ML14274A109: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1 | {{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____1____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________ | ||
____________________________ _____________________________ | |||
_____________________________ | ____________________________ _____________________________ | ||
____________________________ | Initial Conditions: IC 778 - 100% power, Turnover Both units are at 100% power. | ||
_____________________________ | Even Malf. No. Event Event t No. Type* Description C(ATC) 1 U1_RCR16 Pressurizer Safety Valve Leak (SV45B 2gpm) | ||
____________________________ | TS 2 R Power Reduction 3 N Turbine Power Reduction U1_ECP C(BOP) 4 East CCP fails on overcurrent Stator Short TS Feedwater flow controller fails 5 U1_RX33B I(BOP) | ||
_____________________________ | U1_QTC302 6 175 over 5 I(ATC) Charging Letdown Header Temperature QTC-302 fails high Minutes U1_RC01A 7 Major Large break LOCA 60% | ||
Initial Conditions: | U1_ED05E 8 C(BOP) Vital bus T11A Fails (On RX Trip) | ||
-302 fails high 7 | (Trg 1) | ||
U1_RP10A 9 U1_RP11A C(ATC) Auto/Manual SI Train A does not occur U1_RP11C | |||
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 1 Event | ||
2014301 | |||
1 | |||
== Description:== | == Description:== | ||
Safety Valve Leakage SV45 | Safety Valve Leakage SV45-B (2 gpm) | ||
-B (2 gpm) | Time Position Applicant's Actions or Behavior CREW Identify RCS Leakage US Direct entry into 1-OHP-4022-002-020, EXCESSIVE REACTOR COOLANT LEAKAGE ATC Performs the following actions, if directed: | ||
: 1. Manually raises charging flow to maintain pressurizer level | : 1. Manually raises charging flow to maintain pressurizer level. | ||
: 2. Manually adjusts seal injection flow (6-12 gpm / each RCP). | |||
-12 gpm / each RCP) | : 3. Reduces/isolates letdown flow to maintain pressurizer level. | ||
: 4. Attempts to determine RCS leak rate. | |||
BOP/ATC Monitor Containment Pressure Determine RCS Leak Rate (~2gpm) | |||
BOP/ATC | Check no leak into CCW Check for Primary to Secondary leak Crew Identify Source of Primary Leak and attempt to isolate source Identify that leak is from Safety to PRT and cannot be isolated Crew | ||
: 1. Check PRZ PORV and Safety valves for Leakage | |||
Determine RCS Leak Rate (~ | |||
2gpm) | |||
Check no leak into CCW | |||
Check for Primary to Secondary leak Crew | |||
Identify that leak is from Safety to PRT and cannot be isolated Crew | |||
: 2. Check PRT Conditions | : 2. Check PRT Conditions | ||
: 3. Check Safety Valve Tailpipe Temperatures Crew | : 3. Check Safety Valve Tailpipe Temperatures Crew May elect to Use 1-OHP-4021-002-006 PRT Operations Attachment 4, Feed and Bleed of PRT to Reduce Pressure Or Temperature, to reduce PRT pressure US Check TS 3.4.13 RCS Operational leakage Check TS 3.4.10 PRZ Safety Valve US Notify Station Management NOTE: Shift Manager Directs the Unit to Be Shutdown using 1-OHP 4022-001-006 Rapid Power Reduction at 1% per minute Page 2 of 11 | ||
-OHP-4021-002-006 PRT Operations Attachment 4, Feed and Bleed of PRT to Reduce Pressure Or Temperature, to reduce PRT pressure | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 2 Event | ||
2014301 | |||
2 | |||
== Description:== | == Description:== | ||
Power Reduction Time | Power Reduction Time Position Applicant's Actions or Behavior US Directs RO to commence Rapid Power Reduction in accordance with 1-OHP 4022-001-006. | ||
RO Performs (Att. D) NORMAL BORATION: | |||
-Flow (CCP ELO) | * Verify charging is > 75 gpm | ||
* CLOSE 1-QMO-225, EAST CCP Mini-Flow (CCP ELO) | |||
* Place RC Makeup Blend control switch in STOP. | |||
* Place RC Makeup Blend Control Mode switch in BORATE. | |||
-303 to MANUAL/OPEN (as required) to maintain VCT level and pressure. 1-OHP 4022-001-006 Attachment D Table | * Adjust BA Controller/Totalizer to the desired flow rate and amount. | ||
Verify all PRZ backup heaters ON. | * Place RC Makeup Blend control switch in START. | ||
Ensures control rods in AUTO | * May take QRV-303 to MANUAL/OPEN (as required) to maintain VCT level and pressure. | ||
1-OHP 4022-001-006 Attachment D Table RO Commences power reduction: | |||
* Verify all PRZ backup heaters ON. | |||
* Ensures control rods in AUTO. | |||
BOP Acts as peer checker for RO and verifies appropriate reactivity feedback. | |||
RO Energize Pressurizer Backup Heaters Page 3 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 3 Event | ||
2014301 | |||
3 | |||
== Description:== | == Description:== | ||
Turbine Load Reduction Time | Turbine Load Reduction Time Position Applicant's Actions or Behavior US Directs BOP to setup Turbine HMI for Load Reduction using attachment F BOP Commences Turbine Power reduction: | ||
* Places Main Turbine in MW IN | * Places Main Turbine in MW IN | ||
* Enters MW Load Target Into HMI | * Enters MW Load Target Into HMI | ||
* Enters Ramp Rate into HMI (11.5 MW/MIN) | * Enters Ramp Rate into HMI (11.5 MW/MIN) | ||
* Depress GO to lower turbine load (reactor power) using HMI. | * Depress GO to lower turbine load (reactor power) using HMI. | ||
BOP | BOP May Initiate actions to remove MSR from Service per Attachment A BOP Monitors main electrical generator temperatures. | ||
Page 4 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 4 Event | ||
2014301 | |||
4 | |||
== Description:== | == Description:== | ||
East CCP fails on overcurrent Time | East CCP fails on overcurrent Time Position Applicant's Actions or Behavior ATC Recognizes and reports multiple annunciators on Panel #107, #108 and #109 which are indicative of a loss of charging capability. | ||
Loss of charging flow Loss of letdown flow Loss of RCP seal injection flow Crew | * Loss of charging flow | ||
1-OHP 4024-108 Drop 20, Charging Flow < Min Set Point 1-OHP 4024-109 Drop 11, East CCP Motor Instant Trip ATC | * Loss of letdown flow | ||
* Loss of RCP seal injection flow Crew Identify Annunciator 109 Drop 11, EAST CCP MOTOR INSTANT TRIP in alarm US Directs RO to start the W CCP per annunciator response procedure(s): | |||
Check Status of Letdown Start 1-PP-50W-ALOP, West CCP Auxiliary Lube Oil Pump Verify the West CCP has a suction source available AND aligned | * 1-OHP 4024-108 Drop 20, Charging Flow < Min Set Point | ||
Starts W CCP Adjusts QRV | * 1-OHP 4024-109 Drop 11, East CCP Motor Instant Trip ATC Verify Breaker T11D7 trips. | ||
-200 and QRV | Check Status of Letdown Start 1-PP-50W-ALOP, West CCP Auxiliary Lube Oil Pump Verify the West CCP has a suction source available AND aligned Performs the following as directed: | ||
-251 flow to maintain RCP seal injection flow and pressurizer level. | ATC | ||
Places normal letdown back in service in accordance with 1 | * Starts W CCP | ||
-OHP-4021-003-001, Attachment 13. | * Adjusts QRV-200 and QRV-251 flow to maintain RCP seal injection flow and pressurizer level. | ||
* Places normal letdown back in service in accordance with 1-OHP-4021-003-001, Attachment 13. | |||
(Continued on next page) | (Continued on next page) | ||
Page 5 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 4 Event | ||
4 | |||
== Description:== | == Description:== | ||
East CCP fails on overcurrent Time | East CCP fails on overcurrent Time Position Applicant's Actions or Behavior ATC Restores normal letdown per 1-OHP-4021-003-001 Attachment 13 as: | ||
-OHP-4021-003-001 Attachment 13 as: | : 1. Places QRV-302 in divert position. | ||
: 1. Places QRV | : 2. Verifies orifice isolations closed (QRV-160, 161 and 162). | ||
-302 in divert position. | : 3. Adjusts CRV-470 controller to 50%. | ||
: 2. Verifies orifice isolations closed (QRV | |||
-160, 161 and 162). | |||
: 3. Adjusts CRV | |||
-470 controller to 50%. | |||
: 4. Verifies open letdown isolation valves: | : 4. Verifies open letdown isolation valves: | ||
QCR-300 | * QCR-300 | ||
-301controller to 50%. | * QCR-301 | ||
* QRV-111 | |||
* QRV-112 | |||
: 5. Adjusts QRV-301controller to 50%. | |||
: 6. Checks/adjusts charging flow to > 75 gpm. | : 6. Checks/adjusts charging flow to > 75 gpm. | ||
: 7. Opens QRV-161 or 162. | : 7. Opens QRV-161 or 162. | ||
: 8. Adjusts QRV | : 8. Adjusts QRV-301 to maintain 160 - 350 psig. | ||
-301 to maintain 160 | : 9. Places QRV-301 in AUTO. | ||
- 350 psig. 9. Places QRV | : 10. Nulls and returns CRV-470 controller to AUTO. | ||
-301 in AUTO. | |||
: 10. Nulls and returns CRV | |||
-470 controller to AUTO. | |||
: 11. Adjusts charging flow as required to maintain PRZ level. | : 11. Adjusts charging flow as required to maintain PRZ level. | ||
: 12. Places PRZ level control in automatic (if desired). | : 12. Places PRZ level control in automatic (if desired). | ||
: 13. Places QRV | : 13. Places QRV-302 in normal (demineralizer) position when letdown temperature is stable. | ||
-302 in normal (demineralizer) position when letdown temperature is stable. | US Refer to Technical Specifications and Technical Requirements Manual. | ||
US | : a. 3.5.2, ECCS-Operating Refer to Technical Requirements Manual: | ||
: a. 3.5.2, ECCS | : a. 8.1.1, Boration System-Operating MAY refer to TS 3.2.3 AFD if rods continue to insert due to Turbine Load Reduction. | ||
-Operating | Page 6 of 11 | ||
: a. 8.1.1, Boration System | |||
-Operating | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 5 Event | ||
5 | |||
== Description:== | == Description:== | ||
Feedwater Flow Controller Fails Low | Feedwater Flow Controller Fails Low Time Position Applicant's Actions or Behavior Crew Recognize ANNUNCIATOR #115 Drop 53 Feedwater Controller Trouble Alarm BOP Reports malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
- | * Verifies FRV-220, SG 2 Feedwater Regulating Valve, controls in MANUAL. | ||
Verifies FRV | * Restores SG level to Program US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
-220, SG 2 Feedwater Regulating Valve, controls in MANUAL. | US Direct crew response to alarm using 1-OHP-4024-115 BOP Recognize 1-RU-10, Level Control 1-FRV-220 as failed LOW | ||
Restores SG level to Program US | * Note that RU-10 (1-XL-192, Steam Generator OME-3-2) Level Control System Signal Controller (flow control) has failed | ||
-4022-IFR-001, Instrument Failure Response procedure. | * Note S/G level controller defaults to Manual | ||
US | * At the panel: Determine affected controller by observing controller faceplate alarm light and/or audible alarm. | ||
-RU-10, Level Control 1 | * Press the Alarm Scroll key to silence the audible alarm (upper right hand corner of controller) | ||
-FRV-220 as failed LOW Note that RU-10 (1-XL-192, Steam Generator | * Monitor Steam Generator levels and adjust as necessary. | ||
Press the Alarm Scroll key to silence the audible alarm (upper right hand corner of controller) | * Contact MTI to confirm failure mode and replace/repair controller. | ||
Monitor Steam Generator levels and adjust as necessary. | Page 7 of 11 | ||
Contact MTI to confirm failure mode and replace/repair controller. | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 6 Event | ||
6 | |||
== Description:== | == Description:== | ||
CVCS Letdown Temperature Controller (QTC | CVCS Letdown Temperature Controller (QTC-302) output fails HIGH. | ||
-302) output fails HIGH. Time | Time Position Applicant's Actions or Behavior RO Recognize and reports annunciator Panel 109 alarms which indicates a malfunction of CCW cooling to the letdown heat exchanger: | ||
Drop 8, Letdown HX Outlet Temp High RO/BOP | * Drop 8, Letdown HX Outlet Temp High RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
Places CRV | * Places CRV-470, Letdown Temperature Control valve, controller to MANUAL. | ||
-470, Letdown Temperature Control valve, controller to MANUAL. Opens CRV-470 and attempts restore letdown temperature to normal. US | * Opens CRV-470 and attempts restore letdown temperature to normal. | ||
-4022-IFR-001, Instrument Failure Response procedure. | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
RO | RO | ||
Isolate normal letdown Minimize charging flow Establish excess letdown US | * Verifies letdown flow diverted to RC Filter | ||
NOTE: QRV-302 Letdown Demineralizer Divert Valve will reposition based on QTS | * May identifiy that QTC-302 has failed high Since Indicated letdown temperature continues to climb, the crew may : | ||
-301. Diverts past Demins at | RO | ||
-302). Crew May Elect to Trip RX (Due to loss of Normal Reactivity addition, loss of Letdown and requirement to shutdown.) | * Isolate normal letdown | ||
* Minimize charging flow | |||
* Establish excess letdown US Initiates action to have MTI investigate problem with letdown temperature controller/indicator. | |||
NOTE: | |||
QRV-302 Letdown Demineralizer Divert Valve will reposition based on QTS-301. Diverts past Demins at 143°F. This is a separate switch from the Controller & Instrument that has failed (QTC-302). | |||
Crew May Elect to Trip RX (Due to loss of Normal Reactivity addition, loss of Letdown and requirement to shutdown.) | |||
Page 8 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 7,8,9 Event | ||
== Description:== | == Description:== | ||
Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time | Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time Position Applicant's Actions or Behavior RO/US Acknowledge Ann. 122, Drop 83 ICE CONDENSER DOORS OPEN. | ||
Determines that a loss of reactor coolant is occurring based on the following: | Determines that a loss of reactor coolant is occurring based on the following: | ||
Pressurizer Pressure and level change. | * Pressurizer Pressure and level change. | ||
Containment radiation monitoring trend. | * Containment radiation monitoring trend. | ||
Containment pressure rise. | * Containment pressure rise. | ||
Containment sump level rise. | * Containment sump level rise. | ||
US | US Directs RO/BOP to verify/trip the reactor and perform the immediate actions of E-0, Reactor Trip or Safety Injection. | ||
RO/BOP Performs the immediate actions of E-0: | |||
* Checks reactor trip. | |||
* Checks turbine trip. | |||
* Checks power to AC emergency buses. Notes : Vital Bus T11A De-energized | |||
* Checks safety injection status. | |||
US Ensures immediate actions of E-0 are completed US Directs subsequent actions of E-0. | |||
RO/BOP Reviews E-0 Foldout Page Criteria. | |||
CREW Determines that Containment Pressure requires Steamline Isolation, Phase B Isolation, and CTS Actuation. | |||
* Verifies Steamlines Isolated. | |||
* Verifies CTS Actuation. | |||
* Aligns Lower Cont. Vent Fans. | |||
CREW Manually stops all Reactor Coolant Pumps (RCPs) due to Phase B Isolation and/or RCS pressure lowering below 1300 psig. | |||
BOP Manually controls AFW flow to maintain SG narrow range levels 14% - 50% | |||
once one SG narrow range level is > 14%. | |||
Page 9 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 7,8,9 Event | |||
Appendix D Required Operator Actions Form ES-D-2 | |||
7 , 8 , 9 | |||
== Description:== | == Description:== | ||
Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time | Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time Position Applicant's Actions or Behavior RO Reports that the E CCP is not running due to a previous failure RO/BOP Performs manual actions of E-0 Attachment A Crew Manually Aligns Safety Injection - Train A. | ||
-0 Attachment A Crew | Critical Task -AND- | ||
#1 Manually align valves to establish at least one train of isolation CREW Completes all actions of E-0 through step 19 (Check If RCS Is Intact). | |||
- Train A. -AND- Manually align valves to establish at least one train of isolation CREW | US Announces transition to E-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E-0). | ||
-0 through step 19 (Check If RCS Is Intact). | Note: The Crew may transition to OHP-4023-ES-1.3, Transfer to COLD Leg Recirculation if the RWST is low enough prior to the E-1 transition point (See Page 11 For actions). | ||
US | Note: The Crew may momentarily enter OHP-4023-FR-P.1, Response To Imminent Pressurized Thermal Shock Condition, on a Red Path, then exit once RHR flow is verified. | ||
-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E-0). Note: The Crew may transition to OHP | RO/BOP Reviews E-1 Foldout Page Criteria. | ||
-4023-ES-1.3, Transfer to COLD Leg Recirculation if the RWST is low enough prior to the E | US Directs actions of E-1, Loss Of Reactor Or Secondary Coolant. | ||
-1 transition point (See Page 11 For actions). | BOP Maintains SG narrow range levels 20% - 50%. | ||
Note: The Crew may momentarily enter OHP-4023-FR-P.1, Response To Imminent Pressurized Thermal Shock Condition, on a Red Path, then exit once RHR flow is verified. | CREW Performs the following: | ||
RO/BOP | |||
US | |||
-1, Loss Of Reactor Or Secondary Coolant. | |||
BOP | |||
- 50%. | |||
Resets Containment Isolation Phase A. | Resets Containment Isolation Phase A. | ||
Notifies Chemistry to sample SGs for activity. | Notifies Chemistry to sample SGs for activity. | ||
US | US Checks if SI Termination Criteria is MET: | ||
RCS Subcooling > | RCS Subcooling >40°F. | ||
3 Secondary Heat Sink (AFW Flow >240x10 or SG >14% [28% | |||
ADVERSE]). | |||
RCS Pressure rising or stable. | RCS Pressure rising or stable. | ||
Pressurizer Level >21% [25%ADVERSE]. | Pressurizer Level >21% [25%ADVERSE]. | ||
US | US Check for CTS termination Criteria RCS pressure is <300 psig - Wait for 24 Hours Page 10 of 11 | ||
- Wait for 24 Hours | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 7,8,9 Event | ||
7 , 8 , 9 | |||
== Description:== | == Description:== | ||
Large break | Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time Position Applicant's Actions or Behavior RO/BOP Performs the following as directed: | ||
: 1. Resets both trains of Safety Injection. | : 1. Resets both trains of Safety Injection. | ||
: 2. Stops running Emergency Diesel Generators (EDG). | : 2. Stops running Emergency Diesel Generators (EDG). | ||
: 3. Dispatches operator to secure EDG jacket water pumps. | : 3. Dispatches operator to secure EDG jacket water pumps. | ||
Applicants actions or behavior associated with ES | Applicants actions or behavior associated with ES-1.3, Transfer To Cold Leg Recirculation. | ||
-1.3, Transfer To Cold Leg Recirculation | US Announces transition to ES-1.3, Transfer To Cold Leg Recirculation when RWST level < 30% per: | ||
* E-0, Foldout Page, Criteria 3 | |||
-1.3, Transfer To Cold Leg Recirculation when RWST level < 30% per: | * E-1, Foldout Page, Criteria 5 | ||
E-0, Foldout Page, Criteria 3 E-1, Foldout Page, Criteria 5 E-1, Step 13 US Directs actions of ES | * E-1, Step 13 US Directs actions of ES-1.3, Transfer To Cold Leg Recirculation. | ||
-1.3, Transfer To Cold Leg Recirculation. | RO/BOP Resets both trains of Safety Injection. | ||
RO/BOP Resets both trains of Safety Injection. | RO/BOP Establishes CCW return flow on each RHR HX at 3000-3500 gpm. | ||
RO/BOP | (may only perform for the East CCW HX) | ||
RO/BOP | RO/BOP Checks the following prior to switching over to cold leg recirc: | ||
RWST level < 20% | * RWST level < 20% | ||
Cntmt water level > MIN RECIRC LEVEL US/RO | * Cntmt water level > MIN RECIRC LEVEL US/RO Directs/Performs switchover as follows: | ||
Critical Task NOTE: If RWST level < 9% then stop CCPs and SI pumps. | |||
NOTE: If RWST level < | #2 | ||
9% then stop CCPs and SI pumps. | * Stops and locks out East CTS pump | ||
Stops and locks out East CTS pump Stops and locks out East RHR pump Checks East CTS and East RHR pumps stopped Initiates valve closure: | * Stops and locks out East RHR pump | ||
IMO-310, East RHR pump suction IMO-215, East CTS pump suction from RWST Stops and locks out West CTS pump Stops and locks out West RHR pump | * Checks East CTS and East RHR pumps stopped | ||
IMO-320, West RHR pump suction IMO-225, West CTS pump suction from RWST Restore control power to ICM-305, recirc sump to East RHR/CTS pumps | * Initiates valve closure: | ||
* IMO-310, East RHR pump suction | |||
* IMO-215, East CTS pump suction from RWST | |||
* Stops and locks out West CTS pump | |||
* Stops and locks out West RHR pump | |||
* Checks West CTS and West RHR pumps stopped | |||
* Initiates valve closure: | |||
* IMO-320, West RHR pump suction | |||
* IMO-225, West CTS pump suction from RWST | |||
* Restore control power to ICM-305, recirc sump to East RHR/CTS pumps | |||
* Check 1-ICM-305 open | |||
* IMO-215 - Full Closed | |||
* IMO-310 - Full Closed | |||
* Open ICM-305 and check full open | |||
* Start East RHR pump and East CST pump (if previously running) | |||
Terminate Scenario when RHR/CTS pump is restarted. | Terminate Scenario when RHR/CTS pump is restarted. | ||
Page 11 of 11 | |||
Appendix D Scenario Outline Form ES-D-1 | Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____3____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________ | ||
____________________________ _____________________________ | |||
_____________________________ | ____________________________ _____________________________ | ||
____________________________ | Initial Conditions: IC 779 92% EDG CD has been run following mechanical maintenance on the injector. The run is complete and the EDG is ready to be shutdown and placed in standby. | ||
_____________________________ | Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through 4.7 in main body. U1 is at 92% power following turbine valve testing. TS 3.8.1 Action B.5 Day 1 of 14. | ||
____________________________ | Event Event Event Malf. No. | ||
_____________________________ | No. Type* Description 1 N Secure the CD D/G U1_NI10B I(ATC) 2 200 over 1 Power range detector (NI-42) fails high min TS 3 R Power increase to restore power U1_FW40A 4 C(BOP) Condenser Level Control failure (100%) | ||
Initial Conditions: IC 779 92% | 100 U1_BLP131 I(BOP) 5 Steam generator #3 BLP131 controlling level channel fails low 0 over 30sec TS U1_MS02C 6 Major Steam line #3 break inside containment 50% | ||
EDG CD has been run following mechanical maintenance on the injector. The run is complete and the EDG is ready to be shutdown and placed in standby. | U1_RP03A Reactor Trip Breaker Failures (ATWS), (Cannot be opened - | ||
Turnover: | 7 C(ATC) | ||
1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through 4.7 in main body. U1 is at | U1_RP03B Rods Drop when MG sets de-energized) | ||
Event No. | U1_RP09A 8 C(BOP) Feedwater isolation does not occur in automatic U1_RP09B 9 U1_FW48C C(BOP) TDAFW pump does not start in auto | ||
-42) fails high 3 | * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 11 | ||
-energized) 8 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 1 Event | ||
2014301 | |||
1 | |||
== Description:== | == Description:== | ||
Secure the CD D/G and place in standby Time | Secure the CD D/G and place in standby Time Time Time US Directs actions of 1-OHP-4021-032-001CD Attachment 2, DG1CD Operation On Safeguards Buses. | ||
US | US Directs the following actions to secure EDG CD. | ||
BOP | BOP Performs the following to EDG CD as directed: | ||
: 1. Opens the following breakers: | : 1. Opens the following breakers: | ||
T11D8 | * T11D8 | ||
: 3. Verifies DG1CD Start Gen & 69/4KV Voltmeter Sel switch in | * T11C3 | ||
- OFF. 4. Returns to Procedure Body Step 4. | : 2. Adjusts diesel speed using DG1CD GOVENOR CONTROL to 60 Hz. | ||
7: | : 3. Verifies DG1CD Start Gen & 69/4KV Voltmeter Sel switch in - OFF. | ||
: 5. Verifies T11D8, T11C3, and DGTCD | : 4. Returns to Procedure Body Step 4.7: | ||
- OPEN 6. Verifies diesel UNLOADED for approximately 2 minutes | Note: Step 4.1.7 and 4.1.8 were not performed | ||
: 7. Stops DG1CD by placing DG1CD Stop | : 5. Verifies T11D8, T11C3, and DGTCD - OPEN | ||
-Run control switch to STOP | : 6. Verifies diesel UNLOADED for approximately 2 minutes | ||
: 8. Verifies green target at DG1CD Stop | : 7. Stops DG1CD by placing DG1CD Stop-Run control switch to STOP | ||
-Run control switch | : 8. Verifies green target at DG1CD Stop-Run control switch Page 2 of 11 | ||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 2,3 Event | ||
2014301 | |||
2,3 | |||
== Description:== | == Description:== | ||
Power range detector (NI | Power range detector (NI-42) fails high Time Position Applicant's Actions or Behavior ATC Recognizes and reports annunciators on Panel 110 which are indicative of a NI instrument failure (Drops 11, 13, 18, & 19). | ||
-42) fails high Time | ATC Reports malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
ATC | * Checks for no turbine runback | ||
-4022-IFR-001, Instrument Failure Response: | * Ensures control rods are in manual with no rod motion US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
Checks for no turbine runback Ensures control rods are in manual with no rod motion US | US Enters and directs actions of 1-OHP-4022-012-003, Continuous Control Bank Movement procedure. | ||
-4022-IFR-001, Instrument Failure Response procedure. | RO Performs the following as directed: | ||
US | * Checks for no turbine runback | ||
-OHP-4022-012-003, Continuous Control Bank Movement procedure. | * Ensures control rods are in manual with no rod motion | ||
RO | * Checks rod position above low-low rod insertion limit | ||
Checks for no turbine runback Ensures control rods are in manual with no rod motion | * Checks axial flux difference (AFD) within target band | ||
-low rod insertion limit Checks axial flux difference (AFD) within target band Identifies failed power range channel | * Identifies failed power range channel | ||
* Determines reactivity plan to restore power and AFD to required RO conditions. | |||
Initiates restoration of equilibrium conditions (power) using either: | Initiates restoration of equilibrium conditions (power) using either: | ||
Control rod movement Turbine load adjustment US | * Control rod movement | ||
-OHP-4022-013-004, Power Range Malfunction procedure. | * Turbine load adjustment US Enters and directs actions of 1-OHP-4022-013-004, Power Range Malfunction procedure. | ||
Continued on Next Page | Continued on Next Page Page 3 of 11 | ||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 2,3 Event | ||
2014301 | |||
2,3 | |||
== Description:== | == Description:== | ||
Power range detector (NI | Power range detector (NI-42) fails high Time Position Applicant's Actions or Behavior Performs the following as directed: | ||
-42) fails high Time | ATC/BOP | ||
Verify Control Rods | * Verify Control Rods - MANUAL | ||
- MANUAL | * Place Rod Stop Bypass Selector In Failed Channel Position | ||
Comparator Channel Defeat Selector Upper Section Detector Current Comparator Defeat Selector Lower Section Detector Current Comparator Defeat Selector Power Mismatch Bypass Selector Check The Following Interlocks Are In The Required State For Existing Conditions: | * Remove Affected Channel From Service By Placing Selector Switches To Failed Channel Position: | ||
P-7 | * Comparator Channel Defeat Selector | ||
- WITHIN TARGET | * Upper Section Detector Current Comparator Defeat Selector | ||
- SELECTED TO AN UNAFFECTED CHANNEL POSITION: | * Lower Section Detector Current Comparator Defeat Selector | ||
-T Caution - Control Rods should not be placed in automatic until at least 5 minutes have elapsed after placing Power Mismatch Bypass Selector to failed channel. Place Control Rods In AUTOMATIC If Applicable US | * Power Mismatch Bypass Selector | ||
-42 Power Range Malfunction per Attachment D of 1 | * Check The Following Interlocks Are In The Required State For Existing Conditions: | ||
-OHP-4022-013-004. US | * P-7 | ||
3.3.1 RTS Instrumentation (Table 3.3.1 | * P-8 | ||
-1, Functions 2a,2b, 3, 6 18c&d Conditions C, D, & L) | * P-10 | ||
* Check AFD - WITHIN TARGET BAND | |||
* Verify Recorder Inputs - SELECTED TO AN UNAFFECTED CHANNEL POSITION: | |||
* Delta-T | |||
* Overtemperature Delta-T Caution - Control Rods should not be placed in automatic until at least 5 minutes have elapsed after placing Power Mismatch Bypass Selector to failed channel. | |||
* Place Control Rods In AUTOMATIC If Applicable US Directs actions to trip bistables associated with NI-42 Power Range Malfunction per Attachment D of 1-OHP-4022-013-004. | |||
US Refers to Tech Specs: | |||
3.3.1 RTS Instrumentation (Table 3.3.1-1, Functions 2a,2b, 3, 6 18c&d Conditions C, D, & L) | |||
P-8 & P-10 must be verified in Correct Condition within 1 hour of channel failure. | P-8 & P-10 must be verified in Correct Condition within 1 hour of channel failure. | ||
3.2.3 AFD | 3.2.3 AFD Only applicable if Rods drive AFD outside of target band 3.2.4 QPTR May be referenced. | ||
Page 4 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 4 Event | ||
2014301 | |||
4 | |||
== Description:== | == Description:== | ||
Condenser Level Control failure (100%) | Condenser Level Control failure (100%) (ot used, not needed.) | ||
(ot used, not needed. | Time Position Applicant's Actions or Behavior Crew Respond to ANNUNCIATOR #116 RESPONSE: CONDENSATE: | ||
Drop 2, Condenser A Hotwell Level Low Drop 12, Condenser B Hotwell Level Low Drop 22, Condenser C Hotwell Level Low US Direct BOP to Take Actions per 1-OHP-4024-116 Drop 2, 12, 22 BOP | |||
Drop 2, Condenser A Hotwell Level Low Drop 12, Condenser B Hotwell Level Low Drop | * IF Hotwell Level Controller not operating properly, THEN control level manually. | ||
* Verify 1-CRV-155, Condensate Excess Letdown Valve and 1-CMO-155 Bypass Valve - CLOSED. | |||
-CMO-55, Cndst Makeup Valve Bypass, as required to maintain low level clear. | * Throttle open 1-CMO-55, Cndst Makeup Valve Bypass, as required to maintain low level clear. | ||
Page 5 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 5 Event | ||
2014301 | |||
5 | |||
== Description:== | == Description:== | ||
Steam generator #3 controlling level channel fails low Time | Steam generator #3 controlling level channel fails low Time Position Applicant's Actions or Behavior Crew Respond to ANNUNCIATOR #114 RESPONSE: STEAM GENERATOR 3 AND 4: | ||
Drop 3: STEAM GEN 3 WATER LVL LOW DEVIATION Drop 5: STEAM GEN 3 WATER LEVEL LOW | Drop 3: STEAM GEN 3 WATER LVL LOW DEVIATION Drop 5: STEAM GEN 3 WATER LEVEL LOW-LOW Drop 13: STEAM GEN 3 SF > FWF FLOW MISMATCH BOP Reports malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
-LOW Drop 13: STEAM GEN 3 SF > FWF FLOW MISMATCH BOP | * Verifies FRV-230, SG 3 Feedwater Regulating Valve, controls in MANUAL. | ||
-4022-IFR-001, Instrument Failure Response: | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
Verifies FRV | BOP | ||
-230, SG 3 Feedwater Regulating Valve, controls in MANUAL. | * Restore Steam Generator Narrow Range Level using Manual Control of Feedwater Regulating Valve 1-FRV-230 | ||
US | * Check Steam Generator Narrow Range Level - Stable OR Trending to 44% | ||
-4022-IFR-001, Instrument Failure Response procedure. | US Enters and directs actions of 1-OHP-4022-013-013, Steam Generator Level Instrument Malfunction US Refers to the following TS: | ||
BOP | * TS 3.3.1 RTS Instrumentation (Table 3.3.1-1, Function 14 - Cond D). | ||
-FRV-230 | * TS 3.3.2 ESFAS Instrumentation (Table 3.3.2-1, Function 5b & 6c - | ||
US | Cond D). | ||
* TS 3.3.1 RTS Instrumentation (Table 3.3.1 | Enters action statement that requires bistables to be tripped within 6 hours. | ||
