ML18085A562: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/22/2018
| issue date = 03/22/2018
| title = Notification of Licensed Operator Retake Initial Examination 05000261/2018301
| title = Notification of Licensed Operator Retake Initial Examination 05000261/2018301
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Kapopoulos E J
| addressee name = Kapopoulos E
| addressee affiliation = Duke Energy Progress, LLC
| addressee affiliation = Duke Energy Progress, LLC
| docket = 05000261
| docket = 05000261
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000261/2018301]]
See also: [[see also::IR 05000261/2018301]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                              NUCLEAR REGULATORY COMMISSION
  March 22, 2018  
                                              REGION II
Ernest J. Kapopoulos, Jr. Site Vice President  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
H.B. Robinson Steam Electric Plant  
                                    ATLANTA, GEORGIA 30303-1257
                                          March 22, 2018
Ernest J. Kapopoulos, Jr.
Site Vice President
H.B. Robinson Steam Electric Plant
Duke Energy
3581 West Entrance Road, RNPA01
Hartsville, SC 29550
SUBJECT:        H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
                OPERATOR RETAKE INITIAL EXAMINATION 05000261/2018301
Dear Mr. Kapopoulos:
During a telephone conversation on January 30, 2018, between Mr. Christopher McComber,
Nuclear Station Instructor - Operations, and Mr. Daniel Bacon, Senior Operations Engineer,
arrangements were made for the administration of a retake operator licensing examination at
the H. B. Robinson Steam Electric Plant. Administration of the simulator scenario portion of the
operating test is scheduled for the week of April 23, 2018.
As agreed during the telephone conversation, your staff will prepare the simulator scenario
portion of the operating test based on the guidelines in Revision 11 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examination is administered. Your staff has also agreed to make copies
of all examination materials that are necessary for administering the examination.
Your staff furnished the operating test outline on February 28, 2018. The simulator scenario
portion of the operating test and the supporting reference materials identified in Attachment 3 to
ES-201 will be due by April 4, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of
Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee
shall approve the outline and operating test before they are submitted to the NRC for review and
approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


Duke Energy
E. Kapopoulos                                2
3581 West Entrance Road, RNPA01
In order to conduct the requested written examinations and operating tests, it will be necessary
Hartsville, SC  29550
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED 
your staff should retain the original simulator performance data (e.g., system pressures,
  OPERATOR RETAKE INITIAL EXAMINATION 05000261/2018301
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final. Your staff has agreed that the simulator scenarios administered for the NRC
examination will not be video-recorded or audio-recorded in any form.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination
date. Contact Mr. Bacon to determine the method for submission of the waiver or excusal
requests. Preliminary reactor operator and senior reactor operator license applications (OMB
control number 3150-0090) and medical certifications (OMB approval number 3150-0024)
should be submitted at least 30 days before the first examination date. If the preliminary
applications are not received at least 30 days before the examination date, a postponement
may be necessary. Final signed applications certifying that all training has been completed and
requesting any waivers or excusals, as applicable, should be submitted at least 14 days before
the first examination date.
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before
the first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC
Form 398, Personal Qualifications StatementLicensee, or as directed by Mr. Bacon when
contacting him to determine the method for submission). The NRC will document its final
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC
Form 398 submitted for the applicant. The NRC will not provide its decision until the final
application is submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
by the Office of Management and Budget, approval number 3150-0018. The burden to the
public for these voluntary information collections is estimated to average 2,250 hours per
examination or response, including the time for reviewing instructions, searching existing data
sources, gathering and maintaining the data needed, and completing and reviewing the
information collections. You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.


Dear Mr. Kapopoulos:
E. Kapopoulos                                 3
Public Protection Notification
During a telephone conversation on January 30, 2018, between Mr. Christopher McComber,
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
Nuclear Station Instructor - Operations, and Mr. Daniel Bacon, Senior Operations Engineer,  
of information unless the document requesting or requiring the collection displays a currently
arrangements were made for the administration of a retake operator licensing examination at
valid OMB control number.
the H. B. Robinson Steam Electric Plant. Administration of the simulator scenario portion of the operating test is scheduled for the week of April 23, 2018. 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
As agreed during the telephone conversation, your staff will prepare the simulator scenario
Room or from the Publicly Available Records (PARS) component of the NRCs document
portion of the operating test based on the guidelines in Revision 11 of NUREG-1021, "Operator
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss
rm.adams.html (the Public Electronic Reading Room).
with your staff any changes that might be necessary before the examination is administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
Thank you for your cooperation in this matter. Mr. McComber has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRC's
Your staff furnished the operating test outline on February 28, 2018. The simulator scenario
examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet
portion of the operating test and the supporting reference materials identified in Attachment 3 to ES-201 will be due by April 4, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee
E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4551, (Internet E-mail:
shall approve the outline and operating test before they are submitted to the NRC for review and
Eugene.Guthrie@nrc.gov.
approval. All materials shall be complete and ready-to-use. 
                                              Sincerely,
                                              /RA/
                                              Eugene F. Guthrie, Chief
                                              Operations Branch 2
                                              Division of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
cc: Distribution via Listserv


We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
E. Kapopoulos 2
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.  Your staff has agreed that
the simulator scenarios administered for the NRC examination will not be video-recorded or audio-recorded in any form.


__ ____________               SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
OFFICE           RII:DRS         RII:DRS
SIGNATURE         DXB2 EMAIL     EFG
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
NAME             DBACON         EGUTHRIE
and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date.  Contact Mr. Bacon to determine the method for submission of the waiver or excusal requests.  Preliminary reactor operator and senior reactor operator license applications (OMB
DATE                 3/ 20/2018     3/22/2018
control number 3150-0090) and medical certif
E-MAIL COPY?       YES     NO   YES     NO   YES   NO   YES   NO     YES   NO   YES   NO     YES NO
ications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date.  If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary.  Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before
 
the first examination date.
 
Although the guidelines for receiving waiver or excusal requests call for at least 30 days before
 
the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC
Form 398, "Personal Qualifications Statement-Licensee," or as directed by Mr. Bacon when
contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
 
Paperwork Reduction Act Statement
This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved
 
by the Office of Management and Budget, approval number 3150-0018.  The burden to the public for these voluntary information collections is estimated to average 2,250 hours per
examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
 
E. Kapopoulos 3
Public Protection Notification
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB control number.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter.  Mr. McComber has been advised of the policies
and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet
E-mail: Daniel.Bacon@nrc.gov
), or me at (404) 997-4551, (Internet E-mail: Eugene.Guthrie@nrc.gov.  Sincerely,  /RA/  Eugene F. Guthrie, Chief      Operations Branch 2
      Division of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
 
cc:  Distribution via Listserv
 
__
____________   SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS     SIGNATURE DXB2 EMAIL EFG     NAME DBACON EGUTHRIE     DATE 3/ 20/2018 3/22/2018     E-MAIL COPY?     YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO
}}
}}

Latest revision as of 14:53, 21 October 2019

Notification of Licensed Operator Retake Initial Examination 05000261/2018301
ML18085A562
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/22/2018
From: Eugene Guthrie
Division of Reactor Safety II
To: Kapopoulos E
Duke Energy Progress
References
50-261/OL-18-01
Download: ML18085A562 (4)


See also: IR 05000261/2018301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

March 22, 2018

Ernest J. Kapopoulos, Jr.

Site Vice President

H.B. Robinson Steam Electric Plant

Duke Energy

3581 West Entrance Road, RNPA01

Hartsville, SC 29550

SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR RETAKE INITIAL EXAMINATION 05000261/2018301

Dear Mr. Kapopoulos:

During a telephone conversation on January 30, 2018, between Mr. Christopher McComber,

Nuclear Station Instructor - Operations, and Mr. Daniel Bacon, Senior Operations Engineer,

arrangements were made for the administration of a retake operator licensing examination at

the H. B. Robinson Steam Electric Plant. Administration of the simulator scenario portion of the

operating test is scheduled for the week of April 23, 2018.

As agreed during the telephone conversation, your staff will prepare the simulator scenario

portion of the operating test based on the guidelines in Revision 11 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examination is administered. Your staff has also agreed to make copies

of all examination materials that are necessary for administering the examination.

Your staff furnished the operating test outline on February 28, 2018. The simulator scenario

portion of the operating test and the supporting reference materials identified in Attachment 3 to

ES-201 will be due by April 4, 2018. Pursuant to Title 10, Section 55.40(b)(3), of the Code of

Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee

shall approve the outline and operating test before they are submitted to the NRC for review and

approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

E. Kapopoulos 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final. Your staff has agreed that the simulator scenarios administered for the NRC

examination will not be video-recorded or audio-recorded in any form.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination

date. Contact Mr. Bacon to determine the method for submission of the waiver or excusal

requests. Preliminary reactor operator and senior reactor operator license applications (OMB

control number 3150-0090) and medical certifications (OMB approval number 3150-0024)

should be submitted at least 30 days before the first examination date. If the preliminary

applications are not received at least 30 days before the examination date, a postponement

may be necessary. Final signed applications certifying that all training has been completed and

requesting any waivers or excusals, as applicable, should be submitted at least 14 days before

the first examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60-day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC

Form 398, Personal Qualifications StatementLicensee, or as directed by Mr. Bacon when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC

Form 398 submitted for the applicant. The NRC will not provide its decision until the final

application is submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collection requirements that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved

by the Office of Management and Budget, approval number 3150-0018. The burden to the

public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per

examination or response, including the time for reviewing instructions, searching existing data

sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. You may submit comments on any aspect of the information collections,

including suggestions for reducing the burden, to FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

E. Kapopoulos 3

Public Protection Notification

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless the document requesting or requiring the collection displays a currently

valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. McComber has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Bacon at (404) 997-4518, (Internet

E-mail: Daniel.Bacon@nrc.gov), or me at (404) 997-4551, (Internet E-mail:

Eugene.Guthrie@nrc.gov.

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

cc: Distribution via Listserv

__ ____________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE DXB2 EMAIL EFG

NAME DBACON EGUTHRIE

DATE 3/ 20/2018 3/22/2018

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO