| issue date = 08/31/1994
| issue date = 08/31/1994
| title = Informs That Util Successfully Completed Repairs of MDAFWP B on 940831.Pump Parameters as Documented in Post Maint Testing of MDAFWP B Provided in Encl.Nrc Approved Enforcement Discretion Not Required or Used
| title = Informs That Util Successfully Completed Repairs of MDAFWP B on 940831.Pump Parameters as Documented in Post Maint Testing of MDAFWP B Provided in Encl.Nrc Approved Enforcement Discretion Not Required or Used
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = MARTIN T T
| addressee name = Martin T
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:i//!iirrrrrr/I/Iarrriilifr
{{#Wiki_filter:i                                                                                                                     C 1
//////////i
        //!iirrrrrr/I/Iarrriilifr
///lf/Ill/8 ROCHESTER GASANDEIECTRICCORPORATION
        //////////i   ///lf/Ill/8 ROCHESTER GAS AND EI ECTRIC CORPORATION                          ~   89 EAST AVENU@
~89EASTAVENU@C1ROBERTCMECREOYVicePreridenr CinnaNuclearPioduclion August31,1994TELEPHONE rriiEACOOEPie 546-2TOOU.S.NuclearRegulatory Commission RegionalAdministrator, RegionIMr.ThomasT.Martin475Allendale RoadKingofPrussia,PA19406
ROBERT C MECREOY Vice Preridenr                                              August 31, 1994                                    TELEPHONE rriiEACOOEPie 546-2TOO Cinna Nuclear Pioduclion U.S. Nuclear Regulatory Commission Regional Administrator, Region I Mr. Thomas T. Martin 475 Allendale Road King of Prussia, PA 19406


==Subject:==
==Subject:==
RequestForEnforcement Discretion R.E.GinnaNuclearPowerPlantDocketNo.50-244
Request For Enforcement Discretion R. E. Ginna Nuclear Power Plant Docket No. 50-244


==Reference:==
==Reference:==
: a.      Letter from R. C. Mecredy, RG&E, to T.T. Martin, NRC,


a.LetterfromR.C.Mecredy,RG&E,toT.T.Martin,NRC,
==Subject:==
"Request For Enforcement Discretion," dated August 30, 1994.


==Subject:==
==Dear Mr. Martin,==
"RequestForEnforcement Discretion,"
 
datedAugust30,1994.
In accordance with                10 CFR Part 2, Appendix C, and using the guidance contained in NRC Inspection Manual Part 9900, RG&E had requested Enforcement Discretion on August 30, 1994 with respect to Ginna Station Technical Specification 3.4.2.1.a (Ref. a). Mls request was a contingency action in the event that necessary repairs and testing of Motor-Driven Auxiliary Feedwater (MDAFW) Pump B could not be completed within the seven day LCO limit which expired on August 31, 1994 at 0530 hours. Me requested Enforcement Discretion was verbally approved by the NRC during a phone conversation between Mr. William Lazarus NRC, Region I, and Robert Mecredy, Vice President, Nuclear Production at approximately 1720 EST on August 30, 1994.
RG&E successfully completed repairs of MDAFW Pump B on August 31, 1994 at 0508 hours. The pump parameters as documented in the post maintenance testing of MDAFW Pump B are provided in Attachment A.
Therefore, the LCO was exited before the expiration of the seven day LCO limit and the NRC authorized. Enforcement Discretion was not required or used.
Very    ly yours, C. Mecred cC'obert XC:            U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Assistant Director for Region I Reactors Mr. Jose A. Calvo Washington, D.C. 20555 Ginna Station Senior Resident Inspector I
I 94gi030359 ~4>02                  05000244          I PDR            ADDCK PDR P


