| {{#Wiki_filter:fi/~4IKWP'..":"rT i'raI;,'I jiI PI 4J'iki7i, ROCHESTER GAS AND ELECTRIC CORPORATION r Toe%ttate~89 EAST AVENUE, ROCHESTER N.Y.14649.0001 ROBERT C MECREDY Vice Pretident Cinna Nuclear Production TELEPHONE AREA CODE 7t6 546'2700 March 26, 1991 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 | | {{#Wiki_filter:fi/~4IKW P'..":"rT r Toe% |
| | jiI i'raI;,'I PI 4J'iki7i, ttate ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER N. Y. 14649.0001 ROBERT C MECREDY TELEPHONE Vice Pretident AREA CODE 7t6 546'2700 Cinna Nuclear Production March 26, 1991 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Reply to a Notice of Violation NRC Inspection Report No.50-244/91-04 R.E.Ginna Nuclear Power Plant NRC Docket No.50-244 | | Reply to a Notice of Violation NRC Inspection Report No. 50-244/91-04 R. E. Ginna Nuclear Power Plant NRC Docket No. 50-244 |
|
| |
|
| ==Dear Sir:== | | ==Dear Sir:== |
| This letter is in response to the February 25, 1991 letter from James H.Joyner, Chief, Facilities Radiological Safety and Safeguards Branch, to Robert C.Mecredy, Vice President, Ginna Nuclear Production.
| |
| This letter provides the reply to the Notice of Violation, pursuant to 10 CFR Part 26, as well as, infrequent unescorted site access (UNR 50-244/91-04-01).RE TATEMENT F VI LATI N's a result of the inspection conducted on January 23-25, 1991, and in accordance with the"General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1990), the following violation was identified:
| |
| Appendix A, Subpart B, Paragraph 2.4,"Specimen Collection Procedures," Subparagraph (g)(24)states that the collection site person shall enter in the permanent record book all information identifying the specimens.
| |
| The collection site person shall sign the permanent record book next to the identifying information.
| |
| Appendix A, Subpart A, Paragraph 1.2, DeGnitions, of 10 CFR Part 26 de6nes the"Permanent Record Book" as a permanently bound book in which identifying data on each specimen collected at a collection site are permanently recorded in the sequence of collection.
| |
|
| |
|
| Contrary to the above, on January 24, 1991, the inspector determined that the licensee's collection site staff was not maintaining, in the Permanent Record Book, identifying data on each specimen collected at the collection site, in the sequence of collection.
| | This letter is in response to the February 25, 1991 letter from James H. Joyner, Chief, Facilities Radiological Safety and Safeguards Branch, to Robert C. Mecredy, Vice President, Ginna Nuclear Production. This letter provides the reply to the Notice of Violation, pursuant to 10 CFR Part 26, as well as, infrequent unescorted site access (UNR 50-244/91-04-01). |
| Only contractor personnel specimen collections were being entered in a record book;licensee personnel specimen collections were being maintained in a computer based records system.This is a Severity Level IV Violation.(Supplement VII)REPLY T THE VI LATI N 1.Th R nfr h Vil in Rochester Gas and Electric Corporation (RG&E)concurs that the stated violation occurred.Since.developing the FFD program, a computerized system for tracking each individual tested, including contractor employees, has been maintained.
| | RE TATEMENT F VI LATI N's a result of the inspection conducted on January 23-25, 1991, and in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1990), the following violation was identified: |
| This computer program could, if necessary, print a list in chronological order.We also retained a copy of each chain-of-custody form to use as a record signed by the employee being tested, which listed all information identifying the specimens.
| | Appendix A, Subpart B, Paragraph 2.4, "Specimen Collection Procedures," |
| We believed that the combination of the computerized tracking system and a copy of the chain-of-custody form would adequately serve as a permanent record.2.Th rr iv Th Hv B k n Th R'Ahiv RG&E purchased three (3)permanently bound books, one for each collection site.The Site Collection Officer enters the identifying information of the individual tested and specimen collected and the individual signs his/her name.'esults of this action assure that a permanent record book is in place at each collection site to account for all employees, including contractor employees, of the tests performed and specimens collected with identifying information.
| | Subparagraph (g)(24) states that the collection site person shall enter in the permanent record book all information identifying the specimens. The collection site person shall sign the permanent record book next to the identifying information. Appendix A, Subpart A, Paragraph 1.2, DeGnitions, of 10 CFR Part 26 de6nes the "Permanent Record Book" as a permanently bound book in which identifying data on each specimen collected at a collection site are permanently recorded in the sequence of collection. |
| 3.1v WillB TknT Avi F hrVi 1 i n On March 1, 1991, the RG&E Fitness For Duty Program Procedures were implemented as a controlled document and distributed to key personnel.
| |
| The process for utilizing the permanent record book is included in procedure number FFD-9 titled,"Collection Process and Chain of Custody."
| |
|
| |
|
| Th D WhnF11 m lin WillB iv FuH compliance with 10 CFR Part 26, Appendix A, Subpart B, Paragraph 2.4,"Specimen Collection Procedures," Subparagraph (g)(24)was achieved on January 24, 1991.On that date, the permanent record book was purchased and the process for entering the required information was activated. | | Contrary to the above, on January 24, 1991, the inspector determined that the licensee's collection site staff was not maintaining, in the Permanent Record Book, identifying data on each specimen collected at the collection site, in the sequence of collection. Only contractor personnel specimen collections were being entered in a record book; licensee personnel specimen collections were being maintained in a computer based records system. |
| 244 1--TE TIN FEMP YEE WITH INFRE NT ITEA E All employees who have infrequent access to the site are covered by the Company's Fitness For Duty testing program and must adhere to all provisions of the corporate Drug and Alcohol Abuse Policy.Therefore, we do not believe any additional policies or procedures are necessary. | | This is a Severity Level IV Violation. (Supplement VII) |
| However, RG&E has developed an interim practice for testing of non-RG&E personnel with infrequent site access.We are currently using this interim practice for a trial period to assist us in determining the best method for reaching these individuals. | | REPLY T THE VI LATI N |
| Based on the results of the interim practice during this trial period, an approved procedure will be implemented and included in the RG&E Fitness For Duty Program.Very truly yours, Robert C.Mecredy~IC Mr.Thomas T.Martin Regional Administrator Region 1 475 Allendale Road King of Prussia, PA 19406 Mr.Thomas Moslak USNRC Senior Resident Inspector Ginna Station 1503 Lake Road Ontario, NY 14519 m I~~I J S}} | | : 1. Th R nfr h Vil in Rochester Gas and Electric Corporation (RG&E) concurs that the stated violation occurred. Since. developing the FFD program, a computerized system for tracking each individual tested, including contractor employees, has been maintained. This computer program could, if necessary, print a list in chronological order. We also retained a copy of each chain-of-custody form to use as a record signed by the employee being tested, which listed all information identifying the specimens. We believed that the combination of the computerized tracking system and a copy of the chain-of-custody form would adequately serve as a permanent record. |
| | : 2. Th rr iv Th Hv B k n Th R' Ahiv RG&E purchased three (3) permanently bound books, one for each collection site. |
| | The Site Collection Officer enters the identifying information of the individual tested and specimen collected and the individual signs his/her name. |
| | 'esults of this action assure that a permanent record book is in place at each collection site to account for all employees, including contractor employees, of the tests performed and specimens collected with identifying information. |
