Line 3: |
Line 3: |
| | issue date = 06/20/2008 | | | issue date = 06/20/2008 |
| | title = IR 05000272-08-502, 05000311-08-502, 05000354-08-502 on 05/19/2008 - 5/22/2008 for Hope Creek and Salem; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators | | | title = IR 05000272-08-502, 05000311-08-502, 05000354-08-502 on 05/19/2008 - 5/22/2008 for Hope Creek and Salem; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators |
| | author name = Trapp J A | | | author name = Trapp J |
| | author affiliation = NRC/RGN-I/DRS/PSB1 | | | author affiliation = NRC/RGN-I/DRS/PSB1 |
| | addressee name = Levis W | | | addressee name = Levis W |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:June 20, 2008 |
| [[Issue date::June 20, 2008]]
| |
|
| |
|
| Mr. William Levis President and Chief Nuclear Officer PSEG Nuclear LLC 80 Park Plaza, T4B Newark, NJ 07102 | | Mr. William Levis President and Chief Nuclear Officer PSEG Nuclear LLC 80 Park Plaza, T4B Newark, NJ 07102 |
|
| |
|
| SUBJECT: SALEM AND HOPE CREEK GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. 05000272/2008502, 05000311/2008502, AND 05000354/2008502 | | SUBJECT: SALEM AND HOPE CREEK GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. 05000272/2008502, 05000311/2008502, AND 05000354/2008502 |
Line 34: |
Line 33: |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Sincerely,/RA/ James A. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety | | Sincerely, |
| | | /RA/ James A. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety |
| Docket Nos. 50-272, 50-311, 50-354 License Nos. DPR-70, DPR-75, NPF-57
| | ==SUBJECT:== |
| | | SALEM AND HOPE CREEK GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. 05000272/2008502, 05000311/2008502, and 05000354/2008502 |
| ===Enclosure:=== | |
| NRC Inspection Reports 05000272/2008502, 05000311/2008502, and 05000354/2008502 Mr. William Levis President and Chief Nuclear Officer PSEG Nuclear LLC 80 Park Plaza, T4B Newark, NJ 07102
| |
| | |
| SUBJECT: SALEM AND HOPE CREEK GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. 05000272/2008502, 05000311/2008502, and 05000354/2008502
| |
|
| |
|
| Dear M | | Dear M |
Line 62: |
Line 57: |
| ==REACTOR SAFETY== | | ==REACTOR SAFETY== |
|
| |
|
| ===Cornerstone:=== | | ===Cornerstone: Emergency Preparedness (EP)=== |
| Emergency Preparedness (EP) | |
|
| |
|
| 1EP1 Exercise Evaluation (71114.01 - 1 Sample) | | 1EP1 Exercise Evaluation (71114.01 - 1 Sample) |
Line 122: |
Line 116: |
| None | | None |
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| ==Section 1EP1: Exercise Evaluation==
| |
| : PSEG Nuclear LLC Emergency Plan (Revision 59) PSEG Nuclear Emergency Plan Implementing Procedures PSEG Nuclear May 20, 2008, Hope Creek Emergency Exercise Scenario Package PSEG Nuclear Emergency Preparedness Drill Reports, January 2007 - March 2008
| |
| ===Condition Reports===
| |
| written for the May 20, 2008, exercise:
| |
| : 20370774,
| |
| : 20370851,
| |
| : 20370957,
| |
| : 20370961,
| |
| : 20370977,
| |
| : 20370993,
| |
| : 20370998,
| |
| : 20371005,
| |
| : 20371010,
| |
| : 20371013,
| |
| : 20371056,
| |
| : 20371106,
| |
| : 20371126,
| |
| : 20371204,
| |
| : 20371550,
| |
| : 20371595,
| |
| : 20371628,
| |
| : 20371631,
| |
| : 20371642,
| |
| : 20371652,
| |
| : 20371781,
| |
| : 20371800,
| |
| : 20371805,
| |
| : 20372044, 20380978
| |
|
| |
| ==Section 1EP4: Emergency Action Level and Emergency Plan Changes==
| |
|
| |
| ===Procedure===
| |
| : NC.EP-AP.ZZ-1003, 10CFR50.54(q) Effectiveness Review Guide (Rev. 3)
| |
| ===Procedure===
| |
| : LS-AA-104, Exelon 50.59 Review Process (Rev. 5) Procedure
| |
| : LS-AA-104-1007, 50.59 Resource Manual - Emergency Plan Guidance for Salem and Hop Creek Stations (Rev. 0) Emergency Preparedness EAL Vulnerability Upgrade Project (March 2006- December 2007) 10
| |
| : CFR 50.54(q) Reviews, Performed January 2007 - April 2008
| |
|
| |
| ==Section 4OA1: Performance Indicator Verification==
| |
|
| |
|
| ===Procedure===
| |
| : EP-AA-125, Emergency Preparedness Self Evaluation Process (Rev. 0) Procedure
| |
| : EP-AA-125-1001, EP Performance Indicator Guidance (Rev. 0) Procedure
| |
| : EP-AA-125-1002, ERO Performance - Performance Indicator Guidance (Rev. 0) Procedure
| |
| : EP-AA-125-1003, ERO Readiness - Performance Indicator Guidance (Rev. 0) Procedure
| |
| : EP-AA-125-1004, Emergency Response Facilities & Equipment - Performance Indicator Guidance (Rev. 0) ERO Drill Participation PI data, January 2007 - March 2008 Public Notification System PI data, January 2007 - March 2008 DEP PI data, January 2007 - March 2008
| |
| ==LIST OF ACRONYMS==
| |
| : [[ANS]] [[Alert Notification System]]
| |
| : [[DEP]] [[Drill and Exercise Performance]]
| |
| : [[EAL]] [[Emergency Action Level]]
| |
| : [[EOF]] [[Emergency Operations Facility]]
