ML17128A306: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/05/2017
| issue date = 05/05/2017
| title = William B. McGuire Nuclear Plant - Notification of Inspection and Request for Information
| title = William B. McGuire Nuclear Plant - Notification of Inspection and Request for Information
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/PSB1
| author affiliation = NRC/RGN-II/DRS/PSB1
| addressee name = Capps S D
| addressee name = Capps S
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000369, 05000370
| docket = 05000369, 05000370
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257   May 5, 2017 Steven D. Capps Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2017 Steven D. Capps Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985


==SUBJECT:==
==SUBJECT:==
WILLIAM B. McGUIRE NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
WILLIAM B. McGUIRE NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION


==Dear Mr. Capps,==
==Dear Mr. Capps,==
During the week of June 5 - 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the McGuire Nuclear Station (NRC Inspection Procedures 71124.06, 71124.07, 71134.08 and 71151).
During the week of June 5 - 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the McGuire Nuclear Station (NRC Inspection Procedures 71124.06, 71124.07, 71134.08 and 71151).
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 26, 2017.  
Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 26, 2017.
We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Joseph Hussey, Regulatory Affairs, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Carmen Dykes at 404-997-1401, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers


We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Joseph Hussey, Regulatory Affairs, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Carmen Dykes at 404-997-1401, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.
S. Capps                                   2 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
 
Sincerely,
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public inspections, exemptions, requests for withholding," a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers S. Capps 2 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number. Sincerely,  
                                            /RA/
/RA/ Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17
Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17


==Enclosure:==
==Enclosure:==


Pre-Inspection Document Request  
Pre-Inspection Document Request cc: Distribution via Listserv


cc:  Distribution via Listserv S. Capps 3
S. Capps                                         3


==SUBJECT:==
==SUBJECT:==
WILLIAM B. McGUIRE NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION - DATED: May 5, 2017   Distribution: F. Ehrhardt, RII, DRP J. Worosilo, RII, SR PE M. Toth, RII, PE A. Hutto, RII, SRI R. Cureton, RII, RI RIDSNRRDIRS Public  
WILLIAM B. McGUIRE NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION - DATED: May 5, 2017 Distribution:
F. Ehrhardt, RII, DRP J. Worosilo, RII, SR PE M. Toth, RII, PE A. Hutto, RII, SRI R. Cureton, RII, RI RIDSNRRDIRS Public PUBLICLY AVAILABLE                NON-PUBLICLY AVAILABLE                SENSITIVE        NON-SENSITIVE ADAMS:    Yes    ACCESSION NUMBER:_________________________                SUNSI REVIEW COMPLETE      FORM 665 ATTACHED OFFICE            RII:DRS        RII:DRS SIGNATURE          CMD via email  BRB via email NAME              CDYKES          BBONSER DATE                  .5/5/2017      5/5/2017    5/ /2017    5/  /2017      5/  /2017      5/ /2017      5/  /2017 E-MAIL COPY?        YES      NO    YES      NO  YES    NO  YES    NO      YES      NO    YES    NO    YES    NO OFFICIAL    RECORD        COPY      DOCUMENT    NAME:      G:\DRSII\PSB1\RFI    INFORMATION    REQUEST LETTERS\MCGUIRE\2017\MCGUIRE RP RFI 2017 002.DOCX


PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE  NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE CMD via email BRB via email      NAME CDYKES BBONSER      DATE .5/5/2017 5/5/2017 5/   /2017 5/   /2017 5/   /2017 5/    /2017 5/    /2017 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME: G:\DRSII\PSB1\RFI INFORMATION REQUEST LETTERS\MCGUIRE\2017\MCGUIRE RP RFI 2017 002.DOCX
Pre-Inspection Document Request Occupational and Public Radiation Safety Cornerstone Inspection Dates:                      June 5 - 9, 2017 Documents Due to Region II by:         May 26, 2017 Licensee:                             McGuire Nuclear Station Docket Number:                         05000369, 370 Inspection Procedure:                 IP 71124.06   Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07   Radiological Environmental Monitoring Program IP 71124.08   Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation IP 71151      Performance Indicator Verification Lead Inspector & Mailing Address:
Carmen Dykes                  U.S. Nuclear Regulatory Commission Health Physicist              Region II U.S. NRC Region II            ATTN: Carmen Dykes 404-997-4401                  245 Peachtree Center Ave., N.E Carmen.dykes@nrc.gov          Suite 1200 Atlanta, GA 30303 Note: The current version of these documents is expected unless specified otherwise.
Electronic media (CDs, DvDs, FTP site) is preferred if readily available. [Note do not provide data on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. Please note the date ranges for the items requested as they may change from item to item. If there are questions or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector, Carmen Dykes at (404) 997-4101.
Miscellaneous
: 1. List of primary contacts for each inspection area including names and telephone numbers
: 2. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers.
: 3. List of radiation protection procedures, including title and number.
: 4. Corrective action program (CAP) procedures Enclosure


Enclosure Pre-Inspection Document Request  Occupational and Public Radiation Safety Cornerstone  Inspection Dates:   June 5 - 9, 2017
2 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected June 2015)
: 1. Site and/or corporate procedures associated with implementing the effluents and the groundwater monitoring program. Procedures should include those that address:
: a. Effluent sampling
: b. Effluent monitor set-point determinations
: c. Dose calculations
: d. Groundwater monitoring and reporting of spills/leaks
: e. Methodology for determining effluent stack/vent flow rates
: 2. Offsite Dose Calculation Manual (ODCM) and a list of changes made in the last revision.
: 3. Annual Radiological Effluent Releaser Reports (ARERRs) for calendar years (CYs) 2015 and 2016.
: 4. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 1 day since June 1, 2015, including any special reports submitted to the NRC as a result of effluent monitor operability.
: 5. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since June 1, 2015. If applicable, provide the Licensee Event Report (LER), event report, and/or special report.
: 6. List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed, since June 1, 2015.
: 7. List of any changes to the effluent release points or effluent treatment systems, and associated 10 CFR 50.59 documentation since June 1, 2015.
: 8. Material condition surveillance records for effluent system components not readily accessible, including those inaccessible due to radiological conditions.
: 9. Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases. Only provide permits for last releases within each category.
: 10. Results of inter-laboratory comparison program for the count lab since June 1 2015.
: 11. Last two surveillance results for the engineered safety feature (ESF) ventilation systems (e.g., system flow, HEPA, charcoal filter tests).
: 12. Groundwater monitoring results since June 1, 2015.
: 13. List of changes to the written groundwater monitoring program for identifying/controlling contaminated spills/leaks since June 1, 2015.
: 14. List of onsite surface water bodies (e.g., ponds, retention basins, lakes) that contain or potentially contain radioactivity.


Documents Due to Region II by: May 26, 2017
3
: 15. List of CAP problem identification programs (PIPs) generated since June 1, 2015, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
: 16. Audit and self-assessment documents generated since July 1, 2013, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
71124.07 - Radiological Environmental Monitoring Program (Last Inspected June 2015)
: 1. Collection schedule for Radiological Environmental monitor Program (REMP) samples during the week of inspection.
: 2. Site and corporate procedures associated with radiological environmental monitoring, including:
: a. Collection, preparation, and analysis of environmental samples including air, Thermoluminescent Dosimeter (TLD) stations, ground and surface water, sediment, vegetation, milk, fish, etc.
: b. Calibration and maintenance of air and water sampling equipment.
: c. Calibration and quality control (QC) activities for sample counting instruments.
: d. Sampling and monitoring program to detect leaks from contaminated, or
: e. potentially contaminated, systems, structures, or components (SSCs).
: f. Calibration, operation, maintenance, and routine surveillances of meteorological monitoring instruments (wind speed & direction, air temperature, etc.).
: 3. Annual Radiological Environmental Operating Reports (AREORs) for CYs 2015 and 2016.
: 4. List of SSCs that contain, or could contain, licensed material for which there is a credible mechanism for the radioactive material (RAM) to reach ground water.
: 5. Summary of leaks and/or spills since June 1, 2015, (i.e. additions to the 10 CFR 50.75(g) file).
: 6. List of changes to the REMP (sample locations, sample frequency, type of samples, etc.)
since June 1, 2015.
: 7. Calibration and maintenance records for REMP air and composite water samplers since June 1, 2015.
: 8. Inter-laboratory comparison program results since June 1, 2015, (in-house or vendor laboratory).
: 9. Last two calibration/surveillance/maintenance records for the meteorological monitoring instruments since June 1, 2015, (wind speed, wind direction, and air temperature).
: 10. Results of TLD environmental monitoring since the last inspection.


Licensee:   McGuire Nuclear Station  Docket Number:   05000369, 370
4
: 11. List of CAP PIPs generated since June 1, 2015, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g.,
environmental lab).
: 12. Audit and self-assessment documents generated since June 1, 2015, related to REMP.
The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab).
71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected 09/2015)
: 1. Provide Procedures/Guidance Documents describing licensee compliance with 10 CFR Parts 20, 61, and 71, and 49 CFR Parts 170-189. Procedures/manuals should include:
: a. Solid and liquid radwaste processing procedures.
: b. Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers.
: c. Waste stream mixing and/or sampling procedures, including:
: i. waste concentration averaging; ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides; iii. ensuring waste stream composition data accounts for changing operational parameters.
: d. Shipping/transportation procedures.
: e. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports.
: 2. Provide a list of radioactive material (RAM) storage areas, including satellite radiological controlled areas (RCAs)
: 3. Provide Liquid and solid radwaste system diagrams and detailed system descriptions (e.g., information that might be contained in curricula for training new system engineers)
: 4. Provide the most recent radio-chemical sample analysis results (i.e., 10 CFR Part 61" analysis) for each of the radioactive waste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials).
: 5. List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the PCP since the September 2015, and associated 10 CFR 50.59 documentation, as appropriate.
: 6. Provide a log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since September 2015. (The inspectors will select three to five packages to review in detail.)
: 7. List of CAP NCRs (AR, CR, NCR, etc.) related to involving radioactive waste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) issued since September 2015. This should be a list of corrective action documents containing an (AR, CR, NCR, etc.) number and brief description, not full documents.


Inspection Procedure: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation  IP 71151  Performance Indicator Verification Lead Inspector & Mailing Address: Carmen Dykes Health Physicist U.S. NRC Region II 404-997-4401 Carmen.dykes@nrc.gov  U.S. Nuclear Regulatory Commission Region II ATTN:  Carmen Dykes 245 Peachtree Center Ave., N.E Suite 1200 Atlanta, GA 30303 Note:  The current version of these documents is expected unless specified otherwise. Electronic media (CDs, DvDs, FTP site) is preferred if readily available.  [Note do not provide data on USB or "flash" drives due to NRC IT security policies.]  Please organize the information as it is arranged below to the extent possible. Please note the date ranges for the items requested as they may change from item to item. If there are questions or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector, Carmen Dykes at (404) 997-4101. Miscellaneous  1. List of primary contacts for each inspection area including names and telephone numbers 2. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers. 3. List of radiation protection procedures, including title and number.
5
: 4. Corrective action program (CAP) procedures 2  71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected June 2015)  1. Site and/or corporate procedures associated with implementing the effluents and the groundwater monitoring program. Procedures should include those that address: a. Effluent sampling
: 8. Available for onsite review during the inspection:
: b. Effluent monitor set-point determinations
: a. Site drawing(s) showing the location of all stored RAMs and all stored radioactive waste.
: c. Dose calculations
: b. Plant drawings sufficient to permit the inspector to walkdown the liquid and solid radioactive waste processing systems, to verify current system configuration/
: d. Groundwater monitoring and reporting of spills/leaks e. Methodology for determining effluent stack/vent flow rates  2. Offsite Dose Calculation Manual (ODCM) and a list of changes made in the last revision. 3. Annual Radiological Effluent Releaser Reports (ARERRs) for calendar years (CYs) 2015 and 2016. 4. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 1 day since June 1, 2015, including any special reports submitted to the NRC as a result of effluent monitor operability. 5. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since June 1, 2015. If applicable, provide the Licensee Event Report (LER), event report, and/or special report. 6. List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed, since June 1, 2015. 7. List of any changes to the effluent release points or effluent treatment systems, and associated 10 CFR 50.59 documentation since June 1, 2015. 8. Material condition surveillance records for effluent system components not readily  accessible, including those inaccessible due to radiological conditions. 9. Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases. Only provide permits for last releases within each category. 10. Results of inter-laboratory comparison program for the count lab since June 1 2015. 11. Last two surveillance results for the engineered safety feature (ESF) ventilation systems (e.g., system flow, HEPA, charcoal filter tests). 12. Groundwater monitoring results since June 1, 2015. 13. List of changes to the written groundwater monitoring program for identifying/controlling contaminated spills/leaks since June 1, 2015. 14. List of onsite surface water bodies (e.g., ponds, retention basins, lakes) that contain or potentially contain radioactivity.
operation agree with the descriptions contained in the Updated Final Safety Analysis Report and in the PCP.
3  15. List of CAP problem identification programs (PIPs) generated since June 1, 2015, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program. 16. Audit and self-assessment documents generated since July 1, 2013, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
: c. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.
71124.07 - Radiological Environmental Monitoring Program  (Last Inspected June 2015) 1. Collection schedule for Radiological Environmental monitor Program (REMP) samples during the week of inspection. 2. Site and corporate procedures associated with radiological environmental monitoring, including: a. Collection, preparation, and analysis of environmental samples including air, Thermoluminescent Dosimeter (TLD) stations, ground and surface water, sediment, vegetation, milk, fish, etc. b. Calibration and maintenance of air and water sampling equipment. c. Calibration and quality control (QC) activities for sample counting instruments.
: d. Information concerning the sites waste disposal volume and waste reduction program.
: d. Sampling and monitoring program to detect leaks from contaminated, or 
: e. Training and qualification records for personnel responsible for radioactive waste.
: e. potentially contaminated, systems, structures, or components (SSCs). f. Calibration, operation, maintenance, and routine surveillances of meteorological monitoring instruments (wind speed & direction, air temperature, etc.). 3. Annual Radiological Environmental Operating Reports (AREORs) for CYs 2015 and 2016. 4. List of SSCs that contain, or could contain, licensed material for which there is a credible mechanism for the radioactive material (RAM) to reach ground water. 5. Summary of leaks and/or spills since June 1, 2015, (i.e. additions to the 10 CFR 50.75(g) file). 6. List of changes to the REMP (sample locations, sample frequency, type of samples, etc.) since June 1, 2015. 7. Calibration and maintenance records for REMP air and composite water samplers since June 1, 2015. 8. Inter-laboratory comparison program results since June 1, 2015, (in-house or vendor laboratory). 9. Last two calibration/surveillance/maintenance records for the meteorological monitoring instruments since June 1, 2015, (wind speed, wind direction, and air temperature). 10. Results of TLD environmental monitoring since the last inspection.