| | : 3. 1v WillB TknT Avi F hrVi 1 i n On March 1, 1991, the RG&E Fitness For Duty Program Procedures were implemented as a controlled document and distributed to key personnel. The process for utilizing the permanent record book is included in procedure number FFD-9 titled, "Collection Process and Chain of Custody." |
| | |
| | Th D WhnF11 m lin WillB iv FuH compliance with 10 CFR Part 26, Appendix A, Subpart B, Paragraph 2.4, "Specimen Collection Procedures," Subparagraph (g)(24) was achieved on January 24, 1991. On that date, the permanent record book was purchased and the process for entering the required information was activated. |
| | 244 1- - TE TIN FEMP YEE WITHINFRE NT ITEA E All employees who have infrequent access to the site are covered by the Company's Fitness For Duty testing program and must adhere to all provisions of the corporate Drug and Alcohol Abuse Policy. Therefore, we do not believe any additional policies or procedures are necessary. However, RG&E has developed an interim practice for testing of non-RG&E personnel with infrequent site access. We are currently using this interim practice for a trial period to assist us in determining the best method for reaching these individuals. Based on the results of the interim practice during this trial period, an approved procedure willbe implemented and included in the RG&E Fitness For Duty Program. |
| | Very truly yours, Robert C. Mecredy |
| | ~ IC Mr. Thomas T. Martin Regional Administrator Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Thomas Moslak USNRC Senior Resident Inspector Ginna Station 1503 Lake Road Ontario, NY 14519 |
| | |
| | m I ~ |
| | ~ |
| | JI S}} |
Similar Documents at Ginna |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated IR 05000244/19990081999-10-14014 October 1999 Forwards Insp Rept 50-244/99-08 on 990809-0919.Severity Level IV Violation of NRC Requirements Occurred & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs IR 05000244/19992011999-09-24024 September 1999 Forwards Insp Rept 50-244/99-201 (Operational Safeguards Response Evaluation) on 990621-24.No Violations Noted. Primary Purpose of Osre to Assess Licensee Ability to Respond to External Threat.Insp Rept Withheld ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17250B3041999-10-20020 October 1999 Forwards Changes to Tech Specs Bases for Re Ginna Nuclear Power Plant.Change Bars Indicate Those Revs Which Have Been Incorporated ML17265A7651999-10-0808 October 1999 Forwards Fifteen Relief Requests That Will Be Utilized for Ginna NPP Fourth Interval ISI Program That Will Start on Jan 1,2000.Attachment 1 Includes Summaries & Detailed Description of Each Relief Request ML17265A7631999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 43 to Address Volumetric Examination Limitations (Less than 90%) Associated with a & B RHR Heat Exchanger Outlet Nozzle to Shell Welds.Approval Is Requested by Dec 31,2000 ML17265A7641999-10-0505 October 1999 Requests Approval for Use of Relief Request Number 42 to Address Volumetric Examinations Limitations (Less than 90%) Associated with Eight Class 1 Identified Welds or Areas of Reactor Pressure Vessel ML20212J3561999-09-30030 September 1999 Forwards Four Copies of Re Ginna NPP Training & Qualification Plan for Security Officers, Rev 7,dtd 990930. Synopsis of Changes,Encl.Encl Withheld Per 10CFR73.21 ML20212J3801999-09-30030 September 1999 Forwards Four Copies of Rev to Re Ginna NPP Security Plan.Rev Changes Contingency Weapons Available to Response Force to Those Most Effective in Current Defensive Strategy.Encl Withheld Per 10CFR73.21 IR 05000244/19990051999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7571999-09-24024 September 1999 Forwards More Detailed Response Re Main Steam Check Valve Performance Questions Arising from NRC Insp Rept 50-244/99-05 Following Completion of Independent Assessment Being Performed by Duke Engineering & Svcs ML17265A7461999-08-31031 August 1999 Submits Response to NRC Administrative Ltr 95-03,rev 2, Availability of Reactor Vessel Integrity Database,Version, Dtd 990726 ML17265A7401999-08-26026 