ML18127A032: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.
 
ML18127A032 Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.
 
ML18127A032}}

Latest revision as of 06:36, 21 October 2019

Statement of Senator Elizabeth Warren - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018
ML18127A032
Person / Time
Site: Pilgrim
Issue date: 05/07/2018
From: Warren E
US SEN (Senate)
To:
Division Reactor Projects I
Dimitriadis A
References
Download: ML18127A032 (2)


Text

Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.

ML18127A032 Memo to File: May 7, 2018 Attached is a prepared statement from Senator Elizabeth Warren, presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.

ML18127A032