ML072840011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 10/15/2007
| issue date = 10/15/2007
| title = Withdrawal of License Amendment Request Add License Condition 2.C That Allows Technical Specifications Surveillance Intervals to Be Extended on One-time Basis for 14th Fuel Cycle
| title = Withdrawal of License Amendment Request Add License Condition 2.C That Allows Technical Specifications Surveillance Intervals to Be Extended on One-time Basis for 14th Fuel Cycle
| author name = Vaidya B K
| author name = Vaidya B
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| author affiliation = NRC/NRR/ADRO/DORL/LPLIV
| addressee name = Venable J E
| addressee name = Venable J
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
| license number = NPF-047
| license number = NPF-047
| contact person = Vaidya B K, NRR/DORL/LPL4, 415-3308
| contact person = Vaidya B, NRR/DORL/LPL4, 415-3308
| case reference number = TAC MD6741
| case reference number = TAC MD6741
| document type = Federal Register Notice, Letter
| document type = Federal Register Notice, Letter

Revision as of 19:55, 12 July 2019

Withdrawal of License Amendment Request Add License Condition 2.C That Allows Technical Specifications Surveillance Intervals to Be Extended on One-time Basis for 14th Fuel Cycle
ML072840011
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/15/2007
From: Bhalchandra Vaidya
NRC/NRR/ADRO/DORL/LPLIV
To: Venable J
Entergy Operations
Vaidya B, NRR/DORL/LPL4, 415-3308
References
TAC MD6741
Download: ML072840011 (5)


Text

October 15, 2007

Mr. Joseph E. Venable Site Vice President Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF LICENSE AMENDMENT REQUEST RE: REFUELING OUTAGE 14 SURVEILLANCE FREQUENCY EXTENSION (TAC NO. MD6741)

Dear Mr. Venable:

By letter dated September 13, 2007, you applied for an amendment to the River Bend Station, Unit 1 (RBS), Facility Oper ating License No. NPF-47. The proposed change would have modified the facility Technical Specifications (TS) pertaining to the facility operati ng license.

The proposed change would have added a License C ondition 2.C to the Facility Operating License NPF-47 that would have allowed certain RBS TS surveillance intervals to be extended on a one-time basis for the 14th Fuel Cycle to account for the effects of a delayed refueling outage. Subsequently, by letter dated October 3, 2007, you withdrew the amendment request.

The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.

Sincerely,

/RA/ Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-458

Enclosure:

Notice of Withdrawal

cc w/encl: See next page

ML072840011 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC

NAME BVaidya JBurkhardt MThadani for THiltz DATE 10/15/07 10/12/07 10/15/07 7590-01-P

UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY OPERATIONS, INC.

DOCKET NO. 50-458 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE

The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Entergy Operations, Inc., (the licensee) to withdraw its September 13, 2007, application for a proposed amendment to Facility O perating License No. NPF-47 for the River Bend Station, Unit 1, located in West Feliciana Parish, Louisiana. The proposed amendment would have revised the facility Technical Specifications and the operating license. The proposed change would have added a License Condition 2.C to the Facility Operating License NPF-47 that allows River Bend Station, Unit 1, Technical Specifications surveillance intervals to be extended on a one-time basis for the 14 th Fuel Cycle to account for the effects of a delayed refueling outage. The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on October 9, 2007 (72 FR 57354).

However, by letter dated October 3, 2007, the licensee withdrew the proposed change. For further details with respect to this action, see the application for amendment dated September 13, 2007, and the licensee's letter dated October 3, 2007, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC=s Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.

Dated at Rockville, Maryland, this 15 th day of October, 2007.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation River Bend Station

cc:

Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995

Senior Vice President and COO Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

Vice President, Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

General Manager, Plant Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

Director, Nuclear Safety & Licensing Entergy Services, Inc.

440 Hamilton Avenue White Plains, NY 10601

Director, Nuclear Safety Assurance Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

Senior Manager, Nuclear Safety & Licensing Entergy Services, Inc.

P.O. Box 31995 Jackson, MS 39286-1995

Manager, Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312

Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9095

President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA 70775

Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326

Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326

Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806

Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497

Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064