| number = ML16062A286
| number = ML16062A286
| issue date = 03/02/2016
| issue date = 03/02/2016
| title = Watts Bar, Unit 1, Annual Assessment Letter
| title = Annual Assessment Letter
| author name = Blamey A
| author name = Blamey A
| author affiliation = NRC/RGN-II/DRP/RPB6
| author affiliation = NRC/RGN-II/DRP/RPB6
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000390
| docket = 05000390
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 2, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
-1257 March 2, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing
 
Tennessee Valley Authority 1101 Market Street, LP 3D
-C Chattanooga, TN 37402
-2801


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/201 5006 
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006


==Dear Mr. Shea:==
==Dear Mr. Shea:==


On February 11, 2016, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant (WBN) Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from Janua ry 1, 2015, through December 31, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On February 11, 2016, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant (WBN) Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC
Routine inspections performed by resident inspectors are not included in the inspection plan.
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan.
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and Operator Licensing Examinations. The NRC will continue to evaluate the effectiveness of TVAs oversight and management of operations during Unit 2 startup, in accordance with IMC 2517 Watts Bar 2 Inspection Program. This will include inspections and reviews addressing the organizational and operational challenges associated with the integration of both Watts Bar units.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include:
Inspection Procedure (IP) 43004, Inspection of Commercial
-Grade Dedication Programs, and Operator Licensing Examinations. The NRC will continue to evaluate the effectiveness of TVA's oversight and management of operations during Unit 2 startup, in accordance with IMC 2517 "Watts Bar 2 Inspection Program". This will include inspections and reviews addressing the organizational and operational challenges associated with the integration of both Watts Bar units.
 
J. Shea 2  In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure
," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 


J. Shea                                        2 In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (404) 997-4415 with any questions you have regarding this letter.
Please contact me at (404) 997-4415 with any questions you have regarding this letter.
Sincerely,
Sincerely,
          /RA/ Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.
                                                /RA/
: 50-390 License No.
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-390 License No.: NPF-90
: NPF-90


==Enclosure:==
==Enclosure:==
Watts Bar Inspection/Activity Plan (03/01/2016 - 12/31/2017) cc: Distribution via ListServ


Watts Bar Inspection/Activity Plan (03/01/2016 - 12/31/2017)  cc:  Distribution via List Serv    
________________        SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE            RII:DRP        RII:DRP SIGNATURE          CRK1          ABJ3 NAME              C. Kontz        A. Blamey DATE                  2/26/2016      3/2/2016 E-MAIL COPY?        YES    NO    YES      NO  YES    NO      YES    NO   YES    NO    YES  NO


________________
J. Shea                                   3 Letter to Joseph W. Shea from Alan Blamey dated March 2, 2016
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP    SIGNATURE CRK1 ABJ3        NAME C. Kontz A. Blamey DATE 2/26/2016 3/2/2016        E-MAIL COPY?
YES NO      YES NO      YES NO      YES NO      YES NO      YES NO J. Shea 3   Letter to Joseph W. Shea from Alan Blamey dated March 2, 2016


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/201 5006 Distribution w/encl
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006 Distribution w/encl:
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)