-1, Function 14 | US Direct actions to trip bistables per Attachment C-2 of 1-OHP-4022-013-013. | ||
- Cond D). | Page 6 of 11 | ||
* TS 3.3.2 ESFAS Instrumentation (Table 3.3.2 | |||
-1, Function 5b & 6c | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 6,7,8,9 Event | ||
-2 of 1-OHP-4022-013-013. | |||
Appendix D Required Operator Actions Form ES-D-2 | |||
2014301 | |||
6,7,8,9 | |||
== Description:== | == Description:== | ||
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time | Steam line #3 break inside containment, Reactor trip failure (ATWS), | ||
Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior Crew Recognize containment pressure increase, and reactor trip requirements. | |||
-S.1, Response to Nuclear Power Generation/ATWS: | Directs RO to Perform Reactor trip US Enter 1-OHP-4023-E-0: Reactor Trip ATC Recognizes and reports failure of reactor to manually trip US Directs actions of FR-S.1, Response to Nuclear Power Generation/ATWS: | ||
ATC | ATC Performs the immediate actions of FR.S-1: | ||
-1: 1. Checks reactor trip Automatically | : 1. Checks reactor trip Critical Automatically/Manually insert control rods(must Insert Task #1 Negative Reactivity through Inserting Control Rods or Emergency Boration) | ||
/Manually insert control rods(must Insert Negative Reactivity through Inserting Control Rods or Emergency Boration) | BOP Performs the immediate actions of FR.S-1: | ||
-1: 1. Manually actuate AMSAC | : 1. Manually actuate AMSAC | ||
: 2. Check Turbine Trip | : 2. Check Turbine Trip | ||
: 3. Check AFW pumps running MDAFPs - Both Running TDAFP - did not start in automatic | : 3. Check AFW pumps running | ||
- manually starts the TDAFP | * MDAFPs - Both Running | ||
-1 are completed ATC | * TDAFP - did not start in automatic - manually starts the TDAFP US Ensures immediate actions of FR.S-1 are completed ATC Initiate Emergency Boration of RCS(must Insert Negative Critical Reactivity through Inserting Control Rods or Emergency Task #1 Boration) | ||
- GREATER THAN 44 GPM Check PRZ pressure LESS THAN 2335 PSIG Check Containment Isolation Valves Closed: | * CCPs - at least one running | ||
Continued on Next Page | * Initiate emergency boration o Start both boric acid transfer pumps in FAST speed o Open 1-QMO-410. Emergency boration to CCP suction valve o Check emergency boration flow - GREATER THAN 44 GPM Check PRZ pressure LESS THAN 2335 PSIG Check Containment Isolation Valves Closed: | ||
Continued on Next Page Page 7 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event | ||
03 | |||
== Description:== | == Description:== | ||
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time | Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior Check Containment Isolation valves VCR-101-107, VCR-201-207 Closed Crew Check SI Status - Actuation status light - NOT LIT | ||
-101-107, VCR-201-207 Closed Check SI Status | * As time permits, perform Steps 5 through 13 of E-0 US Check if the following trips have occurred: | ||
- Actuation status light | * Reactor Trip - Reactor Trip Breakers, Bypass breakers, Rod drive MG set output breakers | ||
- NOT LIT | * Turbine Trip Dispatch Operator to Locally Trip Reactor CREW Check if Reactor is Subcritical - Go to step 20 Continue Boration To Maintain Adequate Shutdown Margin During Subsequent Recovery Actions: | ||
-0 | * Determine shutdown margin using 1-OHP-4021-001-012, Determination Of Reactor Shutdown Margin Return To Procedure And Step In Effect E-0 Crew May Transition to FR Z.1 if Containment Pressure is Still High | ||
Reactor Trip | * Asterisk Steps are performed in Z.1 US Transition to OHP-4023-E-0 and direct actions CREW Check Reactor Trip Check Turbine Trip Check Power to AC Busses - At least ONE Energized AC Emergency Busses - ALL Energized Check SI Status - Status Light LIT BOTH CCP Leakoff valve Safety Injection Signal white lights - LIT BOP | ||
- Reactor Trip Breakers, Bypass breakers, Rod drive MG set output breakers Turbine Trip Dispatch Operator to Locally Trip Reactor CREW Check if Reactor is Subcritical | * Check Main Steamline Isolation NOT Required - Verify all SG stop valves and SG SV Dump Valves are closed ATC | ||
- Go to step 20 Continue Boration To Maintain Adequate Shutdown Margin During Subsequent Recovery Actions: | * Check CTS actuated Check containment isolation Phase B is actuated Stop all RCPs Place lower containment vent Unit fans in OFF | ||
Determine shutdown margin using 1 | * 1-HV-CLV-1A and 1-HV-CLV-3A | ||
-OHP-4021-001-012, Determination Of Reactor Shutdown Margin Return To Procedure And Step In Effect | * 1-HV-CLV-2A and 1-HV-CLV-4A | ||
-0 Crew May Transition to FR Z.1 if Containment Pressure is Still High | * 1-HV-CLV-1B and 1-HV-CLV-3B | ||
* Asterisk Steps are performed in Z.1 US Transition to OHP | * 1-HV-CLV-2B and 1-HV-CLV-4B Place control rod drive mech fans in STOP: | ||
-4023-E-0 and direct actions CREW Check Reactor Trip Check Turbine Trip Check Power to AC Busses | * 1-HV-CRD-3A | ||
- At least ONE Energized AC Emergency Busses | * 1-HV-CRD-3B | ||
- ALL Energized Check SI Status | * 1-HV-CRD-4A | ||
- Status Light LIT BOTH CCP Leakoff valve | * 1-HV-CRD-4B Continued on Next Page Page 8 of 11 | ||
- LIT | |||
* Check Main Steamline Isolation NOT Required | |||
- Verify all SG stop valves and SG SV Dump Valves are closed ATC | |||
* Check CTS actuated Check containment isolation Phase B is actuated Stop all RCPs Place lower containment vent Unit fans in OFF 1-HV-CLV-1A and 1-HV-CLV-3A | |||
1-HV-CRD-3A | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event | ||
03 | |||
== Description:== | == Description:== | ||
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time | Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior Implement Attachment A (Page 27) While Continuing With This Procedure Crew | ||
- NONE rising in an uncontrolled manner Check AFW pumps running | * Check If Ruptured SG Is Suspected: SG narrow range levels - NONE rising in an uncontrolled manner | ||
- MDAFPs - both running, TDAFP | * Check AFW pumps running - MDAFPs - both running, TDAFP - running 3 | ||
- running | * Check Total AFW flow - GREATER THAN 240x10 PPH Minimize Unnecessary RCS Cooldown: | ||
- GREATER THAN 240x10 | * Check SG narrow range level Greater than 14% | ||
Check SG narrow range level Greater than 14% | * Control feed flow to maintain SG narrow range level between 14% and 50% | ||
Control feed flow to maintain SG narrow range level between 14% and 50% Check AFW Pump Discharge valves | Check AFW Pump Discharge valves - OPEN or Throttled Check FW Isolation | ||
- OPEN or Throttled Check FW Isolation Main feed pumps | * Main feed pumps - BOTH TRIPPED Feed pump discharge valves - CLOSED | ||
- BOTH TRIPPED Feed pump discharge valves | * Feedwater regulating valves - CLOSED | ||
- CLOSED | * Feedwater isolation valves - CLOSED Check RCS Temperature: | ||
- CLOSED | * No RCPs running - RCS Cold leg temperatures stable at of trending to 547°F RNO: | ||
- CLOSED Check RCS Temperature: | * Stop dumping steam | ||
No RCPs running | * Verify 1-DRV-407 CLOSED | ||
- RCS Cold leg temperatures stable at of trending to 547°F RNO: | * If cooldown continues, then control total feed flow | ||
Trip all SG stop valves closed Verify SG stop valve dump valves are closed Check PRZ PORVs ad Spray Valves CLOSED PORV block valves at least one energized Block valves at least one open Check IF RCPs Should Be Stopped: | * If cooldown continued, then perform the following: | ||
RCS Pressure less than 1300 PSIG | * Trip all SG stop valves closed | ||
Pressure in all SGs | * Verify SG stop valve dump valves are closed Check PRZ PORVs ad Spray Valves CLOSED | ||
* PORV block valves at least one energized | |||
* Block valves at least one open Check IF RCPs Should Be Stopped: | |||
* RCS Pressure less than 1300 PSIG | |||
* ECCS pumps at least one running | |||
* Stop all RCPs Check If SG Secondary Pressure Boundaries are Intact: | |||
Pressure in all SGs: | |||
* NO SG pressure lowering in an uncontrolled manner | |||
* NO SG completely depressurized Go to E-2 Continued on Next Page Page 9 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event | ||
03 | |||
== Description:== | == Description:== | ||
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time | Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior US Announces entry into E-2 Crew Check SG Stop Valves CLOSED Check SG Stop Valve Dump Valves CLOSED Check if any SG secondary pressure boundary is intact | ||
* Pressure in all SGs - Any stable or rising Identify Faulted SG | |||
* Check pressure in all SGs | |||
* Any SG Pressure Lowering in an Uncontrolled Manner or | |||
* Any SG Completely Depressurized Critical Task *Isolate Faulted SG: | |||
#2 Isolate #3 S/G. | |||
* Check feedwater valves for faulted SG CLOSED Complete | |||
* Check AFW valves for faulted SG CLOSED during FRZ-1 or | |||
* Check TDAFP steam supply valve for faulted SG CLOSED E-2. | |||
* Check PORVs for faulted SG CLOSED | |||
* Check blowdown isolation valve for faulted SG CLOSED BOP | |||
* Place 1-DRV-407, SG stop valves drain valve in CLOSED | |||
* Check 1-DRV-407 CLOSED | |||
* Check Steam line warming valves CLOSED Check CST Level Greater Than 15% | |||
Check Secondary Radiation: | |||
* Reset containment isolation Phase A if Necessary | |||
* Direct Chemistry to periodically sample all SGs for activity | |||
* Check SG PORV radiation monitors | |||
* Secondary radiation - NORMAL Check If ECCS Flow Should Be Reduced RCS subcooling based on core exit TCs - Greater than 40F Secondary heat sink: | |||
3 | |||
* Total feed flow to intact SGs - Greater Than 240x10 PPH or | |||
* Narrow range level in at least one intact SG - Greater Than 14% | |||
RCS pressure - Stable or Rising PZR level - Greater than 21% | |||
Go to ES-1.1 Continued on Next Page May Terminate once SG is Isolated Page 10 of 11 | |||
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event | |||
03 | |||
== Description:== | == Description:== | ||
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time | Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior US Transition to OHP-4023-ES-1.1 SI Termination and Direct Actions US Direct operator to Reset SI SI will NOT Reset with trip Breakers Closed Implement SUP-016, Resetting SI in the SSPS Cabinets, while continuing with Step 2. | ||
-4023-ES-1.1 SI Termination and Direct Actions US | CREW Stop CCP Reestablish Air to Containment | ||
CREW | * Verify Spray valves closed | ||
- Rising Isolate BIT | * Check Air Pressure | ||
* Open Containment Air Supply Valves Check RCS Pressure - Rising Isolate BIT Verify QMO-225 & 226 Open Close IMO-255 & IMO-256 Close ICM-250 and ICM-251 Establish Charging Flow Stop SI Pumps Stop RHR Pumps Verify RCS Pressure Stable Maintain RCS Temperature Restore Letdown per Sup 15 TERMINATE SCENARIO Page 11 of 11 | |||
Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___4_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________ | |||
____________________________ _____________________________ | |||
____________________________ _____________________________ | |||
Appendix D Scenario Outline Form ES-D-1 | |||
2014301 | |||
_____________________________ | |||
____________________________ | |||
_____________________________ | |||
____________________________ | |||
_____________________________ | |||
Initial Conditions: 12% power, main generator has just been paralleled. | Initial Conditions: 12% power, main generator has just been paralleled. | ||
Turnover: | Turnover: The unit is at 12% power with the generator has just been paralleled to the grid. | ||
The unit was down powered to fix leak on the weld for FTR | The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. | ||
-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power. | Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%. | ||
Procedure 1 | Event Event Event Malf. No. | ||
-OHP-4021-001-006, Power Escalation is complete up to step 4. | No. Type* Description 1 N Control Feed Flow In Manual 2 R Raise Power U1_MPC253 3 I(ATC) Turbine impulse pressure instrument (MPC-253) fails HIGH to 740 U1_MPP222 4 C(BOP) MPP 222 SG #2 PORV Pressure Channel 1500 U1_FPC_250 5 A to 1 over 2 I(BOP) Main Feedwater discharge pressure (FPC-250A) fails Low min U1_RC10D Small break LOCA in containment (200 gpm with a 5 min 6 10% over 5 Major Min ramp after West CCP Start) | ||
U1_RP10A 7 I(ATC) Auto SI fails U1_RP10B U1_TC02 8 C(BOP) Main turbine fails to trip U1_TC03 U1_RD0435 9 n/a Two rods fail to Drop (H4 & H6) | |||
Event No. | U1_RD0441 U1_ECP 10 Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RX trip | ||
-253) fails HIGH 4 | * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 7 | ||
-250A) fails Low | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 1,2 Event | ||
2014301 | |||
1,2 | |||
== Description:== | == Description:== | ||
Control Feedwater Flow in Manual and Raise Power Time | Control Feedwater Flow in Manual and Raise Power Time Position Applicant's Actions or Behavior US Direct the BOP to SG Levels ~40% to 48% using Manual Control of FRV210-240 and Main FW Pump Speed/DP BOP | ||
- 240 to Maintain SG levels within Designated band Adjust Main FW Pump Speed / DP target to ensure adequate FW Discharge to SG DP Place FW Regulating Valves in Auto if FRVs are open far enough | * Adjust FRV210 - 240 to Maintain SG levels within Designated band | ||
RO | * Adjust Main FW Pump Speed / DP target to ensure adequate FW Discharge to SG DP | ||
US | * Place FW Regulating Valves in Auto if FRVs are open far enough RO Calculates the dilution required per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination. | ||
US | RO Briefs crew on reactivity plan for power escalation. | ||
RO | US Reviews / concurs with reactivity plan. | ||
): | US Directs RO to commence Power Escalation in accordance with OHP-4021-001-006, Power Escalation (at step 4.77) | ||
May close QRV | RO Performs DILUTION (batch add OR Continuous): | ||
-451 if aligning to CCP Suction Only Place RC Makeup Blend control switch in START May take QRV | * Place RC Makeup Blend control switch in STOP | ||
-303 to Manual and Open as required to maintain VCT Level and Pressure. | * Place RC Makeup Blend Control Mode switch in DILUTE or ALT DILUTE | ||
RO | * Adjust PW to the desired flow rate and/or amount. | ||
Raises turbine load (reactor power) using the DCS HMI. | * May close QRV-451 if aligning to CCP Suction Only | ||
Maintains Tavg/Tref deviation within limits by dilution and turbine load adjustments. | * Place RC Makeup Blend control switch in START | ||
Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed. | * May take QRV-303 to Manual and Open as required to maintain VCT Level and Pressure. | ||
RO | RO Commences escalation: | ||
* Raises turbine load (reactor power) using the DCS HMI. | |||
* Maintains Tavg/Tref deviation within limits by dilution and turbine load adjustments. | |||
* Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed. | |||
RO RO verifies appropriate reactivity feedback. | |||
Page 2 of 7 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 3 Event | ||
2014301 | |||
3 | |||
== Description:== | == Description:== | ||
Turbine impulse pressure instrument (MPC | Turbine impulse pressure instrument (MPC-253) fails HIGH Time Position Applicant's Actions or Behavior US Assure plant is stable then direct RO or BOP to review Annunciator Response Procedures. | ||
-253) fails HIGH Time | BOP Respond to ANN Panel 111 Drop 20, Tavg Low Tavg<Tref Deviation Respond to ANN Panel 112 Drop 6, Main Turbine DCS Trouble RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
