ML18143A960: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:htRC Fud<<," 195,,<(~iM)V.S.NUCLEAR REGULATORY MISSION TO: MR~O'TEILLY FROM: ROCHESTER GAS 8o ELEC CORP ROCHESTER'Y L D WHITE, JR NRC fllSTR(BUTION FDR PART 50 DOCKET MATERIAL DOCKET NUMIIER 5a-k DATE RECEIVE~FILL'UMBER XNCXDENT REPORT DATE OF DOCUMENT s-"t t'TTEB ABORIGINAL COPY DESCRIPTION QNOTOBIZED
{{#Wiki_filter:V.S. NUCLEAR REGULATORY      MISSION DOCKET NUMIIER htRC Fud<<," 195,,<
/UNCLASSIFIED PROP INPUT FORM ENCLOSURE NVMOEB OF COPIES RECEIVE D~sic uzb LTR REF THEIR 4-23-76 RO 76-l2 30-DAY REPORT...ADVISING CORRECTIVE ACTION IS PLANNED TO PLACE KEEPERS ON THE PACKING GLAND NUTS-TO PREVXZPP ROTATION@~~~~~~~~~~~~~~~~~~~~~~...,DO NOT REMOVE ZCZZOV/LEDGE0 I PLANT NAME~NOTE: IF PERSONNEL EXPOSURE IS INVOI.VED SEND DIRECTLY TO KREGER/J.COLLINS SAFETY BRANCH CHIEF: W 3 CYS FOR ACTION LICE ASST: W/CYS ACRS Lg,CYS HOLDING ENT TO LA FOR ACTION/INFORMATION ENVXRO RE FX NRC PDR X&E 2 c'SCHROEDER/XPPOLXTO INTERNAL D Rl BUTION IST NOVAK CHECK jS"~GAS hhEQlF~L'DL'SC~OMACCARY F..I BARR SIIAO OI.L?IERQBI INCH RHCzEI<JQ~OIj.
(~iM)                                                                                                     5a- k FILL'UMBER NRC fllSTR(BUTION FDR PART 50 DOCKET MATERIAL                                        XNCXDENT REPORT TO:                                                   FROM: ROCHESTER GAS           ELEC CORP       DATE OF DOCUMENT MR~ O'TEILLY                                                ROCHESTER'Y 8o s-"t t L D WHITE, JR                       DATE RECEIVE~
NS C.eSTL=R Q5 LPDR: iX(NSXC EXTERNAL OISTRIBUTION CONTROL NUMBFR ggof S te'~4~~~t~~~~C<<4 ROCHESTER GAS AND ELECTRIC CORPORATION r r r~rr I o 89 EAST AVENUE, ROCHESTER, N.Y.14649 LEON D.WHITE.JR, VICE uAESIDENT Regulatory Docket Fite'ay 25, 1976 TELEu+ONE AREA COOE 7ld 546.-2700~g''/Mr.James P.O'Reilly, Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement qo~" Region I~gu~631 Park Avenue King of Prussia, Pennsylvania 19406~b  
NVMOEB OF COPIES RECEIVE D
  'TTEB ABORIGINAL COPY QNOTOBIZED
                            /UNCLASSIFIED PROP                   INPUT FORM
                                                                                                        ~ sic uzb DESCRIPTION                                                            ENCLOSURE LTR REF THEIR         4-23-76 RO 76-l2 30-DAY REPORT...
ADVISING CORRECTIVE ACTION IS PLANNED TO PLACE KEEPERS ON THE PACKING GLAND NUTS - TO PREVXZPP ROTATION@ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
                                                                                  ...,DO NOT REMOVE ZCZZOV/LEDGE0 I
PLANT     NAME~                                                         NOTE:     IF PERSONNEL EXPOSURE IS INVOI.VED SEND DIRECTLY TO KREGER/J. COLLINS SAFETY                                       FOR ACTION/INFORMATION                    ENVXRO BRANCH CHIEF:
W 3 CYS FOR ACTION LICE ASST:
W/ CYS ACRS         Lg,CYS   HOLDING           ENT TO LA INTERNAL D IST Rl BUTION RE     FX NRC PDR X &E       2 c'
SCHROEDER/XPPOLXTO NOVAK CHECK GAS jS"~
hhEQlF~
L'DL'SC~OMACCARY F .. I BARR SIIAO OI.L? IERQBIINCH RHCzEI<JQ~OIj.       NS C. eSTL=R     Q5               EXTERNAL OISTRIBUTION                                        CONTROL NUMBFR LPDR:
iX(
NSXC ggof
 
S te '
    ~
4
        ~ ~ ~ t ~ ~ ~ ~   C <<4
 
r r r rr I
                                                                                                ~
ROCHESTER GAS AND ELECTRIC CORPORATION         o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR,                                                               TELEu+ONE VICE uAESIDENT                                                         AREA COOE 7ld 546.-2700 Regulatory Docket     Fite'ay         25, 1976
                                                          ~g''/
Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement                             qo~"
Region I                                                   ~gu~
631 Park Avenue King of Prussia, Pennsylvania         19406
                                                      ~b


==Subject:==
==Subject:==
Supplemental Report on Reportable e 76-12, 30-day report, dated April 23, 1976 R.E.Ginna Nuclear Power Plant, Unit No.1 Docket No.50-244  
Supplemental Report on Reportable                 e 76-12, 30-day report, dated April 23, 1976 R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244
 
==Dear Mr. O'Reilly:==
 
On April 23,  1976 we submitted Reportable Occurrence 76-12, 30-day report, Containment      Personnel Airlock Handwheel Shaft Seal Excessive Leak-age During Testing.        In that report the statement was made that action to prevent a recurrence      of that event was being investigated.
This is to inform you that the corrective action planned is to place keepers on the packing gland nuts to prevent them from rotating with the shaft, precluding their loosening and permitting leakage through the packing.
These keepers will be installed at a future plant outage when the door assemblies can be dismantled for this maintenance.
In addition, procedure changes have been submitted to require as initial conditions that a mechanic verify proper seating of the packing gland nut prior to performing the applicable tests.
Two additional copies of this letter are enclosed to conform to the original submittal of Reportable Occurrence 76-12, 30-day report.
Very truly yours,
                                                          " "  /J'.
D. White, Jr.
cc: Dr. Ernst Volgenau (30)
Mr. William Q. McDonald (3)


==Dear Mr.O'Reilly:==
4~
On April 23, 1976 we submitted Reportable Occurrence 76-12, 30-day report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leak-age During Testing.In that report the statement was made that action to prevent a recurrence of that event was being investigated.
1       ~/
This is to inform you that the corrective action planned is to place keepers on the packing gland nuts to prevent them from rotating with the shaft, precluding their loosening and permitting leakage through the packing.These keepers will be installed at a future plant outage when the door assemblies can be dismantled for this maintenance.
lf P
In addition, procedure changes have been submitted to require as initial conditions that a mechanic verify proper seating of the packing gland nut prior to performing the applicable tests.Two additional copies of this letter are enclosed to conform to the original submittal of Reportable Occurrence 76-12, 30-day report.Very truly yours,""/J'.D.White, Jr.cc: Dr.Ernst Volgenau (30)Mr.William Q.McDonald (3) 1 4~~/lf P/f l f}}
  /f l f}}

Latest revision as of 02:14, 21 October 2019

R. E. Ginna - Supplemental Report on Reportable Occurrence 76-12, 30-Day Report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leakage During Testing
ML18143A960
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/25/1976
From: White L
Rochester Gas & Electric Corp
To: O'Reilly J
NRC/IE, NRC Region 1
References
LER 1976-012-00
Download: ML18143A960 (4)


Text

V.S. NUCLEAR REGULATORY MISSION DOCKET NUMIIER htRC Fud<<," 195,,<

(~iM) 5a- k FILL'UMBER NRC fllSTR(BUTION FDR PART 50 DOCKET MATERIAL XNCXDENT REPORT TO: FROM: ROCHESTER GAS ELEC CORP DATE OF DOCUMENT MR~ O'TEILLY ROCHESTER'Y 8o s-"t t L D WHITE, JR DATE RECEIVE~

NVMOEB OF COPIES RECEIVE D

'TTEB ABORIGINAL COPY QNOTOBIZED

/UNCLASSIFIED PROP INPUT FORM

~ sic uzb DESCRIPTION ENCLOSURE LTR REF THEIR 4-23-76 RO 76-l2 30-DAY REPORT...

ADVISING CORRECTIVE ACTION IS PLANNED TO PLACE KEEPERS ON THE PACKING GLAND NUTS - TO PREVXZPP ROTATION@ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

...,DO NOT REMOVE ZCZZOV/LEDGE0 I

PLANT NAME~ NOTE: IF PERSONNEL EXPOSURE IS INVOI.VED SEND DIRECTLY TO KREGER/J. COLLINS SAFETY FOR ACTION/INFORMATION ENVXRO BRANCH CHIEF:

W 3 CYS FOR ACTION LICE ASST:

W/ CYS ACRS Lg,CYS HOLDING ENT TO LA INTERNAL D IST Rl BUTION RE FX NRC PDR X &E 2 c'

SCHROEDER/XPPOLXTO NOVAK CHECK GAS jS"~

hhEQlF~

L'DL'SC~OMACCARY F .. I BARR SIIAO OI.L? IERQBIINCH RHCzEI<JQ~OIj. NS C. eSTL=R Q5 EXTERNAL OISTRIBUTION CONTROL NUMBFR LPDR:

iX(

NSXC ggof

S te '

~

4

~ ~ ~ t ~ ~ ~ ~ C <<4

r r r rr I

~

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR, TELEu+ONE VICE uAESIDENT AREA COOE 7ld 546.-2700 Regulatory Docket Fite'ay 25, 1976

~g/

Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement qo~"

Region I ~gu~

631 Park Avenue King of Prussia, Pennsylvania 19406

~b

Subject:

Supplemental Report on Reportable e 76-12, 30-day report, dated April 23, 1976 R. E. Ginna Nuclear Power Plant, Unit No. 1 Docket No. 50-244

Dear Mr. O'Reilly:

On April 23, 1976 we submitted Reportable Occurrence 76-12, 30-day report, Containment Personnel Airlock Handwheel Shaft Seal Excessive Leak-age During Testing. In that report the statement was made that action to prevent a recurrence of that event was being investigated.

This is to inform you that the corrective action planned is to place keepers on the packing gland nuts to prevent them from rotating with the shaft, precluding their loosening and permitting leakage through the packing.

These keepers will be installed at a future plant outage when the door assemblies can be dismantled for this maintenance.

In addition, procedure changes have been submitted to require as initial conditions that a mechanic verify proper seating of the packing gland nut prior to performing the applicable tests.

Two additional copies of this letter are enclosed to conform to the original submittal of Reportable Occurrence 76-12, 30-day report.