ML101370003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/17/2010
| issue date = 05/17/2010
| title = IR 05000245-10-007, on 03/15-16/2010 & 04/12/2010, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut, Transmittal Letter (Corrected Copy)
| title = IR 05000245-10-007, on 03/15-16/2010 & 04/12/2010, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut, Transmittal Letter (Corrected Copy)
| author name = Joustra J A
| author name = Joustra J
| author affiliation = NRC/RGN-I/DNMS/DB
| author affiliation = NRC/RGN-I/DNMS/DB
| addressee name = Heacock D
| addressee name = Heacock D
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000245/2010007]]
See also: [[see also::IR 05000245/2010007]]


=Text=
=Text=

Revision as of 09:32, 11 July 2019

IR 05000245-10-007, on 03/15-16/2010 & 04/12/2010, Dominion Resources, Dominion Nuclear Connecticut, Millstone Power Station (Unit 1), Waterford, Connecticut, Transmittal Letter (Corrected Copy)
ML101370003
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/17/2010
From: Joustra J
Decommissioning Branch I
To: Heacock D
Dominion Resources
References
FOIA/PA-2011-0115 IR-10-007
Download: ML101370003 (4)


See also: IR 05000245/2010007

Text

UNITED STATES NUCLEAR REGULATORY

COMMISSION

REGION I 475 ALLENDALE

ROAD KING OF PRUSSIA, PENNSYLVANIA

19406-1415

David A. Heacock President

and Chief Nuclear Officer Dominion Resources

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

May n, 2010 SUBJECT: NRC INSPECTION

REPORT NO. 05000245/2010007, DOMINION RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE

POWER STATION (UNIT 1), WATERFORD, CONNECTICUT

Dear Mr. Heacock: On May 11, 2010, the NRC issued inspection

report, No. 05000247/2010007, documenting

an NRC inspection

of an examination

of your licensed activities

as they relate to radiation

safety. After the report was issued, an error was noted in the inspection

number for pages i and ii. We have corrected

these pages and have enclosed the corrected

copy to this letter. Please replace this Section of the report with the enclosed pages. We apologize

for any inconvenience

or problems this error may have caused you. Enclosure:

As stated. Distribution

via ListServ cc: State of Connecticut

Sincerely,

dith A. Joustra, Chief Decommissioning

Branch Division of Nuclear Materials

Safety

David A. Heacock President

and Chief Nuclear Officer Dominion Resources

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

May 17, 2010 SUBJECT: NRC INSPECTION

REPORT NO. 05000245/2010007, DOMINION RESOURCES, DOMINION NUCLEAR CONNECTICUT, MILLSTONE

POWER STATION (UNIT 1), WATERFORD, CONNECTICUT

Dear Mr. Heacock: On May 11, 2010, the NRC issued inspection

report, No. 05000247/2010007, documenting

an NRC inspection

of an examination

of your licensed activities

as they relate to radiation

safety. After the report was issued, an error was noted in the inspection

number for pages i and ii. We have corrected

these pages and have enclosed the corrected

copy to this letter. Please replace this Section of the report with the enclosed pages. We apologize

for any inconvenience

or problems this error may have caused you. Enclosure:

As stated. Distribution

via ListServ cc: State of Connecticut

Sincerely, IRA! Judith A. Joustra, Chief Decommissioning

Branch Division of Nuclear Materials

Safety DOCUMENT NAME: T:IDNMSIWordDocslCurrentlMisc

LetterlCorrection

Letter.ldpr*21.2010007.0511201

O.doc SUNSI Review Complete:

KModes After declaring

this document "An Official Agency Record" it will be released to the Public. To receive a coPy of this document, indicate in the box: "e" ;; COpy w/o attach/enel

uE" = COpy wi attach/encl

OFFICE DNMS/RI IN DNMS/RI IN DNMS/RI I NAME LKauffrnan.JAJ

For KModes/KDM

JJoustra/JAJ

DATE 05/17/2010

05/14/2010

5117110 ML 101370003

OFFICIAL RECORD COpy :;; No coPy I

U.S. NUCLEAR REGULATORY

COMMISSION

REGION I Inspection

No. Docket No. License No. Licensee:

Location:

Inspection

Dates: Date Follow up Information

Received:

Inspectors:

Approved By: INSPECTION

REPORT 05000245/2010007

05000245 DPR-21 Dominion Nuclear Connecticut, I.nc. Millstone

Power Station, Unit 1 (U1) Rope Ferry Road Waterford, CT 06385 March 15 -16, 201 0 (on-site)

April 12, 2010 (telephone)

March 17,23, and 29, 2010 Kathy Modes Senior Health Physicist

Decommissioning

Branch Division of Nuclear Materials

Safety Laurie A. Kauffman Health Physicist

Decommissioning

Branch Division of Nuclear Materials

Safety Judith A. Joustra, Chief Decommissioning

Branch Division of Nuclear Materials

Safety

SUMMARY OF FINDINGS Dominion Nuclear Connecticut, Inc. NRC Inspection

Report No. 05000245/2010007

A routine announced

safety inspection

was conducted

from March 15-16,2010, at Millstone

Power Station Unit

1 (U 1). The inspection

reviewed operations, maintenance, and plant support activities

associated

with U 1 while in SAFSTOR status. The inspector

also reviewed additional

information

provided by the licensee dated March 17, 23, and 29, 2010 as part of this inspection.

Within the scope of this inspection, no safety concerns or violations were

identified.

There are no ongoing decommissioning

activities

being conducted

at Millstone

U 1. Facilities

Management

and Control The only changes expected to the licensee's

program are personnel

changes due to a reduction

in force. Retention

of personnel

with knowledge

of plant functions

and operations

will meet the staffing requirements

required in their Technical

Specifications

Section 6.2.2. The NRC will continue to review the knowledge

management

transfer during future inspections.

Regarding

transfer and sale of non-safety

related systems and components, the licensee maintained

a comprehensive

record of each transfer and sale. Spent Fuel Pool Safety The licensee adequately

maintained

safety-related

systems and components

necessary

for the safe operation

of the Spent Fuel Pool. Inspections

of Final Surveys The licensee's

implementation

of its radiation

survey program was adequate.

The licensee continued

to survey the buildings

in order to identify areas of contamination

and minimize the spread of contamination.

The licensee had no near term plans to decontaminate

the buildings

and pursue decommissioning

at this time. The licensee plans to continue in the SAFSTOR program until 2048. Independent

Spent Fuel Storage Installation (lSFSI) Construction

and Component

Fabrication

After a formal assessment

of spent fuel storage options in 2007, the licensee concluded

that they would keep the Millstone

U1 fuel in the Spent Fuel Pool, in a SAFSTOR status, until 2048. Based on the results of this inspection, the licensee maintained

the fuel and Spent Fuel Pool, along with the necessary

support infrastructure, in an adequate manner and satisfied

the requirements

of a SAFSTOR site. 11