Respond to ANN Panel 111 Drop 20, Tavg Low Tavg<Tref Deviation Respond to ANN Panel 112 Drop 6, Main Turbine DCS Trouble RO/BOP | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
US | US Identify failed MPC-253 failed HIGH and go to OHP-4022-013-016, Turbine First Stage Impulse Pressure Instrument Malfunction. | ||
-4022-IFR-001, Instrument Failure Response procedure. | BOP Check For Failed Turbine First Stage Impulse Pressure Instrument: | ||
US | |||
-253 failed HIGH and go to OHP | |||
-4022-013-016, Turbine First Stage Impulse Pressure Instrument Malfunction. | |||
BOP | |||
Notify Shift Manager of the instrument failure. | Notify Shift Manager of the instrument failure. | ||
Channel 1, 1 | Channel 1, 1-MPC-253 - Indicating High, Go To RNO | ||
-MPC-253 - Indicating High | * Perform the following: | ||
, Go To RNO Perform the following: | * Place AMSAC Bypass/Test Switch in Bypass/Test 101-AM-2 | ||
Place AMSAC Bypass/Test Switch in Bypass/Test | * If Operating Steam Dumps in Tavg Mode - Place steam dump control selector switches in OFF Verify P-13 Status - PROPER for CURRENT PLANT CONDITIONS | ||
- Place steam dump control selector switches in OFF Verify P-13 Status | * Record Time P-13 Interlock Status verified US Initiates actions to trip bistables for MPC-253 failure per Attachment A of 1-OHP 4022-013-016. | ||
- PROPER for CURRENT PLANT CONDITIONS Record Time P | US Refers to ITS LCO: | ||
-13 Interlock Status verified US | : 1. 3.3.1 Reactor Trip System Instrumentation (Table 3.3.1-1, Function 18e - | ||
-253 failure per Attachment A of 1 | Cond L | ||
-OHP 4022-013-016. US | : 2. 3.3.2 ESFAS Instrumentation (Table 3.3.2-1, Function 4e - Cond D) | ||
: 1. 3.3.1 | : 3. TRM 8.3.6 ATWS Mitigation System Actuation Circuitry (AMSAC) | ||
-1, Function 18e | |||
-1, Function 4e | |||
- Cond D) 3. TRM 8.3.6 ATWS Mitigation System Actuation Circuitry (AMSAC) | |||
(Applicable at > 40% power) | (Applicable at > 40% power) | ||
Page 3 of 7 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 4 Event | ||
2014301 | |||
4 | |||
== Description:== | == Description:== | ||
MPP 222 SG #2 PORV Pressure Channel Time | MPP 222 SG #2 PORV Pressure Channel Time Position Applicant's Actions or Behavior BOP Recognize and reports Annunciator Panel #114, Drop 22, 1-MRV-223 OP OR HSD1 PANEL OVERRIDE alarm that indicates SG #2 PORV (MRV-223) has opened. | ||
2 PORV (MRV- | Panel 114 Drop 14 SG 3 DP may alarm RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
Panel 114 Drop 14 SG 3 DP may alarm RO/BOP | * Place # 2 SG PORV MRV-223 in Manual and Closes. | ||
Place # 2 SG PORV MRV-223 in Manual and Closes. | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
US | * Direct operator actions to determine cause, reclose SG #2 PORV, and monitor Reactor Power. | ||
-4022-IFR-001, Instrument Failure Response procedure. | US Enters and directs actions of 1-OHP-4022-013-012, Steam Generator Pressure Instrument Malfunction procedure. | ||
Direct operator actions to determine cause, reclose SG # | BOP Performs the following actions as directed: | ||
2 PORV, and monitor Reactor Power. | |||
US | |||
-OHP-4022-013-012, Steam Generator Pressure Instrument Malfunction procedure. | |||
BOP | |||
: 1. Checks SG PORVs closed. | : 1. Checks SG PORVs closed. | ||
: 2. Reports MPP | : 2. Reports MPP-222 has failed high. | ||
- | |||
: 3. Returns MFP P controller to auto (if placed in manual). | : 3. Returns MFP P controller to auto (if placed in manual). | ||
US | US Refers to TSs / TRM: | ||
* TS 3.3.2 ESFAS Instrumentation (Table 3.3.2 | * TS 3.3.2 ESFAS Instrumentation (Table 3.3.2-1, Function 1.e (2) | ||
-1, Function 1.e (2) | |||
* Trip bistables in 6 hours Condition D | * Trip bistables in 6 hours Condition D | ||
* TS 3.7.4, SG PORVs (Note: Only Manual Ops Required) | * TS 3.7.4, SG PORVs (Note: Only Manual Ops Required) - N/A | ||
- N/A | * TRM 8.3.8. Radiation Monitoring Instrumentation (Table 8.3.8-1, Function 2.b - Condition C) | ||
* TRM 8.3.8. Radiation Monitoring Instrumentation (Table 8.3.8 | * Declares MRA-1701 inoperable | ||
-1, Function 2.b | * Restore in 7 days US Initiates actions to trip bistables associated with MPP-222 Steam Generator Pressure Instrument Failure per Attachment B-3 of 1-OHP-4022-013-012. | ||
- | Page 4 of 7 | ||
* Declares MRA | |||
- | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 5 Event | ||
* Restore in 7 days US Initiates actions to trip bistables associated with MPP | |||
- | |||
Appendix D Required Operator Actions Form ES-D-2 | |||
2014301 | |||
5 | |||
== Description:== | == Description:== | ||
Main Feedwater discharge pressure (FPC | Main Feedwater discharge pressure (FPC-250A) fails Low (Not used - | ||
-250A) fails Low ( | power level was too low to have feedwater in automatic.) | ||
-16 m2C_ALM2016 FPC | Time Position Applicant's Actions or Behavior BOP Recognizes and reports Ann.115 Drop 42, FPT DCS Trouble caused by FW DCS Screen Alarm Drop C-16 m2C_ALM2016 FPC-250A (B) - | ||
-250A (B) - MFP DISCH HDR PRESS | MFP DISCH HDR PRESS - XMTR DEVIATION and indications of a failure affecting main feedwater to all steam generators (SGs): | ||
- XMTR DEVIATION and indications of a failure affecting main feedwater to all steam generators (SGs): | * Main FW Pump Disch Pressure | ||
Main FW Pump Disch Pressure All SG levels raising All feedwater regulating valves closing Main feedwater pumps speed raising RO/BOP | * All SG levels raising | ||
Verifies/Places both Main FW Pumps to speed control in manual and lowers output (MFW Pump Speed) to restore DP and match feedwater flow with steam flow and restore SG levels to program. | * All feedwater regulating valves closing | ||
US | * Main feedwater pumps speed raising RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
-4022-IFR-001, Instrument Failure Response procedure. | * Verifies/Places both Main FW Pumps to speed control in manual and lowers output (MFW Pump Speed) to restore DP and match feedwater flow with steam flow and restore SG levels to program. | ||
CREW | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
BOP | CREW Identifies that Main Feedwater Pump Discharge Pressure Transmitter FPC-250A has failed low. | ||
BOP Verify the failed channel disabled and restore FWP Delta-P. | |||
Monitors/adjusts MFP differential pressure to restore SG levels to program. | |||
RO Monitors nuclear power during feedwater transient. | |||
Page 5 of 7 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 6,7,8,9,10 Event | ||
2014301 | |||
6 , 7 , 8 , 9 , | |||
== Description:== | == Description:== | ||
Small break LOCA in containment (150 gpm with a 5 min ramp), Auto SI fails, Main Turbine Fails to Trip, Two Rods Fail to Drop, East CCP trips on overcurrent Time | Small break LOCA in containment (150 gpm with a 5 min ramp), Auto SI fails, Main Turbine Fails to Trip, Two Rods Fail to Drop, East CCP trips on overcurrent Time Position Applicant's Actions or Behavior CREW Acknowledges Ann. Panel 122, Drop 83, ICE CONDENSER INLET DOORS OPEN, alarm and/or RMS PPC Alarms on Panel 111 and determines that a loss of reactor coolant is occurring based on the following: | ||
Pressurizer and VCT level change Charging and letdown flow mismatch Containment radiation monitoring trend Containment pressure rise Containment sump level rise | * Pressurizer and VCT level change | ||
-OHP-4022-002-020, EXCESSIVE REACTOR COOLANT LEAKAGE Monitor PRZ Level Maintain PRZ level by adjusting 1 | * Charging and letdown flow mismatch | ||
-QRV-251 and 1-QVR-200 as necessary | * Containment radiation monitoring trend | ||
-0 | * Containment pressure rise | ||
-0 | * Containment sump level rise Direct implementation of 1-OHP-4022-002-020, EXCESSIVE REACTOR COOLANT LEAKAGE US Monitor PRZ Level ATC | ||
-0: | * Maintain PRZ level by adjusting 1-QRV-251 and 1-QVR-200 as necessary | ||
( Announces that 2 rods not fully inserted. | * Reduce or isolate letdown flow as necessary to maintain PZR level | ||
* Close letdown valves | |||
* Start second CCP | |||
Manually trips the main turbine Acutate AMSAC Isolate Main Steam Lines Checks power to AC emergency buses. | * If level cannot be maintained Trip the reactor and go to E-0 US Directs entry into E-0 ATC/BOP Performs the immediate actions of E-0: | ||
Checks safety injection status. US | * Checks reactor trip.( Announces that 2 rods not fully inserted.) | ||
-0 are complete Directs subsequent actions of E | Critical | ||
-0 Appendix D Required Operator Actions Form ES-D-2 | * Checks turbine trip. - (Auto Failed) | ||
04 | Task | ||
* Manually trips the main turbine | |||
* Acutate AMSAC | |||
* Isolate Main Steam Lines | |||
* Checks power to AC emergency buses. | |||
* Checks safety injection status. | |||
* US Ensures immediate actions of E-0 are complete Directs subsequent actions of E-0 Page 6 of 7 | |||
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 04 Event No.: 6,7,8,9,10 Event | |||
== Description:== | == Description:== | ||
Small break LOCA in containment (150 gpm with a 5 min ramp), Auto SI fails, Main Turbine Fails to Trip, Two Rods Fail to Drop, East CCP trips on overcurrent 3 minutes after the trip Time | Small break LOCA in containment (150 gpm with a 5 min ramp), Auto SI fails, Main Turbine Fails to Trip, Two Rods Fail to Drop, East CCP trips on overcurrent 3 minutes after the trip Time Position Applicant's Actions or Behavior Announces that 2 rods not fully inserted. | ||
Manually trips the reactor | ATC Manually trips the reactor Announces East CCP trip ATC Place East CCP Lockout - May reset and attempt one restart Start West CCP Crew Critical Manually Actuates Safety Injection Task Crew Completes all actions of E-0 through step 19 (Check If RCS Is Intact). | ||
- May reset and attempt one restart Start West CCP Crew Critical | Manually Perform Generator Trip in Attachment A US Announces transition to E-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E-0). | ||
-0 through step 19 (Check If RCS Is Intact). | Reviews E-1 Foldout Page Criteria. | ||
Manually Perform Generator Trip in Attachment A US | Crew Check if RCPs should be stopped Check If SG Secondary Pressure Boundaries Are Intact: | ||
-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E | Check Intact SG Levels Check Secondary Radiation Check PRZ PORVs and Block Valves US Checks if SI Termination Criteria is MET: | ||
-0). | RCS Subcooling >40°F. | ||
Check if RCPs should be stopped Check If SG Secondary Pressure Boundaries Are Intact: | Secondary Heat Sink (AFW Flow >240x103 or SG >14% [28% | ||
Check Intact SG Levels Check Secondary Radiation Check PRZ PORVs and Block Valves US Checks if SI Termination Criteria is MET: | |||
RCS Subcooling >40 F. Secondary Heat Sink (AFW Flow >240x103 or SG >14% [28% | |||
ADVERSE]). | ADVERSE]). | ||
RCS Pressure rising or stable. | RCS Pressure rising or stable. | ||
Pressurizer Level >21% | Pressurizer Level >21% [25%ADVERSE]. | ||
[25%ADVERSE]. | NOTE: May transition to ES-1.1 SI Termination based on the Small Leak Size CREW Check if Containment Spray Should be Stopped - | ||
NOTE: May transition to ES | Check If RHR Pumps Should Be Stopped - | ||
-1.1 SI Termination based on the Small Leak Size CREW | Check RCS And SG Pressures: | ||
Check If DGs Should Be Stopped: - Stop & Place In Standby May Terminate once transition decision is made. | |||
Page 7 of 7 | |||
Check If DGs Should Be Stopped: | |||
Appendix D Scenario Outline Form ES-D-1 | Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___5_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________ | ||
____________________________ _____________________________ | |||
2014301 | ____________________________ _____________________________ | ||
_____________________________ | Initial Conditions: IC 783 79% power, Power ready to begin. | ||
____________________________ | Turnover: Unit is stable at 79% power. Perform a power reduction to take the unit off line. | ||
_____________________________ | Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - Swapping with the Middle CB which was just started. | ||
____________________________ | Event Event Event Malf. No. | ||
_____________________________ | No. Type* Description 1 N Remove North Condensate Booster from service U1_QLC451 I(ATC) 2 VCT level instrument (QLC-451) fails low To 0% TS 3 R Power reduction U1_MFC140 I(BOP) 4 Steam flow channel (MFC-140) fails low (Controlling) to 0 TS U1_RCR20 Pressurizer PORV (NRC-153) Leaking (requires isolation) 5 C(ATC) to 5 - 5% open NOTE: Use Time Compression U1_RC23D Reactor Trip with S/G #4 tube rupture (600 gpm (60%) | ||
Initial Conditions: IC 783 79% power, Power ready to begin | 6 to 30 over 10 Major ramp to 30% over 10 minutes - raise to 60% on trip) min U1_MS06D 7 C(BOP) Steam generator safety valve (SV3-4) opens - 80% | ||
to 80% | |||
% power. Perform a power reduction to take the unit off line. Currently performing Step 4.11.1 of 02 | * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 10 | ||
-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service | |||
- Swapping with the Middle CB which was just started. Event No. | |||
-451) fails low 3 | |||
-140) fails low (Controlling) | |||
-153) Leaking (requires isolation) | |||
- 5% open NOTE: Use Time Compression | |||
- raise to 60% on trip | |||
) 7 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 1 Event | ||
2014301 | |||
05 | |||
1 | |||
== Description:== | == Description:== | ||
Shutdown the North Condensate Booster Pump Time | Shutdown the North Condensate Booster Pump Time Position Applicant's Actions or Behavior US Directs actions of 1-OHP-4021-054-001, Attachment 2, Operation of Hotwell (HW) and Condensate Booster (CB) Pumps to stop the North CB pump. | ||
-OHP-4021-054-001, Attachment 2, Operation of Hotwell (HW) and Condensate Booster (CB) Pumps to stop the North CB pump | BOP Performs the following to shutdown the CB pump as directed: | ||
: 1. Verifies the following switches in NEUTRAL: | : 1. Verifies the following switches in NEUTRAL: | ||
Standby Hotwell pump Standby TACW pump | * Standby Hotwell pump | ||
: 2. Stops the North CB pump | * Standby TACW pump | ||
US | : 2. Stops the North CB pump NOTE: Ann. 116, Drop 73, CNDST BOOSTER PUMP DISCH PRESSURE LOW may annunciate during this evolution. | ||
Stop the North CB pump | US Directs the following actions to realign condensate system: | ||
* Stop the North CB pump | |||
* Notify chemistry of condensate system configuration change. | |||
Page 2 of 10 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 2 Event | ||
2014301 | |||
2 | |||
== Description:== | == Description:== | ||
VCT level instrument (QLC | VCT level instrument (QLC-451) fails low Time Position Applicant's Actions or Behavior Crew Acknowledge ANNUNCIATOR #109 RESPONSE: BORIC ACID, Drop 49 alarm, VOLUME CONTROL TANK LEVEL LOW RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
-451) fails low Time | * Check VCT Level Channels - BOTH LESS THAN 78%, | ||
Check VCT Level Channels | * Check Auto VCT Makeup - NOT IN PROGRESS | ||
- BOTH LESS THAN 78%, | * Place Reactor Coolant Makeup Blend Control to STOP/NEUTRAL: | ||
- NOT IN PROGRESS Place Reactor Coolant Makeup Blend Control to STOP/NEUTRAL: | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
US | US Directs entry into 1-OHP-4022-013-017 ATC Check 1-QLC-451, VCT level channel failed - Full scale Low | ||
-4022-IFR-001, Instrument Failure Response procedure. | * 1-QLC-451 NOT trending with VCT pressure | ||
US | * 1-QLC-452 reading expected VCT level Initiate makeup per 1-OHP-4021-005-002, Operation of the Unit 1 Boric Acid Blender. If needed Verify pressurizer level control functioning properly. | ||
