ML16217A344: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16217A344 | | number = ML16217A344 | ||
| issue date = 08/02/2016 | | issue date = 08/02/2016 | ||
| title = | | title = ES-301-2 Srou | ||
| author name = | | author name = | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/20/16 thru 6/20/16 __ | ||
Exam Level: RO SRO(I) SRO(U) Operating Test No.: __DB NRC 2016__ | |||
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U) | |||
System / JPM Title Type Code* Safety Function S1 - (001) / Swap CRD Booster Pumps N, A, S 1 (Alt Path - Loss of CRDM cooling flow) (JPM New) | |||
S2 - (006) / Transfer LPI Suction to the Emergency Sump D, A, S, E, (Alt Path - Failure of Permit Interlock) (JPM 291) 2 EN S7 - (012) / Deenergize Source Range NIs D, S, L 7 (JPM 185) | |||
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) | |||
P2 - (039) / Locally Operate Atmospheric Vent Valve ICS11A D, E, R 4s (JPM 024) | |||
P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries D, A 6 (Alt Path - Cooling Fan Failure) (JPM 258) | |||
@ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system) | |||
(L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected) | |||
(R)CA 1/1/1 (S)imulator}} |
Latest revision as of 16:30, 30 October 2019
ML16217A344 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 08/02/2016 |
From: | Operations Branch III |
To: | FirstEnergy Nuclear Operating Co |
Shared Package | |
ML15274A353 | List: |
References | |
L-16-044 | |
Download: ML16217A344 (1) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/20/16 thru 6/20/16 __
Exam Level: RO SRO(I) SRO(U) Operating Test No.: __DB NRC 2016__
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
System / JPM Title Type Code* Safety Function S1 - (001) / Swap CRD Booster Pumps N, A, S 1 (Alt Path - Loss of CRDM cooling flow) (JPM New)
S2 - (006) / Transfer LPI Suction to the Emergency Sump D, A, S, E, (Alt Path - Failure of Permit Interlock) (JPM 291) 2 EN S7 - (012) / Deenergize Source Range NIs D, S, L 7 (JPM 185)
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P2 - (039) / Locally Operate Atmospheric Vent Valve ICS11A D, E, R 4s (JPM 024)
P3 - (064) / Energize Station Blackout Diesel Generator Auxiliaries D, A 6 (Alt Path - Cooling Fan Failure) (JPM 258)
@ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path 4-6 /4-6 /2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature 1 / 1 / > 1 (control room system)
(L)ow-power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3/ 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator