ML103280203: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/24/2010
| issue date = 11/24/2010
| title = 2010-12 - Examination Approval
| title = 2010-12 - Examination Approval
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Perito M
| addressee name = Perito M

Revision as of 01:58, 11 July 2019

2010-12 - Examination Approval
ML103280203
Person / Time
Site: River Bend Entergy icon.png
Issue date: 11/24/2010
From: Mark Haire
Operations Branch IV
To: Mike Perito
Entergy Operations
References
50-458/10-302
Download: ML103280203 (4)


Text

November 24, 2011 Michael Perito Vice President, Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NRC INITIAL OPERATOR LICENSING EXAMINATION APPROVAL 05000458/2010302

Dear Mr. Perito:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at River Bend Station.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Angie Orgeron, Senior Instructor. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examination in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, on December 2, 2010. The NRC staff will administer the operating tests during the week of December 6, 2010. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (817) 860-8159.

Please contact your Chief Examiner, Steve Garchow, at (817) 276-4426, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

Sincerely,

/RA/ Mark S. Haire, Chief Operations Branch Division of Reactor Safety UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125 Entergy Operations, Inc.

Docket: 50-458 License: NPF-47

Enclosure:

ES-201-4 cc w/enclosure:

Angie Orgeron, Senior Instructor Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

cc w/o enclosure Senior Vice President and COO Entergy Operations, Inc P. O. Box 31995 Jackson, MS 39286-1995

Vice President, Oversight Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995

Senior Manager, Nuclear Safety & Licensing Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995

Manager, Licensing Entergy Operations, Inc. 5485 US Highway 61N St. Francisville, LA 70775

Attorney General State of Louisiana P. O. Box 94005 Baton Rouge, LA 70804-9005

Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775

Entergy Operations, Inc.

Mr. Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 Austin, TX 78701-3326

Mr. Jim Calloway Public Utility Commission of Texas 1701 N. Congress Avenue Austin, TX 78711-3326

Louisiana Department of Environmental Quality Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312

Joseph A. Aluise Associate General Counsel - Nuclear Entergy Services, Inc. 639 Loyola Avenue New Orleans, LA 70113

Chief, Technological Hazards Branch FEMA Region VI 800 N. Loop 288 Denton, TX 76209-3606

Entergy Operations, Inc.

Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Grant.Larkin@nrc.gov) Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov) RBS Administrative Assistant (Lisa.Day@nrc.gov) Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Alan.Wang@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

ADAMS: Yes X SUNSI Review Complete Reviewer Initials: lah X Publicly Available X Non-Sensitive LA:OB SOE:OB C:OB LAHurley SMGarchow MSHaire /RA/ /RA/ /RA/ 11/22/10 11/22/10 11/24/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax