{{#Wiki_filter:Page 1 of 4  Fermi 2015 Operating Test Comments Administrative JPMs Comments Response RO Admin JPM 4101.450 Data Sheet provided (2400.000.02) has adverse trending (drifting). Drifting does not result in failing an acceptance criterion. Need to fail an surveillance Acceptance Criteria!!
{{#Wiki_filter:Fermi 2015 Operating Test Comments Administrative JPMs Comments                                                       Response RO Admin JPM 4101.450 Data Sheet provided (2400.000.02) has adverse trending (drifting). Drifting does not result in failing an acceptance criterion. Need to fail an surveillance Acceptance Criteria!!
Data Sheet (Example) appears to have readings that do not meet acceptance criteria. Which one of these sheets is to be provided to the applicants?
Data Sheet (Example) appears to have readings that do not meet acceptance criteria. Which one of these sheets is to be provided to the applicants?
This JPM only has one error
This JPM only has one error. Suggest that RO applicants also perform Section 4 of Surveillance procedure. Section 4 should have any error also. (It would probably be an easy error to identify, but must have more than one error!)
. Suggest that RO applicants also perform Section 4 of Surveillance procedure. Section 4 should have any error also. (It would probably be an easy error to identify, but must have more than one error!)
Provide applicant with Cue Sheet #2 only after they show examiner where T23-800 indicator is located!
Provide applicant with Cue Sheet #2 only after they show examiner where T23
Why are JPM steps 1, 2, 4, 5, 6, & 7 marked as critical (verify or Sat steps)?
-800 indicator is locat ed!   Why are JPM steps 1, 2, 4, 5, 6, & 7 marked as critical (verify or Sat steps)
Why are you providing Cue Sheet 3 to the applicants? These are the answers!! Have applicants explain to the examiner what they identified rather than the other way around! Any cue provided by the examiner here would be the CARD number (even this is optional, so long as the applicants mention they need to write one!).
Why are you providing Cue Sheet 3 to the applicants? These are the answers!! Have applicants explain to the examiner what they identified rather than the other way around! Any cue provided by the examiner here would be the CARD number (even this is optional, so long as the applicants mention they need to write one!).
SRO Admin JPM 4101.449:                                         No comments.
SRO Admin JPM 4101.449:
SRO/RO Admin JPM 4101.408 If steps 3, 4, & 5 are critical, you may want to include a band During OV, this was not an for correct answers, (ie: 133.9 + .1°F), otherwise, a rounding issue, and the licensee found error could result in a failed JPM!                             that only a final error band was desirable.
No comments.
Why is this JPM given to SRO applicants also? Is this           During OV, this was not an surveillance performed by SROs in the plant? May want to       issue and sufficient SRO-only add a question for SRO applicants only; If this surveillance   tasks were identified without was completed unsat, what restrictions (Tech Specs) apply?     modifying this specific JPM.
SRO/RO Admin JPM 4101.408 If steps 3, 4, & 5 are critical, you may want to include a band for correct answers, (ie: 133.9  
SRO/RO Admin JPM 4101.418                                       No comments SRO/RO Admin JPM 4101.403 In the Initiating Cue, do not tell the applicant the area is a During OV, this was not found Page 1 of 4
+ .1°F), otherwise, a rounding error could result in a failed JPM!
 
During OV, this was not an issue, and the licensee found that only a final error band was desirable
locked high rad area and contaminated area. Instead provide     to be an issue and the applicant a rad map of the area of concern. Have the       discriminating tasks were applicant make the decision for the type of radiation area and identified without modifying the suiting requirements. Suggest the rad map include a room       JPM. Also, the need for an with high contamination area and high radiation outside the     additional reference (MWC15 job work area. Add a step to have the applicant determine the   - Elevated Risk Management) path from the room entrance to the work area (avoiding the      was avoided by stating that the high radiation area for ALARA purposes) and have applicant     area was <800 mrem.
. Why is this JPM given to SRO applicants also? Is this surveillance performed by SRO's in the plant? May want to add a question for SRO applicants only; "If this surveillance was completed unsat, what restrictions (Tech Spec s) apply?"
explain: a. briefing requirements; b. dosimetry requirements;
During OV, this was not an issue and sufficient SRO
: c. protective clothing to wear; d. respiratory requirements; e.
-only tasks were identified without modifying this specific JPM.
RP coverage requirements. Better yet, can you do this JPM in a rad mock-up area?
SRO/RO Admin JPM 4101.418 No comments SRO/RO Admin JPM 4101.403 In the Initiating Cue, do not tell the applicant the area is a During OV, this was not found Page 2 of 4 locked high rad area and contaminated area. Instead provide the applicant a rad map of the area of concern. Have the applicant make the decision for the type of radiation area and suiting requirements. Suggest the rad map include a room with high contamination area and high radiation outsid e the job work area. Add a step to have the applicant determine the path from the room entrance to the work area (avoiding the high radiation area for ALARA purposes) and have applicant explain: a. briefing requirements; b. dosimetry requirements; c. protective clothing to wear; d. respiratory requirements; e. RP coverage requirements.
RO Admin JPM 00001.403                                         Fill Out Notification Form I assume the applicant gets wind direction and speed from an   Handout indicator in the simulator?
Better yet, can you do this JPM in a rad mock
SRO Admin JPM 0001.401                                          No comments In-Plant JPMs IP JPM 3006.305                                                 No comments IP JPM 0272.401 (OV) There needs to be more detailed actions for contacting     Provided in NOTE.
-up area? to be an issue and discriminating tasks were identified without modifying th e JPM. Also, the need for an additional reference (MWC15
the MCR, etc. when the alternate path begins due to lack of proper response.
- Elevated Risk Management) was avoided by stating that the area was <800 mrem.
Delete 2nd bullet from Initiating Cue since the applicant will Kept bullet to expedite entry probably read the cue sheet elsewhere in the plant!             into appropriate room.
RO Admin JPM 00001.403 Fill Out Notification Form I assume the applicant gets wind direction and speed from an indicator in the simulator?
Are steps 1 & 2 of the JPM really critical if they are not     Not by our criteria, however, successful?                                                    there are sufficient actual critical steps, so if the licensee chooses to treat these additional steps as critical, the exam remains acceptable.
Handout SRO Admin JPM 0001.40 1 No comment s  In-Plant JPMs IP JPM 3006.305 No comment s IP JPM 0272.401 (OV) There needs to be more detailed actions for contacting the MCR, etc. when the alternate path begins due to lack of proper response.
Should there be a cue after step 2 stating that there is no     Discussed at OV. This was sound of CO2 emission?                                         done to address previous Cue after step 3 should read Breaks glass.                   concerns and can be properly The cue before step 4 has you give cue that lever indicates     handled now that the open before the step that the applicant positions the lever to examiners have become OPEN!!                                                         familiar with the format.
Provided in NOTE.
(Cues in this JPM are before the step rather than after the step!)
Delete 2nd bullet from Initiating Cue since the applicant will probably read the cue sheet elsewhere in the plant!
IP JPM 2001.216
Kept bullet to expedite entry into appropriate room.
: 1. Explain how this is an alternate path JPM. Step B.5 is       1. True, however, Step performed independent of whether the RPS Scram                   C.1 is required to be White lights are on or off!                                     performed (from a
Are steps 1 & 2 of the JPM really critical if they are not successful?
: 2. Step 2 contained multiple actions; Obtain keys and               picture) IF unable to place Mode Switches out of OPER.                                 SCRAM the reactor.
Not by our criteria, however, there are sufficient "actual" critical steps, so if the licensee chooses to treat these additional steps as critical, the exam remains acceptable
. Should there be a cue after step 2 stating that there is no sound of CO2 emission?
Cue after step 3 should read "Breaks glass".
The cue before step 4 has you give cue that lever indicates open before the step that the applicant positions the lever to OPEN!! (Cues in this JPM are before the step rather than after the step!)   Discussed at OV. This was done to address previous concerns and can be properly handled now that the examiners have become familiar with the format
. IP JPM 2001.216
: 1. Explain how this is an alternate path JPM
. Step B.5 is performed independent of whether the RPS Scram White lights are on or off!
: 2. Step 2 contained multiple actions; Obtain keys and place Mode Switches out of OPER.
: 1. True, however, Step C.1 is required to be performed (from a picture)
IF unable to SCRAM the reactor.
: 2. Separated into 2 steps.
: 2. Separated into 2 steps.
Page 2 of 4


