ML16301A135: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Lamb, John Sent: Thursday, October 27, 2016 10:33 AM To:Guth, Mitch (Mitch.Guth@fpl.com)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                         Lamb, John Sent:                         Thursday, October 27, 2016 10:33 AM To:                           Guth, Mitch (Mitch.Guth@fpl.com)
Cc: Catron, Steve; Mack, Jarrett; Hanek, Olga; Czaya, Paul; Klett, Audrey; Hamm, Matthew
Cc:                           Catron, Steve; Mack, Jarrett; Hanek, Olga; Czaya, Paul; Klett, Audrey; Hamm, Matthew


==Subject:==
==Subject:==
TURKEY POINT 3 AND 4 - RAI FOR LICENSE AMENDMENT REQUEST TO REVISE THE AUXILARY FEEDWATER SYSTEM TECHNICA L SPECIFICATIONS (CAC NOS. MF8068 AND MF8069)Importance:High
TURKEY POINT 3 AND 4 - RAI FOR LICENSE AMENDMENT REQUEST TO REVISE THE AUXILARY FEEDWATER SYSTEM TECHNICAL SPECIFICATIONS (CAC NOS. MF8068 AND MF8069)
Importance:                   High


==Dear Mr. Guth:==
==Dear Mr. Guth:==


By application dated June 30, 2016, (Agencywide Documents Access and Management System Accession No. ML16194A342), Florida Power & Light Company (FPL or the licensee), submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) at Turkey Point Nuclear Plant, Units 3 and 4 (Turkey Point).
By application dated June 30, 2016, (Agencywide Documents Access and Management System Accession No.
The licensee's proposed LAR would revise Turkey Point TS 3/4.7.1.2, "Auxiliary Feedwater System," to correct a non-conservative TS.  
ML16194A342), Florida Power & Light Company (FPL or the licensee), submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) at Turkey Point Nuclear Plant, Units 3 and 4 (Turkey Point).
 
The licensees proposed LAR would revise Turkey Point TS 3/4.7.1.2, Auxiliary Feedwater System, to correct a non-conservative TS.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by FPL in its submittal dated June 30, 2016, and determined that additional information is needed to complete the review.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by FPL in its submittal dated June 30, 2016, and determined that additional information is needed to complete the review.
 
The below enclosed documents the NRC staff's specific request for additional information (RAI). As previously discussed with Jarrett Mack and Steve Catron of your staff on October 27, 2016, the NRC is requesting a response to the RAI by November 17, 2016.
The below enclosed documents the NRC staff's specific req uest for additional information (RAI). As previously discussed with Jarrett Mack and Steve Catron of your staff on October 27, 2016, the NRC is requesting a response to the RAI by November 17, 2016.
Please contact me at 301-415-3100 if you have any questions.
Please contact me at 301-415-3100 if you have any questions.
Sincerely,
Sincerely, John G. Lamb John G. Lamb, Senior Project Manager Plant Licensing Branch 4-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos: 50-250 and 50-251
 
John G. Lamb John G. Lamb, Senior Project Manager Plant Licensing Branch 4-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket Nos: 50-250 and 50-251  


==Enclosure:==
==Enclosure:==
As stated  
As stated RAI By application dated June 30, 2016, (Agencywide Documents Access and Management System Accession No.
 
ML16194A342), Florida Power & Light Company (FPL or the licensee), submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) at Turkey Point Nuclear Plant, Units 3 and 4 (Turkey 1
RAI By application dated June 30, 2016, (Agencywide Documents Access and Management System Accession No. ML16194A342), Florida Power & Light Company (FPL or the licensee), submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) at Turkey Point Nuclear Plant, Units 3 and 4 (Turkey 2Point). The licensee's proposed LAR would revise Turkey Point TS 3/4.7.1.2, "Auxiliary Feedwater System," to correct a non-conservative TS.
 
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by FPL in its submittal dated June 30, 2016, and determined that additional information is needed to complete the review.
 
REQUEST FOR ADDITIONAL INFORMATION
 
Table 3.7-3 describes the allowable plant configurations which satisfy the current Limiting Condition for Operation (LCO) 3.7.1.2 requirement of three operable auxiliary feedwater (AFW) pumps and associated flow paths. Table 3.7-3 is supplemented by 3 notes. Note 3 states:
 
If any local manual realignment of valves is required when operating the auxiliary feedwater pumps, a dedicated individual, who is in communication with the control room, shall be stationed at the auxiliary feedwater pump area. Upon instructions from the control room, this operator would realign the valves in the AFW system train to its normal operational alignment.