: f. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of RAM and radioactive waste as specified by 49 CFR Part 172.
4  11. List of CAP PIPs generated since June 1, 2015, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g.,
71151 - Performance Indicator Verification (Last inspected March 2016)
environmental lab). 12. Audit and self-assessment documents generated since June 1, 2015, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab).
: 1. Monthly/Quarterly PI reports and copies of associated CAP documents, for Occupational Exposure Control Effectiveness and Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences since March 1, 2016.
71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected 09/2015) 1. Provide Procedures/Guidance Documents describing licensee compliance with 10 CFR Parts 20, 61, and 71, and 49 CFR Parts 170-189. Procedures/manuals should include: a. Solid and liquid radwaste processing procedures. b. Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers. c. Waste stream mixing and/or sampling procedures, including:  i. waste concentration averaging; ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides;  iii. ensuring waste stream composition data accounts for changing operational parameters. d. Shipping/transportation procedures.
: 2. Procedure(s) for identifying, notification of, tracking, and correcting PI occurrences.
: e. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports. 2. Provide a list of radioactive material (RAM) storage areas, including satellite radiological controlled areas (RCAs)  3. Provide Liquid and solid radwaste system diagrams and detailed system descriptions (e.g., information that might be contained in curricula for training new system engineers)  4. Provide the most recent radio-chemical sample analysis results (i.e., "10 CFR Part 61" analysis) for each of the radioactive waste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials). 5. List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the PCP since the September 2015, and associated  10 CFR 50.59 documentation, as appropriate.
: 3. Liquid and gaseous effluent release permits since March 1, 2016, which specify the quarterly and annual curies released by isotope and associated public dose assessments.
6. Provide a log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since September 2015.  (The inspectors will select three to five packages to review in detail.)  7. List of CAP NCRs (AR, CR, NCR, etc.) related to involving radioactive waste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) issued since September 2015. This should be a list of corrective action documents containing an (AR, CR, NCR, etc.) number and brief description, not full documents.
: 4. List of all CAP documents since March 1, 2016 using keywords such as high radiation area (HRA), locked high radiation area (LHRA), very high radiation area (VHRA),
8. Available for onsite review during the inspection: a. Site drawing(s) showing the location of all stored RAMs and all stored radioactive waste. b. Plant drawings sufficient to permit the inspector to walkdown the liquid and solid radioactive waste processing systems, to verify current system configuration/
unintended dose, unlocked LHRA door, etc.
operation agree with the descriptions contained in the Updated Final Safety Analysis Report and in the PCP. c. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place. d. Information concerning the site's waste disposal volume and waste reduction program. e. Training and qualification records for personnel responsible for radioactive waste.  
: 5. List of CAP documents since March 1, 2016, using keywords such as abnormal unmonitored effluent release, etc.
: f. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of RAM and radioactive waste as specified by 49 CFR Part 172. 71151 - Performance Indicator Verification (Last inspected March 2016) 1. Monthly/Quarterly PI reports and copies of associated CAP documents, for Occupational Exposure Control Effectiveness and Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences since March 1, 2016. 2. Procedure(s) for identifying, notification of, tracking, and correcting PI occurrences. 3. Liquid and gaseous effluent release permits since March 1, 2016, which specify the quarterly and annual curies released by isotope and associated public dose assessments. 4. List of all CAP documents since March 1, 2016 using keywords such as high radiation area (HRA), locked high radiation area (LHRA), very high radiation area (VHRA),
: 6. List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since March 1, 2016
unintended dose, unlocked LHRA door, etc. 5. List of CAP documents since March 1, 2016, using keywords such as abnormal unmonitored effluent release, etc. 6. List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since March 1, 2016 7. Audit and self-assessment documents generated since March 1, 2016, related to PIs 6  LIST OF ACRONYMS  ARs Action Requests CAP Corrective Action Program CRs Condition Reports DAW Dry Active Waste HP Health Physics HRA High Radiation Area LHRA Locked High Radiation Area NCRs Nonconformance Reports  PCP Process Control Program RAM Radioactive Material RCAs Radiological Controlled Areas RWPs Radiation Work Permits VHRA Very High Radiation Area 
: 7. Audit and self-assessment documents generated since March 1, 2016, related to PIs


}}
6 LIST OF ACRONYMS ARs        Action Requests CAP        Corrective Action Program CRs        Condition Reports DAW        Dry Active Waste HP        Health Physics HRA        High Radiation Area LHRA      Locked High Radiation Area NCRs      Nonconformance Reports PCP        Process Control Program RAM        Radioactive Material RCAs      Radiological Controlled Areas RWPs      Radiation Work Permits VHRA      Very High Radiation Area}}

Latest revision as of 03:52, 30 October 2019

William B. McGuire Nuclear Plant - Notification of Inspection and Request for Information
ML17128A306
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/05/2017
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Capps S
Duke Energy Carolinas
References
Download: ML17128A306 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2017 Steven D. Capps Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985

SUBJECT:

WILLIAM B. McGUIRE NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Capps,

During the week of June 5 - 9, 2017, the U.S. Nuclear Regulatory Commission (NRC) will perform a baseline Radiation Safety Inspection at the McGuire Nuclear Station (NRC Inspection Procedures 71124.06, 71124.07, 71134.08 and 71151).

Experience has shown that this inspection is resource-intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this activity. It is important that all of these documents are up-to-date, and complete, thereby minimizing the number of additional documents requested during the preparation, and/or the onsite portions of the inspection. The NRC requests that these documents be provided to the inspectors no later than May 26, 2017.

We have discussed the schedule for these inspection activities with your staff, and understand that our regulatory contact for this inspection will be Joseph Hussey, Regulatory Affairs, of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Carmen Dykes at 404-997-1401, or the Plant Support Branch 1 Chief, Brian Bonser at 404-997-4653.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS); accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control numbers

S. Capps 2 3150-0008, 3150-0011, 3150-0014, 3150-0044, and 3150-0135. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Sincerely,

/RA/

Brian R. Bonser, Chief Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17

Enclosure:

Pre-Inspection Document Request cc: Distribution via Listserv

S. Capps 3

SUBJECT:

WILLIAM B. McGUIRE NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION - DATED: May 5, 2017 Distribution:

F. Ehrhardt, RII, DRP J. Worosilo, RII, SR PE M. Toth, RII, PE A. Hutto, RII, SRI R. Cureton, RII, RI RIDSNRRDIRS Public PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE CMD via email BRB via email NAME CDYKES BBONSER DATE .5/5/2017 5/5/2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 5/ /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\PSB1\RFI INFORMATION REQUEST LETTERS\MCGUIRE\2017\MCGUIRE RP RFI 2017 002.DOCX

Pre-Inspection Document Request Occupational and Public Radiation Safety Cornerstone Inspection Dates: June 5 - 9, 2017 Documents Due to Region II by: May 26, 2017 Licensee: McGuire Nuclear Station Docket Number: 05000369, 370 Inspection Procedure: IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment IP 71124.07 Radiological Environmental Monitoring Program IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation IP 71151 Performance Indicator Verification Lead Inspector & Mailing Address:

Carmen Dykes U.S. Nuclear Regulatory Commission Health Physicist Region II U.S. NRC Region II ATTN: Carmen Dykes 404-997-4401 245 Peachtree Center Ave., N.E Carmen.dykes@nrc.gov Suite 1200 Atlanta, GA 30303 Note: The current version of these documents is expected unless specified otherwise.

Electronic media (CDs, DvDs, FTP site) is preferred if readily available. [Note do not provide data on USB or flash drives due to NRC IT security policies.] Please organize the information as it is arranged below to the extent possible. Please note the date ranges for the items requested as they may change from item to item. If there are questions or if the documents cannot be provided by the due date, please do not hesitate to contact the lead inspector, Carmen Dykes at (404) 997-4101.