August 1999 Requests Approval for Use of Relief Request Number 35 Re Use of ASME Section XI Code,1995 Edition,1996 Addenda.Code Will Be Used to Develop Plant Fourth 10-year Interval ISI Program on Class 1,2 & 3 Components ML17265A7411999-08-26026 August 1999 Forwards LER 99-004-01 Re Plant Being Outside Design Basis Due to Containment Recirculation Fan Moisture Separator Vanes Being Incorrectly Installed.Part 21 Notification of 990512 Is Being Rescinded ML17250B3021999-08-23023 August 1999 Informs That Util & NRC Had Conference Call on 990816 to Review Approach in Responding to Questions,As Result of Questions Re Main Steam Check Valve Performance Included in Insp Rept 50-244/99-05,dtd 990806 ML17265A7451999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Rept for Six Months Ending 990630,per 10CFR26.71(d) ML17265A7271999-07-30030 July 1999 Forwards 10CFR21 Interim Rept Per Reporting of Defects & Noncompliance,Section 21 (a) (2).Interim Rept Prepared Because Evaluation Cannot Be Completed within 60 Days from Discovery of Deviation or Failure to Comply ML17265A7151999-07-23023 July 1999 Forwards LER 99-007-01 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Reactor Trip.Further Investigation of Event Identified Addl Corrective Actions ML17265A7061999-07-22022 July 1999 Forwards LER 98-003-02,re Actuations of CR Emergency Air Treatment Sys.All Creats Actuations,Including Those Originally Believed to Be Valid Actuations,Were,In Fact Invalid Actuations ML17265A7191999-07-21021 July 1999 Forwards Ginna Station ISI Rept for Refueling Outage Conducted in 1999 ML17265A7141999-07-21021 July 1999 Withdraws Relief Request 35 for Plant Inservice Insp Program Section XI Requirements,Submitted on 980806.Licensee Plans to Resubmit Relief Request,Which Includes Addl Level of Detail,In Near Future ML17265A7041999-07-16016 July 1999 Submits Info Re Specific Licensing Actions Which May Be Expected to Generate Complex Reviews,In Response to Administrative Ltr 99-02,dtd 990603 ML17265A6911999-06-30030 June 1999 Responds to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Readiness Disclosure Attached ML17265A6871999-06-22022 June 1999 Forwards Response to RAI Made During 990225 Telcon Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves. Calculation Encl. Encl ML17265A6841999-06-21021 June 1999 Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment ML17265A6741999-06-15015 June 1999 Submits Annual ECCS Rept IAW 10CFR50.46(a)(3)(ii) Requirements.No Changes Have Been Made to Large Break LOCA PCT & Small Break LOCA PCT ML17265A6751999-06-11011 June 1999 Responds to NRC RAI Re Licensee GL 96-05 Program.Encl Info Verifies That Util Is Implementing Provisions of JOG Program on MOV Periodic Verification ML17309A6551999-06-0707 June 1999 Responds to NRC 990310 RAI Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment ML17265A6671999-06-0101 June 1999 Requests Approval of Ginna QA Program for Radioactive Matl Packages,Form 311,approval Number 0019.Ginna QA Program for Station Operation, Was Most Recently Submitted to NRC by Ltr Dtd 981221 & Supplemented on 990301 ML17265A6641999-05-25025 May 1999 Forwards Addl Info on Use of GIP Method a for Re Ginna Nuclear Power Plant.Copy of Re Ginna Station USI A-46 Outlier Resolution Table as Requested ML17265A6611999-05-24024 May 1999 Forwards LER 99-007-00 Re Personnel Error Which Caused Two Channels to Be in Tripped Condition,Resulting in Rt.Util Is Planning to Submit Suppl to LER by 990730 ML20206U0921999-05-13013 May 1999 Forwards Four Copies of Rev R to Gnpp Security Plan,Per Provisions of 10CFR50.54(p).Rev Clarifies Armed Response Team Assignments & Does Not Degrade Physical Security Effectiveness.Rev Withheld,Per 10CFR73.21 ML17265A6461999-05-12012 May 1999 Forwards 1998 Annual Radioactive Effluent Release Rept & 1998 Annual Radiological Environ Operating Rept, for Re Ginna NPP ML17265A6411999-05-12012 May 1999 Forwards LER 99-004-00 IAW 10CFR50.73 & 10CFR21.Further Assessment