{{#Wiki_filter:* ~Ente,gy ----*---------------W3F1-2019-0041 June 13, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Entergy Operations, Inc. 17265 RIYer Rold Killona, LA 70057-3093 Tel 504 464 3786 ---------PIIUIWood Manager -Regulatoly Aauranca Waterford 3  
{{#Wiki_filter:*
~Ente,gy
-- - - *- --             --------- - - -
Entergy Operations, Inc.
17265 RIYer Rold Killona, LA 70057-3093 Tel 504 464 3786
                                                                                ---------
PIIUIWood Manager - Regulatoly Aauranca Waterford 3 W3F1-2019-0041 June 13, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Submittal of Owner's Activity Report Form for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 Renewed Facility Operating License No. NPF-38 Attached is the subject report which covers the Owner's Activity Report Form, OAR-1, for Waterford 3 Operating Cycle 22 / Refuel 22, enclosed as Attachment
Submittal of Owner's Activity Report Form for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 Renewed Facility Operating License No. NPF-38 Attached is the subject report which covers the Owner's Activity Report Form, OAR-1, for Waterford 3 Operating Cycle 22 / Refuel 22, enclosed as Attachment 1. This report is being submitted In accordance with ASME Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Summary Report Preparation and Submission,* which was adopted for use at Waterford 3 commencing its incorporation Into Regulatory Guide 1.147 and subsequent revision to CEP-RR:.001 "ASME Section XI Repair/Replacement Program* on September 10, 2018.
: 1. This report is being submitted In accordance with ASME Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Summary Report Preparation and Submission,*
The OAR-1 form Is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-1 form provides: (1) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division 1 and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria. A copy of this letter and the attached report Is also being submitted to the office of the Louisiana State Fire Marshall.
which was adopted for use at Waterford 3 commencing its incorporation Into Regulatory Guide 1.147 and subsequent revision to CEP-RR:.001 "ASME Section XI Repair/Replacement Program* on September 10, 2018. The OAR-1 form Is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-1 form provides: ( 1 ) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division 1 and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria.
There are no new commitments contained in this submittal.
A copy of this letter and the attached report Is also being submitted to the office of the Louisiana State Fire Marshall. There are no new commitments contained in this submittal.
Please contact Paul Wood, Regulatory Assurance Manager, at (504) 464-3786 should you have any questions regarding this submittal.
Please contact Paul Wood, Regulatory Assurance Manager, at (504) 464-3786 should you have any questions regarding this submittal. Respectfully, PW  
Respectfully, PW


==Attachment:==
==Attachment:==
: 1. Owner's Activity Report for lnservlce Inspection Performed During Operating Cycle 22/ Refuel 22 W3F1-2019-0041 Page 2 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector-Waterford 3 NRC Project Manager -Waterford 3 Mr. H. "Butch" Browning, Jr. Office of the State Fire Marshall 8181 Independence Blvd. Baton Rouge, LA 70806 ATTACHMENT 1 To W3F1-2019-0041 Owner's Activity Report for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNERS ACTIVITY REPORT. Report Numbor Cyclo 22 / Refuel 22 Plant Waterford Stoam Elecbic Station, 17265 River Road, Klllona, La. 70057 Unit No. (lf oppllc:oblo)
: 1. Owner's Activity Report for lnservlce Inspection Performed During Operating Cycle 22/ Refuel 22
Commorclal service date -'-08"'/2=-"4/'"'1_98""5'"--------
 
