ML061220693: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 9: | Line 9: | ||
| docket = 05000302 | | docket = 05000302 | ||
| license number = DPR-072 | | license number = DPR-072 | ||
| contact person = Mozafari B | | contact person = Mozafari B, NRR/ADRO/DORL, 415-2020 | ||
| case reference number = TAC MC8535, TAC MC9562 | | case reference number = TAC MC8535, TAC MC9562 | ||
| package number = ML061350141 | | package number = ML061350141 |
Revision as of 19:09, 13 July 2019
ML061220693 | |
Person / Time | |
---|---|
Site: | Crystal River |
Issue date: | 05/30/2006 |
From: | Progress Energy Co |
To: | Office of Nuclear Reactor Regulation |
Mozafari B, NRR/ADRO/DORL, 415-2020 | |
Shared Package | |
ML061350141 | List: |
References | |
TAC MC8535, TAC MC9562 | |
Download: ML061220693 (6) | |
Text
http://nggweb/cr3environmentalradcontrol/chemist ry/out/podchem.
pdf (2-year plot)Primary to Secondary Leakrate / RM-A12 Method 3.5-3 -235- .kj t 05 -: @ $ 5? 00 Date 00 W)0'6'el Ab Progress Energy Provide a description of the inspections performed including the areas examined and the probes used.Scope A B 100% Full Length Bobbin Coil (UTS to LTS) 15,232 14,748 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice 15,232 14,748 Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve 55 54 34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus 55 54 6" below the end of the sleeve)34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes 13 10 34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region 45 45 Sleeved and Un-Sleeved Tubes Visual Inspection of ALL Plugs 598 1566 100% MRPC of the I-600 Rolled Plugs 20 47 100% MRPC of the Dents Adjacent to Explosive Plugged Tubes 17 66 34% MRPC of all Dents LTS +4" to UTE 160 70 34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in 2054 1387 the Sludge Pile Region 100% MRPC of the Inservice Tubes with IGA in the First Span N/A 167 Mi Progres Energy The scope of the inspection and the expansion criteria Scope 100% Full Length Bobbin Coil 100%/6 Inspection, no further expansion Is possible 100% Upper and Lower Roll Transition Of The Non-Sleeved Tubes Inservice 100% Inspection, no further expansion Is possible Using MRPC 34% Bobbin Coil of the Inservice Sleeves Examined Full Length of the Sleeve IF C-I: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes in the affected OTSG and 20% additional tubes in the other OTSG.34% MRPC of the Rolled Joints in the UTS and 15S of the Inservice Sleeves (Plus IEC-1: ITHE NO EXPANSION REQUIRED 6" below the end of the sleeve) jfC-2 or C-3:. THEN Inspect the remaining tubes In the affected OTSG and 20% additional tubes in the other OTSG.34% MRPC exam UTS and 15S of Remainder Lane Region Un-sleeved tubes IF C-1: THEN NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes in the affected OTSG and 20% additional tubes in the other OTSG.34% MRPC @ 15S Exam Of One Tube Boundary Around Lane/Wedge Region IE C-I: THEN NO EXPANSION REQUIRED Sleeved and Un-Sleeved Tubes LF C-2 or C-3:. IHEN Inspect the remaining tubes In the affected OTSG and 20% additional tubes In the other OTSG.Visual Inspection of ALL Plugs 100% Inspection, no further expansion Is possible 100% MRPC of the I-600 Rolled Plugs 100% Inspection, no further expansion Is possible 100% MRPC of the Dents Adjacent to Explos Plugged Tubes 100% Inspection, no further expansion is possible 34% MRPC of all Dents LTS +4" to UTE IF C-1: TH3N NO EXPANSION REQUIRED IF C-2 or C-3:. THEN Inspect the remaining tubes in the affected OTSG and 20% additional tubes In the other OTSG.34% MRPC in the Lower Tube Sheet Crevice Area, +4" to -8" from the LTSF in IF C-1: THEN NO EXPANSION REQUIRED the Sludge Pile Region IEC-2 or C-3:. THEN Inspect the remaining tubes in the affected OTSG and 20% additional tubes in the other OTSG.100% MRPC of the Inservice Tubes with IGA in the First Span (B OTSG) N/A doG Progress Energy UIC (i0 38 38 37 38 38 40 39 40 39 37 39 40 39 38 48--l_ 24.00' I C_ .UTS 15S 149 139 12S m 009S_089 078 089 049 03S , 02S 01 S LTS LTE II k4 r Ab Progress Energy W smi Q(uaet Ae)5 -... .............
...:.....:................
.. ._ .. ...\ R 50 = I; ~~~~~~~~~~~.......................................................................
ViD,=Nefl,,,,,,N
\ O SS15--.... .... ..... ... tN~~...- ......~~*---: ..........
......30 * * *5.n 40- _*R.............
U -_-...............
--..........
I.. ..... .........
..........
......*.**** S.......................
K 40 -... ~..*.4 .... .U ,.I.I 0 -_:~*.se, : .....................
,,_ ; .......................
- .::-:. .... .. .. ..:........... .z 136
- I I4 V 5 5 *N ..................
so5 .............
... .. ...135 -............
1....<8?G C Progress Energy EC TYPICAL TUBE END CRACKING'T Indications 3/16" -1/2 "1 V'* Characteristics
- Axial and Circumferential
- Adjacent to TS Clad Region C2 Progress Energy