Page 1 of 2 03/02/2016 08:19:01Report 22 UnitNumberPlanned Dates Start          EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 03/01/2016
Page 1 of 2                                                                               Watts Bar 03/02/2016     08:19:01                                                        Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit          Planned Dates                                                                                                                                  No. of Staff Number          Start      End    Inspection Activity                                                          Title                                          on Site MODS         - PLANT MODIFICATIONS INSPECTION                                                                                     3 1          03/07/2016  03/11/2016  IP 7111117T            Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1          03/21/2016  03/25/2016   IP 7111117T            Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications OL EXAM       - INITIAL LICENSE EXAM PREP                                                                                           3 1          06/20/2016  06/24/2016      V23475              WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES CDBI         - COMPONENT DESIGN BASES INSPECTION                                                                                   7 1          06/27/2016   07/01/2016   IP 7111121              Component Design Bases Inspection 1          07/18/2016   07/22/2016   IP 7111121              Component Design Bases Inspection 1          08/08/2016   08/12/2016   IP 7111121              Component Design Bases Inspection 1          08/22/2016   08/26/2016  IP 7111121              Component Design Bases Inspection OL EXAM       - INITIAL LICENSE EXAM                                                                                               3 1          07/18/2016  07/22/2016      V23475              WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES RP           - RP PUBLIC RAD SAFETY BASELINE                                                                                       4 1          08/01/2016  08/05/2016  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          08/01/2016   08/05/2016   IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          08/01/2016   08/05/2016   IP 71124.07            Radiological Environmental Monitoring Program 1          08/01/2016   08/05/2016   IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1          08/01/2016   08/05/2016   IP 71151                Performance Indicator Verification PI&R         - PROBLEM IDENTIFICATION AND RESOLUTION                                                                               5 1          10/31/2016  11/04/2016   IP 71152B              Problem Identification and Resolution 1          11/14/2016  11/18/2016   IP 71152B              Problem Identification and Resolution EP           - EP PROGRAM INSPECTION                                                                                               5 1          11/14/2016  11/18/2016  IP 7111402              Alert and Notification System Testing 1          11/14/2016  11/18/2016   IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          11/14/2016  11/18/2016   IP 7111404              Emergency Action Level and Emergency Plan Changes 1          11/14/2016  11/18/2016   IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          11/14/2016  11/18/2016   IP 71151                Performance Indicator Verification OL RQ         - REQUAL INSP                                                                                                         2 1          11/14/2016  11/18/2016   IP 7111111B            Licensed Operator Requalification Program ISI           - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM                                                                             2 1          03/27/2017   03/31/2017   IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL INSPECTION WEEK 1                                                                                   2 1         03/27/2017   03/31/2017   IP 71124.01            Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.
-12/31/2017 MODS-PLANT MODIFICATIONS INSPECTION 31    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/07/201603/11/2016 1    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/21/2016 03/25/2016OL EXAM-INITIAL LICENSE EXAM PREP 31    WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347506/20/2016 06/24/2016 CDBI-COMPONENT DESIGN BASES INSPECTION 71    IPComponent Design Bases Inspection711112106/27/2016 07/01/2016 1    IPComponent Design Bases Inspection711112107/18/2016 07/22/2016 1    IPComponent Design Bases Inspection711112108/08/2016 08/12/2016 1    IPComponent Design Bases Inspection711112108/22/2016 08/26/2016OL EXAM-INITIAL LICENSE EXAM 31    WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347507/18/2016 07/22/2016 RP-RP PUBLIC RAD SAFETY BASELINE 41    IPRadiological Hazard Assessment and Exposure Controls71124.0108/01/2016 08/05/2016 1    IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/01/2016 08/05/2016 1    IPRadiological Environmental Monitoring Program71124.0708/01/2016 08/05/2016 1    IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/01/2016 08/05/2016 1    IPPerformance Indicator Verification7115108/01/2016 08/05/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51    IPProblem Identification and Resolution71152B10/31/201611/04/2016 1    IPProblem Identification and Resolution71152B11/14/201611/18/2016 EP-EP PROGRAM INSPECTION 51    IPAlert and Notification System Testing711140211/14/201611/18/2016 1    IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016 1    IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016 1    IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016 1    IPPerformance Indicator Verification7115111/14/201611/18/2016OL RQ-REQUAL INSP 21    IPLicensed Operator Requalification Program7111111B11/14/201611/18/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 21    IPInservice Inspection Activities - PWR7111108P03/27/2017 03/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21    IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/2017 03/31/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.                                             Enclosure
Page 2 of 2 03/02/2016 08:19:01Report 22 UnitNumberPlanned Dates Start          EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 03/01/2016
-12/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21    IPOccupational ALARA Planning and Controls71124.0203/27/2017 03/31/2017 1     IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/2017 03/31/2017 1    IPOccupational Dose Assessment71124.0403/27/2017 03/31/2017 1    IPRadiation Monitoring Instrumentation71124.0503/27/2017 03/31/2017 1    IPPerformance Indicator Verification7115103/27/2017 03/31/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11    IPInservice Inspection Activities - PWR7111108P04/03/2017 04/07/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31    IPRadiological Hazard Assessment and Exposure Controls71124.0104/17/2017 04/21/2017 1    IPOccupational ALARA Planning and Controls71124.0204/17/2017 04/21/2017 1    IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/17/2017 04/21/2017 1    IPOccupational Dose Assessment71124.0404/17/2017 04/21/2017 1    IPRadiation Monitoring Instrumentation71124.0504/17/2017 04/21/2017 1    IPPerformance Indicator Verification7115104/17/2017 04/21/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 11    IPFire Protection [Triennial]7111105T09/18/2017 09/22/2017 1    IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 EP-EP EXERCISE 31    IPExercise Evaluation711140111/13/201711/17/2017 1    IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 1    IPExercise Evaluation - Scenario Review711140811/13/201711/17/2017 1    IPPerformance Indicator Verification7115111/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303
-1257  March 2, 2016  Mr. Joseph W. Shea Vice President, Nuclear Licensing