Page 3 of 4  Simulator JPMs S JPM 0110
Simulator JPMs S JPM 0110-406 Suggest that applicant be able to move the first control rod at least one step before putting in the malfunction.
-406 Suggest that applicant be able to move the first control rod at least one step before putting in the malfunction.
Steps 11 & 17 (Standard Column), delete insert since the applicants should be withdrawing control rod for this JPM.
Steps 11 & 17 (Standard Column), delete 'insert' since the applicants should be withdrawing control rod for this JPM.
How are steps 13 & 14 critical if rod does not move?
How are steps 13 & 14 critical if rod does not move?
S JPM 0118
S JPM 0118-002 (OV) Step 4 needed to be revised to refer to the East (vs.     Correction made.
-002 (OV) Step 4 needed to be revised to refer to the East (vs. West) SBFW pump. Correction made.
West) SBFW pump.
Second Cue seems unnecessary. Applicant should be able to 'navigate' alternate path without assistance from the examiner.
Second Cue seems unnecessary. Applicant should be able to       No assistance is provided -
No assistance is provided
navigate alternate path without assistance from the           direction is given only IF examiner.                                                      recommended.
- direction is given only IF recommended.
S JPM 0105-402 Is it necessary to give the 2nd cue? Wouldnt the applicant be Worked well at OV - no able to determine if C71A-K3E was deenergized without the       changes required.
S JPM 0105
cue? (This is one of the better JPMs Ive seen!)
-402 Is it necessary to give the 2nd cue? Wouldn't the applicant be able to determine if C71A
S JPM 0140-409 This is not the same JPM listed on Form ES-301-2,d. Need     Contacted licensee to revise to correct Form ES-301-2.                                       ES-301-2, but also to verify that the JPM is an adequate replacement as well.
-K3E was deenergized without the cue? (This is one of the better JPM's I've seen!)
S JPM 0119-002                                                 No comments.
Worked well at OV
S JPM 0158-401                                                 No comments.
- no changes required.
S JPM 0172-001                                                 Typo on P8000-RC002?
S JPM 0140
Page 3 of 4
-409 This is not the same JPM listed on Form ES
-301-2,'d'. Need to correct Form ES
-301-2. Contacted licensee to revise ES-301-2, but also to verify that the JPM is an adequate replacement as well.
S JPM 0119
-002 No comments.
S JPM 0158
-401 No comments.
S JPM 0172
-001 Typo on P8000-RC002?
Page 4 of 4   S JPM 0150
-402  Cue after step 5 tells applicant to manually shift CCHVAC to RECIRC. This should not be prompted by the examiner, the applicant should know to do this. Delete last sentence in this cue and replace with, "When applicant determines that procedure 23.413 is needed to shift CCHVAC, provide applicant a copy of 23.413.
Agreed. The "CRS" will only direct the applicant to perform