Will Be Provided in Suppl to LER by 990630 ML20206E7221999-04-29029 April 1999 Forwards Four Copies of Rev Q to Re Ginna Nuclear Power Plant Security Plan,Per 10CFR50.54(p).Changes Do Not Degrade Physical Security Effectiveness.Encl Withheld,Per 10CFR73.21 ML20206H6911999-04-22022 April 1999 Forwards Info Requested During Informal Telcon on 980408 Concerning Upcoming Osre at Ginna Station.Info Requested Listed.Without Encls ML17265A6271999-04-19019 April 1999 Forwards Rev 0 & Rev 1 to Colr,Cycle 28 for Re Ginna NPP, Per TS 5.6.5 ML17309A6501999-04-14014 April 1999 Forwards Revised Ginna Station EOPs & Procedures Index ML17265A6121999-03-29029 March 1999 Forwards Rept on Status of Decommissioning Funding for Re Ginna Npp,For Which Rg&E Is Sole Owner,Per 10CFR50.75. Data Presented Herein,Current as of 981231 ML17265A6041999-03-24024 March 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(ii)(B) & 10CFR21.Addl Analyses Are Being Performed to Support Future Cycle Operation & Supplemental LER Is Scheduled to Be Submitted by 990618 ML17265A5641999-03-0101 March 1999 Forwards Response to NRC 990217 RAI Concerning Changes to QA Program for Re Ginna Station Operation.Rg&E Is Modifying Changes Requested in 981221 Submittal.Modified QA Program,Encl ML17265A5671999-03-0101 March 1999 Forwards Application for Amend to License DPR-18,to Revise TSs Battery Cell Parameters Limit for Specific Gravity (SR 3.8.6.3 & SR 3.8.6.6).Supporting Tss,Encl ML17265A5551999-02-25025 February 1999 Informs That Util Is in Process of Revising fitness-for-duty Program,Developed in Accordance with 10CFR26.Util Will Continue to Use Dept of Health & Human Svcs Certified Test Facility for Majority of Tests During Yr ML17265A5561999-02-22022 February 1999 Forwards FFD Performance Data Rept for Six Months Ending 981231,per 10CFR26.71(d) ML17265A5451999-02-12012 February 1999 Forwards Simulator Four Year Certification Rept,Per 10CFR55.45(b)(5)(ii) ML17309A6491999-02-12012 February 1999 Forwards Ginna Station EOPs ML17265A5431999-02-0909 February 1999 Supplements 980806 Relief Request with Attached Table.Util Third 10-Yr ISI of Reactor Vessel Being Performed During 1999 Refueling Outage,Beginning on 990301 ML17265A5361999-02-0202 February 1999 Forwards Response to NRC 981203 RAI Re Resolution of Unresolved Safety Issue USI A-46.Util Does Not Agree with NRCs Interpretation.Detailed Bases,Encl ML17311A0691999-01-25025 January 1999 Forwards Revs to Ginna Station Emergency Plan Implementing Procedures (Epips).Previous Rev Had Incorrect Effective Date ML17311A0671999-01-14014 January 1999 Forwards Revised Emergency Operating Procedures for Re Ginna NPP ML17265A5131999-01-12012 January 1999 Forwards Revised Cover Page for Ginna Station Technical Requirements Manual (Trm), Rev 7,correcting Error in Effective Date ML17265A5111999-01-11011 January 1999 Requests Relief Per 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME Bp&V Code for ISI Program.Relief Requests 37,38 & 39 Encl ML17265A5101999-01-11011 January 1999 Requests Relief Per to 10CFR50.55a(a)(3)(ii) from Certain Requirements of Section XI of ASME B&PV Code for ISI Program.Relief Request 40 Encl 1999-09-30
[Table view] |
Text
fi/~4IKW P'..":"rT r Toe%
jiI i'raI;,'I PI 4J'iki7i, ttate ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER N. Y. 14649.0001 ROBERT C MECREDY TELEPHONE Vice Pretident AREA CODE 7t6 546'2700 Cinna Nuclear Production March 26, 1991 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Reply to a Notice of Violation NRC Inspection Report No. 50-244/91-04 R. E. Ginna Nuclear Power Plant NRC Docket No. 50-244
Dear Sir:
This letter is in response to the February 25, 1991 letter from James H. Joyner, Chief, Facilities Radiological Safety and Safeguards Branch, to Robert C. Mecredy, Vice President, Ginna Nuclear Production. This letter provides the reply to the Notice of Violation, pursuant to 10 CFR Part 26, as well as, infrequent unescorted site access (UNR 50-244/91-04-01).
RE TATEMENT F VI LATI N's a result of the inspection conducted on January 23-25, 1991, and in accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (Enforcement Policy 1990), the following violation was identified:
Appendix A, Subpart B, Paragraph 2.4, "Specimen Collection Procedures,"
Subparagraph (g)(24) states that the collection site person shall enter in the permanent record book all information identifying the specimens. The collection site person shall sign the permanent record book next to the identifying information. Appendix A, Subpart A, Paragraph 1.2, DeGnitions, of 10 CFR Part 26 de6nes the "Permanent Record Book" as a permanently bound book in which identifying data on each specimen collected at a collection site are permanently recorded in the sequence of collection.
Contrary to the above, on January 24, 1991, the inspector determined that the licensee's collection site staff was not maintaining, in the Permanent Record Book, identifying data on each specimen collected at the collection site, in the sequence of collection. Only contractor personnel specimen collections were being entered in a record book; licensee personnel specimen collections were being maintained in a computer based records system.
This is a Severity Level IV Violation. (Supplement VII)
REPLY T THE VI LATI N
- 1. Th R nfr h Vil in Rochester Gas and Electric Corporation (RG&E) concurs that the stated violation occurred. Since. developing the FFD program, a computerized system for tracking each individual tested, including contractor employees, has been maintained. This computer program could, if necessary, print a list in chronological order. We also retained a copy of each chain-of-custody form to use as a record signed by the employee being tested, which listed all information identifying the specimens. We believed that the combination of the computerized tracking system and a copy of the chain-of-custody form would adequately serve as a permanent record.
- 2. Th rr iv Th Hv B k n Th R' Ahiv RG&E purchased three (3) permanently bound books, one for each collection site.
The Site Collection Officer enters the identifying information of the individual tested and specimen collected and the individual signs his/her name.
'esults of this action assure that a permanent record book is in place at each collection site to account for all employees, including contractor employees, of the tests performed and specimens collected with identifying information.
- 3. 1v WillB TknT Avi F hrVi 1 i n On March 1, 1991, the RG&E Fitness For Duty Program Procedures were implemented as a controlled document and distributed to key personnel. The process for utilizing the permanent record book is included in procedure number FFD-9 titled, "Collection Process and Chain of Custody."
Th D WhnF11 m lin WillB iv FuH compliance with 10 CFR Part 26, Appendix A, Subpart B, Paragraph 2.4, "Specimen Collection Procedures," Subparagraph (g)(24) was achieved on January 24, 1991. On that date, the permanent record book was purchased and the process for entering the required information was activated.
244 1- - TE TIN FEMP YEE WITHINFRE NT ITEA E All employees who have infrequent access to the site are covered by the Company's Fitness For Duty testing program and must adhere to all provisions of the corporate Drug and Alcohol Abuse Policy. Therefore, we do not believe any additional policies or procedures are necessary. However, RG&E has developed an interim practice for testing of non-RG&E personnel with infrequent site access. We are currently using this interim practice for a trial period to assist us in determining the best method for reaching these individuals. Based on the results of the interim practice during this trial period, an approved procedure willbe implemented and included in the RG&E Fitness For Duty Program.
Very truly yours, Robert C. Mecredy
~ IC Mr. Thomas T. Martin Regional Administrator Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Thomas Moslak USNRC Senior Resident Inspector Ginna Station 1503 Lake Road Ontario, NY 14519
m I ~
~
JI S