Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2015 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 * |
| * June 24, 2015 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389) | | HOPE CREEK GENERATING STATION - CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389) |
|
| |
|
| ==Dear Mr. Braun:== | | ==Dear Mr. Braun:== |
| On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15141A271). | | |
| The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML14343A926 and ML15099A766, respectively). | | On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. |
| The amendments revised PSEG's Environm.ental Protection Plans (Non-Radiological). | | DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15141A271). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML14343A926 and ML15099A766, respectively). The amendments revised PSEG's Environm.ental Protection Plans (Non-Radiological). |
| On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. | | On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed. |
| Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. | | Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. |
| Docket No. 50-354 | | If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov. |
| | Sincyely, j "--:> |
| | Wo. I~ |
| | Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
|
| Hope Creek License Page 3 cc w/encl: Distribution via Listserv Sincyely, j "--:> Wo. Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 1 O CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | | Hope Creek License Page 3 cc w/encl: Distribution via Listserv |
| Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation.
| |
| (7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.
| |
| C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 198, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. Renewed License No. NPF-57 Amendment No. 198 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC -N09 P.O. Box 236 Hancocks Bridge, NJ 08038
| |
| | |
| ==SUBJECT:==
| |
| HOPE CREEK GENERATING STATION -CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389)
| |
|
| |
|
| ==Dear Mr. Braun:==
| | reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 1O CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation. |
| On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos. DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15141A271
| | (7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60. |
| ). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML14343A926 and ML15099A766, respectively). | | C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: |
| The amendments revised PSEG's Environmental Protection Plans (Non-Radiological).
| | (1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein. |
| On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed.
| | (2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 198, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan. |
| Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused. If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov.
| | Renewed License No. NPF-57 Amendment No. 198 |
| Docket No. 50-354
| |
| | |
| ==Enclosure:==
| |
|
| |
|
| Hope Creek License Page 3 cc w/encl: Distribution via Listserv DISTRIBUTION:
| | ML15174A127 OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 6/23/15 6/23/15 6/24/15 6/24/15}} |
| PUBLIC LPL 1-2 R/F RidsNrrDlrRerb Resource RidsNrrLALRonewiczResource RidsRgn1 MailCenter Resource ADAMS Accession No.: ML15174A127 Sincerely, IRA/ Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation GHill, OIS RidsACRS MailCTR Resource RidsNrrDorlLpl 1-2 Resource RidsNrrPMHopeCreek Resource BGrange, NRR OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 6/23/15 6/23/15 6/24/15 6/24/15 OFFICIAL RECORD COPY}}
| |
Letter Sequence Other |
---|
|
|
MONTHYEARLR-N14-0224, License Amendment Request to Update Appendix B to the Renewed Facility Operating License2014-12-0909 December 2014 License Amendment Request to Update Appendix B to the Renewed Facility Operating License Project stage: Request ML15005A0172014-12-31031 December 2014 Update to Appendix B LAR Acceptance Review Project stage: Acceptance Review ML15055A3772015-03-10010 March 2015 and Salem Nuclear Generating Station, Unit Nos. 1 and 2, Request for Additional Information Request to Update Appendix B to Renewed Facility Operating License DPR-70, DPR-75 and NPF-57 Project stage: RAI ML15099A7662015-04-0909 April 2015 Response to Request for Additional Information Regarding License Amendment Request to Update Appendix B to Renewed Facility Operating Licenses Project stage: Response to RAI ML15138A1032015-04-29029 April 2015 Comment (1) of Christine Arnott Opposing Behalf of Delaware River Keeper on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations Project stage: Request ML15132A6682015-06-0404 June 2015 Hc and Salem, Unit 1 and 2 - Draft Environmental Assessment and Finding of No Significant Impact Related to the Proposed License Amendment to Update Appendix B to the Renewed Facility Operating Licenses Project stage: Draft Other ML15141A2712015-06-17017 June 2015 and Salem Nuclear Generating Station, Unit Nos.1 and 2, Issuance of Amendments Update of Appendix B to the Renewed Facility Operating Licenses Project stage: Approval ML15174A1272015-06-24024 June 2015 Correction to Amendment No. 198 Regarding Update of Appendix B to the Renewed Facility Operating License Project stage: Other 2015-04-29
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary ML24197A0552024-07-15015 July 2024 Requalification Program Inspection 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0027, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 ML23341A1372024-01-16016 January 2024 Issuance of Amendment No. 235 Revise Trip and Standby Auto-Start Logic Associated with Safety Related Heating, Ventilation and Air Conditioning ML23335A1122023-12-15015 December 2023 Retest Schedule for Drywell to Suppression Chamber Vacuum Breakers 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 24, 2015 Mr. Robert Braun President and Chief Nuclear Officer PSEG Nuclear LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038 *
SUBJECT:
HOPE CREEK GENERATING STATION - CORRECTION TO AMENDMENT NO. 198 REGARDING UPDATE OF APPENDIX B TO THE RENEWED FACILITY OPERATING LICENSE (TAC NO. MF5389)
Dear Mr. Braun:
On June 17, 2015, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 198 to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station (Hope Creek), and Amendment Nos. 308 and 290 to Renewed Facility Operating License Nos.
DPR-70 and DPR-75 for Salem Nuclear Generating Station, Unit Nos. 1 and 2 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15141A271). The amendments were issued in response to PSEG Nuclear LLC's (PSEG) application dated December 9, 2014, as supplemented by letter dated April 9, 2015 (ADAMS Accession Nos. ML14343A926 and ML15099A766, respectively). The amendments revised PSEG's Environm.ental Protection Plans (Non-Radiological).
On June 22, 2015, PSEG staff notified the NRC staff that one of the license pages revised by Hope Creek Amendment No. 198 was in error. Specifically, on page 3 of the license, License Condition C.(2) incorrectly refers to Appendix S instead of Appendix Band the amendment number was inadvertently left off the bottom of the same page. The corrected page 3 is enclosed.
Please replace page 3 of Renewed Facility Operating License No. NPF-57 with the enclosed page. The NRC staff regrets any inconvenience this may have caused.
If you have any questions, please contact me at 301-415-1603 or carleen.parker@nrc.gov.
Sincyely, j "--:>
Wo. I~
Carleen J. Parker, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-354
Enclosure:
Hope Creek License Page 3 cc w/encl: Distribution via Listserv
reactor operation, as described in the Final Safety Analysis Report, as supplemented and amended; (4) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use at any time any byproduct, source and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) PSEG Nuclear LLC, pursuant to the Act and 1O CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (6) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. Mechanical disassembly of the GE14i isotope test assemblies containing Cobalt-60 is not considered separation.
(7) PSEG Nuclear LLC, pursuant to the Act and 10 CFR Part 30, to intentionally produce, possess, receive, transfer, and use Cobalt-60.
C. This renewed license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level PSEG Nuclear LLC is authorized to operate the facility at reactor core power levels not in excess of 3840 megawatts thermal (100 percent rated power) in accordance with the conditions specified herein.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 198, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the renewed license. PSEG Nuclear LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
Renewed License No. NPF-57 Amendment No. 198
ML15174A127 OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME CParker LRonewicz DBroaddus CParker DATE 6/23/15 6/23/15 6/24/15 6/24/15