{{#Wiki_filter:Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department APR 0 2 1993, NLR-N93052 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
{{#Wiki_filter:Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department APR 0 2 1993, NLR-N93052 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
SMALL BREAK LOCA NOTRUMP ANALYSIS REPORT SALEM GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Attached for your review is the Salem Generating Station (SGS) Small Break LOCA Analysis Report (WCAP-13657), using Westinghouse's NOTRUMP analysis methodology.
SMALL BREAK LOCA NOTRUMP ANALYSIS REPORT SALEM GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Attached for your review is the Salem Generating Station (SGS)
The evaluations described in the report were performed in support of the Salem Fuel Upgrade and Margin Recovery Project. PSE&G plans to provide a schedule of the project to the NRC in May 1993. The attached report is also applicable to the present design of the Salem Units, and would remain applicable to SGS subsequent to NRC approval of the ECCS flow balance changes requested via License Change Request LCR 91-03 (dated April 24, 1992). Attachment 5 I PDR . ADOCK 05000272 : P PDR The power is in your hands. 95-2168 REV. 11/91
Small Break LOCA Analysis Report (WCAP-13657), using Westinghouse's NOTRUMP analysis methodology. The evaluations described in the report were performed in support of the Salem Fuel Upgrade and Margin Recovery Project. PSE&G plans to provide a schedule of the project to the NRC in May 1993.
... ... Document Control Desk NLR-N93052 C Mr. J. C. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. K. Tosch, Chief Bureau of Nuclear Engineering Department of Environmental Protection CN 415 Trenton, New Jersey 08625 APR 02 1993}}
The attached report is also applicable to the present design of the Salem Units, and would remain applicable to SGS subsequent to NRC approval of the ECCS flow balance changes requested via License Change Request LCR 91-03 (dated April 24, 1992).
Attachment
(~-9304090299 930402~- ~-~ 5 0
I     PDR     .ADOCK 05000272               :
P                         PDR The power is in your hands.
95-2168 REV. 11/91
 
...   ...
APR 02 1993 Document Control Desk               NLR-N93052 C     Mr. J. C. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. K. Tosch, Chief Bureau of Nuclear Engineering Department of Environmental Protection CN 415 Trenton, New Jersey 08625}}

Revision as of 09:43, 21 October 2019

Forwards WCAP-13657, Salem Units 1 & 2 Small Break LOCA Notrump Analysis Engineering Rept in Support of Fuel Upgrade/Margin Recovery Program.
ML18100A289
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/02/1993
From: Hagan J
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18100A290 List:
References
NLR-N93052, NUDOCS 9304090299
Download: ML18100A289 (2)


Text

Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department APR 0 2 1993, NLR-N93052 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

SMALL BREAK LOCA NOTRUMP ANALYSIS REPORT SALEM GENERATING STATION, UNIT NOS. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 Attached for your review is the Salem Generating Station (SGS)

Small Break LOCA Analysis Report (WCAP-13657), using Westinghouse's NOTRUMP analysis methodology. The evaluations described in the report were performed in support of the Salem Fuel Upgrade and Margin Recovery Project. PSE&G plans to provide a schedule of the project to the NRC in May 1993.

The attached report is also applicable to the present design of the Salem Units, and would remain applicable to SGS subsequent to NRC approval of the ECCS flow balance changes requested via License Change Request LCR 91-03 (dated April 24, 1992).

Attachment

(~-9304090299 930402~- ~-~ 5 0

I PDR .ADOCK 05000272  :

P PDR The power is in your hands.

95-2168 REV. 11/91

... ...

APR 02 1993 Document Control Desk NLR-N93052 C Mr. J. C. Stone Licensing Project Manager Mr. T. Johnson Senior Resident Inspector Mr. T. Martin, Administrator Region I Mr. K. Tosch, Chief Bureau of Nuclear Engineering Department of Environmental Protection CN 415 Trenton, New Jersey 08625