ML15153A137: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15153A137
| number = ML15153A137
| issue date = 05/28/2015
| issue date = 05/28/2015
| title = Oyster Creek Aam - NRC Slide Presentation May 28 2015
| title = Aam - NRC Slide Presentation May 28 2015
| author name = Kennedy S R
| author name = Kennedy S
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Welcome!Nuclear Regulatory Commission -Region I 1
{{#Wiki_filter:Welcome!
2014 Annual Assessment Summary*Exelonoperated Oyster Creek safely and in a manner that preserved the public health and safety and protected the environment.
Nuclear Regulatory Commission - Region I 1
*Oyster Creek is in the Regulatory Response ygypColumn of the NRC's Reactor Oversight Process Action Matrix Action Matrix Licensee ResponseRegulatory ResponseDegraded Cornerstone Multiple/Repetitive Degraded Cornerstone Unacceptable Performance 2
NRC Inspection Activities at Oyster Creek in 20146900hoursofinspectionandrelatedactivities 6900 hours of inspection and related activities2 resident inspectors on site 14 regional ins pectionsgp2 major team inspections Fire Protection fProblem Identi fication and ResolutionFollow-up inspection (95001) for a White unplanned scrams performance indicato rp3 Oyster Creek Performance Indicators and FindingsJanuary1throughDecember312014OWhitfIdit ldJanuary 1 through December 31, 2014One White performance Indicator -unplanned scrams (3Q2014)9Green/SeverityLevelIVinspectionfindings 9 Green / Severity Level IV inspection findings1 White inspection finding -#2 emergency dieselgeneratorfanshaftfailure diesel generator fan shaft failure1 Yellow finding -electromaticrelief valve failures(olddesignissue
-noactionmatrix failures (old design issue no action matrix input)
Greater-than-Green FindingsNo. 2 Emergency Diesel Generator Fan Shaft FailureNRC Inspection Report 05000219/2014005 (February 11, 2015)ADAMSAccessionNumber:
ML15042A072 2015) ADAMS Accession Number: ML15042A072 ElectromaticReliefValve(EMRV)Failures Electromatic Relief Valve (EMRV) FailuresNRC Inspection Report 05000219/2014009 (February 11, 2015) ADAMS Accession Number: ML15042A231 5
NRC Inspection Plans for 2015NRC plans baseline and supplemental (follow-up) inspections at Oyster Creek for the remainder of 2015. 


2014 Annual Assessment Summary
* Exelon operated Oyster Creek safely and in a manner that preserved the public health and safety and protected the environment.
y
* Oyster    Creek is in the Regulatory g          y Response p
Column of the NRCs Reactor Oversight Process Action Matrix Action Matrix Multiple/Repetitive Licensee  Regulatory  Degraded                        Unacceptable Degraded Response  Response  Cornerstone                      Performance Cornerstone 2
NRC Inspection Activities at Oyster Creek in 2014 6900 hours of inspection and related activities 2 resident inspectors on site g
14 regional      p inspections 2 major team inspections Fire Protection Problem Identification f      and Resolution Follow-up inspection (95001) for a White unplanned scrams performance indicator p
3
Oyster Creek Performance Indicators and Findings January 1 through December 31 31, 2014 One White O    Whit performance f          IIndicator di t - unplanned l  d scrams (3Q2014) 9 Green / Severity Level IV inspection findings 1 White inspection finding - #2 emergency diesel generator fan shaft failure 1 Yellow finding - electromatic relief valve failures (old design issue - no action matrix input)
Greater-than-Green Findings No. 2 Emergency Diesel Generator Fan Shaft Failure NRC Inspection Report 05000219/2014005 (February 11, 2015) ADAMS Accession Number: ML15042A072 Electromatic Relief Valve (EMRV) Failures NRC Inspection Report 05000219/2014009 (February 11, 2015) ADAMS Accession Number: ML15042A231 5
NRC Inspection Plans for 2015 NRC plans baseline and supplemental (follow-up) inspections at Oyster Creek for the remainder of 2015.
This includes:
This includes:
Inspection Procedure 95001-Emergency diesel generatorfanshaftfailurewhitefinding generator fan shaft failure white findingInspection Procedure 95002 -Electromaticrelief valve failures6 7}}
Inspection Procedure 95001 - Emergency diesel generator fan shaft failure white finding Inspection Procedure 95002 - Electromatic relief valve failures 6
 
7}}

Latest revision as of 11:44, 31 October 2019

Aam - NRC Slide Presentation May 28 2015
ML15153A137
Person / Time
Site: Oyster Creek
Issue date: 05/28/2015
From: Silas Kennedy
NRC/RGN-I/DRP/PB6
To:
KENNEDY, SR
Shared Package
ML 15049A480 List:
References
MN 2015-009
Download: ML15153A137 (7)


Text

Welcome!

Nuclear Regulatory Commission - Region I 1

2014 Annual Assessment Summary

  • Exelon operated Oyster Creek safely and in a manner that preserved the public health and safety and protected the environment.

y

  • Oyster Creek is in the Regulatory g y Response p

Column of the NRCs Reactor Oversight Process Action Matrix Action Matrix Multiple/Repetitive Licensee Regulatory Degraded Unacceptable Degraded Response Response Cornerstone Performance Cornerstone 2

NRC Inspection Activities at Oyster Creek in 2014 6900 hours0.0799 days <br />1.917 hours <br />0.0114 weeks <br />0.00263 months <br /> of inspection and related activities 2 resident inspectors on site g

14 regional p inspections 2 major team inspections Fire Protection Problem Identification f and Resolution Follow-up inspection (95001) for a White unplanned scrams performance indicator p

3

Oyster Creek Performance Indicators and Findings January 1 through December 31 31, 2014 One White O Whit performance f IIndicator di t - unplanned l d scrams (3Q2014) 9 Green / Severity Level IV inspection findings 1 White inspection finding - #2 emergency diesel generator fan shaft failure 1 Yellow finding - electromatic relief valve failures (old design issue - no action matrix input)

Greater-than-Green Findings No. 2 Emergency Diesel Generator Fan Shaft Failure NRC Inspection Report 05000219/2014005 (February 11, 2015) ADAMS Accession Number: ML15042A072 Electromatic Relief Valve (EMRV) Failures NRC Inspection Report 05000219/2014009 (February 11, 2015) ADAMS Accession Number: ML15042A231 5

NRC Inspection Plans for 2015 NRC plans baseline and supplemental (follow-up) inspections at Oyster Creek for the remainder of 2015.

This includes:

Inspection Procedure 95001 - Emergency diesel generator fan shaft failure white finding Inspection Procedure 95002 - Electromatic relief valve failures 6