| number = ML16154A270
| number = ML16154A270
| issue date = 06/01/2016
| issue date = 06/01/2016
| title = H.B. Robinson Steam Electric Plant - Notification of Licensed Operator Re-Take Initial Examination 05000261/2016302
| title = Notification of Licensed Operator Re-Take Initial Examination 05000261/2016302
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Glover R M
| addressee name = Glover R
| addressee affiliation = Duke Energy Corp
| addressee affiliation = Duke Energy Corp
| docket = 05000261
| docket = 05000261
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
See also: [[followed by::IR 05000261/2016302]]
See also: [[see also::IR 05000261/2016302]]


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 1, 2016 Richard Michael Glover Site Vice President  
{{#Wiki_filter:UNITED STATES
H.B. Robinson Steam Electric Plant  
                                NUCLEAR REGULATORY COMMISSION
Duke Energy Corporation  
                                              REGION II
3581 West Entrance, RNPA01  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Hartsville, SC 29550 SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
                                      ATLANTA, GEORGIA 30303-1257
  OPERATOR RE-TAKE INITIAL EXAMINATION 05000261/2016302 Dear R. Glover: In a meeting on May 24, 2016, between Mr. Christopher McComber, Training Instructor and
                                          June 1, 2016
Mr. Joseph Rackley, Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations  
Richard Michael Glover
Engineer, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The simulator portion of an operating test is scheduled to be administered during the week of July 25, 2016. The on-site preparatory week is scheduled for the week of July 25, 2016.  
Site Vice President
H.B. Robinson Steam Electric Plant
As agreed during the telephone conversation, your staff will prepare the examinations based on  
Duke Energy Corporation
the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for  
3581 West Entrance, RNPA01
Power Reactors.The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
Hartsville, SC 29550
To meet the above schedule, it will be necessary for your staff to furnish the operating test  
SUBJECT:         H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
outline by June 2, 2016. The operating tests and supporting reference materials identified in  
                OPERATOR RE-TAKE INITIAL EXAMINATION 05000261/2016302
Attachment 3 to ES-201 will be due by July 7, 2016. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the  
Dear R. Glover:
Commission for review and approval. All materials shall be complete and ready-to-use. We  
In a meeting on May 24, 2016, between Mr. Christopher McComber, Training Instructor and
request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in  
Mr. Joseph Rackley, Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
Engineer, arrangements were made for the administration of licensing examinations at
To conduct the requested operating tests, it will be necessary for your staff to provide adequate  
H. B. Robinson Steam Electric Plant. The simulator portion of an operating test is scheduled to
space and accommodations in accordance with ES-402, and to make the simulation facility  
be administered during the week of July 25, 2016. The on-site preparatory week is scheduled
available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
for the week of July 25, 2016.
R. Glover 2
As agreed during the telephone conversation, your staff will prepare the examinations based on
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered.
the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget  
Power Reactors. The NRCs regional office will discuss with your staff any changes that might
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016. If the applications are not received at least 15 days before the examination date, a postponement may be necessary. Signed application certifying that all remedial training has been completed  
be necessary before the examinations are administered.
should be submitted at least by July 14, 2016.  
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by June 2, 2016. The operating tests and supporting reference materials identified in
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for  
Attachment 3 to ES-201 will be due by July 7, 2016. Pursuant to Title 10, Section 55.40(b)(3),
this collection of information is estimated to average 2500 hours per response, including the  
of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the
time for reviewing instructions, gathering and maintaining the data needed, writing the  
facility licensee shall approve the examinations, and tests before they are submitted to the
examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
Commission for review and approval. All materials shall be complete and ready-to-use. We
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;  
request that any personal, proprietary, sensitive unclassified, or safeguards information in your
response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested operating tests, it will be necessary for your staff to provide adequate
space and accommodations in accordance with ES-402, and to make the simulation facility
available on the dates noted above. In accordance with ES-302, your staff should retain the
original simulator performance data (e.g., system pressures, temperatures, and levels)
generated during the dynamic operating tests until the examination results are final.
 
R. Glover                                     2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016. If the
applications are not received at least 15 days before the examination date, a postponement
may be necessary. Signed application certifying that all remedial training has been completed
should be submitted at least by July 14, 2016.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.  
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and  
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Rackely has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail:  
electronically for public inspection in the NRCs Public Document Room or from the Publicly
Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov). Sincerely,       /RA/ Eugene F. Guthrie, Chief       Operations Branch 2       Division of Reactor Safety
Available Records (PARS) component of the NRCs Agencywide Documents Access and
Docket No.: 50-261  
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page
License No.: DPR-23  
of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
cc: Distribution via Listserv  
Thank you for your cooperation in this matter. Mr. Rackely has been advised of the policies and
R. Glover 2  Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered. 
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016.  If the applications are not received at least 15 days before the examination date, a postponement may be necessary. Signed application certifying that all remedial training has been completed should be submitted at least by July 14, 2016.  This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 2500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.  In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page  of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.  Thank you for your cooperation in this matter.  Mr. Rackely has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov).  Sincerely,      /RA/  Eugene F. Guthrie, Chief      Operations Branch 2      Division of Reactor Safety
procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail:
Docket No.: 50-261 License No.: DPR-23
Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
cc: Distribution via Listserv  PUBLICLY AVAILABLE        NON-PUBLICLY AVAILABLE        SENSITIVE        NON-SENSITIVE  ADAMS:  Yes    ACCESSION NUMBER:_ _______    SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RSB2 EFG      NAME BALDWIN GUTHRIE      DATE 6/ 1/2016 6/1/2016      E-MAIL COPY?    YES NO        YES NO          YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\ROBINSON EXAMINATIONS\IINITIAL EXAM - 2016-302 RETAKE EXAM\ROBINSON 2016-302 CORPORATE RE-TAKE NOTIFICATION LETTER.DOCX 
Eugene.Guthrie@nrc.gov).
                                                Sincerely,
                                                /RA/
                                                Eugene F. Guthrie, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
cc: Distribution via Listserv
 


_ _______      SUNSI REVIEW COMPLETE      FORM 665 ATTACHED
OFFICE              RII:DRS        RII:DRS
SIGNATURE          RSB2            EFG
NAME                BALDWIN        GUTHRIE
DATE                    6/ 1/2016      6/1/2016
E-MAIL COPY?          YES      NO    YES    NO                                                                  YES  NO
}}
}}

Latest revision as of 19:21, 30 October 2019

Notification of Licensed Operator Re-Take Initial Examination 05000261/2016302
ML16154A270
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/01/2016
From: Eugene Guthrie
Division of Reactor Safety II
To: Glover R
Duke Energy Corp
References
50-261/16-302
Download: ML16154A270 (3)


See also: IR 05000261/2016302

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

June 1, 2016

Richard Michael Glover

Site Vice President

H.B. Robinson Steam Electric Plant

Duke Energy Corporation

3581 West Entrance, RNPA01

Hartsville, SC 29550

SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR RE-TAKE INITIAL EXAMINATION 05000261/2016302

Dear R. Glover:

In a meeting on May 24, 2016, between Mr. Christopher McComber, Training Instructor and

Mr. Joseph Rackley, Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations

Engineer, arrangements were made for the administration of licensing examinations at

H. B. Robinson Steam Electric Plant. The simulator portion of an operating test is scheduled to

be administered during the week of July 25, 2016. The on-site preparatory week is scheduled

for the week of July 25, 2016.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in Revision 10, of NUREG-1021, Operator Licensing Examination Standards for

Power Reactors. The NRCs regional office will discuss with your staff any changes that might

be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by June 2, 2016. The operating tests and supporting reference materials identified in

Attachment 3 to ES-201 will be due by July 7, 2016. Pursuant to Title 10, Section 55.40(b)(3),

of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the

facility licensee shall approve the examinations, and tests before they are submitted to the

Commission for review and approval. All materials shall be complete and ready-to-use. We

request that any personal, proprietary, sensitive unclassified, or safeguards information in your

response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

To conduct the requested operating tests, it will be necessary for your staff to provide adequate

space and accommodations in accordance with ES-402, and to make the simulation facility

available on the dates noted above. In accordance with ES-302, your staff should retain the

original simulator performance data (e.g., system pressures, temperatures, and levels)

generated during the dynamic operating tests until the examination results are final.

R. Glover 2

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016. If the

applications are not received at least 15 days before the examination date, a postponement

may be necessary. Signed application certifying that all remedial training has been completed

should be submitted at least by July 14, 2016.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page

of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Rackely has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail:

Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

cc: Distribution via Listserv

_ _______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RSB2 EFG

NAME BALDWIN GUTHRIE

DATE 6/ 1/2016 6/1/2016