Point). The licensees proposed LAR would revise Turkey Point TS 3/4.7.1.2, Auxiliary Feedwater System, to correct a non-conservative TS.
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by FPL in its submittal dated June 30, 2016, and determined that additional information is needed to complete the review.
REQUEST FOR ADDITIONAL INFORMATION Table 3.7-3 describes the allowable plant configurations which satisfy the current Limiting Condition for Operation (LCO) 3.7.1.2 requirement of three operable auxiliary feedwater (AFW) pumps and associated flow paths. Table 3.7-3 is supplemented by 3 notes. Note 3 states:
If any local manual realignment of valves is required when operating the auxiliary feedwater pumps, a dedicated individual, who is in communication with the control room, shall be stationed at the auxiliary feedwater pump area. Upon instructions from the control room, this operator would realign the valves in the AFW system train to its normal operational alignment.
Notes 1 and 2 for the table are proposed to be rewritten to apply to the LCO statement, while Note 3 is proposed for deletion.
Notes 1 and 2 for the table are proposed to be rewritten to apply to the LCO statement, while Note 3 is proposed for deletion.
Federal Register Notice 58 FR 39132 contains the NRC's Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors. In reference to the four criteria listed in Title 10 of the Code of Federal Regulations, Part 50 (10 CFR), Section 36(c)2(ii), the Policy Statement states: "LCOs which do not meet any of the criteria below may be proposed for removal from the Technical Specifications and relocation to licensee-controlled documents, such as the [Final Safety Analysis Report] FSAR.The Policy statement further states:
Federal Register Notice 58 FR 39132 contains the NRCs Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors. In reference to the four criteria listed in Title 10 of the Code of Federal Regulations, Part 50 (10 CFR), Section 36(c)2(ii), the Policy Statement states: LCOs which do not meet any of the criteria below may be proposed for removal from the Technical Specifications and relocation to licensee-controlled documents, such as the [Final Safety Analysis Report] FSAR.
If a licensee elects to apply these criteria, the requirements of the removed specifications will be relocated to the FSAR or other licensee-controlled documents. Licensees are to operate their facilities in conformance with the descriptions of their facilities and procedures in their FSAR. Changes to the facility or to procedures described in the FSAR are to be made in accordance with 10 CFR 50.59.  
The Policy statement further states:
 
If a licensee elects to apply these criteria, the requirements of the removed specifications will be relocated to the FSAR or other licensee-controlled documents. Licensees are to operate their facilities in conformance with the descriptions of their facilities and procedures in their FSAR.
Please provide a description of:  
Changes to the facility or to procedures described in the FSAR are to be made in accordance with 10 CFR 50.59.
Please provide a description of:
(1) Where the technical and administrative requirements proposed for removal from the TS, in this case the requirements for manual realignment of the AFW system, will be located or are currently located.
(2) The control process(es) that will be used for relocated technical and administrative requirements.
2


(1) Where the technical and administrative requirements proposed for removal from the TS, in this case the requirements for manual realignment of the AFW system, will be located or are currently located.
Hearing Identifier:     NRR_PMDA Email Number:           3127 Mail Envelope Properties     (John.Lamb@nrc.gov20161027103200)
 
(2) The control process(es) that will be used for relocated technical and administrative requirements.
 
Hearing Identifier: NRR_PMDA Email Number: 3127   Mail Envelope Properties   (John.Lamb@nrc.gov20161027103200)


==Subject:==
==Subject:==
TURKEY POINT 3 AND 4 - RAI FOR LICENSE AMENDMENT REQUEST TO REVISE THE AUXILARY FEEDWATER SYSTEM TECHNICAL SPECIFICATIONS (CAC NOS. MF8068 AND MF8069)
TURKEY POINT 3 AND 4 - RAI FOR LICENSE AMENDMENT REQUEST TO REVISE THE AUXILARY FEEDWATER SYSTEM TECHNICAL SPECIFICATIONS (CAC NOS. MF8068 AND MF8069)
Sent Date:   10/27/2016 10:32:54 AM Received Date: 10/27/2016 10:32:00 AM From:   Lamb, John Created By:   John.Lamb@nrc.gov  
Sent Date:               10/27/2016 10:32:54 AM Received Date:           10/27/2016 10:32:00 AM From:                   Lamb, John Created By:             John.Lamb@nrc.gov Recipients:
 
"Catron, Steve" <Steve.Catron@fpl.com>
Recipients:     "Catron, Steve" <Steve.Catron@fpl.com> Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com> Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Czaya, Paul" <Paul.Czaya@fpl.com>
Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com>
Tracking Status: None "Klett, Audrey" <Audrey.Klett@nrc.gov> Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov> Tracking Status: None "Guth, Mitch (Mitch.Guth@fpl.com)" <Mitch.Guth@fpl.com>
Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>
Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   4053     10/27/2016 10:32:00 AM
Tracking Status: None "Czaya, Paul" <Paul.Czaya@fpl.com>
 
Tracking Status: None "Klett, Audrey" <Audrey.Klett@nrc.gov>
Options Priority:     High   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov>
Tracking Status: None "Guth, Mitch (Mitch.Guth@fpl.com)" <Mitch.Guth@fpl.com>
Tracking Status: None Post Office:
Files                           Size                 Date & Time MESSAGE                         4053                 10/27/2016 10:32:00 AM Options Priority:                       High Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Revision as of 12:47, 30 October 2019