| |
| : [[EP]] [[Emergency Preparedness]]
| |
| : [[ERO]] [[Emergency Response Organization]]
| |
| : [[NEI]] [[Nuclear Energy Institute]]
| |
| : [[NRC]] [[Nuclear Regulatory Commission]]
| |
| : [[OSC]] [[Operations Support Center]]
| |
| : [[PI]] [[Performance Indicator]]
| |
| : [[PSEG]] [[Public Service Electric and Gas]]
| |
| : [[RSPS]] [[Risk Significant Planning Standard TSC Technical Support Center]]
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 IR 05000354/20230032023-11-0707 November 2023 Integrated Inspection Report 05000354/2023003 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) IR 05000354/20230052023-08-31031 August 2023 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2023005) IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) IR 05000272/20230022023-08-0909 August 2023 Integrated Inspection Report 05000272/2023002 and 05000311/2023002 IR 05000354/20230022023-08-0303 August 2023 Integrated Inspection Report 05000354/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200048/2023001 IR 05000354/20230102023-08-0303 August 2023 Biennial Problem Identification and Resolution Inspection Report 05000354/2023010 IR 05000272/20230012023-05-0303 May 2023 Integrated Inspection Report 05000272/2023001 and 05000311/2023001 IR 05000272/20233012023-05-0101 May 2023 Initial Operator Licensing Examination Report 05000272/2023301 and 05000311/2023301 IR 05000354/20230112023-05-0101 May 2023 Commercial Grade Dedication Report 05000354/2023011 IR 05000354/20230012023-04-26026 April 2023 Integrated Inspection Report 05000354/2023001 IR 05000272/20230112023-03-0707 March 2023 Comprehensive Engineering Team Inspection Report 05000272/2023011 and 05000311/2023011 IR 05000272/20220062023-03-0101 March 2023 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022006 and 05000311/2022006) IR 05000354/20220062023-03-0101 March 2023 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2022006) IR 05000272/20220042023-01-31031 January 2023 Integrated Inspection Report 05000272/2022004 and 05000311/2022004 IR 05000354/20220042023-01-24024 January 2023 Integrated Inspection Report 05000354/2022004 IR 05000272/20220112023-01-0606 January 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000272/2022011 and 05000311/2022011 ML22335A0412022-12-0101 December 2022 Notification of Commercial Grade Dedication Inspection (05000354/2023011) and Request for Information IR 05000272/20220032022-11-0909 November 2022 Integrated Inspection Report 05000272/2022003 and 05000311/2022003 IR 05000354/20220032022-11-0303 November 2022 Integrated Inspection Report 05000354/2022003 IR 05000354/20223012022-10-24024 October 2022 Initial Operator Licensing Examination Report 05000354/2022301 IR 05000272/20224022022-10-14014 October 2022 Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter Only IR 05000354/20224022022-10-14014 October 2022 Cyber Security Inspection Report 05000354/2022402 - Cover Letter Only IR 05000354/20220122022-09-0808 September 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000354/2022012 IR 05000354/20220052022-08-31031 August 2022 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2022005) IR 05000272/20220052022-08-31031 August 2022 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) 2024-09-23
[Table view] Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment ML24295A3742024-10-23023 October 2024 Project Manager Assignment IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 52024-07-16016 July 2024 – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 ML24197A0552024-07-15015 July 2024 Requalification Program Inspection ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram 2024-09-05
[Table view] |
Text
June 20, 2008
Mr. William Levis President and Chief Nuclear Officer PSEG Nuclear LLC 80 Park Plaza, T4B Newark, NJ 07102
SUBJECT: SALEM AND HOPE CREEK GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. 05000272/2008502, 05000311/2008502, AND 05000354/2008502
Dear Mr. Levis:
On May 22, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the 2008 evaluated emergency preparedness exercise at your Salem and Hope Creek Generating Stations. The enclosed inspection report documents the inspection results, which were discussed on May 22, 2008, with Mr. Carl Fricker, Vice President of Operations Support, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/ James A. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety
SUBJECT:
SALEM AND HOPE CREEK GENERATING STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS. 05000272/2008502, 05000311/2008502, and 05000354/2008502
Dear M
SUMMARY OF FINDINGS
IR 05000272/2008502, 05000311/2008502, 05000354/2008502; 05/19/2008 - 05/22/2008; Hope Creek and Salem Generating Stations; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators.
This was an announced inspection conducted by three region-based inspectors and one senior resident inspector. No findings of significance were identified. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.
Cornerstone: Emergency Preparedness
A. NRC-Identified and Self-Revealing Findings
No findings of significance were identified.
B. Licensee-Identified Findings None.
REPORT DETAILS
REACTOR SAFETY
1EP1 Exercise Evaluation (71114.01 - 1 Sample)
a. Inspection Scope
Prior to the May 20, 2008, emergency preparedness exercise, the NRC inspectors conducted an in-office review of the exercise objectives and scenario, which PSEG had submitted to the NRC, to determine if the exercise would test major elements of the PSEG Nuclear LLC Emergency Plan as required by 10 CFR 50.47(b)(14). This overall exercise inspection activity represented the completion of one sample on a biennial cycle. The exercise evaluation consisted of the following review and assessment:
- The adequacy of PSEG's performance in the biennial full-participation exercise regarding the implementation of the risk-significant planning standards (RSPS) described in 10 CFR 50.47(b)(4), (5), (9), and (10), which are: emergency classification; offsite notification; radiological assessment; and, protective action recommendations, respectively.
- The overall adequacy of PSEG's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC), and Emergency Operations Facility (EOF).
- A review of other performance areas, such as: the emergency response organization's (ERO's) recognition of abnormal plant conditions; command and control; intra- and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies; staffing and procedure adequacy; and, the overall implementation of the emergency plan and its implementing procedures.
- A review of past performance issues from the last NRC exercise inspection report and PSEG's EP drill reports, to determine the effectiveness of licensee corrective actions as demonstrated during the May 20 exercise and to ensure compliance with 10 CFR 50.47(b)(14).
- The licensee's post-exercise critiques, to evaluate PSEG's self-assessment of its ERO performance during the April 2 exercise and to ensure compliance with 10 CFR 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed the documents listed in the attachment to this report.
b. Findings
No findings of significance were identified.
1EP4 Emergency Action Level (EAL) and Emergency Plan Changes (71114.04 - 1 Sample)
a. Inspection Scope
Since the last NRC inspection of this program area, Revision 59 of the PSEG Nuclear LLC Emergency Plan was implemented by PSEG. PSEG had determined that in accordance with 10 CFR 50.54(q), the changes resulted in no decrease in effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors reviewed all EAL changes made since January 2007, and conducted a sampling review of other Emergency Plan changes, including changes to lower-tier emergency plan implementing procedures, to evaluate for any potential decreases in effectiveness of the Emergency Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.
b. Findings
No findings of significance were identified.
OTHER ACTIVITIES (OA)
4OA1 Performance Indicator (PI) Verification (71151 - 3 Samples)
a. Inspection Scope
The inspectors reviewed data for the Salem and Hope Creek EP PIs, which are:
- (1) Drill and Exercise Performance (DEP);
- (2) Emergency Response Organization (ERO) Drill Participation; and,
- (3) Alert and Notification System (ANS) Reliability. The last EP inspection at Salem and Hope Creek was conducted in the first quarter of 2007, so the inspectors reviewed supporting documentation from EP drills and tests from the first, second, third, and fourth calendar quarters of 2007, and the first quarter of 2008, to verify the accuracy of the reported PI data. The review of these PIs was conducted in accordance with NRC Inspection Procedure 71151, using the acceptance criteria documented in NEI 99-02, "Regulatory Assessment Performance Indicator Guidelines," Revision 5.
This inspection activity represented the completion of three samples on an annual cycle.
b. Findings
No findings of significance were identified.
4OA6 Meetings, Including Exit
On May 22, 2008, the inspectors presented the results of this inspection to Mr. C. Fricker, the PSEG Vice President of Operations Support, and other members of the PSEG staff. No proprietary information was provided to the inspectors during this inspection.
ATTACHMENT
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- C. Neely, PSEG Regulatory Affairs Director
- D. Burgin, PSEG Emergency Preparedness Manager
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None
LIST OF DOCUMENTS REVIEWED