-OHP-4022-013-017 | Operate Boric Acid Blender In Manual As Required To Maintain VCT Level Greater Than 15% on 1-QLC-452 US Refers to the Technical Requirements Manual (TRM): | ||
- Full scale Low 1-QLC-451 NOT trending with VCT pressure 1-QLC-452 reading expected VCT level Initiate makeup per 1 | * TRM 8.1.1 Boration System - Operating Condition A.1 - Restore to operable within 72 Hours (RWST to CVCS auto swapover) | ||
-OHP-4021-005-002, Operation of the Unit 1 Boric Acid Blender. If needed Verify pressurizer level control functioning properly. | Page 3 of 10 | ||
Operate Boric Acid Blender In Manual As Required To Maintain VCT Level Greater Than 15% on 1 | |||
-QLC-452 | |||
TRM 8.1.1 Boration System | |||
- Operating Condition A.1 | |||
- Restore to operable within 72 Hours (RWST to CVCS auto swapover) | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 3 Event | ||
2014301 | |||
3 | |||
== Description:== | == Description:== | ||
Power reduction Time | Power reduction Time Position Applicant's Actions or Behavior RO Calculates boric acid addition per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination. | ||
-4021-005-002, Attachment 9, Boration or Dilution Volume Determination. | RO Briefs crew on reactivity plan for power reduction. | ||
RO | US Reviews / concurs with reactivity plan. | ||
US | US Directs RO to commence Power Reduction in accordance with OHP-4021-001-003. | ||
US | RO Energize Pressurizer Backup Heaters RO Performs BORATION: | ||
Place RC Makeup Blend Control Switch in STOP. | Place RC Makeup Blend Control Switch in STOP. | ||
Place RC Makeup Blend Control Mode Selector Switch in BORATE. Set desired batch on BA Flow Totalizer. | Place RC Makeup Blend Control Mode Selector Switch in BORATE. | ||
Adjust BA Flow Ctrl (RU | Set desired batch on BA Flow Totalizer. | ||
-33) to desired flow. | Adjust BA Flow Ctrl (RU-33) to desired flow. | ||
Place RC Makeup Blend Control Switch in START. | Place RC Makeup Blend Control Switch in START. | ||
RO | RO Commences power reduction: | ||
* Lowers turbine load (reactor power) using HMI. | * Lowers turbine load (reactor power) using HMI. | ||
* Maintains Tavg/Tref deviation within limits by boration and turbine load adjustments. | * Maintains Tavg/Tref deviation within limits by boration and turbine load adjustments. | ||
* Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed. | * Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed. | ||
BOP/RO | BOP/RO BOP acts as peer checker for RO during blender operations and RO verifies appropriate reactivity feedback. | ||
BOP | BOP Monitors main electrical generator temperatures. | ||
Page 4 of 10 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 4 Event | ||
4 | |||
== Description:== | == Description:== | ||
SG#4 Steam flow channel 1 (MFC | SG#4 Steam flow channel 1 (MFC-140) fails low (Controlling) | ||
-140) fails low (Controlling) | Time Position Applicant's Actions or Behavior BOP Recognizes and reports annunciators on Panel #114 (Drops 42, 43, and 33) which are indicative of a steam flow instrument failure. | ||
Time | BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response: | ||
BOP | Determine SG 4 level is lowering and that its Feedwater Regulating Valve (FRV-240) is not responding as expected. | ||
Determine SG 4 level is lowering and that its Feedwater Regulating Valve (FRV- | * Notify US and takes manual control of FRV-240. | ||
Notify US and takes manual control of FRV | * Determine failure affects MFPs, and take P controller to MANUAL. | ||
- | * Stabilize SG 4 level in manual. | ||
US | US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure. | ||
-4022-IFR-001, Instrument Failure Response procedure. | US Enters and directs actions of 1-OHP-4022-013-014, Steam Flow Instrument Malfunction procedure. | ||
US | BOP Performs the following actions as directed: | ||
-OHP-4022-013-014, Steam Flow Instrument Malfunction procedure. | : 1. Restores SG 4 level using MANUAL control of FRV-240. | ||
BOP | : 2. Places MFP P controller in MANUAL and maintains pressure. | ||
: 1. Restores SG 4 level using MANUAL control of FRV | : 3. Reports MFC-140 has failed low. | ||
-240. 2. Places MFP P controller in MANUAL and maintains pressure. | : 4. Places 1-FS-542C selector switch in channel 2 position. | ||
: 3. Reports MFC | : 5. Nulls and returns FRV-240 controller to AUTO. | ||
-140 has failed low. 4. Places 1-FS-542C selector switch in channel 2 position. | |||
: 5. Nulls and returns FRV | |||
-240 controller to AUTO. | |||
: 6. Returns MFP P controller to AUTO. | : 6. Returns MFP P controller to AUTO. | ||
US | US Refers to the following Tech Specs (TS): | ||
-1) | TS 3.3.1 RTS Instrumentation (Table 3.3.1-1) | ||
- Refer to Table Function 15 Condition D | Condition A - Refer to Table Function 15 Condition D - Trip Bistables in 6 Hours TS 3.3.2 ESFAS Instrumentation (Table 3.3.2-1) | ||
Condition A - Refer to Table Function 4e Condition D - Trip Bistables in 6 Hours US Initiates actions to trip bistables associated with MFC-140 failure per Attachment D-1 of 1-OHP-4022-013-014. | |||
-1) | Page 5 of 10 | ||
- Refer to Table Function 4e Condition D | |||
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 5 Event | |||
-1 of 1-OHP-4022-013-014. | |||
Appendix D Required Operator Actions Form ES-D-2 | |||
05 | |||
5 | |||
== Description:== | == Description:== | ||
PRZ PORV (NRV-153) Leak by (5 gpm) | |||
Time Position Applicants Actions or Behavior RO Recognizes Annunciators on Panel 108, Drop 24, PRZ PORV Disch Temp Hi, and Drop 31, PRZ PRT Press Hi/Lo, which are indicative of PORV leakage. | |||
Note: Procedure OHP-4022-002-009 is written to identify the leaking valve and isolate it. The crew may determine that the Acoustic Monitor provides indication as to which valve is leaking and so may directly isolate the applicable PORV. | |||
Time compression may be used as the procedure requires a 15 minute wait time after unisolating each PORV (Block Valve). If required, provide the crew that indications remain the same for PORV NRV-151 (NMO-151) & NRV-152 (NMO-152). | |||
US Enters and directs operator actions per OHP-4022-002-009, Leaking PORV. | |||
RO Performs actions as directed by US: | |||
* Closes PORV Block Valves as directed. | |||
* Reopens Block Valves and Monitors PRT/Temperatures to determine which PORV is leaking. | |||
* Monitors PORV Discharge Temperatures. | |||
* Monitors PRT. | |||
* Place PORV in Close when identified as leaking PORV. | |||
Note: The crew may elect to implement OHP-4022-002-020, Excessive Reactor Coolant Leakage. | |||
The Crew may perform actions of OHP-4021-002-006, PRT Operations, to restore the PRT conditions if required. | |||
US May Direct operator action per OHP-4022-002-020, RCS Leakage: | |||
* Check PRZ Level and adjust Charging as required. | |||
* Check VCT Level | |||
* Determine RCS Leakrate | |||
* Check PRZ PORV and Safety Valve Leakage US Refers to Tech Specs (TS): | |||
* TS 3.4.11 Pressurizer Power Operated Relief Valves (PORVs). Condition A - Closes Block Valve 1-NMO-153 within 1 hour with power maintained to block valve. | |||
May Refer to TS : | |||
* TS 3.4.12 Low Temperature Overpressure Protection (LTOP) System - | |||
Mode 4 & 5 applicability | |||
* TS 3.4.13, RCS Operational LEAKAGE, if leak is not isolated. | |||
RO Monitors PRZ pressure control system and ensures pressure remains at normal conditions (~2085 psig). | |||
Page 6 of 10 | |||
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event | |||
Appendix D Required Operator Actions Form ES-D-2 | |||
2014301 | |||
6,7 | |||
== Description:== | == Description:== | ||
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve ( | Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80% | ||
Recognizes and reports excessive charging flow demand as indicated by: | Time Position Applicant's Actions or Behavior RO/BOP Perform the following: | ||
o Lowering Pressurizer level o Lowering Pressurizer pressure o PRZ level deviation | * Recognizes and reports excessive charging flow demand as indicated by: | ||
US | o Lowering Pressurizer level o Lowering Pressurizer pressure o PRZ level deviation alarm | ||
-4022-002-021 SG Tube Leakage (or OHP | * Recognize SG leakage based on RMS alarm on 1805 (GS Cond) and/or 1905 (SJAE) monitor. | ||
-4022-002-020, Excessive RCS Leakage): | US May enter and direct operator actions per OHP-4022-002-021 SG Tube Leakage (or OHP-4022-002-020, Excessive RCS Leakage): | ||
Raise charging flow and isolate letdown Start the second CCP Maintain VCT level RO | * Raise charging flow and isolate letdown | ||
-OR- unable to maintain Pressurizer level/VCT level US | * Start the second CCP | ||
-0, Reactor Trip or Safety Injection (based on RCS leak rate beyond charging system capability, may also initiate SI). | * Maintain VCT level RO Recognizes and reports RCS leak rate greater than the capacity of charging pump -OR- unable to maintain Pressurizer level/VCT level US Directs RO/BOP to manually trip the reactor and perform the immediate actions of E-0, Reactor Trip or Safety Injection (based on RCS leak rate beyond charging system capability, may also initiate SI). | ||
CREW | CREW Performs the immediate actions of E-0: | ||
-0: | * Checks reactor trip. | ||
Checks turbine trip. | * Checks turbine trip. | ||
Checks power to AC emergency buses. Checks safety injection status. Status light LIT Continued on Next Page | * Checks power to AC emergency buses. | ||
* Checks safety injection status. Status light LIT | |||
* Continued on Next Page Page 7 of 10 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event | ||
2014301 | |||
6,7 | |||
== Description:== | == Description:== | ||
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve ( | Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80% | ||
- Recognize SG14 is Ruptured Close AFW Valves 1 | Time Position Applicant's Actions or Behavior BOP | ||
-FMO-241 and 242 (When >14%) | * Review Foldout Page Criteria | ||
Check AFW Pumps Running Check Total AFW flow | * Check Main Steamline Isolation NOT Required | ||
- Greater than | * Check CTS NOT Required | ||
* Implement Attachment A (Page 27) While Continuing With This Procedure | |||
-2 first or May transition to E | * Check If Ruptured SG is Suspected - Recognize SG14 is Ruptured Critical | ||
-3 First and then Return to E | * Close AFW Valves 1-FMO-241 and 242 (When >14%) | ||
-2 | Step Isolate | ||
-2 | * Check AFW Pumps Running SG AFW | ||
- Greater Than 15% | * Check Total AFW flow - Greater than 240x103 PPH Flow | ||
Check Secondary Radiation NOT Normal GO TO E-3, Steam Generator Tube Rupture, Step 1 Continued on Next Page | * Minimize Unnecessary RCS Cooldown | ||
* Check AFW Pump Discharge Valves - Open or Throttled | |||
* Check FW Isolation | |||
* Check RCS Temperature | |||
* Check PRZ PORVs and Spray valves | |||
* Check if RCPs Should be stopped | |||
* Check if SG Secondary Pressure Boundaries are Intact - | |||
* Recognize that the SG Safety Valve is OPEN Go To E-2, Faulted Steam Generator Isolation NOTE : Crew May transition to E-2 first or May transition to E-3 First and then Return to E-2 US Direct entry into E-2 Crew | |||
* Check SG Stop Valves Closed | |||
* Check SG Stop Valve Dump Valves Closed Critical | |||
* Check If any SG Secondary Boundary is Intact Step Isolate | |||
* Identify Faulted SG SG #4 | |||
* Isolate Faulted SG Steam Line | |||
* Check CST Level - Greater Than 15% | |||
from other | |||
* Check Secondary Radiation NOT Normal SGs | |||
* GO TO E-3, Steam Generator Tube Rupture, Step 1 | |||
* Continued on Next Page Page 8 of 10 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event | ||
2014301 | |||
6,7 | |||
== Description:== | == Description:== | ||
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve ( | Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80% | ||
-3 | Time Position Applicant's Actions or Behavior US Direct enter into E-3 Crew | ||
-Isolated From at Least One Intact SG Check Ruptured SG Pressure | * Check If RCPs Should be Stopped | ||
- Greater Than 450 PSIG o If <450 | * Identify Ruptured SG | ||
-3.1, SGTR With Loss of Reactor Coolant | * Isolate Flow From Ruptured SG | ||
- Subcooled Recovery Desired, Step 1 BOP/ATC | * Check Ruptured SG Level | ||
-Lo Perm P12 status light | * Check Ruptured SG -Isolated From at Least One Intact SG | ||
- LIT | * Check Ruptured SG Pressure - Greater Than 450 PSIG o If <450 PSIG - Enter RNO GO TO ECA-3.1, SGTR With Loss of Reactor Coolant - Subcooled Recovery Desired, Step 1 BOP/ATC | ||
o Block steam line break SI o Bypass steam dump low | * Initiate RCS Cooldown | ||
-low Tavg interlock BOP/ATC | * Determine the required core exit temperature | ||
Core exit TCs | * Check RCP running | ||
- less than required temperature Stop RCS cooldown Maintain core exit TCs | * Check condenser available | ||
- less than | * Transfer condenser steam dumps to steam pressure mode | ||
- stable or rising | * Dump steam to condenser at maximum rate | ||
* Check Tavg Lo-Lo Perm P12 status light - LIT | |||
* Perform the following: | |||
o Block steam line break SI o Bypass steam dump low-low Tavg interlock BOP/ATC | |||
* Check SG levels | |||
* Check PZR Porvs | |||
* Reset SI and Phase A | |||
* Restore IA to Containment | |||
* Stop RHR pumps BOP/ATC Check if RCS cooldown should be stopped: | |||
* Core exit TCs - less than required temperature | |||
* Stop RCS cooldown | |||
* Maintain core exit TCs - less than required temperature US Check Ruptured SG pressure - stable or rising Page 9 of 10 | |||
Appendix D Required Operator Actions Form ES-D-2 | Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event | ||
2014301 | |||
6,7 | |||
== Description:== | == Description:== | ||
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve ( | Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80% | ||
-3.1 Check RCS subcooling based on core exit TCs | Time Position Applicant's Actions or Behavior | ||
- greater than | * NO - Check > 250 PSID or ECA-3.1 Check RCS subcooling based on core exit TCs - greater than 60oF | ||
-3.1 | * NO - Check > 60 or ECA-3.1 US Directs entry into ECA-3.1 SGTR With Loss of Reactor Coolant - | ||
-3.1 SGTR With Loss of Reactor Coolant | Subcooled Recovery Desired, Step 1 Crew | ||
* Reset SI | |||
- Energized By Offsite Power Check Intact SG Levels Terminate Event at Evaluators Discretion After Entry to ECA | * Reset Containment Isolation | ||
-3.1}} | * Establish Control Air to Containment | ||
* Trip All PZR Heaters | |||
* Check If Containment Spray Should be Stopped | |||
* Check Ruptured SG Level | |||
* Check If RHR Pumps Should be Stopped | |||
* Initiate Evaluation of Plant Status | |||
* Check If SG Secondary Pressure Boundaries are Intact | |||
* Check all faulted SG isolated | |||
* Check All AC Buses - Energized By Offsite Power | |||
* Check Intact SG Levels Terminate Event at Evaluators Discretion After Entry to ECA-3.1 Page 10 of 10}} |
Revision as of 00:51, 4 November 2019
ML14274A109 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 08/01/2014 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | Indiana Michigan Power Co |
References | |
Download: ML14274A109 (39) | |
Text
Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____1____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________
____________________________ _____________________________
____________________________ _____________________________
Initial Conditions: IC 778 - 100% power, Turnover Both units are at 100% power.
