ML17160A347: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| docket = PROJ0753
| docket = PROJ0753
| license number =  
| license number =  
| contact person = Honcharik M C, NRR/STSB  415-1774
| contact person = Honcharik M, NRR/STSB  415-1774
| package number = ML17160A344
| package number = ML17160A344
| document type = Meeting Briefing Package/Handouts
| document type = Meeting Briefing Package/Handouts
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Risk Evaluation Approaches Page 1 6/13/2017 The NRC has indicated a need to include a license condition related to their acceptance of the PRA models in plant-specific Safety Evaluations for amendments to adopt TSTF-505. The primary purpose of this would be to specify th at only PRA technical a pproaches (e.g. Fire PRA or Seismic Margin Analysis) included in the application may be used in the RICT program, unless a new LAR is submitted to request approval of a new technical approach.
{{#Wiki_filter:Risk Evaluation Approaches The NRC has indicated a need to include a license condition related to their acceptance of the PRA models in plant-specific Safety Evaluations for amendments to adopt TSTF-505. The primary purpose of this would be to specify that only PRA technical approaches (e.g. Fire PRA or Seismic Margin Analysis) included in the application may be used in the RICT program, unless a new LAR is submitted to request approval of a new technical approach.
 
In lieu of a license condition on PRA methods, the industry proposes adding the following to the TS Risk Informed Completion Time Program to fulfill the NRCs purposes:
In lieu of a license condition on PRA methods, the industry proposes adding the following to the TS Risk Informed Completion Time Program to fulfill the NRC's purposes:
The risk evaluation approaches to calculate a RICT are: [Internal PRA to assess internal risk; Fire PRA to assess fire risk; Seismic Margin Analysis (SMA) to assess seismic risk; Individual Plant Examination of External Events (IPEEE) screening to assess the risk from other external hazards (high winds, external floods); and Shutdown Safety Plan to assess shutdown risk].
The risk evaluation approaches to calculate a RICT are: [Internal PRA to assess internal risk; Fire PRA to assess fire risk; Seismic Margin Analysis (SMA) to assess seismic risk; Individual Plant Examination of External Events (IPEEE) screeni ng to assess the risk from other external hazards (high winds, exte rnal floods); and Shutdown Safety Plan to assess shutdown risk].
As the Technical Specifications will state which methods may be used, use of methods not listed would require prior NRC approval. It is not necessary or consistent with the TS to state that prior approval is needed to use methods not listed in the paragraph.
As the Technical Specifications will state which methods may be used, use of methods not listed would require prior NRC approval. It is not necessary or consistent with the TS to state that prior approval is needed to use me thods not listed in the paragraph.}}
Page 1                                  6/13/2017}}

Latest revision as of 03:14, 30 October 2019

Documents to Support June 13, 2017, Public Teleconference TSTF-505, Risk Evaluation Approaches
ML17160A347
Person / Time
Site: Technical Specifications Task Force
Issue date: 06/09/2017
From:
Technical Specifications Task Force
To:
Honcharik M, NRR/STSB 415-1774
Shared Package
ML17160A344 List:
References
Download: ML17160A347 (1)


Text

Risk Evaluation Approaches The NRC has indicated a need to include a license condition related to their acceptance of the PRA models in plant-specific Safety Evaluations for amendments to adopt TSTF-505. The primary purpose of this would be to specify that only PRA technical approaches (e.g. Fire PRA or Seismic Margin Analysis) included in the application may be used in the RICT program, unless a new LAR is submitted to request approval of a new technical approach.

In lieu of a license condition on PRA methods, the industry proposes adding the following to the TS Risk Informed Completion Time Program to fulfill the NRCs purposes:

The risk evaluation approaches to calculate a RICT are: [Internal PRA to assess internal risk; Fire PRA to assess fire risk; Seismic Margin Analysis (SMA) to assess seismic risk; Individual Plant Examination of External Events (IPEEE) screening to assess the risk from other external hazards (high winds, external floods); and Shutdown Safety Plan to assess shutdown risk].

As the Technical Specifications will state which methods may be used, use of methods not listed would require prior NRC approval. It is not necessary or consistent with the TS to state that prior approval is needed to use methods not listed in the paragraph.

Page 1 6/13/2017