Refuollng outago no. 22 Curront Inspection lntorval -=-3'-"rd'-----------------"7'.:=::-:=:-,:-:-.,----------------( 1* .2"' S" 4"', other) Curront lntpocllon porfod 3rd Edition and Addenda of Section XI oppllcablo to tho lnapoctlon piano 2001 Edition Through 2003 Addenda , 2007 Edition Through 2008 Addenda Date and nivlalon of Inspection plans 4/27/2017 Revision 006 SEP-ISl-104 Edltlon and Addonda of Soctlon XI appllcablo to repelr/replacemenl octlvlti.a, If different than the Inspection plana Same as above Code Caa1111 used: __ N-532......,_-5
W3F1-2019-0041 Page 2 cc:   NRC Region IV Regional Administrator NRC Senior Resident Inspector-Waterford 3 NRC Project Manager - Waterford 3 Mr. H. "Butch" Browning, Jr.
__________________
Office of the State Fire Marshall 8181 Independence Blvd.
-;;: 1 1f.::::=cabla=-.-------------------
Baton Rouge, LA 70806
CERTIFICATE OF CONFORMANCE I certify that (*) tho statements mado In this repor1 an1 corroet, (b) the examln a tlon a and teats meet tho ln1pctetlon Pl a n ea roqulrod by tho ASME Codo, Section XI , and (c) tho n,palr/ropla~ment actlvltlus and evaluations eupportlng the completion of -:ccRT"efv-=ei__.22.,....._..,....,,--_
 
confonn to the requlromonts of Section XI. c--_, Date CERTIFICATE OF INSERVICE INSPECTION I , th9 undersigned , hold i ng a valid <<>mmission issued by the National Board of Boiler and Prossure Vossol lnspo<;tors and the State or Province of Louisiana and employed by The Hartford Stoam Bodor Inspection and Insurance Company or Connochcut of Hartforo, CT have inspacted the It.ms deacrlbod in th l a Owner's Activity Report and atato that, to the beat of my knowledgo and bolief, tho OWnor has performed all activities represonted by thia roport In Accordance wtth the niqulrements of Section XI. By signing this certificate neither the Inspector nor hi11 employer makes any warranty, expn1saed or Implied , concerning Iha repair/ replacement ac:tlvltln and evaluation described In this report. Furthennoro, nolther tho lnspoctor nor his omployer shall be liable In any mannor for any po111onai injury or property damago or loH of any kind 11rl11ln9 from or connected with this Inspection. P~--~ Commiulon fv(l I (;07'-l . LA t 7t; '7-,* I<, I V r}....1:_
ATTACHMENT 1 To W3F1-2019-0041 Owner's Activity Report for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22
Hatlonal Boa rd, St.a tio , Provln<*, a n d E.ndo.-.~ Dato _ _{,_j I 1 I j CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Date Repair/Replacement Work Completed Plan Number Perform weld overlay 1 1 RC2-46RL 1 A in accordance with 5/23/2019 19-RR-07 EC-81233 and WSI traveler Perform weld overlay 1 1 RC2-48RL2A in accordance with 5/23/2019 19-RR-08 EC-81233 and WSI traveler 3CC1 1/2-17 A1 (RCP 1A SEAL COOLER INLET Repair Pipe Leak 3 FAIL SAFE TUBING.) CR-WF3-2019-5316 6/11/2019 19-RR-02}}
 
CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNERS ACTIVITY REPORT.
Report Numbor             Cyclo 22 / Refuel 22 Plant       Waterford Stoam Elecbic Station, 17265 River Road, Klllona, La. 70057 Unit No.     -=3-------                            Commorclal service date   -'-08"'/2=-"4/'"'1_98""5'"-------- Refuollng outago no.             22 (lf oppllc:oblo)
Curront Inspection lntorval               -=-3'-"rd'-----------------"7'.:=::-:=:-,:-:-.,----------------- -
( 1*.2"' S" 4"', other)
Curront lntpocllon porfod                   3rd Edition and Addenda of Section XI oppllcablo to tho lnapoctlon piano                 2001 Edition Through 2003 Addenda, 2007 Edition Through 2008 Addenda Date and nivlalon of Inspection plans               4/27/2017 Revision 006 SEP-ISl-104 Edltlon and Addonda of Soctlon XI appllcablo to repelr/replacemenl octlvlti.a, If different than the Inspection plana                       Same as above Code Caa1111 used: __     N-532......,_-5
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-;;:           1f.::::=cabla=-.-------------------
1 CERTIFICATE OF CONFORMANCE I certify that (*) tho statements mado In this repor1 an1 corroet, (b) the examlnatlona and teats meet tho ln1pctetlon Plan ea roqulrod by c--_,
tho ASME Codo, Section XI, and (c) tho n,palr/ropla~ment actlvltlus and evaluations eupportlng the completion of -:ccRT"efv-=ei__.22.,....._..,....,,--_
confonn to the requlromonts of Section XI.
Date CERTIFICATE OF INSERVICE INSPECTION I, th9 undersigned, holding a valid <<>mmission issued by the National Board of Boiler and Prossure Vossol lnspo<;tors and the State or Province of       Louisiana               and employed by     The Hartford Stoam Bodor Inspection and Insurance Company or Connochcut                   of Hartforo, CT                                                                       have inspacted the It.ms deacrlbod in thla Owner's Activity Report and atato that, to the beat of my knowledgo and bolief, tho OWnor has performed all activities represonted by thia roport In Accordance wtth the niqulrements of Section XI.
By signing this certificate neither the Inspector nor hi11 employer makes any warranty, expn1saed or Implied, concerning Iha repair/
replacement ac:tlvltln and evaluation described In this report. Furthennoro, nolther tho lnspoctor nor his omployer shall be liable In any mannor for any po111onai injury or property damago or loH of any kind 11rl11ln9 from or connected with this Inspection.
P~--~                                                     Commiulon                   fv(l I (;07'-l . LA t 7t; '7- ,*           I<, IV Hatlonal Board, St.atio , Provln<*, and E.ndo.-. ~
r}....1:_
Dato     _ _{,_j I 1 I j
 
CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and     Item Description             Evaluation Description Item Number None               None       None
 
CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of       Date   Repair/Replacement Code Class    Item Description Work         Completed     Plan Number Perform weld overlay in accordance with 1           1RC2-46RL 1A                          5/23/2019     19-RR-07 EC-81233 and WSI traveler Perform weld overlay in accordance with 1           1RC2-48RL2A                           5/23/2019     19-RR-08 EC-81233 and WSI traveler 3CC1 1/2-17 A1 (RCP 1A SEAL COOLER INLET       Repair Pipe Leak 3       FAIL SAFE TUBING.)   CR-WF3-2019-5316     6/11/2019     19-RR-02}}

Revision as of 18:13, 19 October 2019

Submittal of Owner'S Activity Report Form for Lnservice Inspection Performed During Operating Cycle 22 / Refuel 22
ML19165A083
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/13/2019
From: Wood P
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2019-0041
Download: ML19165A083 (6)


Text

~Ente,gy

-- - - *- -- --------- - - -

Entergy Operations, Inc.

17265 RIYer Rold Killona, LA 70057-3093 Tel 504 464 3786


PIIUIWood Manager - Regulatoly Aauranca Waterford 3 W3F1-2019-0041 June 13, 2019 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Submittal of Owner's Activity Report Form for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 Renewed Facility Operating License No. NPF-38 Attached is the subject report which covers the Owner's Activity Report Form, OAR-1, for Waterford 3 Operating Cycle 22 / Refuel 22, enclosed as Attachment 1. This report is being submitted In accordance with ASME Code Case N-532-5, "Repair/Replacement Activity Documentation Requirements and lnservice Summary Report Preparation and Submission,* which was adopted for use at Waterford 3 commencing its incorporation Into Regulatory Guide 1.147 and subsequent revision to CEP-RR:.001 "ASME Section XI Repair/Replacement Program* on September 10, 2018.

The OAR-1 form Is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-1 form provides: (1) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division 1 and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria. A copy of this letter and the attached report Is also being submitted to the office of the Louisiana State Fire Marshall.

There are no new commitments contained in this submittal.

Please contact Paul Wood, Regulatory Assurance Manager, at (504) 464-3786 should you have any questions regarding this submittal.

Respectfully, PW

Attachment:

1. Owner's Activity Report for lnservlce Inspection Performed During Operating Cycle 22/ Refuel 22

W3F1-2019-0041 Page 2 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector-Waterford 3 NRC Project Manager - Waterford 3 Mr. H. "Butch" Browning, Jr.

Office of the State Fire Marshall 8181 Independence Blvd.

Baton Rouge, LA 70806

ATTACHMENT 1 To W3F1-2019-0041 Owner's Activity Report for lnservice Inspection Performed During Operating Cycle 22 / Refuel 22

CASES OF ASME BOILER AND PRESSURE VESSEL CODE FORM OAR-1 OWNERS ACTIVITY REPORT.

Report Numbor Cyclo 22 / Refuel 22 Plant Waterford Stoam Elecbic Station, 17265 River Road, Klllona, La. 70057 Unit No. -=3------- Commorclal service date -'-08"'/2=-"4/'"'1_98""5'"-------- Refuollng outago no. 22 (lf oppllc:oblo)

Curront Inspection lntorval -=-3'-"rd'-----------------"7'.:=::-:=:-,:-:-.,----------------- -

( 1*.2"' S" 4"', other)

Curront lntpocllon porfod 3rd Edition and Addenda of Section XI oppllcablo to tho lnapoctlon piano 2001 Edition Through 2003 Addenda, 2007 Edition Through 2008 Addenda Date and nivlalon of Inspection plans 4/27/2017 Revision 006 SEP-ISl-104 Edltlon and Addonda of Soctlon XI appllcablo to repelr/replacemenl octlvlti.a, If different than the Inspection plana Same as above Code Caa1111 used: __ N-532......,_-5

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-;;: 1f.::::=cabla=-.-------------------

1 CERTIFICATE OF CONFORMANCE I certify that (*) tho statements mado In this repor1 an1 corroet, (b) the examlnatlona and teats meet tho ln1pctetlon Plan ea roqulrod by c--_,

tho ASME Codo,Section XI, and (c) tho n,palr/ropla~ment actlvltlus and evaluations eupportlng the completion of -:ccRT"efv-=ei__.22.,....._..,....,,--_

confonn to the requlromonts of Section XI.

Date CERTIFICATE OF INSERVICE INSPECTION I, th9 undersigned, holding a valid <<>mmission issued by the National Board of Boiler and Prossure Vossol lnspo<;tors and the State or Province of Louisiana and employed by The Hartford Stoam Bodor Inspection and Insurance Company or Connochcut of Hartforo, CT have inspacted the It.ms deacrlbod in thla Owner's Activity Report and atato that, to the beat of my knowledgo and bolief, tho OWnor has performed all activities represonted by thia roport In Accordance wtth the niqulrements of Section XI.

By signing this certificate neither the Inspector nor hi11 employer makes any warranty, expn1saed or Implied, concerning Iha repair/

replacement ac:tlvltln and evaluation described In this report. Furthennoro, nolther tho lnspoctor nor his omployer shall be liable In any mannor for any po111onai injury or property damago or loH of any kind 11rl11ln9 from or connected with this Inspection.

P~--~ Commiulon fv(l I (;07'-l . LA t 7t; '7- ,* I<, IV Hatlonal Board, St.atio , Provln<*, and E.ndo.-. ~

r}....1:_

Dato _ _{,_j I 1 I j

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Date Repair/Replacement Code Class Item Description Work Completed Plan Number Perform weld overlay in accordance with 1 1RC2-46RL 1A 5/23/2019 19-RR-07 EC-81233 and WSI traveler Perform weld overlay in accordance with 1 1RC2-48RL2A 5/23/2019 19-RR-08 EC-81233 and WSI traveler 3CC1 1/2-17 A1 (RCP 1A SEAL COOLER INLET Repair Pipe Leak 3 FAIL SAFE TUBING.) CR-WF3-2019-5316 6/11/2019 19-RR-02