ML15030A167: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 01/30/2015
| issue date = 01/30/2015
| title = January 2015 Status Update Letter
| title = January 2015 Status Update Letter
| author name = Wachutka J L
| author name = Wachutka J
| author affiliation = NRC/OGC
| author affiliation = NRC/OGC
| addressee name = Froehlich W J, Kastenberg W E, Trikouros N G
| addressee name = Froehlich W, Kastenberg W, Trikouros N
| addressee affiliation = NRC/ASLBP
| addressee affiliation = NRC/ASLBP
| docket = 05000346
| docket = 05000346
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:January 30, 201 5    In the Matter of FirstEnergy Nuclear Operating Co.
{{#Wiki_filter:January 30, 2015 Administrative Judge                            Administrative Judge William J. Froehlich, Chair                    Nicholas G. Trikouros Atomic Safety and Licensing Board              Atomic Safety and Licensing Board Mail Stop: T-3F23                              Mail Stop: T-3F23 Washington, DC 20555-001                        Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.
(Davis-Besse Nuclear Power Station, Unit 1)
(Davis-Besse Nuclear Power Station, Unit 1)
Docket No. 50
Docket No. 50-346-LR
-34 6-LR  Dear Administrative Judges
:
Pursuant to the Atomic Safety and Licensing Board's ("Board") Memorandum and Order dated June 15, 2011
("Order") and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission ("Staff") notes that the Safety Evaluation Report ("SER") with open items was published July 31, 2012. The Staff publish ed the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement ("
DSEIS") in February 2014. The Staff anticipates publishing the Final SEIS in February 2015. The Staff now plans to issue a supplemental SER in May 2015. Respectfully submitted,        /signed (electronically) by/
Jeremy Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15
-D21 Washington, DC 20555 Telephone:  (301) 415
-1571 E-mail: Jeremy.Wachutka@nrc.gov Administrative Judge William J. Froehlich, Chair Atomic Safety and Licensing Board Mail Stop: T
-3F23 Washington, DC 20555
-001  Administrative Judge Nicholas G. Trikouros Atomic Safety and Licensing Board Mail Stop: T
-3F23 Washington, DC 20555-0001  Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T
-3F23 Washington, DC 20555
-0001 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
    )        )  FIRSTENERGY NUCLEAR OPERATING CO.
  )  Docket No.
50-346-LR ) (Davis-Besse Nuclear Power Station, Unit 1)
)          )  CERTIFICATE OF SERVICE


Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the January 30
==Dear Administrative Judges:==
, 201 5 Letter from Jeremy Wachutka in the above
 
-captioned proceeding have been served upon the Electronic Information Exchange, the NRC's E
Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement (DSEIS) in February 2014. The Staff anticipates publishing the Final SEIS in February 2015. The Staff now plans to issue a supplemental SER in May 2015.
-Filing System, in the above captioned proceeding, this 30th day of January, 201 5.
Respectfully submitted,
Signed (electronically) by Jeremy Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15
                                                  /signed (electronically) by/
-D21 Washington, DC 20555 Telephone: (301) 415
Jeremy Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-1571 E-mail: Jeremy.Wachutka@nrc.gov
-1571 E-mail: Jeremy.Wachutka@nrc.gov}}
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
FIRSTENERGY NUCLEAR OPERATING CO.                    )      Docket No. 50-346-LR
                                                    )
(Davis-Besse Nuclear Power Station, Unit 1)          )
                                                    )
CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the January 30, 2015 Letter from Jeremy Wachutka in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 30th day of January, 2015.
Signed (electronically) by Jeremy Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-1571 E-mail: Jeremy.Wachutka@nrc.gov}}

Latest revision as of 17:24, 31 October 2019

January 2015 Status Update Letter
ML15030A167
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/30/2015
From: Jeremy Wachutka
NRC/OGC
To: William Froehlich, Kastenberg W, Nicholas Trikouros
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-346-LR, ASLBP 11-907-01-LR-BD01, RAS 27150
Download: ML15030A167 (2)


Text

January 30, 2015 Administrative Judge Administrative Judge William J. Froehlich, Chair Nicholas G. Trikouros Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop: T-3F23 Mail Stop: T-3F23 Washington, DC 20555-001 Washington, DC 20555-0001 Administrative Judge Dr. William E. Kastenberg Atomic Safety and Licensing Board Mail Stop: T-3F23 Washington, DC 20555-0001 In the Matter of FirstEnergy Nuclear Operating Co.

(Davis-Besse Nuclear Power Station, Unit 1)

Docket No. 50-346-LR

Dear Administrative Judges:

Pursuant to the Atomic Safety and Licensing Boards (Board) Memorandum and Order dated June 15, 2011 (Order) and Order (Granting Motion for Modification of Initial Scheduling Order) dated November 2, 2011, the staff of the Nuclear Regulatory Commission (Staff) notes that the Safety Evaluation Report (SER) with open items was published July 31, 2012. The Staff published the SER on September 3, 2013. The Staff published the Draft Supplemental Environmental Impact Statement (DSEIS) in February 2014. The Staff anticipates publishing the Final SEIS in February 2015. The Staff now plans to issue a supplemental SER in May 2015.

Respectfully submitted,

/signed (electronically) by/

Jeremy Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-1571 E-mail: Jeremy.Wachutka@nrc.gov

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

FIRSTENERGY NUCLEAR OPERATING CO. ) Docket No. 50-346-LR

)

(Davis-Besse Nuclear Power Station, Unit 1) )

)

CERTIFICATE OF SERVICE Pursuant to 10 C.F.R § 2.305 (revised), I hereby certify that copies of the January 30, 2015 Letter from Jeremy Wachutka in the above-captioned proceeding have been served upon the Electronic Information Exchange, the NRCs E-Filing System, in the above captioned proceeding, this 30th day of January, 2015.

Signed (electronically) by Jeremy Wachutka Counsel for the NRC Staff U.S. Nuclear Regulatory Commission Office of the General Counsel Mail Stop O15-D21 Washington, DC 20555 Telephone: (301) 415-1571 E-mail: Jeremy.Wachutka@nrc.gov