those actions recommended by the applicant.
S JPM 0150-402 Cue after step 5 tells applicant to manually shift CCHVAC to    Agreed. The CRS will only RECIRC. This should not be prompted by the examiner, the        direct the applicant to perform applicant should know to do this. Delete last sentence in this  those actions recommended cue and replace with, When applicant determines that          by the applicant.
Scenario #1 (OV) D-1 sheets were requested with scenarios (D
procedure 23.413 is needed to shift CCHVAC, provide applicant a copy of 23.413.
-2) provided to the examiners.
Scenario #1 (OV) D-1 sheets were requested with scenarios (D-2)             D-1 sheets were provided.
D-1 sheets were provided
provided to the examiners.
. Should have criteria for ending the scenario.
Should have criteria for ending the scenario.                   Provided criteria.
Provided criteria.
Scenario #2 (OV) D-1 sheets were requested with scenarios (D-2)             D-1 sheets were provided.
Scenario #2 (OV) D-1 sheets were requested with scenarios (D-2) provided to the examiners.
provided to the examiners.
D-1 sheets were provided
Critical Task on Pg 14: What criteria exceeded requires         The Critical Task List on the spraying the drywell? Should have applicant control DW         last page of scenario guide pressure rather than relying on SRO say so!                     provides a summary of CTs and their criteria.
. Critical Task on Pg 14: What criteria exceeded requires spraying the drywell? Should have applicant control DW pressure rather than relying on SRO say so!
Should have criteria for ending the scenario. (ie: controls DW pressure, commence flooding up drywell, etc.)                   D-1 sheets were provided.
Should have criteria for ending the scenario. (ie: controls DW pressure, commence flooding up drywell, etc.)
Note: List critical tasks and failure criteria with each scenario.
The Critical Task List on the last page of scenario guide provides a summary of CTs and their criteria.
Page 4 of 4}}
D-1 sheets were provided
. Note: List critical tasks and failure criteria with each scenario.}}

Latest revision as of 06:43, 31 October 2019

2015 Fermi Power Plant Initial License Examination Operating Test Comments
ML15287A334
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/13/2015
From:
Division of Reactor Safety III
To:
Detroit Edison, Co
Zoia, C D
Shared Package
ML15268A032 List:
References
Download: ML15287A334 (4)


Text

Fermi 2015 Operating Test Comments Administrative JPMs Comments Response RO Admin JPM 4101.450 Data Sheet provided (2400.000.02) has adverse trending (drifting). Drifting does not result in failing an acceptance criterion. Need to fail an surveillance Acceptance Criteria!!

Data Sheet (Example) appears to have readings that do not meet acceptance criteria. Which one of these sheets is to be provided to the applicants?

This JPM only has one error. Suggest that RO applicants also perform Section 4 of Surveillance procedure. Section 4 should have any error also. (It would probably be an easy error to identify, but must have more than one error!)

Provide applicant with Cue Sheet #2 only after they show examiner where T23-800 indicator is located!

Why are JPM steps 1, 2, 4, 5, 6, & 7 marked as critical (verify or Sat steps)?

Why are you providing Cue Sheet 3 to the applicants? These are the answers!! Have applicants explain to the examiner what they identified rather than the other way around! Any cue provided by the examiner here would be the CARD number (even this is optional, so long as the applicants mention they need to write one!).

SRO Admin JPM 4101.449: No comments.

SRO/RO Admin JPM 4101.408 If steps 3, 4, & 5 are critical, you may want to include a band During OV, this was not an for correct answers, (ie: 133.9 + .1°F), otherwise, a rounding issue, and the licensee found error could result in a failed JPM! that only a final error band was desirable.

Why is this JPM given to SRO applicants also? Is this During OV, this was not an surveillance performed by SROs in the plant? May want to issue and sufficient SRO-only add a question for SRO applicants only; If this surveillance tasks were identified without was completed unsat, what restrictions (Tech Specs) apply? modifying this specific JPM.

SRO/RO Admin JPM 4101.418 No comments SRO/RO Admin JPM 4101.403 In the Initiating Cue, do not tell the applicant the area is a During OV, this was not found Page 1 of 4

locked high rad area and contaminated area. Instead provide to be an issue and the applicant a rad map of the area of concern. Have the discriminating tasks were applicant make the decision for the type of radiation area and identified without modifying the suiting requirements. Suggest the rad map include a room JPM. Also, the need for an with high contamination area and high radiation outside the additional reference (MWC15 job work area. Add a step to have the applicant determine the - Elevated Risk Management) path from the room entrance to the work area (avoiding the was avoided by stating that the high radiation area for ALARA purposes) and have applicant area was <800 mrem.

explain: a. briefing requirements; b. dosimetry requirements;

c. protective clothing to wear; d. respiratory requirements; e.

RP coverage requirements. Better yet, can you do this JPM in a rad mock-up area?

RO Admin JPM 00001.403 Fill Out Notification Form I assume the applicant gets wind direction and speed from an Handout indicator in the simulator?

SRO Admin JPM 0001.401 No comments In-Plant JPMs IP JPM 3006.305 No comments IP JPM 0272.401 (OV) There needs to be more detailed actions for contacting Provided in NOTE.

the MCR, etc. when the alternate path begins due to lack of proper response.

Delete 2nd bullet from Initiating Cue since the applicant will Kept bullet to expedite entry probably read the cue sheet elsewhere in the plant! into appropriate room.

Are steps 1 & 2 of the JPM really critical if they are not Not by our criteria, however, successful? there are sufficient actual critical steps, so if the licensee chooses to treat these additional steps as critical, the exam remains acceptable.

Should there be a cue after step 2 stating that there is no Discussed at OV. This was sound of CO2 emission? done to address previous Cue after step 3 should read Breaks glass. concerns and can be properly The cue before step 4 has you give cue that lever indicates handled now that the open before the step that the applicant positions the lever to examiners have become OPEN!! familiar with the format.

(Cues in this JPM are before the step rather than after the step!)

IP JPM 2001.216

1. Explain how this is an alternate path JPM. Step B.5 is 1. True, however, Step performed independent of whether the RPS Scram C.1 is required to be White lights are on or off! performed (from a
2. Step 2 contained multiple actions; Obtain keys and picture) IF unable to place Mode Switches out of OPER. SCRAM the reactor.
2. Separated into 2 steps.

Page 2 of 4

Simulator JPMs S JPM 0110-406 Suggest that applicant be able to move the first control rod at least one step before putting in the malfunction.

Steps 11 & 17 (Standard Column), delete insert since the applicants should be withdrawing control rod for this JPM.

How are steps 13 & 14 critical if rod does not move?

S JPM 0118-002 (OV) Step 4 needed to be revised to refer to the East (vs. Correction made.

West) SBFW pump.

Second Cue seems unnecessary. Applicant should be able to No assistance is provided -

navigate alternate path without assistance from the direction is given only IF examiner. recommended.

S JPM 0105-402 Is it necessary to give the 2nd cue? Wouldnt the applicant be Worked well at OV - no able to determine if C71A-K3E was deenergized without the changes required.

cue? (This is one of the better JPMs Ive seen!)

S JPM 0140-409 This is not the same JPM listed on Form ES-301-2,d. Need Contacted licensee to revise to correct Form ES-301-2. ES-301-2, but also to verify that the JPM is an adequate replacement as well.

S JPM 0119-002 No comments.

S JPM 0158-401 No comments.

S JPM 0172-001 Typo on P8000-RC002?

Page 3 of 4

S JPM 0150-402 Cue after step 5 tells applicant to manually shift CCHVAC to Agreed. The CRS will only RECIRC. This should not be prompted by the examiner, the direct the applicant to perform applicant should know to do this. Delete last sentence in this those actions recommended cue and replace with, When applicant determines that by the applicant.

procedure 23.413 is needed to shift CCHVAC, provide applicant a copy of 23.413.

Scenario #1 (OV) D-1 sheets were requested with scenarios (D-2) D-1 sheets were provided.

provided to the examiners.

Should have criteria for ending the scenario. Provided criteria.

Scenario #2 (OV) D-1 sheets were requested with scenarios (D-2) D-1 sheets were provided.

provided to the examiners.

Critical Task on Pg 14: What criteria exceeded requires The Critical Task List on the spraying the drywell? Should have applicant control DW last page of scenario guide pressure rather than relying on SRO say so! provides a summary of CTs and their criteria.

Should have criteria for ending the scenario. (ie: controls DW pressure, commence flooding up drywell, etc.) D-1 sheets were provided.

Note: List critical tasks and failure criteria with each scenario.

Page 4 of 4