Tennessee Valley Authority 1101 Market Street, LP 3D
Page 2 of 2                                                                                Watts Bar 03/02/2016    08:19:01                                                        Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit          Planned Dates                                                                                            No. of Staff Number          Start      End    Inspection Activity                                                              Title  on Site RP            - RP OCCUPATIONAL INSPECTION WEEK 1                                              2 1          03/27/2017  03/31/2017  IP 71124.02            Occupational ALARA Planning and Controls 1          03/27/2017  03/31/2017  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          03/27/2017  03/31/2017  IP 71124.04            Occupational Dose Assessment 1          03/27/2017  03/31/2017  IP 71124.05            Radiation Monitoring Instrumentation 1          03/27/2017  03/31/2017  IP 71151                Performance Indicator Verification SGISI        - UNIT 1 SG IN-SERVICE INSPECTION                                                1 1          04/03/2017  04/07/2017  IP 7111108P            Inservice Inspection Activities - PWR RP            - RP OCCUPATIONAL INSPECTION WEEK 2                                              3 1          04/17/2017  04/21/2017  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          04/17/2017  04/21/2017  IP 71124.02            Occupational ALARA Planning and Controls 1          04/17/2017  04/21/2017  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          04/17/2017  04/21/2017  IP 71124.04            Occupational Dose Assessment 1          04/17/2017  04/21/2017  IP 71124.05            Radiation Monitoring Instrumentation 1          04/17/2017  04/21/2017  IP 71151                Performance Indicator Verification TFPI          - TRIENNIEL FIRE PROTECTION INSPECTION                                          1 1          09/18/2017  09/22/2017  IP 7111105T            Fire Protection [Triennial]
-C Chattanooga, TN 37402
1          10/02/2017  10/06/2017  IP 7111105T            Fire Protection [Triennial]
-2801
EP            - EP EXERCISE                                                                    3 1          11/13/2017  11/17/2017  IP 7111401              Exercise Evaluation 1          11/13/2017  11/17/2017  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          11/13/2017  11/17/2017  IP 7111408              Exercise Evaluation - Scenario Review 1          11/13/2017  11/17/2017  IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
 
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 2, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/201 5006 
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006


==Dear Mr. Shea:==
==Dear Mr. Shea:==


On February 11, 2016, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant (WBN) Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from Janua ry 1, 2015, through December 31, 2015. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
On February 11, 2016, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant (WBN) Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
 
The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017.
The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC
Routine inspections performed by resident inspectors are not included in the inspection plan.
's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2017. Routine inspections performed by resident inspectors are not included in the inspection plan.
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and Operator Licensing Examinations. The NRC will continue to evaluate the effectiveness of TVAs oversight and management of operations during Unit 2 startup, in accordance with IMC 2517 Watts Bar 2 Inspection Program. This will include inspections and reviews addressing the organizational and operational challenges associated with the integration of both Watts Bar units.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
This inspection plan does not include security related inspections, which will be sent via separate, non
-publicly available correspondence.
In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include:
Inspection Procedure (IP) 43004, Inspection of Commercial
-Grade Dedication Programs, and Operator Licensing Examinations. The NRC will continue to evaluate the effectiveness of TVA's oversight and management of operations during Unit 2 startup, in accordance with IMC 2517 "Watts Bar 2 Inspection Program". This will include inspections and reviews addressing the organizational and operational challenges associated with the integration of both Watts Bar units.
 
J. Shea 2  In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure
," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 


J. Shea                                        2 In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (404) 997-4415 with any questions you have regarding this letter.
Please contact me at (404) 997-4415 with any questions you have regarding this letter.
Sincerely,
Sincerely,
          /RA/ Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.
                                                /RA/
: 50-390 License No.
Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-390 License No.: NPF-90
: NPF-90


==Enclosure:==
==Enclosure:==
Watts Bar Inspection/Activity Plan (03/01/2016 - 12/31/2017) cc: Distribution via ListServ


Watts Bar Inspection/Activity Plan (03/01/2016 - 12/31/2017)  cc:  Distribution via List Serv    
________________        SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE            RII:DRP        RII:DRP SIGNATURE          CRK1          ABJ3 NAME              C. Kontz        A. Blamey DATE                  2/26/2016      3/2/2016 E-MAIL COPY?        YES    NO    YES      NO  YES    NO      YES    NO   YES    NO    YES  NO


________________
J. Shea                                   3 Letter to Joseph W. Shea from Alan Blamey dated March 2, 2016
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP    SIGNATURE CRK1 ABJ3        NAME C. Kontz A. Blamey DATE 2/26/2016 3/2/2016        E-MAIL COPY?
YES NO      YES NO      YES NO      YES NO      YES NO      YES NO J. Shea 3   Letter to Joseph W. Shea from Alan Blamey dated March 2, 2016


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/201 5006 Distribution w/encl
ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006 Distribution w/encl:
: D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)
 
Page 1 of 2                                                                                Watts Bar 03/02/2016    08:19:01                                                        Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit          Planned Dates                                                                                                                                  No. of Staff Number          Start      End    Inspection Activity                                                          Title                                          on Site MODS          - PLANT MODIFICATIONS INSPECTION                                                                                      3 1          03/07/2016  03/11/2016  IP 7111117T            Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1          03/21/2016  03/25/2016  IP 7111117T            Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications OL EXAM      - INITIAL LICENSE EXAM PREP                                                                                          3 1          06/20/2016  06/24/2016      V23475              WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES CDBI          - COMPONENT DESIGN BASES INSPECTION                                                                                  7 1          06/27/2016  07/01/2016  IP 7111121              Component Design Bases Inspection 1          07/18/2016  07/22/2016  IP 7111121              Component Design Bases Inspection 1          08/08/2016  08/12/2016  IP 7111121              Component Design Bases Inspection 1          08/22/2016  08/26/2016  IP 7111121              Component Design Bases Inspection OL EXAM      - INITIAL LICENSE EXAM                                                                                                3 1          07/18/2016  07/22/2016      V23475              WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES RP            - RP PUBLIC RAD SAFETY BASELINE                                                                                      4 1          08/01/2016  08/05/2016  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          08/01/2016  08/05/2016  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment 1          08/01/2016  08/05/2016  IP 71124.07            Radiological Environmental Monitoring Program 1          08/01/2016  08/05/2016  IP 71124.08            Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1          08/01/2016  08/05/2016  IP 71151                Performance Indicator Verification PI&R          - PROBLEM IDENTIFICATION AND RESOLUTION                                                                              5 1          10/31/2016  11/04/2016  IP 71152B              Problem Identification and Resolution 1          11/14/2016  11/18/2016  IP 71152B              Problem Identification and Resolution EP            - EP PROGRAM INSPECTION                                                                                              5 1          11/14/2016  11/18/2016  IP 7111402              Alert and Notification System Testing 1          11/14/2016  11/18/2016  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1          11/14/2016  11/18/2016  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          11/14/2016  11/18/2016  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          11/14/2016  11/18/2016  IP 71151                Performance Indicator Verification OL RQ        - REQUAL INSP                                                                                                        2 1          11/14/2016  11/18/2016  IP 7111111B            Licensed Operator Requalification Program ISI          - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM                                                                            2 1          03/27/2017  03/31/2017  IP 7111108P            Inservice Inspection Activities - PWR RP            - RP OCCUPATIONAL INSPECTION WEEK 1                                                                                  2 1          03/27/2017  03/31/2017  IP 71124.01            Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                            Enclosure


Page 1 of 2 03/02/2016 08:19:01Report 22 UnitNumberPlanned Dates Start          EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 03/01/2016
Page 2 of 2                                                                               Watts Bar 03/02/2016     08:19:01                                                        Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit          Planned Dates                                                                                            No. of Staff Number          Start      End     Inspection Activity                                                              Title  on Site RP           - RP OCCUPATIONAL INSPECTION WEEK 1                                             2 1          03/27/2017   03/31/2017   IP 71124.02             Occupational ALARA Planning and Controls 1          03/27/2017   03/31/2017   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          03/27/2017   03/31/2017   IP 71124.04            Occupational Dose Assessment 1         03/27/2017   03/31/2017   IP 71124.05            Radiation Monitoring Instrumentation 1         03/27/2017   03/31/2017   IP 71151                Performance Indicator Verification SGISI         - UNIT 1 SG IN-SERVICE INSPECTION                                               1 1          04/03/2017   04/07/2017   IP 7111108P            Inservice Inspection Activities - PWR RP           - RP OCCUPATIONAL INSPECTION WEEK 2                                             3 1          04/17/2017  04/21/2017  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          04/17/2017   04/21/2017   IP 71124.02            Occupational ALARA Planning and Controls 1          04/17/2017   04/21/2017   IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          04/17/2017   04/21/2017   IP 71124.04             Occupational Dose Assessment 1         04/17/2017   04/21/2017   IP 71124.05            Radiation Monitoring Instrumentation 1         04/17/2017   04/21/2017   IP 71151                Performance Indicator Verification TFPI         - TRIENNIEL FIRE PROTECTION INSPECTION                                           1 1          09/18/2017   09/22/2017   IP 7111105T            Fire Protection [Triennial]
-12/31/2017 MODS-PLANT MODIFICATIONS INSPECTION 31    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/07/201603/11/2016 1    IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T03/21/2016 03/25/2016OL EXAM-INITIAL LICENSE EXAM PREP 31    WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347506/20/2016 06/24/2016 CDBI-COMPONENT DESIGN BASES INSPECTION 71    IPComponent Design Bases Inspection711112106/27/2016 07/01/2016 1    IPComponent Design Bases Inspection711112107/18/2016 07/22/2016 1    IPComponent Design Bases Inspection711112108/08/2016 08/12/2016 1    IPComponent Design Bases Inspection711112108/22/2016 08/26/2016OL EXAM-INITIAL LICENSE EXAM 31    WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347507/18/2016 07/22/2016 RP-RP PUBLIC RAD SAFETY BASELINE 41    IPRadiological Hazard Assessment and Exposure Controls71124.0108/01/2016 08/05/2016 1    IPRadioactive Gaseous and Liquid Effluent Treatment71124.0608/01/2016 08/05/2016 1    IPRadiological Environmental Monitoring Program71124.0708/01/2016 08/05/2016 1    IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0808/01/2016 08/05/2016 1    IPPerformance Indicator Verification7115108/01/2016 08/05/2016 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 51    IPProblem Identification and Resolution71152B10/31/201611/04/2016 1    IPProblem Identification and Resolution71152B11/14/201611/18/2016 EP-EP PROGRAM INSPECTION 51    IPAlert and Notification System Testing711140211/14/201611/18/2016 1    IPEmergency Preparedness Organization Staffing and Augmentation System711140311/14/201611/18/2016 1    IPEmergency Action Level and Emergency Plan Changes711140411/14/201611/18/2016 1    IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140511/14/201611/18/2016 1    IPPerformance Indicator Verification7115111/14/201611/18/2016OL RQ-REQUAL INSP 21    IPLicensed Operator Requalification Program7111111B11/14/201611/18/2016 ISI-UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 21     IPInservice Inspection Activities - PWR7111108P03/27/2017 03/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21    IPRadiological Hazard Assessment and Exposure Controls71124.0103/27/2017 03/31/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
1          10/02/2017   10/06/2017   IP 7111105T            Fire Protection [Triennial]
Page 2 of 2 03/02/2016 08:19:01Report 22 UnitNumberPlanned Dates Start          EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 03/01/2016
EP           - EP EXERCISE                                                                   3 1          11/13/2017  11/17/2017   IP 7111401              Exercise Evaluation 1         11/13/2017  11/17/2017  IP 7111404              Emergency Action Level and Emergency Plan Changes 1          11/13/2017  11/17/2017   IP 7111408              Exercise Evaluation - Scenario Review 1          11/13/2017  11/17/2017   IP 71151                Performance Indicator Verification This report does not include INPO and OUTAGE activities.
-12/31/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 1 21    IPOccupational ALARA Planning and Controls71124.0203/27/2017 03/31/2017 1    IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0303/27/2017 03/31/2017 1     IPOccupational Dose Assessment71124.0403/27/2017 03/31/2017 1     IPRadiation Monitoring Instrumentation71124.0503/27/2017 03/31/2017 1    IPPerformance Indicator Verification7115103/27/2017 03/31/2017 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 11    IPInservice Inspection Activities - PWR7111108P04/03/2017 04/07/2017 RP-RP OCCUPATIONAL INSPECTION WEEK 2 31    IPRadiological Hazard Assessment and Exposure Controls71124.0104/17/2017 04/21/2017 1    IPOccupational ALARA Planning and Controls71124.0204/17/2017 04/21/2017 1    IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0304/17/2017 04/21/2017 1    IPOccupational Dose Assessment71124.0404/17/2017 04/21/2017 1     IPRadiation Monitoring Instrumentation71124.0504/17/2017 04/21/2017 1     IPPerformance Indicator Verification7115104/17/2017 04/21/2017 TFPI-TRIENNIEL FIRE PROTECTION INSPECTION 11    IPFire Protection [Triennial]7111105T09/18/2017 09/22/2017 1    IPFire Protection [Triennial]7111105T10/02/2017 10/06/2017 EP-EP EXERCISE 31    IPExercise Evaluation711140111/13/201711/17/2017 1     IPEmergency Action Level and Emergency Plan Changes711140411/13/201711/17/2017 1    IPExercise Evaluation - Scenario Review711140811/13/201711/17/2017 1    IPPerformance Indicator Verification7115111/13/201711/17/2017 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 22:16, 30 October 2019

