IR 05000285/2018410: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18137A296
| number = ML18137A296
| issue date = 05/17/2018
| issue date = 05/17/2018
| title = Fort Calhoun Station - NRC Security Baseline Inspection Report 05000285/2018410
| title = NRC Security Baseline Inspection Report 05000285/2018410
| author name = Groom J R
| author name = Groom J
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Fisher M J
| addressee name = Fisher M
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations
{{#Wiki_filter:May 17, 2018


/RA/  
==SUBJECT:==
FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2018410


/RA/ /RA/ /RA/ /RA /RA/
==Dear Ms. Fisher:==
On April 19, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fort Calhoun Station. The NRC inspector discussed the results of this inspection with Mr. C. Heimes, Security Director, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
 
The inspection examined activities conducted under your license as they relate to security and access controls. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspector identified one violation of NRC requirements that was determined to be Severity Level IV under the traditional enforcement process. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
 
If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
 
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390," in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
 
Sincerely,
/RA/
Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Enclosure:
Inspection Report 05000285/2018410 cc w/o encl:
Electronic Distribution ML18137A278 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: JRG Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18137A296 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
SUNSI Review By: JRG Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 DNMS C:PSB1 NAME DHolman AMeyen JGroom RKellar JGroom SIGNATURE /RA/ /RA/ /RA/ /RA /RA/
DATE 5/10/18 5/10/18 5/15/18 05/16/18 05/17/18
}}
}}

Latest revision as of 02:51, 21 October 2019

NRC Security Baseline Inspection Report 05000285/2018410
ML18137A296
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/17/2018
From: Jeremy Groom
Division of Reactor Safety IV
To: Fisher M
Omaha Public Power District
Groom, J
References
IR 2018410
Download: ML18137A296 (3)


Text

May 17, 2018

SUBJECT:

FORT CALHOUN STATION - NRC SECURITY BASELINE INSPECTION REPORT 05000285/2018410

Dear Ms. Fisher:

On April 19, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fort Calhoun Station. The NRC inspector discussed the results of this inspection with Mr. C. Heimes, Security Director, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The inspection examined activities conducted under your license as they relate to security and access controls. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

The inspector identified one violation of NRC requirements that was determined to be Severity Level IV under the traditional enforcement process. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; and the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390," in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Jeremy R. Groom, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Enclosure:

Inspection Report 05000285/2018410 cc w/o encl:

Electronic Distribution ML18137A278 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: JRG Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18137A296 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: JRG Yes No Publicly Available Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 DNMS C:PSB1 NAME DHolman AMeyen JGroom RKellar JGroom SIGNATURE /RA/ /RA/ /RA/ /RA /RA/

DATE 5/10/18 5/10/18 5/15/18 05/16/18 05/17/18