Line 3: |
Line 3: |
| | issue date = 09/25/2008 | | | issue date = 09/25/2008 |
| | title = Correction to Facility Operating License Page 3 to Amendment No. 233 Containment Spray Nozzle Technical Specification Test Requirements | | | title = Correction to Facility Operating License Page 3 to Amendment No. 233 Containment Spray Nozzle Technical Specification Test Requirements |
| | author name = Wang A B | | | author name = Wang A |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = | | | addressee name = |
Line 101: |
Line 101: |
| Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 | | Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 |
|
| |
|
| ENCLOSURE CORRECTED LICENSE PAGE 3 FOR AMENDMENT NO. 233 FACILITY OPERATING LICENSE NO. DPR-51 ARKANSAS NUCLEAR ONE, UNIT NO. 1 Renewed License No. DPR-51 Amendment No. 233 (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. | | ENCLOSURE CORRECTED LICENSE PAGE 3 FOR AMENDMENT NO. 233 FACILITY OPERATING LICENSE NO. DPR-51 ARKANSAS NUCLEAR ONE, UNIT NO. 1 Renewed License No. DPR-51 Amendment No. 233 (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility. |
| : c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal. | | : c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal. |
| (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the renewed license.
| | (2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the renewed license. |
| EOI shall operate the facility in accordance with the Technical Specifications. | | EOI shall operate the facility in accordance with the Technical Specifications. |
| (3) Safety Analysis Report The licensee's SAR supplement submitted pursuant to 10 CFR 54.21(d),
| | (3) Safety Analysis Report The licensee's SAR supplement submitted pursuant to 10 CFR 54.21(d), |
| as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014. | | as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014. |
| (4) Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Arkansas Nuclear One Physical Security Plan, Training and Qualifications Plan, and Safeguards Contingency Plan," as submitted on May 4, 2006.}}
| | (4) Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Arkansas Nuclear One Physical Security Plan, Training and Qualifications Plan, and Safeguards Contingency Plan," as submitted on May 4, 2006.}} |
|
---|
Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23020A9362023-01-27027 January 2023 Audit Plan to Support Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML22263A1912022-12-0909 December 2022 Issuance of Amendment No. 278 Revision to Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations (EPID L-2021-LLA-0181) - Non-Proprietary ML22291A2392022-10-28028 October 2022 Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to SUNSI (EPID L-2021-LLA-0181) Letter ML22165A2442022-07-19019 July 2022 Issuance of Amendment No. 331 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22138A4312022-06-23023 June 2022 Issuance of Amendment No. 277 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML22083A1242022-04-28028 April 2022 Arkansas, Units 1 and 2; Grand Gulf Nuclear Station; River Bend Station; and Waterford Steam Electric Station - Issuance of Amendments Revise Technical Specifications to Adopt TSTF-541, Revision 2 ML22039A2822022-03-15015 March 2022 Issuance of Amendment Nos. 274 and 328 One-Time Change to Support Proactive Upgrade of the Emergency Cooling Pond Supply Piping ML21225A0552021-12-17017 December 2021 Issuance of Amendment No. 327 Addition of Technical Specification Limiting Condition for Operation 3.0.6 and Adoption of Safety Function Determination Program ML21341B2262021-12-13013 December 2021 Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specifications 3.4.12 and 3.4.13 Based on Revised Dose Calculations ML21313A0082021-12-0808 December 2021 Issuance of Amendments to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21320A2122021-11-17017 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Concerning Revised Dose Calculations ML21281A2542021-10-15015 October 2021 Audit Meeting Agenda & Audit Questions for LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization and Treatment of Structures, System, and Components for Nuclear Power Reactors (EPIDs L-2021-LLA-0105, L-2021-LLA-0106 ML21208A4492021-09-20020 September 2021 Issuance of Amendment No. 325 Revise Loss of Voltage Relay Allowable Values and Number of Degraded Voltage Channels ML21088A4332021-04-14014 April 2021 Issuance of Amendment No. 324 Adoption of Technical Specification Task Force Traveler, TSTF-569, Revision 2, Revise Response Time Testing Definition ML21027A4282021-03-23023 March 2021 Issuance of Amendment No. 272 Replacement of Reactor Building Spray Sodium Hydroxide Additive with a Passive Reactor Building Sump Buffering Agent ML21040A5132021-03-10010 March 2021 Issuance of Amendment No. 271 Revision to Loss of Voltage Relay Allowable Values ML20351A1532021-02-0808 February 2021 Issuance of Amendment No. 323 Technical Specification Deletions, Additions, and Relocations NUREG-1432, Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-14322020-10-30030 October 2020 Issuance of Amendment No. 322 Technical Specification Changes Related to Revised Fuel Handling Accident Analysis and Adoption of Technical Specification Improvements Consistent with NUREG-1432 ML20135H1412020-06-30030 June 2020 Issuance of Amendment Nos. 269 and 321 Request to Incorporate the Tornado Missile Risk Evaluator Into the Licensing Basis ML20160A1472020-06-30030 June 2020 Issuance of Amendment No. 270 to Adopt TSTF 563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20087L8032020-04-0808 April 2020 Issuance of Amendment No. 320 to Revise Control Element Assembly Drop Times ML19231A2972020-01-29029 January 2020 Issuance of Amendment No. 318 Addition of Technical Specification Actions to Address Inoperability of the Containment Building Sump ML19269B6722019-10-22022 October 2019 Issuance of Amendment Nos. 267 and 317 to Extend Implementation Dates for Amendment Nos. 263 and 314, Revision to Emergency Action Level Scheme ML19220A9382019-09-27027 September 2019 Issuance of Amendment No. 266 Adoption of Technical Specifications Task Force Traveler TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19098A9552019-05-22022 May 2019 Issuance of Amendment No. 264 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19127A2992019-05-15015 May 2019 Correction to Amendment No. 315 Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3 ML19063B9482019-04-23023 April 2019 Issuance of Amendment No. 315 Adoption of Technical Specification Task Force Traveler TSTF-425, Revision 3 ML18337A2472019-01-17017 January 2019 Issuance of Amendment Nos. 263 and 314 Revision to Emergency Action Level Scheme ML18317A3822018-12-19019 December 2018 Issuance of Amendment No. 313, Revise Technical Specification 3.3.3.6, Post-Accident Instrumentation ML18306A5132018-11-30030 November 2018 Issuance of Conforming Amendment Nos. 262, 312 and 215 Transfers of Renewed Facility Operating Licenses ML18298A0122018-11-27027 November 2018 Issuance of Amendment No. 311 Updating the Reactor Coolant System Pressure Temperature Limits ML18260A3392018-10-24024 October 2018 Issuance of Amendment No. 261 Revision to Technical Specification Bases Related to Emergency Feedwater Turbine-Driven Pump Steam Supply Valves ML18115A2822018-06-19019 June 2018 Issuance of Amendment No. 260 Technical Specification Changes Pursuant to Technical Specifications Task Force (TSTF) Traveler TSTF-412 Revision 3 (CAC No. MG0009; EPID L-2017-LLA-0267) ML18134A2532018-06-19019 June 2018 Issuance of Amendment No. 310 Technical Specification Changes to Provide Actions for Emergency Feedwater Pump Inoperability Consistent with NUREG-1432, Revision 4 (CAC No. MG0016; EPID L-2017-LLA-0268) ML18051A5892018-02-26026 February 2018 Issuance of Amendment No. 309 to Adopt TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (CAC No. MG0131; EPID L-2017-LLA-0302) ML18033A1752018-02-26026 February 2018 Issuance of Amendment No. 259 to Adopt TSTF-427, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (CAC No. MG0132; EPID L-2017-LLA-0301) ML18011A0642018-01-18018 January 2018 Issuance of Amendment No. 308 to Exclude Exercise of Control Element Assembly 4 with Respect to Surveillance Requirement 4.1.3.1.2 for the Remainder of Cycle 26 (Exigent Circumstances) ML17251A2112017-10-10010 October 2017 Issuance of Amendment No. 307 Revision of Steam Generator Technical Specifications to Reflect Adoption of Technical Specifications Task Force Traveler TSTF-510 (CAC MF9654; EPID L-2017-LLA-0222) ML17235A5192017-10-10010 October 2017 Issuance of Amendment No. 258 Revision of Steam Generator Technical Specifications to Reflect Adoption of TSTF-510 (CAC MF9653; EPID L-2017-LLA-0221) ML17096A2352017-05-12012 May 2017 Issuance of Amendment No. 306 Request to Revise the National Fire Protection Association (NFPA) Standard 805 Modifications ML16215A3712017-03-29029 March 2017 Issuance of Amendment No. 305 to Adopt Technical Specifications Task Force Traveler TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing... ML16165A4232017-03-10010 March 2017 Issuance of Amendment No. 257 Adoption of Technical Specifications Task Force Traveler TSTF-545, Revision 3, ML16267A1392016-12-29029 December 2016 Issuance of Amendment Revise Technical Specfications to Adopt TSTF-426, to Revise or Add Actions to Preclude Entry Into Lco 3.0.3 Ritstf Initiative 6b & 6c ML16223A4812016-10-0707 October 2016 Issuance of Amendment No. 256 Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) (Cac No. MF3419) ML16027A1092016-02-24024 February 2016 Issuance of Amendment Nos. 255 and 303 Cyber Security Plan Implementation Schedule (CAC Nos. MF6258 and MF6259) ML15096A3812015-04-29029 April 2015 Issuance of Amendment No. 302, Revise Technical Specification Surveillance Requirement 4.1.3.1.2 Note to Eliminate Movement of Control Element Assembly 18 for Remainder of Operating Cycle 24 2024-01-24
[Table view] |
Text
September 25, 2008
Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:
CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)
Dear Sir or Madam:
On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008
The amendment revised the Surveill ance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.
Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.
If you have any questions, please call me at 301-415-1445.
Sincerely,
/RA by Michael T. Markley for/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-313
Enclosure:
As stated cc w/encl: See next page Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:
CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)
Dear Sir or Madam:
On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008
The amendment revised the Surveill ance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.
Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.
If you have any questions, please call me at 301-415-1445.
Sincerely,
/RA by Michael T. Markley for/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-313
Enclosure:
As stated cc w/encl: See next page DISTRIBUTION PUBLIC LPLIV r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDirsItsb Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl4 Resource RidsNrrPMAWang Resource RidsNrrLAGLappert Resource RidsOgcRp Resource RidsRgn4MailCenter Resource GHill, OIS (2) ADAMS Accession No. ML082681136 *Concurred by Email OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang* GLappert MMarkley DATE 9/24/08 9/25/08 9/25/08 OFFICIAL AGENCY RECORD
Arkansas Nuclear One (June 2008)
cc:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Senior Manager, Nuclear Safety
& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Senior Vice President
& Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS 39286-1995
Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS 39286-1995
Manager, Licensing Entergy Operations, Inc.
Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802 Section Chief, Division of Health Radiation Control Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867
Section Chief, Division of Health Emergency Management Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR 72205-3867
Pope County Judge Pope County Courthouse 100 W. Main Street Russellville, AR 72801
Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 London, AR 72847
Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125
ENCLOSURE CORRECTED LICENSE PAGE 3 FOR AMENDMENT NO. 233 FACILITY OPERATING LICENSE NO. DPR-51 ARKANSAS NUCLEAR ONE, UNIT NO. 1 Renewed License No. DPR-51 Amendment No. 233 (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
- c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal.
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the renewed license.
EOI shall operate the facility in accordance with the Technical Specifications.
(3) Safety Analysis Report The licensee's SAR supplement submitted pursuant to 10 CFR 54.21(d),
as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014.
(4) Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Arkansas Nuclear One Physical Security Plan, Training and Qualifications Plan, and Safeguards Contingency Plan," as submitted on May 4, 2006.