 608, 2-BKR-248-0002AE, is in OFF.

Performance Step 7: Critical Not Critical X

[6] PROCEED TO 250V BATTERY BOARD 2 Breaker 607, AND PLACE 0-BKR-280-0002/607 250V BATTERY CHARGER 2B EMER TIE TO DC BD 2, in ON.

Standard:

Simulates placing BATTERY CHARGER 2B EMER TIE TO DC BD 2 in ON.

SAT UNSAT N/A COMMENTS:

CUE: The BATTERY CHARGER 2B EMER TIE TO DC BD 2 is in ON.

7

JPM j

Performance Step 8: Critical X Not Critical

[7] PERFORM the following at BATTERY CHARGER 2B OUTPUT TRANSFER SWITCH 2B, 0-XSW-248-0002B:

[7.1] PLACE BATTERY CHARGER 2B OUTPUT TRANSFER SWITCH 2B, 0-XSW-248-0002B, Mechanical interlock, in TO BATTERY BD 2 BKR 607 position.

[7.2] PLACE TO BATTERY BD 2 BKR 607 breaker, in ON.

Standard:

Simulates sliding the Mechanical Interlock left to the TO BATTERY BD 2 BKR 607 position, and placing TO BATTERY BD 2 BKR 607 breaker in ON.

SAT UNSAT N/A COMMENTS:

CUE: The Mechanical interlock, is in TO BATTERY BD 2 BKR 607 position, and TO BATTERY BD 2 BKR 607 breaker is in ON.

8

JPM j

Performance Step 9: Critical X Not Critical

[7.3] PROCEED TO 250V BATTERY CHARGER 2B, 0-CHGA-248-0002B, AND PERFORM the following:

[7.3.1] PLACE NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D, 0-BKR-248-0002BA, in ON.

[7.3.2] PLACE DC BREAKER, 0-BKR-248-0002B/DC, in ON.

Standard:

Simulates placing NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D in ON, and placing DC BREAKER in ON.

SAT UNSAT N/A COMMENTS:

CUE: The NORMAL SUPPLY INPUT FROM 480V SD BD 2B/6D is in ON, and the DC BREAKER is in ON.

9

JPM j

Performance Step 10: Critical X Not Critical NOTE The following step will place Battery Charger 2B in service with the 480V load shed logic trip bypassed.

[7.3.3] PLACE POWER ON, 0-HS-248-0002B, in EMERG.

Standard:

Simulates placing POWER ON, 0-HS-248-0002B, in EMERG.

SAT UNSAT N/A COMMENTS:

CUE: The POWER ON handswitch is in EMERGENCY.

10

JPM j

Performance Step 11: Critical __ Not Critical X

[8] NOTIFY Unit 2 Unit Supervisor of completion of this section.

Standard:

Notifies the Unit 2 Unit Supervisor of completion of this section.

SAT UNSAT N/A COMMENTS:

CUE: Another Operator will perform Section 3.0. This completes your task.

END OF TASK STOP TIME 60 Minutes is the time-critical allowed maximum 11

JPM k OPERATOR: _________________________________

RO ____ SRO ____ DATE: __________

JPM NUMBER: i TASK NUMBER: U-000-EM-19 TASK TITLE: 1-EOI Appendix-1A Removal of RPS SCRAM Fuses K/A NUMBER: 212000 A2.20 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 1-EOI Appendix-1A LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 1-EOI Appendix-1A VALIDATION TIME: 10 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are the Extra Operator. The Unit 1 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 1-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 1-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM k

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are the Extra Operator. The Unit 1 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 1-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 1-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

3

JPM k START TIME

Performance Step 1: Critical Not Critical X

1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 1-9-5.

Standard:

Given in initial conditions SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

2. DISPATCH personnel to the Auxiliary Instrument Room to perform the following:
a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.

Standard:

Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT UNSAT N/A COMMENTS:

CUE: When location of EOI Storage Box identified, Operator has the fuse pullers 4

JPM k

Performance Step 3: Critical X Not Critical

b. LOCATE Terminal Strip CC inside 1-PNLA-009-0015, Bay 2, Rear.
c. REMOVE the following fuses (located at bottom of terminal strip CC, 1-PNLA-009-0015):

RPS BUS A BLOCK NUMBER FUSE ID CC FOUR (4) 1-FU1-085-0037AA CC FIVE (5) 1-FU1-085-0039A/2 CC SIX (6) 1-FU1-085-0039A/3 CC SEVEN (7) 1-FU1-085-0039A/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A COMMENTS:

CUE: When location of proper Fuse is indicated the Fuse has been removed 5

JPM k

Performance Step 4: Critical X Not Critical

d. LOCATE Terminal Strip CC inside 1-PNLA-009-0017, Bay 2, Rear.
e. REMOVE the following fuses (located at bottom of terminal strip CC, 1-PNLA-009-0017):

RPS BUS B BLOCK NUMBER FUSE ID CC FOUR (4) 1-FU1-085-0037BA CC FIVE (5) 1-FU1-085-0039B/2 CC SIX (6) 1-FU1-085-0039B/3 CC SEVEN (7) 1-FU1-085-0039B/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A COMMENTS:

CUE: When location of proper Fuse is indicated the Fuse has been removed 6

JPM k

Performance Step 5: Critical Not Critical X

f. WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.

Standard:

Notifies Unit 1 Operator All RPS Fuse removed SAT UNSAT N/A COMMENTS:

CUE: Acknowledge Notification, SRO Does not direct replacement of fuses END OF TASK STOP TIME 7

JPM k OPERATOR: _________________________________

RO ____ SRO ____ DATE: __________

JPM NUMBER: i TASK NUMBER: U-000-EM-19 TASK TITLE: 2-EOI Appendix-1A Removal of RPS SCRAM Fuses K/A NUMBER: 212000 A2.20 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 2-EOI Appendix-1A LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 2-EOI Appendix-1A VALIDATION TIME: 10 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM k

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are the Extra Operator. The Unit 2 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 2-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 2-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

3

JPM k START TIME

Performance Step 1: Critical Not Critical X

1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.

Standard:

Given in initial conditions SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

2. DISPATCH personnel to Unit 2 Auxiliary Instrument Room to perform the following:
a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.

Standard:

Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT UNSAT N/A COMMENTS:

CUE: When location of EOI Storage Box identified, Operator has the fuse pullers 4

JPM k

Performance Step 3: Critical X Not Critical

b. LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
c. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15):

RPS BUS A BLOCK NUMBER FUSE ID CC FOUR (4) 2-FU1-085-0037AA CC FIVE (5) 2-FU1-085-0039A/2 CC SIX (6) 2-FU1-085-0039A/3 CC SEVEN (7) 2-FU1-085-0039A/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A COMMENTS:

CUE: When location of proper Fuse is indicated the Fuse has been removed 5

JPM k

Performance Step 4: Critical X Not Critical

d. LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
e. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-17):

RPS BUS B BLOCK NUMBER FUSE ID CC FOUR (4) 2-FU1-085-0037BA CC FIVE (5) 2-FU1-085-0039B/2 CC SIX (6) 2-FU1-085-0039B/3 CC SEVEN (7) 2-FU1-085-0039B/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A COMMENTS:

CUE: When location of proper Fuse is indicated the Fuse has been removed 6

JPM k

Performance Step 5: Critical Not Critical X

f. WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.

Standard:

Notifies Unit 2 Operator All RPS Fuse removed SAT UNSAT N/A COMMENTS:

CUE: Acknowledge Notification, SRO Does not direct replacement of fuses END OF TASK STOP TIME 7

JPM k OPERATOR: _________________________________

RO ____ SRO ____ DATE: __________

JPM NUMBER: i TASK NUMBER: U-000-EM-19 TASK TITLE: 3-EOI Appendix-1A Removal of RPS SCRAM Fuses K/A NUMBER: 212000 A2.20 K/A RATING: RO 4.1 SRO 4.2 TASK STANDARD: Simulate removal of SCRAM Fuses IAW 3-EOI Appendix-1A LOCATION OF PERFORMANCE: Plant REFERENCES/PROCEDURES NEEDED: 3-EOI Appendix-1A VALIDATION TIME: 10 minutes PERFORMANCE TIME:

COMMENTS: __________________________________________________________

______________________________________________________________________

______________________________________________________________________

Additional comment sheets attached? YES ___ NO ___

RESULTS: SATISFACTORY ____ UNSATISFACTORY ____

SIGNATURE: __________________________ DATE: __________

EXAMINER 1

INITIAL CONDITIONS: You are the Extra Operator. The Unit 3 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 3-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 3-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

JPM k

IN-PLANT: I will explain the initial conditions and state the task to be performed. ALL STEPS WILL BE SIMULATED. Do NOT operate any plant equipment. Touch STAAR may be carried out to the point of touching a label. If it becomes necessary to physically touch a control switch, use a non-conductive pointing device. I will provide initiating cues and indicate any steps to be discussed.

When you complete the task successfully, the objective for this job performance measure will be satisfied. When your task is given, you will repeat the task and I will acknowledge "That's correct" (or That's incorrect", if applicable). When you have completed your assigned task, you will say, "My task is complete" and I will acknowledge that your task is complete.

INITIAL CONDITIONS: You are the Extra Operator. The Unit 3 reactor has scrammed and all control rods did not fully insert. All eight scram solenoid lights on Panel 9-5 are still illuminated.

EOI-1 has been entered and followed to RC/Q-23. The Scram Discharge Volume Vent/Drain Valves indicate closed on panel 3-9-5.

INITIATING CUE: The Unit Supervisor directs you to remove the RPS scram solenoid fuses in accordance with 3-EOI Appendix 1A, Removal and Replacement of RPS Scram Solenoid Fuses.

CAUTION: DO NOT OPERATE ANY PLANT EQUIPMENT!

3

JPM k START TIME

Performance Step 1: Critical Not Critical X

1. VERIFY CLOSED Scram Discharge Volume Vent and Drain Valves at the SCRAM DISCHARGE VOLUME VENT/DRAIN VLVS display on panel 9-5.

Standard:

Given in initial conditions SAT UNSAT N/A COMMENTS:

Performance Step 2: Critical Not Critical X

2. DISPATCH personnel to Unit 3 Auxiliary Instrument Room to perform the following:
a. REFER to Attachment 1 and OBTAIN fuse pullers from EOI Equipment Storage box.

Standard:

Simulate unlocking EOI Equipment storage and obtaining fuse pullers SAT UNSAT N/A COMMENTS:

CUE: When location of EOI Storage Box identified, Operator has the fuse pullers 4

JPM k

Performance Step 3: Critical X Not Critical

b. LOCATE Terminal Strip CC inside Panel 9-15, Bay 2, Rear.
c. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-15):

RPS BUS A BLOCK NUMBER FUSE ID CC FOUR (4) 3-FU1-085-0037AA CC FIVE (5) 3-FU1-085-0039A/2 CC SIX (6) 3-FU1-085-0039A/3 CC SEVEN (7) 3-FU1-085-0039A/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A COMMENTS:

CUE: When location of proper Fuse is indicated the Fuse has been removed 5

JPM k

Performance Step 4: Critical X Not Critical

d. LOCATE Terminal Strip CC inside Panel 9-17, Bay 2, Rear.
e. REMOVE the following fuses (located at bottom of terminal strip CC, Panel 9-17):

RPS BUS B BLOCK NUMBER FUSE ID CC FOUR (4) 3-FU1-085-0037BA CC FIVE (5) 3-FU1-085-0039B/2 CC SIX (6) 3-FU1-085-0039B/3 CC SEVEN (7) 3-FU1-085-0039B/4 Standard:

Identifies terminal strip and simulates removing listed fuses SAT UNSAT N/A COMMENTS:

CUE: When location of proper Fuse is indicated the Fuse has been removed 6

JPM k

Performance Step 5: Critical Not Critical X

f. WHEN ALL fuses are removed, THEN NOTIFY Unit Operator.

Standard:

Notifies Unit 3 Operator All RPS Fuse removed SAT UNSAT N/A COMMENTS:

CUE: Acknowledge Notification, SRO Does not direct replacement of fuses END OF TASK STOP TIME 7