ML14365A120: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/24/2014
| issue date = 11/24/2014
| title = 2014 Braidwood Station Initial License Examination Form ES-301-1 Rev1
| title = 2014 Braidwood Station Initial License Examination Form ES-301-1 Rev1
| author name = McNeil D R
| author name = Mcneil D
| author affiliation = NRC/RGN-III/DRS/OLB
| author affiliation = NRC/RGN-III/DRS/OLB
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility:
{{#Wiki_filter:ES-301                           Administrative Topics Outline                           Form ES-301-1 Facility: Braidwood Station                                       Date of Examination: 11/10/14 Examination Level: RO         SRO                                 Operating Test Number: 2014301 Administrative Topic           Type Describe activity to be performed (See Note)             Code*
Braidwood Station Date of Examination: 11/10/14 Examination Level: RO SRO   Operating Test Number: 2014301   Administrative Topic (See Note)
Conduct of Operations             R, D       R-109 Complete NRC Active License Maintenance Log Conduct of Operations           S, P, D       R-110 Perform Offsite AC Power Availability R-200 Perform Worker Tagout Checklist Equipment Control                R, D Radiation Control Emergency Plan                   R, M       R-403 Perform NARS transmittal for GE NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
Type Code* Describe activity to be performed Conduct of Operations R, D R-109 Complete NRC Active License Maintenance Log Conduct of Operations S, P, D R-110 Perform Offsite AC Power Availability Equipment Control R, D R-200 Perform Worker Tagout Checklist Radiation Control Emergency Plan R, M R-403 Perform NARS transmittal for GE NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
* Type Codes & Criteria:             (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
* Type Codes & Criteria:
(N)ew or (M)odified from bank (> 1)
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (
(P)revious 2 exams (< 1; randomly selected)
< 3 for ROs;  
< 4 for SROs & RO retake s) (N)ew or (M)odified from bank (
> 1) (P)revious 2 exams (
< 1; randomly selected)


ES-301 Administrative Topics Outline Form ES-301-1 Facility:
ES-301                           Administrative Topics Outline                           Form ES-301-1 Facility: Braidwood Station                                       Date of Examination: 11/10/14 Examination Level: RO         SRO                                 Operating Test Number: 2014301 Administrative Topic           Type Describe activity to be performed (See Note)             Code*
Braidwood Station Date of Examination: 11/10/14 Examination Level: RO SRO   Operating Test Number: 2014301   Administrative Topic (See Note)
Conduct of Operations             R, D       S-100 Review Calorimetri Conduct of Operations             R, N       S-112 Review SDM Surveillance Equipment Control                 R, D       S-200 Approve Worker Tagout Radiation Control                 R, D       S-300 Review Containment Release for Approval Emergency Plan                   R, M       S-410 Prepare and Approve NARS Form NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
Type Code* Describe activity to be performed Conduct of Operations R, D S-100 Review Calorimetri Conduct of Operations R, N S-112 Review SDM Surveillance Equipment Control R, D S-200 Approve Worker Tagout Radiation Control R, D S-300 Review Containment Release for Approval Emergency Plan R, M S-410 Prepare and Approve NARS Form NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.
* Type Codes & Criteria:             (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)
* Type Codes & Criteria:
(N)ew or (M)odified from bank (> 1)
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (
(P)revious 2 exams (< 1; randomly selected)}}
< 3 for ROs; < 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (
> 1) (P)revious 2 exams (
< 1; randomly selected)}}

Latest revision as of 18:21, 31 October 2019

2014 Braidwood Station Initial License Examination Form ES-301-1 Rev1
ML14365A120
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 11/24/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Shared Package
ML14344A989 List:
References
ES-301-1 50-456/OL-14, 50-457/OL-14
Download: ML14365A120 (2)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Braidwood Station Date of Examination: 11/10/14 Examination Level: RO SRO Operating Test Number: 2014301 Administrative Topic Type Describe activity to be performed (See Note) Code*

Conduct of Operations R, D R-109 Complete NRC Active License Maintenance Log Conduct of Operations S, P, D R-110 Perform Offsite AC Power Availability R-200 Perform Worker Tagout Checklist Equipment Control R, D Radiation Control Emergency Plan R, M R-403 Perform NARS transmittal for GE NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (< 1; randomly selected)

ES-301 Administrative Topics Outline Form ES-301-1 Facility: Braidwood Station Date of Examination: 11/10/14 Examination Level: RO SRO Operating Test Number: 2014301 Administrative Topic Type Describe activity to be performed (See Note) Code*

Conduct of Operations R, D S-100 Review Calorimetri Conduct of Operations R, N S-112 Review SDM Surveillance Equipment Control R, D S-200 Approve Worker Tagout Radiation Control R, D S-300 Review Containment Release for Approval Emergency Plan R, M S-410 Prepare and Approve NARS Form NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (< 3 for ROs; < 4 for SROs & RO retakes)

(N)ew or (M)odified from bank (> 1)

(P)revious 2 exams (< 1; randomly selected)