| issue date = 08/14/1995
| issue date = 08/14/1995
| title = Informs That as Outlined in 950807 Telcon,Listed Info Included Into Procedure FFD-8,Rev 4 Effective 950808,as Addl C/A in Order to Resolve FFD Testing Procedure Deviation from 950213 Response to NOV Dtd 950113
| title = Informs That as Outlined in 950807 Telcon,Listed Info Included Into Procedure FFD-8,Rev 4 Effective 950808,as Addl C/A in Order to Resolve FFD Testing Procedure Deviation from 950213 Response to NOV Dtd 950113
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A R
| addressee name = Johnson A
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:PRIORITY (ACCELERATED RZDS PROCESSING)
{{#Wiki_filter:PRIORITY (ACCELERATED RZDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9508230364          DOC.DATE: 95/08/14      NOTARIZED: NO          DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester              G 05000244 P AUTH. NAME          AUTHOR AFFILIATION MECREDY,R.C.        Rochester Gas & Electric Corp.
RECIP.NAME          RECIPIENT AFFILIATION JOHNSON,A.R.


==SUBJECT:==
==SUBJECT:==
Informs that as outlined in 950807 telcon,listed info included into procedure FFD-8,Rev 4 effective 950808,as addi C/A in order to resolve FFD testing procedure deviation from 950213 response to NOV dtd 950113.DISTRIBUTION CODE: A022D COPIES RECEIVED:LTR I ENCL 0 SIZE:<2 TITLE: Fitness for Duty Program: Blind Performance Test/Other NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
Informs that as outlined in 950807 telcon,listed info included into procedure FFD-8,Rev 4 effective 950808,as addi C/A in order to resolve FFD testing procedure deviation from 950213 response to NOV dtd 950113.
I 05000244 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9508230364 DOC.DATE: 95/08/14 NOTARIZED:
DISTRIBUTION CODE: A022D COPIES RECEIVED:LTR I ENCL 0 SIZE: <2 TITLE: Fitness for Duty Program: Blind Performance Test/Other NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).                 05000244 I
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 P AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
RECIPIENT         COPIES            RECIPIENT           COPIES ID CODE/NAME       LTTR ENCL         ID CODE/NAME       LTTR ENCL PD1-1 P                              JOHNSON,A INTERNA                                          NRR/DRPM/PERB NRR DRPM/PSGB                          NUDOCS-ABSTRACT RGNl EXTERNAL: NOAC                                   NRC PDR D
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.
0 N
INTERNA RECIPIENT ID CODE/NAME PD1-1 P NRR DRPM/PSGB RGNl COPIES LTTR ENCL RECIPIENT ID CODE/NAME JOHNSON,A NRR/DRPM/PERB NUDOCS-ABSTRACT COPIES LTTR ENCL EXTERNAL: NOAC NRC PDR D 0 N NOTE TO ALL"RZDS" RECZPZENTS:
NOTE TO ALL "RZDS" RECZPZENTS:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD8 (415-2083)
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 vP AND ROCHESTER GAS AND ELECTRIC CORPORATION
TOTAL NUMBER OF COPIES REQUIRED: LTTR           10   ENCL   10
~89 FASTAVENUE, ROCHESTER, N.Y ldbd9-0001 ARFA COOE716 Sd6.27M ROBERT C.MECREDY Vice President Nuclear Operotions August 14, 1995 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Allen R.Johnson Project Directorate I-1 Washington, D.C.20555  
 
vP AND ROCHESTER GAS AND ELECTRIC CORPORATION ~   89 FASTAVENUE, ROCHESTER, N. Y ldbd9-0001     ARFA COOE716 Sd6.27M ROBERT C. MECREDY Vice President Nuclear Operotions                         August 14, 1995 U.S. Nuclear Regulatory Commission Document         Control     Desk Attn: Allen R. Johnson Project Directorate I-1 Washington, D.C.             20555


==Subject:==
==Subject:==
Fitness for Duty Program Additional Corrective Actions R.E.Ginna Nuclear Power Plant Docket No.50-244 Ref.(a): R&f.(b): Letter from R.C.Mecredy (RGit'E)to Allen R.Johnson (NRC),  
Fitness for Duty Program Additional Corrective Actions R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref. (a):         Letter from       R. C. Mecredy       (RGit'E)     to Allen R. Johnson (NRC),  


==Subject:==
==Subject:==
Reply to a Notice of Violation, dated February 13, 1995 NRC Inspection Report 50-244/94-028 (Notice of Violation) dated January 13, 1995  
Reply to a Notice of                 Violation, dated February 13, 1995 R&f. (b):        NRC Inspection Report 50-244/94-028 (Notice of Violation) dated January 13, 1995
 
==Dear Mr. Johnson:==
 
As      outlined in        a  conference      call between RGGE (R. Mecredy, J.
Widay, L. Hauck, R. Teed,                  J. Peters) and the NRC (G. Smith, J.
Joyner, D. Limroth, E. King) on August 7, 1995, the following information has been 'included into procedure FFD-8, Rev. 4 effective 8/8/95, as additional corrective action. This revision was necessary            in order to resolve a fitness for duty testing procedure deviation from our response to the NOV, Reference (a),
concerning testing for backshift personnel.                                        Reference      (b) documented        the  NRC    Notice    of  Violation.
Wordin          in FFD-8 Rev. 4 "If a        backshift worker is selected for                  a random        drug and alcohol test, the test will be conducted before the worker's shift ends.
Conducting the test. before the shift ends will avoid predictability in the time of testing. However, if the worker is not available, the worker        will be    tested during the next scheduled work                        shift."
Ver      ruly ours, Robert      C. Mecre 2wC2    r Q 95082303M 950814 PDR      ADOCK 05000244 9                      PDR


==Dear Mr.Johnson:==
GAHi391 xc: Mr. Allen R. Johnson (Mail Stop 14B2)
As outlined in a conference call between RGGE (R.Mecredy, J.Widay, L.Hauck, R.Teed, J.Peters)and the NRC (G.Smith, J.Joyner, D.Limroth, E.King)on August 7, 1995, the following information has been'included into procedure FFD-8, Rev.4 effective 8/8/95, as additional corrective action.This revision was necessary in order to resolve a fitness for duty testing procedure deviation from our response to the NOV, Reference (a), concerning testing for backshift personnel.
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA   19406 Ginna Senior Resident Inspector}}
Reference (b)documented the NRC Notice of Violation.
Wordin in FFD-8 Rev.4"If a backshift worker is selected for a random drug and alcohol test, the test will be conducted before the worker's shift ends.Conducting the test.before the shift ends will avoid predictability in the time of testing.However, if the worker is not available, the worker will be tested during the next scheduled work shift." Ver ruly ours, Robert C.Mecre 2wC2 r Q 95082303M 950814 PDR ADOCK 05000244 9 PDR GAHi391 xc: Mr.Allen R.Johnson (Mail Stop 14B2)Project Directorate I-1 Washington, D.C.20555 U.S.Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector}}

Latest revision as of 09:44, 29 October 2019

Informs That as Outlined in 950807 Telcon,Listed Info Included Into Procedure FFD-8,Rev 4 Effective 950808,as Addl C/A in Order to Resolve FFD Testing Procedure Deviation from 950213 Response to NOV Dtd 950113
ML17309A587
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/14/1995
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508230364
Download: ML17309A587 (3)


Text

PRIORITY (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9508230364 DOC.DATE: 95/08/14 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 P AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION JOHNSON,A.R.

SUBJECT:

Informs that as outlined in 950807 telcon,listed info included into procedure FFD-8,Rev 4 effective 950808,as addi C/A in order to resolve FFD testing procedure deviation from 950213 response to NOV dtd 950113.

DISTRIBUTION CODE: A022D COPIES RECEIVED:LTR I ENCL 0 SIZE: <2 TITLE: Fitness for Duty Program: Blind Performance Test/Other NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 I

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 P JOHNSON,A INTERNA NRR/DRPM/PERB NRR DRPM/PSGB NUDOCS-ABSTRACT RGNl EXTERNAL: NOAC NRC PDR D

0 N

NOTE TO ALL "RZDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD8 (415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

vP AND ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 FASTAVENUE, ROCHESTER, N. Y ldbd9-0001 ARFA COOE716 Sd6.27M ROBERT C. MECREDY Vice President Nuclear Operotions August 14, 1995 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-1 Washington, D.C. 20555

Subject:

Fitness for Duty Program Additional Corrective Actions R.E. Ginna Nuclear Power Plant Docket No. 50-244 Ref. (a): Letter from R. C. Mecredy (RGit'E) to Allen R. Johnson (NRC),

Subject:

Reply to a Notice of Violation, dated February 13, 1995 R&f. (b): NRC Inspection Report 50-244/94-028 (Notice of Violation) dated January 13, 1995

Dear Mr. Johnson:

As outlined in a conference call between RGGE (R. Mecredy, J.

Widay, L. Hauck, R. Teed, J. Peters) and the NRC (G. Smith, J.

Joyner, D. Limroth, E. King) on August 7, 1995, the following information has been 'included into procedure FFD-8, Rev. 4 effective 8/8/95, as additional corrective action. This revision was necessary in order to resolve a fitness for duty testing procedure deviation from our response to the NOV, Reference (a),

concerning testing for backshift personnel. Reference (b) documented the NRC Notice of Violation.

Wordin in FFD-8 Rev. 4 "If a backshift worker is selected for a random drug and alcohol test, the test will be conducted before the worker's shift ends.

Conducting the test. before the shift ends will avoid predictability in the time of testing. However, if the worker is not available, the worker will be tested during the next scheduled work shift."

Ver ruly ours, Robert C. Mecre 2wC2 r Q 95082303M 950814 PDR ADOCK 05000244 9 PDR

GAHi391 xc: Mr. Allen R. Johnson (Mail Stop 14B2)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector