ML072840011
| ML072840011 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 10/15/2007 |
| From: | Bhalchandra Vaidya NRC/NRR/ADRO/DORL/LPLIV |
| To: | Venable J Entergy Operations |
| Vaidya B, NRR/DORL/LPL4, 415-3308 | |
| References | |
| TAC MD6741 | |
| Download: ML072840011 (5) | |
Text
October 15, 2007 Mr. Joseph E. Venable Site Vice President Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - WITHDRAWAL OF LICENSE AMENDMENT REQUEST RE: REFUELING OUTAGE 14 SURVEILLANCE FREQUENCY EXTENSION (TAC NO. MD6741)
Dear Mr. Venable:
By letter dated September 13, 2007, you applied for an amendment to the River Bend Station, Unit 1 (RBS), Facility Operating License No. NPF-47. The proposed change would have modified the facility Technical Specifications (TS) pertaining to the facility operating license.
The proposed change would have added a License Condition 2.C to the Facility Operating License NPF-47 that would have allowed certain RBS TS surveillance intervals to be extended on a one-time basis for the 14th Fuel Cycle to account for the effects of a delayed refueling outage. Subsequently, by letter dated October 3, 2007, you withdrew the amendment request.
The Commission has filed the enclosed Notice of Withdrawal of Application for Amendment to Facility Operating License with the Office of the Federal Register for publication.
Sincerely,
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458
Enclosure:
Notice of Withdrawal cc w/encl: See next page
ML072840011 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya JBurkhardt MThadani for THiltz DATE 10/15/07 10/12/07 10/15/07
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY OPERATIONS, INC.
DOCKET NO. 50-458 NOTICE OF WITHDRAWAL OF APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has granted the request of Entergy Operations, Inc., (the licensee) to withdraw its September 13, 2007, application for a proposed amendment to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1, located in West Feliciana Parish, Louisiana.
The proposed amendment would have revised the facility Technical Specifications and the operating license. The proposed change would have added a License Condition 2.C to the Facility Operating License NPF-47 that allows River Bend Station, Unit 1, Technical Specifications surveillance intervals to be extended on a one-time basis for the 14th Fuel Cycle to account for the effects of a delayed refueling outage.
The Commission had previously issued a Notice of Consideration of Issuance of Amendment published in the FEDERAL REGISTER on October 9, 2007 (72 FR 57354).
However, by letter dated October 3, 2007, the licensee withdrew the proposed change.
For further details with respect to this action, see the application for amendment dated September 13, 2007, and the licensee's letter dated October 3, 2007, which withdrew the application for license amendment. Documents may be examined, and/or copied for a fee, at the NRC=s Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management
System (ADAMS) Public Electronic Reading Room on the internet at the NRC Web site, http://www.nrc.gov/reading-rm.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209, or 301-415-4737 or by email to pdr@nrc.gov.
Dated at Rockville, Maryland, this 15th day of October, 2007.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
River Bend Station cc:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995 Senior Vice President and COO Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Vice President, Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 General Manager, Plant Operations Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director, Nuclear Safety & Licensing Entergy Services, Inc.
440 Hamilton Avenue White Plains, NY 10601 Director, Nuclear Safety Assurance Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Senior Manager, Nuclear Safety & Licensing Entergy Services, Inc.
P.O. Box 31995 Jackson, MS 39286-1995 Manager, Licensing Entergy Operations, Inc.
River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P.O. Box 4312 Baton Rouge, LA 70821-4312 Louisiana Department of Environmental Quality Office of Environmental Compliance P.O. Box 4312 Baton Rouge, LA 70821-4312 Attorney General State of Louisiana P.O. Box 94095 Baton Rouge, LA 70804-9095 President of West Feliciana Police Jury P.O. Box 1921 St. Francisville, LA 70775 Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326 Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Mr. Richard Penrod, Senior Environmental Scientist/State Liaison Officer Office of Environmental Services Northwestern State University Russell Hall, Room 201 Natchitoches, LA 71497 Senior Resident Inspector P.O. Box 1050 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064