Miscellaneous

1. List of primary contacts for each inspection area including names and telephone numbers
2. Plant Management, Radiation Protection, and Chemistry organizational charts w/ contact numbers.
3. List of radiation protection procedures, including title and number.
4. Corrective action program (CAP) procedures Enclosure

2 71124.06 - Radioactive Gaseous and Liquid Effluent Treatment (Last Inspected June 2015)

1. Site and/or corporate procedures associated with implementing the effluents and the groundwater monitoring program. Procedures should include those that address:
a. Effluent sampling
b. Effluent monitor set-point determinations
c. Dose calculations
d. Groundwater monitoring and reporting of spills/leaks
e. Methodology for determining effluent stack/vent flow rates
2. Offsite Dose Calculation Manual (ODCM) and a list of changes made in the last revision.
3. Annual Radiological Effluent Releaser Reports (ARERRs) for calendar years (CYs) 2015 and 2016.
4. List of liquid and gaseous effluent monitors listed as out-of-service (OOS) for > 1 day since June 1, 2015, including any special reports submitted to the NRC as a result of effluent monitor operability.
5. List of all unmonitored spills, leaks, or unexpected liquid/gaseous discharges since June 1, 2015. If applicable, provide the Licensee Event Report (LER), event report, and/or special report.
6. List of non-radioactive systems that have become contaminated and any 10 CFR 50.59 evaluations performed, since June 1, 2015.
7. List of any changes to the effluent release points or effluent treatment systems, and associated 10 CFR 50.59 documentation since June 1, 2015.
8. Material condition surveillance records for effluent system components not readily accessible, including those inaccessible due to radiological conditions.
9. Effluent release permits for continuous gaseous, batch gaseous, continuous liquid, and/or batch liquid releases. Only provide permits for last releases within each category.
10. Results of inter-laboratory comparison program for the count lab since June 1 2015.
11. Last two surveillance results for the engineered safety feature (ESF) ventilation systems (e.g., system flow, HEPA, charcoal filter tests).
12. Groundwater monitoring results since June 1, 2015.
13. List of changes to the written groundwater monitoring program for identifying/controlling contaminated spills/leaks since June 1, 2015.
14. List of onsite surface water bodies (e.g., ponds, retention basins, lakes) that contain or potentially contain radioactivity.

3

15. List of CAP problem identification programs (PIPs) generated since June 1, 2015, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.
16. Audit and self-assessment documents generated since July 1, 2013, related to liquid and gaseous effluent treatment and monitoring, unmonitored spills, leaks, or effluent discharges, or the groundwater monitoring program.

71124.07 - Radiological Environmental Monitoring Program (Last Inspected June 2015)

1. Collection schedule for Radiological Environmental monitor Program (REMP) samples during the week of inspection.
2. Site and corporate procedures associated with radiological environmental monitoring, including:
a. Collection, preparation, and analysis of environmental samples including air, Thermoluminescent Dosimeter (TLD) stations, ground and surface water, sediment, vegetation, milk, fish, etc.
b. Calibration and maintenance of air and water sampling equipment.
c. Calibration and quality control (QC) activities for sample counting instruments.
d. Sampling and monitoring program to detect leaks from contaminated, or
e. potentially contaminated, systems, structures, or components (SSCs).
f. Calibration, operation, maintenance, and routine surveillances of meteorological monitoring instruments (wind speed & direction, air temperature, etc.).
3. Annual Radiological Environmental Operating Reports (AREORs) for CYs 2015 and 2016.
4. List of SSCs that contain, or could contain, licensed material for which there is a credible mechanism for the radioactive material (RAM) to reach ground water.
5. Summary of leaks and/or spills since June 1, 2015, (i.e. additions to the 10 CFR 50.75(g) file).
6. List of changes to the REMP (sample locations, sample frequency, type of samples, etc.)

since June 1, 2015.

7. Calibration and maintenance records for REMP air and composite water samplers since June 1, 2015.
8. Inter-laboratory comparison program results since June 1, 2015, (in-house or vendor laboratory).
9. Last two calibration/surveillance/maintenance records for the meteorological monitoring instruments since June 1, 2015, (wind speed, wind direction, and air temperature).
10. Results of TLD environmental monitoring since the last inspection.

4

11. List of CAP PIPs generated since June 1, 2015, related to REMP. The data should include any reviews conducted of vendor activities and their facilities (e.g.,

environmental lab).

12. Audit and self-assessment documents generated since June 1, 2015, related to REMP.

The data should include any reviews conducted of vendor activities and their facilities (e.g., environmental lab).

71124.08 - Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation (Last Inspected 09/2015)

1. Provide Procedures/Guidance Documents describing licensee compliance with 10 CFR Parts 20, 61, and 71, and 49 CFR Parts 170-189. Procedures/manuals should include:
a. Solid and liquid radwaste processing procedures.
b. Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers.
c. Waste stream mixing and/or sampling procedures, including:
i. waste concentration averaging; ii. use of scaling factors and calculations used to account for difficult-to-measure radionuclides; iii. ensuring waste stream composition data accounts for changing operational parameters.
d. Shipping/transportation procedures.
e. Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports.
2. Provide a list of radioactive material (RAM) storage areas, including satellite radiological controlled areas (RCAs)
3. Provide Liquid and solid radwaste system diagrams and detailed system descriptions (e.g., information that might be contained in curricula for training new system engineers)
4. Provide the most recent radio-chemical sample analysis results (i.e., 10 CFR Part 61" analysis) for each of the radioactive waste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials).
5. List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the PCP since the September 2015, and associated 10 CFR 50.59 documentation, as appropriate.
6. Provide a log of RAM shipments (LSA I, II, IIII; SCO I, II, Type A, or Type B) since September 2015. (The inspectors will select three to five packages to review in detail.)
7. List of CAP NCRs (AR, CR, NCR, etc.) related to involving radioactive waste and RAM processing and/or transportation (e.g., keyword searches for RAM, shipping, radwaste, 10 Part 61, etc.) issued since September 2015. This should be a list of corrective action documents containing an (AR, CR, NCR, etc.) number and brief description, not full documents.

5

8. Available for onsite review during the inspection:
a. Site drawing(s) showing the location of all stored RAMs and all stored radioactive waste.
b. Plant drawings sufficient to permit the inspector to walkdown the liquid and solid radioactive waste processing systems, to verify current system configuration/

operation agree with the descriptions contained in the Updated Final Safety Analysis Report and in the PCP.

c. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.
d. Information concerning the sites waste disposal volume and waste reduction program.
e. Training and qualification records for personnel responsible for radioactive waste.
f. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of RAM and radioactive waste as specified by 49 CFR Part 172.

71151 - Performance Indicator Verification (Last inspected March 2016)

1. Monthly/Quarterly PI reports and copies of associated CAP documents, for Occupational Exposure Control Effectiveness and Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual (RETS/ODCM) Radiological Effluent Occurrences since March 1, 2016.
2. Procedure(s) for identifying, notification of, tracking, and correcting PI occurrences.
3. Liquid and gaseous effluent release permits since March 1, 2016, which specify the quarterly and annual curies released by isotope and associated public dose assessments.
4. List of all CAP documents since March 1, 2016 using keywords such as high radiation area (HRA), locked high radiation area (LHRA), very high radiation area (VHRA),

unintended dose, unlocked LHRA door, etc.

5. List of CAP documents since March 1, 2016, using keywords such as abnormal unmonitored effluent release, etc.
6. List of all electronic dosimeter (ED) dose rate alarms and all ED dose alarms since March 1, 2016
7. Audit and self-assessment documents generated since March 1, 2016, related to PIs

6 LIST OF ACRONYMS ARs Action Requests CAP Corrective Action Program CRs Condition Reports DAW Dry Active Waste HP Health Physics HRA High Radiation Area LHRA Locked High Radiation Area NCRs Nonconformance Reports PCP Process Control Program RAM Radioactive Material RCAs Radiological Controlled Areas RWPs Radiation Work Permits VHRA Very High Radiation Area