Turkey Point Nuclear Plant, Units 3 and 4 - Request for Additional Information for License Amendment Request to Revise the Auxilary Feedwater System Technical Specifications (CAC Nos. MF8068 and MF8069)
ML16301A135
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/27/2016
From: John Lamb
Plant Licensing Branch IV
To: Guth M
Florida Power & Light Co
References
MF8068, MF8069
Download: ML16301A135 (3)


Text

NRR-PMDAPEm Resource From: Lamb, John Sent: Thursday, October 27, 2016 10:33 AM To: Guth, Mitch (Mitch.Guth@fpl.com)

Cc: Catron, Steve; Mack, Jarrett; Hanek, Olga; Czaya, Paul; Klett, Audrey; Hamm, Matthew

Subject:

TURKEY POINT 3 AND 4 - RAI FOR LICENSE AMENDMENT REQUEST TO REVISE THE AUXILARY FEEDWATER SYSTEM TECHNICAL SPECIFICATIONS (CAC NOS. MF8068 AND MF8069)

Importance: High

Dear Mr. Guth:

By application dated June 30, 2016, (Agencywide Documents Access and Management System Accession No.

ML16194A342), Florida Power & Light Company (FPL or the licensee), submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) at Turkey Point Nuclear Plant, Units 3 and 4 (Turkey Point).

The licensees proposed LAR would revise Turkey Point TS 3/4.7.1.2, Auxiliary Feedwater System, to correct a non-conservative TS.

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by FPL in its submittal dated June 30, 2016, and determined that additional information is needed to complete the review.

The below enclosed documents the NRC staff's specific request for additional information (RAI). As previously discussed with Jarrett Mack and Steve Catron of your staff on October 27, 2016, the NRC is requesting a response to the RAI by November 17, 2016.

Please contact me at 301-415-3100 if you have any questions.

Sincerely, John G. Lamb John G. Lamb, Senior Project Manager Plant Licensing Branch 4-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos: 50-250 and 50-251

Enclosure:

As stated RAI By application dated June 30, 2016, (Agencywide Documents Access and Management System Accession No.

ML16194A342), Florida Power & Light Company (FPL or the licensee), submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) at Turkey Point Nuclear Plant, Units 3 and 4 (Turkey 1

Point). The licensees proposed LAR would revise Turkey Point TS 3/4.7.1.2, Auxiliary Feedwater System, to correct a non-conservative TS.

The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by FPL in its submittal dated June 30, 2016, and determined that additional information is needed to complete the review.

REQUEST FOR ADDITIONAL INFORMATION Table 3.7-3 describes the allowable plant configurations which satisfy the current Limiting Condition for Operation (LCO) 3.7.1.2 requirement of three operable auxiliary feedwater (AFW) pumps and associated flow paths. Table 3.7-3 is supplemented by 3 notes. Note 3 states:

If any local manual realignment of valves is required when operating the auxiliary feedwater pumps, a dedicated individual, who is in communication with the control room, shall be stationed at the auxiliary feedwater pump area. Upon instructions from the control room, this operator would realign the valves in the AFW system train to its normal operational alignment.

Notes 1 and 2 for the table are proposed to be rewritten to apply to the LCO statement, while Note 3 is proposed for deletion.

Federal Register Notice 58 FR 39132 contains the NRCs Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors. In reference to the four criteria listed in Title 10 of the Code of Federal Regulations, Part 50 (10 CFR), Section 36(c)2(ii), the Policy Statement states: LCOs which do not meet any of the criteria below may be proposed for removal from the Technical Specifications and relocation to licensee-controlled documents, such as the [Final Safety Analysis Report] FSAR.

The Policy statement further states:

If a licensee elects to apply these criteria, the requirements of the removed specifications will be relocated to the FSAR or other licensee-controlled documents. Licensees are to operate their facilities in conformance with the descriptions of their facilities and procedures in their FSAR.

Changes to the facility or to procedures described in the FSAR are to be made in accordance with 10 CFR 50.59.

Please provide a description of:

(1) Where the technical and administrative requirements proposed for removal from the TS, in this case the requirements for manual realignment of the AFW system, will be located or are currently located.

(2) The control process(es) that will be used for relocated technical and administrative requirements.

2

Hearing Identifier: NRR_PMDA Email Number: 3127 Mail Envelope Properties (John.Lamb@nrc.gov20161027103200)

Subject:

TURKEY POINT 3 AND 4 - RAI FOR LICENSE AMENDMENT REQUEST TO REVISE THE AUXILARY FEEDWATER SYSTEM TECHNICAL SPECIFICATIONS (CAC NOS. MF8068 AND MF8069)

Sent Date: 10/27/2016 10:32:54 AM Received Date: 10/27/2016 10:32:00 AM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:

"Catron, Steve" <Steve.Catron@fpl.com>

Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com>

Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>

Tracking Status: None "Czaya, Paul" <Paul.Czaya@fpl.com>

Tracking Status: None "Klett, Audrey" <Audrey.Klett@nrc.gov>

Tracking Status: None "Hamm, Matthew" <Matthew.Hamm@nrc.gov>

Tracking Status: None "Guth, Mitch (Mitch.Guth@fpl.com)" <Mitch.Guth@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 4053 10/27/2016 10:32:00 AM Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: