ML072130003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Haney C
| author name = Haney C
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = Blevins M R
| addressee name = Blevins M
| addressee affiliation = TXU Power
| addressee affiliation = TXU Power
| docket = 05000445
| docket = 05000445

Revision as of 22:21, 12 July 2019

Completion of Actions for Confirmatory Action Letter NRR-07-007
ML072130003
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/27/2007
From: Catherine Haney
Plant Licensing Branch III-2
To: Blevins M
TXU Power
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC MD4143, NRR-07-007
Download: ML072130003 (4)


Text

August 27, 2007Mr. M. R. BlevinsSenior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OFACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO.

MD4143)

Dear Mr. Blevins:

On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued ConfirmatoryAction Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL.In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays werecompleted for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007.Based on your letters, the NRC has found that all the commitments listed in the CAL andsupporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143.Thank you for informing us of the actions documented in your letter. These actions may beexamined during a future NRC inspection of your facility.Since the CAL addressed both CPSES units, it will remain open until all CAL commitmentspertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open.Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and theNRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or M. R. Blevins-2-Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will bemade available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html

.Sincerely,/RA/Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-445 cc: See next page

ML072130003*Conurrence via e-mailOFFICENRR/DCI/CPNBNRR/DCI/CPNB/BCNRR/DORL/LPL4/PMNRR/DORL/LPL4/LANAMETlupold, Tchan forTChanBSingalJBurkhardt DATE8/9/078/9/078/7/078/7/07 OFFICENRR/DORL/LPL4/BCNRR/DCI/DDRS/D, RIV *NRR/DORL/D NAMETHiltzMEvansDchamberlain, Wjones forCHaney DATE8/8/078/9/078/21/078/27/07 December 2004Comanche Peak Steam Electric Station cc:Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011Mr. Fred W. Madden, DirectorRegulatory Affairs TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043George L. Edgar, Esq.Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004County JudgeP.O. Box 851 Glen Rose, TX 76043Environmental and Natural Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189Mr. Richard A. Ratliff, ChiefBureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189Mr. Brian AlmonPublic Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326Ms. Susan M. JablonskiOffice of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087Terry Parks, Chief InspectorTexas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711