Annual Assessment Letter
ML16062A286
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/02/2016
From: Alan Blamey
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
IR 2015006
Download: ML16062A286 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 2, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006

Dear Mr. Shea:

On February 11, 2016, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant (WBN) Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and Operator Licensing Examinations. The NRC will continue to evaluate the effectiveness of TVAs oversight and management of operations during Unit 2 startup, in accordance with IMC 2517 Watts Bar 2 Inspection Program. This will include inspections and reviews addressing the organizational and operational challenges associated with the integration of both Watts Bar units.

J. Shea 2 In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-390 License No.: NPF-90

Enclosure:

Watts Bar Inspection/Activity Plan (03/01/2016 - 12/31/2017) cc: Distribution via ListServ

________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE CRK1 ABJ3 NAME C. Kontz A. Blamey DATE 2/26/2016 3/2/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

J. Shea 3 Letter to Joseph W. Shea from Alan Blamey dated March 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006 Distribution w/encl:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Watts Bar 03/02/2016 08:19:01 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 3 1 03/07/2016 03/11/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 03/21/2016 03/25/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/20/2016 06/24/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 7 1 06/27/2016 07/01/2016 IP 7111121 Component Design Bases Inspection 1 07/18/2016 07/22/2016 IP 7111121 Component Design Bases Inspection 1 08/08/2016 08/12/2016 IP 7111121 Component Design Bases Inspection 1 08/22/2016 08/26/2016 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL LICENSE EXAM 3 1 07/18/2016 07/22/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC RAD SAFETY BASELINE 4 1 08/01/2016 08/05/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/01/2016 08/05/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/01/2016 08/05/2016 IP 71124.07 Radiological Environmental Monitoring Program 1 08/01/2016 08/05/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/01/2016 08/05/2016 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 10/31/2016 11/04/2016 IP 71152B Problem Identification and Resolution 1 11/14/2016 11/18/2016 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 5 1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing 1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/14/2016 11/18/2016 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSP 2 1 11/14/2016 11/18/2016 IP 7111111B Licensed Operator Requalification Program ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 03/27/2017 03/31/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Watts Bar 03/02/2016 08:19:01 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 04/03/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1 04/17/2017 04/21/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/17/2017 04/21/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 04/17/2017 04/21/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/17/2017 04/21/2017 IP 71124.04 Occupational Dose Assessment 1 04/17/2017 04/21/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 04/17/2017 04/21/2017 IP 71151 Performance Indicator Verification TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 1 1 09/18/2017 09/22/2017 IP 7111105T Fire Protection [Triennial]

1 10/02/2017 10/06/2017 IP 7111105T Fire Protection [Triennial]

EP - EP EXERCISE 3 1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation 1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/13/2017 11/17/2017 IP 7111408 Exercise Evaluation - Scenario Review 1 11/13/2017 11/17/2017 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 2, 2016 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006

Dear Mr. Shea:

On February 11, 2016, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant (WBN) Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2015, through December 31, 2015. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2017.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Inspection Procedure (IP) 43004, Inspection of Commercial-Grade Dedication Programs, and Operator Licensing Examinations. The NRC will continue to evaluate the effectiveness of TVAs oversight and management of operations during Unit 2 startup, in accordance with IMC 2517 Watts Bar 2 Inspection Program. This will include inspections and reviews addressing the organizational and operational challenges associated with the integration of both Watts Bar units.

