ML14181A024: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 06/30/2014 | | issue date = 06/30/2014 | ||
| title = June 2014 Status Update Letter, in the Matter of Firstenergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1) | | title = June 2014 Status Update Letter, in the Matter of Firstenergy Nuclear Operating Co. (Davis-Besse Nuclear Power Station, Unit 1) | ||
| author name = Harris B | | author name = Harris B | ||
| author affiliation = NRC/OGC | | author affiliation = NRC/OGC | ||
| addressee name = Froehlich W | | addressee name = Froehlich W, Kastenberg W, Trikouros N | ||
| addressee affiliation = NRC/ASLBP | | addressee affiliation = NRC/ASLBP | ||
| docket = 05000346 | | docket = 05000346 | ||
Line 14: | Line 14: | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 June 30, 2014 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co. | |||
(Davis-Besse Nuclear Power Station, Unit 1) | |||
Docket No. 50-346-LR | |||
==Dear Administrative Judges:== | |||
Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement (DSEIS) in February 2014. Currently, the Staff anticipates publishing the Final SEIS in September 2014. | |||
Respectfully submitted, | |||
/signed (electronically) by/ | |||
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov | |||
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) | |||
) | |||
FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA | |||
) | |||
(Davis-Besse Nuclear Power Station, Unit 1) ) | |||
) | |||
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the June 30, 2014 Letter from Brian G. Harris in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 30th day of June, 2014. | |||
Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov}} |
Latest revision as of 02:59, 4 November 2019
ML14181A024 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 06/30/2014 |
From: | Harris B NRC/OGC |
To: | William Froehlich, Kastenberg W, Nicholas Trikouros Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
50-346-LR, ASLBP 11-907-01-LR-BD01, RAS 26124 | |
Download: ML14181A024 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, DC 20555 - 0001 June 30, 2014 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.
(Davis-Besse Nuclear Power Station, Unit 1)
Docket No. 50-346-LR
Dear Administrative Judges:
Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement (DSEIS) in February 2014. Currently, the Staff anticipates publishing the Final SEIS in September 2014.
Respectfully submitted,
/signed (electronically) by/
Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LRA
)
(Davis-Besse Nuclear Power Station, Unit 1) )
)
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the June 30, 2014 Letter from Brian G. Harris in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 30th day of June, 2014.
Signed (electronically) by Brian G. Harris Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Mail Stop O-15 D21 Washington, DC 20555-0001 (301) 415-1392 brian.harris@nrc.gov