Even Malf. No. Event Event t No. Type* Description C(ATC) 1 U1_RCR16 Pressurizer Safety Valve Leak (SV45B 2gpm)
TS 2 R Power Reduction 3 N Turbine Power Reduction U1_ECP C(BOP) 4 East CCP fails on overcurrent Stator Short TS Feedwater flow controller fails 5 U1_RX33B I(BOP)
U1_QTC302 6 175 over 5 I(ATC) Charging Letdown Header Temperature QTC-302 fails high Minutes U1_RC01A 7 Major Large break LOCA 60%
U1_ED05E 8 C(BOP) Vital bus T11A Fails (On RX Trip)
(Trg 1)
U1_RP10A 9 U1_RP11A C(ATC) Auto/Manual SI Train A does not occur U1_RP11C
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 1 Event
Description:
Safety Valve Leakage SV45-B (2 gpm)
Time Position Applicant's Actions or Behavior CREW Identify RCS Leakage US Direct entry into 1-OHP-4022-002-020, EXCESSIVE REACTOR COOLANT LEAKAGE ATC Performs the following actions, if directed:
- 1. Manually raises charging flow to maintain pressurizer level.
- 2. Manually adjusts seal injection flow (6-12 gpm / each RCP).
- 3. Reduces/isolates letdown flow to maintain pressurizer level.
- 4. Attempts to determine RCS leak rate.
BOP/ATC Monitor Containment Pressure Determine RCS Leak Rate (~2gpm)
Check no leak into CCW Check for Primary to Secondary leak Crew Identify Source of Primary Leak and attempt to isolate source Identify that leak is from Safety to PRT and cannot be isolated Crew
- 1. Check PRZ PORV and Safety valves for Leakage
- 2. Check PRT Conditions
- 3. Check Safety Valve Tailpipe Temperatures Crew May elect to Use 1-OHP-4021-002-006 PRT Operations Attachment 4, Feed and Bleed of PRT to Reduce Pressure Or Temperature, to reduce PRT pressure US Check TS 3.4.13 RCS Operational leakage Check TS 3.4.10 PRZ Safety Valve US Notify Station Management NOTE: Shift Manager Directs the Unit to Be Shutdown using 1-OHP 4022-001-006 Rapid Power Reduction at 1% per minute Page 2 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 2 Event
Description:
Power Reduction Time Position Applicant's Actions or Behavior US Directs RO to commence Rapid Power Reduction in accordance with 1-OHP 4022-001-006.
RO Performs (Att. D) NORMAL BORATION:
- Verify charging is > 75 gpm
- Place RC Makeup Blend control switch in STOP.
- Place RC Makeup Blend Control Mode switch in BORATE.
- Adjust BA Controller/Totalizer to the desired flow rate and amount.
- Place RC Makeup Blend control switch in START.
- May take QRV-303 to MANUAL/OPEN (as required) to maintain VCT level and pressure.
1-OHP 4022-001-006 Attachment D Table RO Commences power reduction:
- Verify all PRZ backup heaters ON.
- Ensures control rods in AUTO.
BOP Acts as peer checker for RO and verifies appropriate reactivity feedback.
RO Energize Pressurizer Backup Heaters Page 3 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 3 Event
Description:
Turbine Load Reduction Time Position Applicant's Actions or Behavior US Directs BOP to setup Turbine HMI for Load Reduction using attachment F BOP Commences Turbine Power reduction:
- Places Main Turbine in MW IN
- Enters MW Load Target Into HMI
- Enters Ramp Rate into HMI (11.5 MW/MIN)
- Depress GO to lower turbine load (reactor power) using HMI.
BOP May Initiate actions to remove MSR from Service per Attachment A BOP Monitors main electrical generator temperatures.
Page 4 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 4 Event
Description:
East CCP fails on overcurrent Time Position Applicant's Actions or Behavior ATC Recognizes and reports multiple annunciators on Panel #107, #108 and #109 which are indicative of a loss of charging capability.
- Loss of charging flow
- Loss of letdown flow
- Loss of RCP seal injection flow Crew Identify Annunciator 109 Drop 11, EAST CCP MOTOR INSTANT TRIP in alarm US Directs RO to start the W CCP per annunciator response procedure(s):
- 1-OHP 4024-108 Drop 20, Charging Flow < Min Set Point
Check Status of Letdown Start 1-PP-50W-ALOP, West CCP Auxiliary Lube Oil Pump Verify the West CCP has a suction source available AND aligned Performs the following as directed:
- Starts W CCP
- Adjusts QRV-200 and QRV-251 flow to maintain RCP seal injection flow and pressurizer level.
- Places normal letdown back in service in accordance with 1-OHP-4021-003-001, Attachment 13.
(Continued on next page)
Page 5 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 4 Event
Description:
East CCP fails on overcurrent Time Position Applicant's Actions or Behavior ATC Restores normal letdown per 1-OHP-4021-003-001 Attachment 13 as:
- 1. Places QRV-302 in divert position.
- 2. Verifies orifice isolations closed (QRV-160, 161 and 162).
- 3. Adjusts CRV-470 controller to 50%.
- 4. Verifies open letdown isolation valves:
- QCR-300
- QCR-301
- QRV-111
- QRV-112
- 5. Adjusts QRV-301controller to 50%.
- 6. Checks/adjusts charging flow to > 75 gpm.
- 7. Opens QRV-161 or 162.
- 8. Adjusts QRV-301 to maintain 160 - 350 psig.
- 9. Places QRV-301 in AUTO.
- 10. Nulls and returns CRV-470 controller to AUTO.
- 11. Adjusts charging flow as required to maintain PRZ level.
- 12. Places PRZ level control in automatic (if desired).
- 13. Places QRV-302 in normal (demineralizer) position when letdown temperature is stable.
US Refer to Technical Specifications and Technical Requirements Manual.
- a. 3.5.2, ECCS-Operating Refer to Technical Requirements Manual:
- a. 8.1.1, Boration System-Operating MAY refer to TS 3.2.3 AFD if rods continue to insert due to Turbine Load Reduction.
Page 6 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 5 Event
Description:
Feedwater Flow Controller Fails Low Time Position Applicant's Actions or Behavior Crew Recognize ANNUNCIATOR #115 Drop 53 Feedwater Controller Trouble Alarm BOP Reports malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Restores SG level to Program US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Direct crew response to alarm using 1-OHP-4024-115 BOP Recognize 1-RU-10, Level Control 1-FRV-220 as failed LOW
- Note that RU-10 (1-XL-192, Steam Generator OME-3-2) Level Control System Signal Controller (flow control) has failed
- Note S/G level controller defaults to Manual
- At the panel: Determine affected controller by observing controller faceplate alarm light and/or audible alarm.
- Press the Alarm Scroll key to silence the audible alarm (upper right hand corner of controller)
- Monitor Steam Generator levels and adjust as necessary.
- Contact MTI to confirm failure mode and replace/repair controller.
Page 7 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 6 Event
Description:
CVCS Letdown Temperature Controller (QTC-302) output fails HIGH.
Time Position Applicant's Actions or Behavior RO Recognize and reports annunciator Panel 109 alarms which indicates a malfunction of CCW cooling to the letdown heat exchanger:
- Drop 8, Letdown HX Outlet Temp High RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Places CRV-470, Letdown Temperature Control valve, controller to MANUAL.
- Opens CRV-470 and attempts restore letdown temperature to normal.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
- Verifies letdown flow diverted to RC Filter
- May identifiy that QTC-302 has failed high Since Indicated letdown temperature continues to climb, the crew may :
- Isolate normal letdown
- Minimize charging flow
- Establish excess letdown US Initiates action to have MTI investigate problem with letdown temperature controller/indicator.
NOTE:
QRV-302 Letdown Demineralizer Divert Valve will reposition based on QTS-301. Diverts past Demins at 143°F. This is a separate switch from the Controller & Instrument that has failed (QTC-302).
Crew May Elect to Trip RX (Due to loss of Normal Reactivity addition, loss of Letdown and requirement to shutdown.)
Page 8 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 7,8,9 Event
Description:
Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time Position Applicant's Actions or Behavior RO/US Acknowledge Ann. 122, Drop 83 ICE CONDENSER DOORS OPEN.
Determines that a loss of reactor coolant is occurring based on the following:
- Pressurizer Pressure and level change.
- Containment radiation monitoring trend.
- Containment pressure rise.
- Containment sump level rise.
US Directs RO/BOP to verify/trip the reactor and perform the immediate actions of E-0, Reactor Trip or Safety Injection.
RO/BOP Performs the immediate actions of E-0:
- Checks reactor trip.
- Checks turbine trip.
- Checks power to AC emergency buses. Notes : Vital Bus T11A De-energized
- Checks safety injection status.
US Ensures immediate actions of E-0 are completed US Directs subsequent actions of E-0.
RO/BOP Reviews E-0 Foldout Page Criteria.
CREW Determines that Containment Pressure requires Steamline Isolation, Phase B Isolation, and CTS Actuation.
- Verifies Steamlines Isolated.
- Verifies CTS Actuation.
- Aligns Lower Cont. Vent Fans.
CREW Manually stops all Reactor Coolant Pumps (RCPs) due to Phase B Isolation and/or RCS pressure lowering below 1300 psig.
BOP Manually controls AFW flow to maintain SG narrow range levels 14% - 50%
once one SG narrow range level is > 14%.
Page 9 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 7,8,9 Event
Description:
Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time Position Applicant's Actions or Behavior RO Reports that the E CCP is not running due to a previous failure RO/BOP Performs manual actions of E-0 Attachment A Crew Manually Aligns Safety Injection - Train A.
Critical Task -AND-
- 1 Manually align valves to establish at least one train of isolation CREW Completes all actions of E-0 through step 19 (Check If RCS Is Intact).
US Announces transition to E-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E-0).
Note: The Crew may transition to OHP-4023-ES-1.3, Transfer to COLD Leg Recirculation if the RWST is low enough prior to the E-1 transition point (See Page 11 For actions).
Note: The Crew may momentarily enter OHP-4023-FR-P.1, Response To Imminent Pressurized Thermal Shock Condition, on a Red Path, then exit once RHR flow is verified.
RO/BOP Reviews E-1 Foldout Page Criteria.
US Directs actions of E-1, Loss Of Reactor Or Secondary Coolant.
BOP Maintains SG narrow range levels 20% - 50%.
CREW Performs the following:
Resets Containment Isolation Phase A.
Notifies Chemistry to sample SGs for activity.
US Checks if SI Termination Criteria is MET:
RCS Subcooling >40°F.
3 Secondary Heat Sink (AFW Flow >240x10 or SG >14% [28%
ADVERSE]).
RCS Pressure rising or stable.
Pressurizer Level >21% [25%ADVERSE].
US Check for CTS termination Criteria RCS pressure is <300 psig - Wait for 24 Hours Page 10 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 01 Event No.: 7,8,9 Event
Description:
Large break LOCA Vital bus T11A Fails Auto SI Train A does not occur Time Position Applicant's Actions or Behavior RO/BOP Performs the following as directed:
- 1. Resets both trains of Safety Injection.
- 2. Stops running Emergency Diesel Generators (EDG).
- 3. Dispatches operator to secure EDG jacket water pumps.
Applicants actions or behavior associated with ES-1.3, Transfer To Cold Leg Recirculation.
US Announces transition to ES-1.3, Transfer To Cold Leg Recirculation when RWST level < 30% per:
- E-0, Foldout Page, Criteria 3
- E-1, Foldout Page, Criteria 5
- E-1, Step 13 US Directs actions of ES-1.3, Transfer To Cold Leg Recirculation.
RO/BOP Resets both trains of Safety Injection.
RO/BOP Establishes CCW return flow on each RHR HX at 3000-3500 gpm.
(may only perform for the East CCW HX)
RO/BOP Checks the following prior to switching over to cold leg recirc:
- RWST level < 20%
- Cntmt water level > MIN RECIRC LEVEL US/RO Directs/Performs switchover as follows:
Critical Task NOTE: If RWST level < 9% then stop CCPs and SI pumps.
- 2
- Stops and locks out East CTS pump
- Stops and locks out East RHR pump
- Initiates valve closure:
- IMO-310, East RHR pump suction
- Stops and locks out West CTS pump
- Stops and locks out West RHR pump
- Initiates valve closure:
- IMO-320, West RHR pump suction
- Restore control power to ICM-305, recirc sump to East RHR/CTS pumps
- Check 1-ICM-305 open
- IMO-215 - Full Closed
- IMO-310 - Full Closed
- Open ICM-305 and check full open
Terminate Scenario when RHR/CTS pump is restarted.
Page 11 of 11
Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ____3____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________
____________________________ _____________________________
____________________________ _____________________________
Initial Conditions: IC 779 92% EDG CD has been run following mechanical maintenance on the injector. The run is complete and the EDG is ready to be shutdown and placed in standby.
Turnover: 1-OHP-4021-032-001CD Attachment 2 is complete to step 4.4.2 and the diesel generator is ready to be shut down. Perform Step 4.4.3 through 4.7 in main body. U1 is at 92% power following turbine valve testing. TS 3.8.1 Action B.5 Day 1 of 14.
Event Event Event Malf. No.
No. Type* Description 1 N Secure the CD D/G U1_NI10B I(ATC) 2 200 over 1 Power range detector (NI-42) fails high min TS 3 R Power increase to restore power U1_FW40A 4 C(BOP) Condenser Level Control failure (100%)
100 U1_BLP131 I(BOP) 5 Steam generator #3 BLP131 controlling level channel fails low 0 over 30sec TS U1_MS02C 6 Major Steam line #3 break inside containment 50%
U1_RP03A Reactor Trip Breaker Failures (ATWS), (Cannot be opened -
7 C(ATC)
U1_RP03B Rods Drop when MG sets de-energized)
U1_RP09A 8 C(BOP) Feedwater isolation does not occur in automatic U1_RP09B 9 U1_FW48C C(BOP) TDAFW pump does not start in auto
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 1 Event
Description:
Secure the CD D/G and place in standby Time Time Time US Directs actions of 1-OHP-4021-032-001CD Attachment 2, DG1CD Operation On Safeguards Buses.
US Directs the following actions to secure EDG CD.
BOP Performs the following to EDG CD as directed:
- 1. Opens the following breakers:
- T11D8
- T11C3
- 2. Adjusts diesel speed using DG1CD GOVENOR CONTROL to 60 Hz.
- 3. Verifies DG1CD Start Gen & 69/4KV Voltmeter Sel switch in - OFF.
- 4. Returns to Procedure Body Step 4.7:
Note: Step 4.1.7 and 4.1.8 were not performed
- 5. Verifies T11D8, T11C3, and DGTCD - OPEN
- 6. Verifies diesel UNLOADED for approximately 2 minutes
- 7. Stops DG1CD by placing DG1CD Stop-Run control switch to STOP
- 8. Verifies green target at DG1CD Stop-Run control switch Page 2 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 2,3 Event
Description:
Power range detector (NI-42) fails high Time Position Applicant's Actions or Behavior ATC Recognizes and reports annunciators on Panel 110 which are indicative of a NI instrument failure (Drops 11, 13, 18, & 19).
ATC Reports malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Checks for no turbine runback
- Ensures control rods are in manual with no rod motion US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of 1-OHP-4022-012-003, Continuous Control Bank Movement procedure.
RO Performs the following as directed:
- Checks for no turbine runback
- Ensures control rods are in manual with no rod motion
- Checks rod position above low-low rod insertion limit
- Checks axial flux difference (AFD) within target band
- Identifies failed power range channel
- Determines reactivity plan to restore power and AFD to required RO conditions.
Initiates restoration of equilibrium conditions (power) using either:
- Control rod movement
- Turbine load adjustment US Enters and directs actions of 1-OHP-4022-013-004, Power Range Malfunction procedure.
Continued on Next Page Page 3 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 2,3 Event
Description:
Power range detector (NI-42) fails high Time Position Applicant's Actions or Behavior Performs the following as directed:
ATC/BOP
- Verify Control Rods - MANUAL
- Place Rod Stop Bypass Selector In Failed Channel Position
- Remove Affected Channel From Service By Placing Selector Switches To Failed Channel Position:
- Comparator Channel Defeat Selector
- Upper Section Detector Current Comparator Defeat Selector
- Lower Section Detector Current Comparator Defeat Selector
- Power Mismatch Bypass Selector
- Check The Following Interlocks Are In The Required State For Existing Conditions:
- P-7
- P-8
- P-10
- Check AFD - WITHIN TARGET BAND
- Verify Recorder Inputs - SELECTED TO AN UNAFFECTED CHANNEL POSITION:
- Delta-T
- Overtemperature Delta-T Caution - Control Rods should not be placed in automatic until at least 5 minutes have elapsed after placing Power Mismatch Bypass Selector to failed channel.
- Place Control Rods In AUTOMATIC If Applicable US Directs actions to trip bistables associated with NI-42 Power Range Malfunction per Attachment D of 1-OHP-4022-013-004.
US Refers to Tech Specs:
3.3.1 RTS Instrumentation (Table 3.3.1-1, Functions 2a,2b, 3, 6 18c&d Conditions C, D, & L)
P-8 & P-10 must be verified in Correct Condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of channel failure.
3.2.3 AFD Only applicable if Rods drive AFD outside of target band 3.2.4 QPTR May be referenced.
Page 4 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 4 Event
Description:
Condenser Level Control failure (100%) (ot used, not needed.)
Time Position Applicant's Actions or Behavior Crew Respond to ANNUNCIATOR #116 RESPONSE: CONDENSATE:
Drop 2, Condenser A Hotwell Level Low Drop 12, Condenser B Hotwell Level Low Drop 22, Condenser C Hotwell Level Low US Direct BOP to Take Actions per 1-OHP-4024-116 Drop 2, 12, 22 BOP
- IF Hotwell Level Controller not operating properly, THEN control level manually.
- Verify 1-CRV-155, Condensate Excess Letdown Valve and 1-CMO-155 Bypass Valve - CLOSED.
- Throttle open 1-CMO-55, Cndst Makeup Valve Bypass, as required to maintain low level clear.
Page 5 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 5 Event
Description:
Steam generator #3 controlling level channel fails low Time Position Applicant's Actions or Behavior Crew Respond to ANNUNCIATOR #114 RESPONSE: STEAM GENERATOR 3 AND 4:
Drop 3: STEAM GEN 3 WATER LVL LOW DEVIATION Drop 5: STEAM GEN 3 WATER LEVEL LOW-LOW Drop 13: STEAM GEN 3 SF > FWF FLOW MISMATCH BOP Reports malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
- Restore Steam Generator Narrow Range Level using Manual Control of Feedwater Regulating Valve 1-FRV-230
- Check Steam Generator Narrow Range Level - Stable OR Trending to 44%
US Enters and directs actions of 1-OHP-4022-013-013, Steam Generator Level Instrument Malfunction US Refers to the following TS:
Cond D).
Enters action statement that requires bistables to be tripped within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
US Direct actions to trip bistables per Attachment C-2 of 1-OHP-4022-013-013.
Page 6 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 03 Event No.: 6,7,8,9 Event
Description:
Steam line #3 break inside containment, Reactor trip failure (ATWS),
Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior Crew Recognize containment pressure increase, and reactor trip requirements.
Directs RO to Perform Reactor trip US Enter 1-OHP-4023-E-0: Reactor Trip ATC Recognizes and reports failure of reactor to manually trip US Directs actions of FR-S.1, Response to Nuclear Power Generation/ATWS:
ATC Performs the immediate actions of FR.S-1:
- 1. Checks reactor trip Critical Automatically/Manually insert control rods(must Insert Task #1 Negative Reactivity through Inserting Control Rods or Emergency Boration)
BOP Performs the immediate actions of FR.S-1:
- 1. Manually actuate AMSAC
- 2. Check Turbine Trip
- 3. Check AFW pumps running
- MDAFPs - Both Running
- TDAFP - did not start in automatic - manually starts the TDAFP US Ensures immediate actions of FR.S-1 are completed ATC Initiate Emergency Boration of RCS(must Insert Negative Critical Reactivity through Inserting Control Rods or Emergency Task #1 Boration)
- CCPs - at least one running
- Initiate emergency boration o Start both boric acid transfer pumps in FAST speed o Open 1-QMO-410. Emergency boration to CCP suction valve o Check emergency boration flow - GREATER THAN 44 GPM Check PRZ pressure LESS THAN 2335 PSIG Check Containment Isolation Valves Closed:
Continued on Next Page Page 7 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event
Description:
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior Check Containment Isolation valves VCR-101-107, VCR-201-207 Closed Crew Check SI Status - Actuation status light - NOT LIT
- As time permits, perform Steps 5 through 13 of E-0 US Check if the following trips have occurred:
- Reactor Trip - Reactor Trip Breakers, Bypass breakers, Rod drive MG set output breakers
- Turbine Trip Dispatch Operator to Locally Trip Reactor CREW Check if Reactor is Subcritical - Go to step 20 Continue Boration To Maintain Adequate Shutdown Margin During Subsequent Recovery Actions:
- Determine shutdown margin using 1-OHP-4021-001-012, Determination Of Reactor Shutdown Margin Return To Procedure And Step In Effect E-0 Crew May Transition to FR Z.1 if Containment Pressure is Still High
- Asterisk Steps are performed in Z.1 US Transition to OHP-4023-E-0 and direct actions CREW Check Reactor Trip Check Turbine Trip Check Power to AC Busses - At least ONE Energized AC Emergency Busses - ALL Energized Check SI Status - Status Light LIT BOTH CCP Leakoff valve Safety Injection Signal white lights - LIT BOP
- Check Main Steamline Isolation NOT Required - Verify all SG stop valves and SG SV Dump Valves are closed ATC
- Check CTS actuated Check containment isolation Phase B is actuated Stop all RCPs Place lower containment vent Unit fans in OFF
- 1-HV-CLV-1A and 1-HV-CLV-3A
- 1-HV-CLV-2A and 1-HV-CLV-4A
- 1-HV-CLV-1B and 1-HV-CLV-3B
- 1-HV-CLV-2B and 1-HV-CLV-4B Place control rod drive mech fans in STOP:
- 1-HV-CRD-3A
- 1-HV-CRD-3B
- 1-HV-CRD-4A
- 1-HV-CRD-4B Continued on Next Page Page 8 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event
Description:
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior Implement Attachment A (Page 27) While Continuing With This Procedure Crew
- Check SG narrow range level Greater than 14%
- Control feed flow to maintain SG narrow range level between 14% and 50%
Check AFW Pump Discharge valves - OPEN or Throttled Check FW Isolation
- Main feed pumps - BOTH TRIPPED Feed pump discharge valves - CLOSED
- Feedwater regulating valves - CLOSED
- Stop dumping steam
- Verify 1-DRV-407 CLOSED
- If cooldown continues, then control total feed flow
- If cooldown continued, then perform the following:
- Trip all SG stop valves closed
- PORV block valves at least one energized
- Block valves at least one open Check IF RCPs Should Be Stopped:
- ECCS pumps at least one running
Pressure in all SGs:
- NO SG pressure lowering in an uncontrolled manner
- NO SG completely depressurized Go to E-2 Continued on Next Page Page 9 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event
Description:
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior US Announces entry into E-2 Crew Check SG Stop Valves CLOSED Check SG Stop Valve Dump Valves CLOSED Check if any SG secondary pressure boundary is intact
- Check pressure in all SGs
- Any SG Pressure Lowering in an Uncontrolled Manner or
- Any SG Completely Depressurized Critical Task *Isolate Faulted SG:
- 2 Isolate #3 S/G.
- Place 1-DRV-407, SG stop valves drain valve in CLOSED
- Check 1-DRV-407 CLOSED
- Check Steam line warming valves CLOSED Check CST Level Greater Than 15%
Check Secondary Radiation:
- Reset containment isolation Phase A if Necessary
- Direct Chemistry to periodically sample all SGs for activity
- Secondary radiation - NORMAL Check If ECCS Flow Should Be Reduced RCS subcooling based on core exit TCs - Greater than 40F Secondary heat sink:
3
- Total feed flow to intact SGs - Greater Than 240x10 PPH or
- Narrow range level in at least one intact SG - Greater Than 14%
RCS pressure - Stable or Rising PZR level - Greater than 21%
Go to ES-1.1 Continued on Next Page May Terminate once SG is Isolated Page 10 of 11
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 03 Event No.: 6, 7, 8, 9 Event
Description:
Steam line #3 break inside containment, Reactor trip failure (ATWS), Feedwater isolation does not occur in automatic, TDAFW pump does not start in auto Time Position Applicant's Actions or Behavior US Transition to OHP-4023-ES-1.1 SI Termination and Direct Actions US Direct operator to Reset SI SI will NOT Reset with trip Breakers Closed Implement SUP-016, Resetting SI in the SSPS Cabinets, while continuing with Step 2.
CREW Stop CCP Reestablish Air to Containment
- Verify Spray valves closed
- Check Air Pressure
- Open Containment Air Supply Valves Check RCS Pressure - Rising Isolate BIT Verify QMO-225 & 226 Open Close IMO-255 & IMO-256 Close ICM-250 and ICM-251 Establish Charging Flow Stop SI Pumps Stop RHR Pumps Verify RCS Pressure Stable Maintain RCS Temperature Restore Letdown per Sup 15 TERMINATE SCENARIO Page 11 of 11
Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___4_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________
____________________________ _____________________________
____________________________ _____________________________
Initial Conditions: 12% power, main generator has just been paralleled.
Turnover: The unit is at 12% power with the generator has just been paralleled to the grid.
The unit was down powered to fix leak on the weld for FTR-258, FW Disch Header Temperature tap.. The work is complete and the plant is returning to 100% power.
Procedure 1-OHP-4021-001-006, Power Escalation is complete up to step 4.28. Raise Power at 10%/hour to ~29%.
Event Event Event Malf. No.
No. Type* Description 1 N Control Feed Flow In Manual 2 R Raise Power U1_MPC253 3 I(ATC) Turbine impulse pressure instrument (MPC-253) fails HIGH to 740 U1_MPP222 4 C(BOP) MPP 222 SG #2 PORV Pressure Channel 1500 U1_FPC_250 5 A to 1 over 2 I(BOP) Main Feedwater discharge pressure (FPC-250A) fails Low min U1_RC10D Small break LOCA in containment (200 gpm with a 5 min 6 10% over 5 Major Min ramp after West CCP Start)
U1_RP10A 7 I(ATC) Auto SI fails U1_RP10B U1_TC02 8 C(BOP) Main turbine fails to trip U1_TC03 U1_RD0435 9 n/a Two rods fail to Drop (H4 & H6)
U1_RD0441 U1_ECP 10 Stator Short C(ATC) East CCP trips on overcurrent 3 minutes after the RX trip
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 7
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 1,2 Event
Description:
Control Feedwater Flow in Manual and Raise Power Time Position Applicant's Actions or Behavior US Direct the BOP to SG Levels ~40% to 48% using Manual Control of FRV210-240 and Main FW Pump Speed/DP BOP
- Adjust FRV210 - 240 to Maintain SG levels within Designated band
- Place FW Regulating Valves in Auto if FRVs are open far enough RO Calculates the dilution required per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination.
RO Briefs crew on reactivity plan for power escalation.
US Reviews / concurs with reactivity plan.
US Directs RO to commence Power Escalation in accordance with OHP-4021-001-006, Power Escalation (at step 4.77)
RO Performs DILUTION (batch add OR Continuous):
- Place RC Makeup Blend control switch in STOP
- Place RC Makeup Blend Control Mode switch in DILUTE or ALT DILUTE
- Adjust PW to the desired flow rate and/or amount.
- May close QRV-451 if aligning to CCP Suction Only
- Place RC Makeup Blend control switch in START
- May take QRV-303 to Manual and Open as required to maintain VCT Level and Pressure.
RO Commences escalation:
- Raises turbine load (reactor power) using the DCS HMI.
- Maintains Tavg/Tref deviation within limits by dilution and turbine load adjustments.
- Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed.
RO RO verifies appropriate reactivity feedback.
Page 2 of 7
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 3 Event
Description:
Turbine impulse pressure instrument (MPC-253) fails HIGH Time Position Applicant's Actions or Behavior US Assure plant is stable then direct RO or BOP to review Annunciator Response Procedures.
BOP Respond to ANN Panel 111 Drop 20, Tavg Low Tavg<Tref Deviation Respond to ANN Panel 112 Drop 6, Main Turbine DCS Trouble RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Identify failed MPC-253 failed HIGH and go to OHP-4022-013-016, Turbine First Stage Impulse Pressure Instrument Malfunction.
BOP Check For Failed Turbine First Stage Impulse Pressure Instrument:
Notify Shift Manager of the instrument failure.
Channel 1, 1-MPC-253 - Indicating High, Go To RNO
- Perform the following:
- Place AMSAC Bypass/Test Switch in Bypass/Test 101-AM-2
- If Operating Steam Dumps in Tavg Mode - Place steam dump control selector switches in OFF Verify P-13 Status - PROPER for CURRENT PLANT CONDITIONS
- Record Time P-13 Interlock Status verified US Initiates actions to trip bistables for MPC-253 failure per Attachment A of 1-OHP 4022-013-016.
US Refers to ITS LCO:
- 1. 3.3.1 Reactor Trip System Instrumentation (Table 3.3.1-1, Function 18e -
Cond L
- 2. 3.3.2 ESFAS Instrumentation (Table 3.3.2-1, Function 4e - Cond D)
(Applicable at > 40% power)
Page 3 of 7
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 4 Event
Description:
MPP 222 SG #2 PORV Pressure Channel Time Position Applicant's Actions or Behavior BOP Recognize and reports Annunciator Panel #114, Drop 22, 1-MRV-223 OP OR HSD1 PANEL OVERRIDE alarm that indicates SG #2 PORV (MRV-223) has opened.
Panel 114 Drop 14 SG 3 DP may alarm RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of 1-OHP-4022-013-012, Steam Generator Pressure Instrument Malfunction procedure.
BOP Performs the following actions as directed:
- 2. Reports MPP-222 has failed high.
- 3. Returns MFP P controller to auto (if placed in manual).
US Refers to TSs / TRM:
- Trip bistables in 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> Condition D
- TRM 8.3.8. Radiation Monitoring Instrumentation (Table 8.3.8-1, Function 2.b - Condition C)
- Declares MRA-1701 inoperable
- Restore in 7 days US Initiates actions to trip bistables associated with MPP-222 Steam Generator Pressure Instrument Failure per Attachment B-3 of 1-OHP-4022-013-012.
Page 4 of 7
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 5 Event
Description:
Main Feedwater discharge pressure (FPC-250A) fails Low (Not used -
power level was too low to have feedwater in automatic.)
Time Position Applicant's Actions or Behavior BOP Recognizes and reports Ann.115 Drop 42, FPT DCS Trouble caused by FW DCS Screen Alarm Drop C-16 m2C_ALM2016 FPC-250A (B) -
MFP DISCH HDR PRESS - XMTR DEVIATION and indications of a failure affecting main feedwater to all steam generators (SGs):
- Main FW Pump Disch Pressure
- All SG levels raising
- All feedwater regulating valves closing
- Main feedwater pumps speed raising RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Verifies/Places both Main FW Pumps to speed control in manual and lowers output (MFW Pump Speed) to restore DP and match feedwater flow with steam flow and restore SG levels to program.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
CREW Identifies that Main Feedwater Pump Discharge Pressure Transmitter FPC-250A has failed low.
BOP Verify the failed channel disabled and restore FWP Delta-P.
Monitors/adjusts MFP differential pressure to restore SG levels to program.
RO Monitors nuclear power during feedwater transient.
Page 5 of 7
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 04 Event No.: 6,7,8,9,10 Event
Description:
Small break LOCA in containment (150 gpm with a 5 min ramp), Auto SI fails, Main Turbine Fails to Trip, Two Rods Fail to Drop, East CCP trips on overcurrent Time Position Applicant's Actions or Behavior CREW Acknowledges Ann. Panel 122, Drop 83, ICE CONDENSER INLET DOORS OPEN, alarm and/or RMS PPC Alarms on Panel 111 and determines that a loss of reactor coolant is occurring based on the following:
- Pressurizer and VCT level change
- Charging and letdown flow mismatch
- Containment radiation monitoring trend
- Containment pressure rise
- Containment sump level rise Direct implementation of 1-OHP-4022-002-020, EXCESSIVE REACTOR COOLANT LEAKAGE US Monitor PRZ Level ATC
- Maintain PRZ level by adjusting 1-QRV-251 and 1-QVR-200 as necessary
- Reduce or isolate letdown flow as necessary to maintain PZR level
- Close letdown valves
- Start second CCP
- If level cannot be maintained Trip the reactor and go to E-0 US Directs entry into E-0 ATC/BOP Performs the immediate actions of E-0:
- Checks reactor trip.( Announces that 2 rods not fully inserted.)
Critical
- Checks turbine trip. - (Auto Failed)
Task
- Manually trips the main turbine
- Acutate AMSAC
- Isolate Main Steam Lines
- Checks power to AC emergency buses.
- Checks safety injection status.
- US Ensures immediate actions of E-0 are complete Directs subsequent actions of E-0 Page 6 of 7
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: Crews XX Scenario No.: 04 Event No.: 6,7,8,9,10 Event
Description:
Small break LOCA in containment (150 gpm with a 5 min ramp), Auto SI fails, Main Turbine Fails to Trip, Two Rods Fail to Drop, East CCP trips on overcurrent 3 minutes after the trip Time Position Applicant's Actions or Behavior Announces that 2 rods not fully inserted.
ATC Manually trips the reactor Announces East CCP trip ATC Place East CCP Lockout - May reset and attempt one restart Start West CCP Crew Critical Manually Actuates Safety Injection Task Crew Completes all actions of E-0 through step 19 (Check If RCS Is Intact).
Manually Perform Generator Trip in Attachment A US Announces transition to E-1, Loss Of Reactor Or Secondary Coolant (at step 19 of E-0).
Reviews E-1 Foldout Page Criteria.
Crew Check if RCPs should be stopped Check If SG Secondary Pressure Boundaries Are Intact:
Check Intact SG Levels Check Secondary Radiation Check PRZ PORVs and Block Valves US Checks if SI Termination Criteria is MET:
RCS Subcooling >40°F.
Secondary Heat Sink (AFW Flow >240x103 or SG >14% [28%
ADVERSE]).
RCS Pressure rising or stable.
Pressurizer Level >21% [25%ADVERSE].
NOTE: May transition to ES-1.1 SI Termination based on the Small Leak Size CREW Check if Containment Spray Should be Stopped -
Check If RHR Pumps Should Be Stopped -
Check If DGs Should Be Stopped: - Stop & Place In Standby May Terminate once transition decision is made.
Page 7 of 7
Appendix D Scenario Outline Form ES-D-1 Facility: __D C Cook______ Scenario No.: ___5_____ Op-Test No.: 2014301 Examiners: ____________________________ Operators: _____________________________
____________________________ _____________________________
____________________________ _____________________________
Initial Conditions: IC 783 79% power, Power ready to begin.
Turnover: Unit is stable at 79% power. Perform a power reduction to take the unit off line.
Currently performing Step 4.11.1 of 02-OHP 4021.001.003, Power Reduction. Remove the North Condensate Booster pump from service - Swapping with the Middle CB which was just started.
Event Event Event Malf. No.
No. Type* Description 1 N Remove North Condensate Booster from service U1_QLC451 I(ATC) 2 VCT level instrument (QLC-451) fails low To 0% TS 3 R Power reduction U1_MFC140 I(BOP) 4 Steam flow channel (MFC-140) fails low (Controlling) to 0 TS U1_RCR20 Pressurizer PORV (NRC-153) Leaking (requires isolation) 5 C(ATC) to 5 - 5% open NOTE: Use Time Compression U1_RC23D Reactor Trip with S/G #4 tube rupture (600 gpm (60%)
6 to 30 over 10 Major ramp to 30% over 10 minutes - raise to 60% on trip) min U1_MS06D 7 C(BOP) Steam generator safety valve (SV3-4) opens - 80%
to 80%
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Page 1 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 1 Event
Description:
Shutdown the North Condensate Booster Pump Time Position Applicant's Actions or Behavior US Directs actions of 1-OHP-4021-054-001, Attachment 2, Operation of Hotwell (HW) and Condensate Booster (CB) Pumps to stop the North CB pump.
BOP Performs the following to shutdown the CB pump as directed:
- 1. Verifies the following switches in NEUTRAL:
- Standby Hotwell pump
- Standby TACW pump
- 2. Stops the North CB pump NOTE: Ann. 116, Drop 73, CNDST BOOSTER PUMP DISCH PRESSURE LOW may annunciate during this evolution.
US Directs the following actions to realign condensate system:
- Stop the North CB pump
- Notify chemistry of condensate system configuration change.
Page 2 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 2 Event
Description:
VCT level instrument (QLC-451) fails low Time Position Applicant's Actions or Behavior Crew Acknowledge ANNUNCIATOR #109 RESPONSE: BORIC ACID, Drop 49 alarm, VOLUME CONTROL TANK LEVEL LOW RO/BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
- Check VCT Level Channels - BOTH LESS THAN 78%,
- Check Auto VCT Makeup - NOT IN PROGRESS
- Place Reactor Coolant Makeup Blend Control to STOP/NEUTRAL:
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Directs entry into 1-OHP-4022-013-017 ATC Check 1-QLC-451, VCT level channel failed - Full scale Low
- 1-QLC-451 NOT trending with VCT pressure
- 1-QLC-452 reading expected VCT level Initiate makeup per 1-OHP-4021-005-002, Operation of the Unit 1 Boric Acid Blender. If needed Verify pressurizer level control functioning properly.
Operate Boric Acid Blender In Manual As Required To Maintain VCT Level Greater Than 15% on 1-QLC-452 US Refers to the Technical Requirements Manual (TRM):
- TRM 8.1.1 Boration System - Operating Condition A.1 - Restore to operable within 72 Hours (RWST to CVCS auto swapover)
Page 3 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 3 Event
Description:
Power reduction Time Position Applicant's Actions or Behavior RO Calculates boric acid addition per OHP-4021-005-002, Attachment 9, Boration or Dilution Volume Determination.
RO Briefs crew on reactivity plan for power reduction.
US Reviews / concurs with reactivity plan.
US Directs RO to commence Power Reduction in accordance with OHP-4021-001-003.
RO Energize Pressurizer Backup Heaters RO Performs BORATION:
Place RC Makeup Blend Control Switch in STOP.
Place RC Makeup Blend Control Mode Selector Switch in BORATE.
Set desired batch on BA Flow Totalizer.
Adjust BA Flow Ctrl (RU-33) to desired flow.
Place RC Makeup Blend Control Switch in START.
RO Commences power reduction:
- Lowers turbine load (reactor power) using HMI.
- Maintains Tavg/Tref deviation within limits by boration and turbine load adjustments.
- Ensures Axial Flux Difference (AFD) is maintained within target band by manual control rod movement as needed.
BOP/RO BOP acts as peer checker for RO during blender operations and RO verifies appropriate reactivity feedback.
BOP Monitors main electrical generator temperatures.
Page 4 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 4 Event
Description:
SG#4 Steam flow channel 1 (MFC-140) fails low (Controlling)
Time Position Applicant's Actions or Behavior BOP Recognizes and reports annunciators on Panel #114 (Drops 42, 43, and 33) which are indicative of a steam flow instrument failure.
BOP Reports instrument malfunction and performs the immediate actions of OHP-4022-IFR-001, Instrument Failure Response:
Determine SG 4 level is lowering and that its Feedwater Regulating Valve (FRV-240) is not responding as expected.
- Notify US and takes manual control of FRV-240.
- Determine failure affects MFPs, and take P controller to MANUAL.
- Stabilize SG 4 level in manual.
US Enters and directs actions of OHP-4022-IFR-001, Instrument Failure Response procedure.
US Enters and directs actions of 1-OHP-4022-013-014, Steam Flow Instrument Malfunction procedure.
BOP Performs the following actions as directed:
- 1. Restores SG 4 level using MANUAL control of FRV-240.
- 2. Places MFP P controller in MANUAL and maintains pressure.
- 3. Reports MFC-140 has failed low.
- 4. Places 1-FS-542C selector switch in channel 2 position.
- 5. Nulls and returns FRV-240 controller to AUTO.
- 6. Returns MFP P controller to AUTO.
US Refers to the following Tech Specs (TS):
TS 3.3.1 RTS Instrumentation (Table 3.3.1-1)
Condition A - Refer to Table Function 15 Condition D - Trip Bistables in 6 Hours TS 3.3.2 ESFAS Instrumentation (Table 3.3.2-1)
Condition A - Refer to Table Function 4e Condition D - Trip Bistables in 6 Hours US Initiates actions to trip bistables associated with MFC-140 failure per Attachment D-1 of 1-OHP-4022-013-014.
Page 5 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 5 Event
Description:
PRZ PORV (NRV-153) Leak by (5 gpm)
Time Position Applicants Actions or Behavior RO Recognizes Annunciators on Panel 108, Drop 24, PRZ PORV Disch Temp Hi, and Drop 31, PRZ PRT Press Hi/Lo, which are indicative of PORV leakage.
Note: Procedure OHP-4022-002-009 is written to identify the leaking valve and isolate it. The crew may determine that the Acoustic Monitor provides indication as to which valve is leaking and so may directly isolate the applicable PORV.
Time compression may be used as the procedure requires a 15 minute wait time after unisolating each PORV (Block Valve). If required, provide the crew that indications remain the same for PORV NRV-151 (NMO-151) & NRV-152 (NMO-152).
US Enters and directs operator actions per OHP-4022-002-009, Leaking PORV.
RO Performs actions as directed by US:
- Closes PORV Block Valves as directed.
- Reopens Block Valves and Monitors PRT/Temperatures to determine which PORV is leaking.
- Monitors PORV Discharge Temperatures.
- Monitors PRT.
Note: The crew may elect to implement OHP-4022-002-020, Excessive Reactor Coolant Leakage.
The Crew may perform actions of OHP-4021-002-006, PRT Operations, to restore the PRT conditions if required.
US May Direct operator action per OHP-4022-002-020, RCS Leakage:
- Check PRZ Level and adjust Charging as required.
- Check VCT Level
- Determine RCS Leakrate
- Check PRZ PORV and Safety Valve Leakage US Refers to Tech Specs (TS):
- TS 3.4.11 Pressurizer Power Operated Relief Valves (PORVs). Condition A - Closes Block Valve 1-NMO-153 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> with power maintained to block valve.
May Refer to TS :
Mode 4 & 5 applicability
- TS 3.4.13, RCS Operational LEAKAGE, if leak is not isolated.
RO Monitors PRZ pressure control system and ensures pressure remains at normal conditions (~2085 psig).
Page 6 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event
Description:
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80%
Time Position Applicant's Actions or Behavior RO/BOP Perform the following:
- Recognizes and reports excessive charging flow demand as indicated by:
o Lowering Pressurizer level o Lowering Pressurizer pressure o PRZ level deviation alarm
US May enter and direct operator actions per OHP-4022-002-021 SG Tube Leakage (or OHP-4022-002-020, Excessive RCS Leakage):
- Raise charging flow and isolate letdown
- Start the second CCP
- Maintain VCT level RO Recognizes and reports RCS leak rate greater than the capacity of charging pump -OR- unable to maintain Pressurizer level/VCT level US Directs RO/BOP to manually trip the reactor and perform the immediate actions of E-0, Reactor Trip or Safety Injection (based on RCS leak rate beyond charging system capability, may also initiate SI).
CREW Performs the immediate actions of E-0:
- Checks reactor trip.
- Checks turbine trip.
- Checks power to AC emergency buses.
- Checks safety injection status. Status light LIT
- Continued on Next Page Page 7 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event
Description:
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80%
Time Position Applicant's Actions or Behavior BOP
- Review Foldout Page Criteria
- Check Main Steamline Isolation NOT Required
- Check CTS NOT Required
- Implement Attachment A (Page 27) While Continuing With This Procedure
- Check If Ruptured SG is Suspected - Recognize SG14 is Ruptured Critical
- Close AFW Valves 1-FMO-241 and 242 (When >14%)
Step Isolate
- Check Total AFW flow - Greater than 240x103 PPH Flow
- Minimize Unnecessary RCS Cooldown
- Check AFW Pump Discharge Valves - Open or Throttled
- Check FW Isolation
- Check RCS Temperature
- Check PRZ PORVs and Spray valves
- Check if RCPs Should be stopped
- Check if SG Secondary Pressure Boundaries are Intact -
- Recognize that the SG Safety Valve is OPEN Go To E-2, Faulted Steam Generator Isolation NOTE : Crew May transition to E-2 first or May transition to E-3 First and then Return to E-2 US Direct entry into E-2 Crew
- Check SG Stop Valves Closed
- Check SG Stop Valve Dump Valves Closed Critical
- Check If any SG Secondary Boundary is Intact Step Isolate
- Identify Faulted SG SG #4
- Isolate Faulted SG Steam Line
- Check CST Level - Greater Than 15%
from other
- Check Secondary Radiation NOT Normal SGs
- GO TO E-3, Steam Generator Tube Rupture, Step 1
- Continued on Next Page Page 8 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event
Description:
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80%
Time Position Applicant's Actions or Behavior US Direct enter into E-3 Crew
- Check If RCPs Should be Stopped
- Identify Ruptured SG
- Isolate Flow From Ruptured SG
- Check Ruptured SG Level
- Check Ruptured SG Pressure - Greater Than 450 PSIG o If <450 PSIG - Enter RNO GO TO ECA-3.1, SGTR With Loss of Reactor Coolant - Subcooled Recovery Desired, Step 1 BOP/ATC
- Initiate RCS Cooldown
- Determine the required core exit temperature
- Check RCP running
- Check condenser available
- Transfer condenser steam dumps to steam pressure mode
- Dump steam to condenser at maximum rate
- Check Tavg Lo-Lo Perm P12 status light - LIT
- Perform the following:
o Block steam line break SI o Bypass steam dump low-low Tavg interlock BOP/ATC
- Check SG levels
- Check PZR Porvs
- Reset SI and Phase A
- Restore IA to Containment
- Core exit TCs - less than required temperature
- Stop RCS cooldown
- Maintain core exit TCs - less than required temperature US Check Ruptured SG pressure - stable or rising Page 9 of 10
Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2014301 Scenario No.: 05 Event No.: 6,7 Event
Description:
Reactor Trip with S/G 14 tube rupture (600 gpm ), Steam generator safety valve (SV3-4) opens - 80%
Time Position Applicant's Actions or Behavior
- NO - Check > 60 or ECA-3.1 US Directs entry into ECA-3.1 SGTR With Loss of Reactor Coolant -
Subcooled Recovery Desired, Step 1 Crew
- Reset SI
- Reset Containment Isolation
- Establish Control Air to Containment
- Trip All PZR Heaters
- Check If Containment Spray Should be Stopped
- Check Ruptured SG Level
- Check If RHR Pumps Should be Stopped
- Initiate Evaluation of Plant Status
- Check If SG Secondary Pressure Boundaries are Intact
- Check all faulted SG isolated
- Check All AC Buses - Energized By Offsite Power
- Check Intact SG Levels Terminate Event at Evaluators Discretion After Entry to ECA-3.1 Page 10 of 10