J. Shea 2 In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4415 with any questions you have regarding this letter.

Sincerely,

/RA/

Alan Blamey, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-390 License No.: NPF-90

Enclosure:

Watts Bar Inspection/Activity Plan (03/01/2016 - 12/31/2017) cc: Distribution via ListServ

________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE CRK1 ABJ3 NAME C. Kontz A. Blamey DATE 2/26/2016 3/2/2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO

J. Shea 3 Letter to Joseph W. Shea from Alan Blamey dated March 2, 2016

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2015006 Distribution w/encl:

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 2 Watts Bar 03/02/2016 08:19:01 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PLANT MODIFICATIONS INSPECTION 3 1 03/07/2016 03/11/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 03/21/2016 03/25/2016 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications OL EXAM - INITIAL LICENSE EXAM PREP 3 1 06/20/2016 06/24/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES CDBI - COMPONENT DESIGN BASES INSPECTION 7 1 06/27/2016 07/01/2016 IP 7111121 Component Design Bases Inspection 1 07/18/2016 07/22/2016 IP 7111121 Component Design Bases Inspection 1 08/08/2016 08/12/2016 IP 7111121 Component Design Bases Inspection 1 08/22/2016 08/26/2016 IP 7111121 Component Design Bases Inspection OL EXAM - INITIAL LICENSE EXAM 3 1 07/18/2016 07/22/2016 V23475 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES RP - RP PUBLIC RAD SAFETY BASELINE 4 1 08/01/2016 08/05/2016 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/01/2016 08/05/2016 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 08/01/2016 08/05/2016 IP 71124.07 Radiological Environmental Monitoring Program 1 08/01/2016 08/05/2016 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 1 08/01/2016 08/05/2016 IP 71151 Performance Indicator Verification PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 10/31/2016 11/04/2016 IP 71152B Problem Identification and Resolution 1 11/14/2016 11/18/2016 IP 71152B Problem Identification and Resolution EP - EP PROGRAM INSPECTION 5 1 11/14/2016 11/18/2016 IP 7111402 Alert and Notification System Testing 1 11/14/2016 11/18/2016 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/14/2016 11/18/2016 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/14/2016 11/18/2016 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/14/2016 11/18/2016 IP 71151 Performance Indicator Verification OL RQ - REQUAL INSP 2 1 11/14/2016 11/18/2016 IP 7111111B Licensed Operator Requalification Program ISI - UNIT 1 IN-SERVICE INSPECTION & RVH EXAM 2 1 03/27/2017 03/31/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1 03/27/2017 03/31/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Watts Bar 03/02/2016 08:19:01 Inspection / Activity Plan Report 22 03/01/2016 - 12/31/2017 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RP - RP OCCUPATIONAL INSPECTION WEEK 1 2 1 03/27/2017 03/31/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 03/27/2017 03/31/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/27/2017 03/31/2017 IP 71124.04 Occupational Dose Assessment 1 03/27/2017 03/31/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 03/27/2017 03/31/2017 IP 71151 Performance Indicator Verification SGISI - UNIT 1 SG IN-SERVICE INSPECTION 1 1 04/03/2017 04/07/2017 IP 7111108P Inservice Inspection Activities - PWR RP - RP OCCUPATIONAL INSPECTION WEEK 2 3 1 04/17/2017 04/21/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/17/2017 04/21/2017 IP 71124.02 Occupational ALARA Planning and Controls 1 04/17/2017 04/21/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/17/2017 04/21/2017 IP 71124.04 Occupational Dose Assessment 1 04/17/2017 04/21/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 04/17/2017 04/21/2017 IP 71151 Performance Indicator Verification TFPI - TRIENNIEL FIRE PROTECTION INSPECTION 1 1 09/18/2017 09/22/2017 IP 7111105T Fire Protection [Triennial]

1 10/02/2017 10/06/2017 IP 7111105T Fire Protection [Triennial]

EP - EP EXERCISE 3 1 11/13/2017 11/17/2017 IP 7111401 Exercise Evaluation 1 11/13/2017 11/17/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/13/2017 11/17/2017 IP 7111408 Exercise Evaluation - Scenario Review 1 11/13/2017 11/17/2017 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.