==DearMr.Martin,==
ATTACHMENTA "B" Motor Driven Auxiliary Feedwater Pump Performance Data Pre-Major Maintenance Test: (Degraded Condition)
Inaccordance with10CFRPart2,AppendixC,andusingtheguidancecontained inNRCInspection ManualPart9900,RG&Ehadrequested Enforcement Discretion onAugust30,1994withrespecttoGinnaStationTechnical Specification 3.4.2.1.a (Ref.a).Mlsrequestwasacontingency actionintheeventthatnecessary repairsandtestingofMotor-Driven Auxiliary Feedwater (MDAFW)PumpBcouldnotbecompleted withinthesevendayLCOlimitwhichexpiredonAugust31,1994at0530hours.Merequested Enforcement Discretion wasverballyapprovedbytheNRCduringaphoneconversation betweenMr.WilliamLazarusNRC,RegionI,andRobertMecredy,VicePresident, NuclearProduction atapproximately 1720ESTonAugust30,1994.RG&Esuccessfully completed repairsofMDAFWPumpBonAugust31,1994at0508hours.Thepumpparameters asdocumented inthepostmaintenance testingofMDAFWPumpBareprovidedinAttachment A.Therefore, theLCOwasexitedbeforetheexpiration ofthesevendayLCOlimitandtheNRCauthorized.
Test Date  DP (PSID) Acceptance Criteria Flow (GPM)     Vibration (Mils Disp)
Enforcement Discretion wasnotrequiredorused.Verylyyours,cC'obertC.MecredXC:U.S.NuclearRegulatory Commission OfficeofNuclearReactorRegulation Assistant DirectorforRegionIReactorsMr.JoseA.CalvoWashington, D.C.20555GinnaStationSeniorResidentInspector II94gi030359
(PSID)
~4>02IPDRADDCK05000244PPDR ATTACHMENT A"B"MotorDrivenAuxiliary Feedwater PumpPerformance DataPre-Major Maintenance Test:(Degraded Condition)
Inbd  Outbd  Inbd    Outbd Vert    Vert  Horiz Horiz 8/26/94    1123.2          1125.5                  .08 '10       .12     .14 Post-Major Maintenance Test: (Repair Completed)
TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/26/941123.21125.5InbdOutbdVertVert.08'10.12.14InbdOutbdHorizHorizPost-Major Maintenance Test:(RepairCompleted)
Test Date  DP (PSID) Acceptance Criteria Flow (GPM)     Vibration (Mils Disp)
TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/31/941224.41125.5200InbdOutbdInbdVertVertHoriz.08.08.07OutbdHoriz.09}}
(PSID)
Inbd  Outbd  Inbd    Outbd Vert    Vert  Horiz Horiz 8/31/94    1224.4          1125.5            200  .08     .08   .07    .09}}

Latest revision as of 18:18, 29 October 2019

Informs That Util Successfully Completed Repairs of MDAFWP B on 940831.Pump Parameters as Documented in Post Maint Testing of MDAFWP B Provided in Encl.Nrc Approved Enforcement Discretion Not Required or Used
ML17263A827
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/31/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17263A826 List:
References
NUDOCS 9411030359
Download: ML17263A827 (2)


Text

i C 1

//!iirrrrrr/I/Iarrriilifr

//////////i ///lf/Ill/8 ROCHESTER GAS AND EI ECTRIC CORPORATION ~ 89 EAST AVENU@

ROBERT C MECREOY Vice Preridenr August 31, 1994 TELEPHONE rriiEACOOEPie 546-2TOO Cinna Nuclear Pioduclion U.S. Nuclear Regulatory Commission Regional Administrator, Region I Mr. Thomas T. Martin 475 Allendale Road King of Prussia, PA 19406

Subject:

Request For Enforcement Discretion R. E. Ginna Nuclear Power Plant Docket No. 50-244

Reference:

a. Letter from R. C. Mecredy, RG&E, to T.T. Martin, NRC,

Subject:

"Request For Enforcement Discretion," dated August 30, 1994.

Dear Mr. Martin,

In accordance with 10 CFR Part 2, Appendix C, and using the guidance contained in NRC Inspection Manual Part 9900, RG&E had requested Enforcement Discretion on August 30, 1994 with respect to Ginna Station Technical Specification 3.4.2.1.a (Ref. a). Mls request was a contingency action in the event that necessary repairs and testing of Motor-Driven Auxiliary Feedwater (MDAFW) Pump B could not be completed within the seven day LCO limit which expired on August 31, 1994 at 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br />. Me requested Enforcement Discretion was verbally approved by the NRC during a phone conversation between Mr. William Lazarus NRC, Region I, and Robert Mecredy, Vice President, Nuclear Production at approximately 1720 EST on August 30, 1994.

RG&E successfully completed repairs of MDAFW Pump B on August 31, 1994 at 0508 hours0.00588 days <br />0.141 hours <br />8.399471e-4 weeks <br />1.93294e-4 months <br />. The pump parameters as documented in the post maintenance testing of MDAFW Pump B are provided in Attachment A.

Therefore, the LCO was exited before the expiration of the seven day LCO limit and the NRC authorized. Enforcement Discretion was not required or used.

Very ly yours, C. Mecred cC'obert XC: U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Assistant Director for Region I Reactors Mr. Jose A. Calvo Washington, D.C. 20555 Ginna Station Senior Resident Inspector I

I 94gi030359 ~4>02 05000244 I PDR ADDCK PDR P

ATTACHMENTA "B" Motor Driven Auxiliary Feedwater Pump Performance Data Pre-Major Maintenance Test: (Degraded Condition)

Test Date DP (PSID) Acceptance Criteria Flow (GPM) Vibration (Mils Disp)

(PSID)

Inbd Outbd Inbd Outbd Vert Vert Horiz Horiz 8/26/94 1123.2 1125.5 .08 '10 .12 .14 Post-Major Maintenance Test: (Repair Completed)

Test Date DP (PSID) Acceptance Criteria Flow (GPM) Vibration (Mils Disp)

(PSID)

Inbd Outbd Inbd Outbd Vert Vert Horiz Horiz 8/31/94 1224.4 1125.5 200 .08 .08 .07 .09